Loading...
BLD-2022-2513InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10132 PRADO VISTA DR Cupertino APN: 342 14 094 PERMIT NO: BLD-2022-2513 OWNER'S NAME: CHIA CHOK J TRUSTEE & ET AL OWNER'S PHONE: 408-250-4970 CONTRACTOR: A K D HOMES, PO BOX 5126 REDWOOD CITY CONTRACTOR PHONE: 650-556-5599 DATE ISSUED 4/2/2024 6:59:22 AM ISSUED BY:VALUATION: $120000 JOB DESCRIPTION NEW DETACHED ADU (500 SF) REV # 1 - PER INSEPCTIONS REVISIONS:SUB-PANEL NEW LOCATION SHOWN ON A-5.0 AND A-0.1. REVISE CALGREEN; REVISE T-24 TO REFECT THE WATER HEATER, HVAC INSTALLED RELATED UPDATES APPROVED 03-26-2024 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2023-06-13 Rescheduled   FOUNDATION 2023-06-14 Passed Antonio Torrez UNDERFLOOR FRAMING 2023-07-05 Passed Antonio Torrez UNDERFLOOR PLUMBING 2023-07-05 Passed Antonio Torrez UNDERFLOOR INSULATION 2023-07-19 Passed Antonio Torrez UNDERFLOOR MECHANICAL 2023-07-18 Passed Antonio Torrez UNDERFLOOR INSULATION 2023-07-18 Passed Antonio Torrez ELECTRIC METER RELEASE 2023-08-02 Rescheduled   ELECTRIC METER RELEASE 2023-08-03 Passed Rodney Weathers ROUGH ELECTRICAL 2023-08-03 Failed Rodney Weathers ROOF NAIL 2023-08-08 Passed Antonio Torrez INTERIOR SHEAR 2023-08-08 Passed Antonio Torrez EXTERIOR LATH 2023-08-23 Passed Antonio Torrez ROUGH ELECTRICAL 2023-08-23 Passed Antonio Torrez ROUGH FRAME 2023-08-23 Passed Antonio Torrez ROUGH PLUMBING 2023-08-23 Passed Antonio Torrez ROUGH MECHANICAL 2023-08-23 Passed Antonio Torrez UNDERGROUND SEWER 2023-09-15 Failed Antonio Torrez UNDERGROUND WATER SERVICE 2023-09-15 Failed Antonio Torrez UNDERGROUND ELECTRICAL 2023-09-15 Passed Antonio Torrez INSULATION 2023-09-20 Passed Antonio Torrez SHEETROCK 2023-09-25 Passed Antonio Torrez PROPERTY LINE CLEANOUT 2023-09-26 Rescheduled   PROPERTY LINE CLEANOUT 2023-09-28 Cancelled Antonio Torrez SHOWER PAN 2023-09-28 Passed Antonio Torrez PROPERTY LINE CLEANOUT 2023-10-04 Passed Antonio Torrez SCRATCH COAT 2023-10-04 Passed Antonio Torrez SANITARY - VISUAL 2023-09-29 Passed cupsanitary SANITARY - FINAL 2024-01-22 Passed cupsanitary FINAL BUILDING 2024-02-08 Failed Rodney Weathers FINAL BUILDING 2024-03-29 Passed Antonio Torrez FINAL MECHANICAL 2024-03-29 Passed Antonio Torrez FINAL PLUMBING 2024-03-29 Passed Antonio Torrez FINAL ELECTRICAL 2024-03-29 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.