BLD-2023-1494InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10570 CYPRESS DR Cupertino APN: 316 30 055 PERMIT NO: BLD-2023-1494
OWNER'S NAME: CHEN JOSEPH AND JOYCE OWNER'S PHONE: 408 759 1278
CONTRACTOR: KD GENERAL CONTRACTOR, 1522 KARL STREET SAN JOSE CONTRACTOR PHONE: 4085373843
DATE ISSUED 5/28/2024 2:21:27 PM ISSUED BY:VALUATION: $80000
JOB DESCRIPTION
NEW DETACHED ADU (470 SF) REV#1 -RELOCATE PANEL TO THE BACKYARD - (125 AMP); INSTALL SEWER EJECTOR PUMP; REVISE THE AC TO MINI-SPLIT HEAT PUMP AC UNIT; ROOF
OVERHAND ONE-HOUR FIRE RATED - APPROVED 03/14/2024 REV # 2 - REVISE SHEET A-3R TO SHOW PANEL UPGRADE FOR SERVICE PANEL NOT SUBPANEL - APPROVED 05/08/2024
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2023-12-18 Cancelled James Lee
FOUNDATION 2023-12-21 Failed Rodney Weathers
FOUNDATION 2024-01-10 Cancelled Rodney Weathers
FOUNDATION Pending Pending
FOUNDATION Pending Pending
FOUNDATION 2024-01-03 Passed Rodney Weathers
UNDERFLOOR FRAMING 2024-01-11 Passed 4LEAF1 4LEAF1
UNDERFLOOR PLUMBING 2024-01-11 Passed 4LEAF1 4LEAF1
UNDERFLOOR INSULATION 2024-01-17 Cancelled
ROOF NAIL 2024-01-22 Conditional James Lee
EXTERIOR SHEAR 2024-01-22 Failed James Lee
EXTERIOR SHEAR 2024-01-23 Cancelled
EXTERIOR LATH 2024-02-06 Cancelled
ROUGH ELECTRICAL 2024-02-06 Cancelled
ROUGH PLUMBING 2024-02-06 Cancelled
ROUGH MECHANICAL 2024-02-06 Cancelled
EXTERIOR LATH 2024-02-07 Cancelled James Lee
ROUGH ELECTRICAL 2024-02-07 Cancelled James Lee
ROUGH MECHANICAL 2024-02-07 Cancelled James Lee
ROUGH PLUMBING 2024-02-07 Cancelled James Lee
INSULATION 2024-02-12 Cancelled James Lee
ROUGH ELECTRICAL 2024-02-12 Passed James Lee
ROUGH MECHANICAL 2024-02-12 Passed James Lee
ROUGH PLUMBING 2024-02-12 Passed James Lee
INSULATION 2024-02-14 Passed James Lee
ROUGH FRAME 2024-02-12 Failed James Lee
EXTERIOR LATH 2024-02-14 Passed James Lee
SHEETROCK 2024-02-20 Failed Danielle Carriedo
EXTERIOR LATH 2024-03-05 Cancelled
INTERIOR LATH 2024-03-05 Failed James Lee
SHOWER PAN 2024-03-05 Failed James Lee
INTERIOR LATH 2024-03-11 Passed Danielle Carriedo
SHOWER PAN 2024-03-11 Passed Danielle Carriedo
ELECTRIC METER RELEASE 2024-03-11 Failed Danielle Carriedo
UNDERGROUND SEWER 2024-03-19 Cancelled
UNDERGROUND WATER SERVICE 2024-03-19 Cancelled
UNDERGROUND SEWER 2024-03-20 Cancelled
UNDERGROUND WATER SERVICE 2024-03-20 Cancelled
UNDERGROUND WATER SERVICE 2024-03-21 Passed Danielle Carriedo
UNDERGROUND SEWER 2024-03-21 Passed Danielle Carriedo
ELECTRIC METER RELEASE 2024-03-25 Passed James Lee
FINAL BUILDING 2024-05-15 Failed James Lee
FINAL BUILDING 2024-05-28 Passed James Lee
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.