BUILDING ADDRESS: 1134 YORKSHIRE DR Cupertino APN: 362 08 002 PERMIT NO: BLD-2021-2019
OWNER'S NAME: MASE SCOTT AND MASER DIEP TRUSTEE OWNER'S PHONE: 4083903455
CONTRACTOR: LUIS A MIRANDA - RAMIREZ, 921 HARLISS AVE SAN JOSE CONTRACTOR PHONE: 4086910844
DATE ISSUED 5/28/2024 11:26:13 AM ISSUED BY:VALUATION: $180000
JOB DESCRIPTION
ADDITION TO FRONT OF 1-STORY SFD TO EXTEND THE FOYER AND ADD BATHROOM - (154 SF); REMODEL KITCHEN - (185 SF); REMODEL (3) BATHROOMS - (140 SF); REMODEL OTHER
OF RELOCATING THE LAUNDRY; RAISE LIVING ROOM FLOOR LEVEL TO MATCH (E) HOUSE - (443 SF); UPDATE HOUSE INSULATION (R) VALUE; REPLACE A FEW WINDOWS AND EXTERIOR
DOORS REV #1 - NEW WINDOWS; REPLACE SLIDING DOOR WITH LARGER OPENING; CONVERT FIRE PLACE WITH GAS APPLIANCE; WHOLE-HOUSE REROOF; RELOCATE SUBPANEL TO
STORAGE/PANTRY -APPROVED 4/14/2023 REV # 2 - REVISE THE SCOPE. TO ADD EV CHARGING STATION TO MATCH THE APPROVED PLANS-APPROVED 5/1/2024
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2022-08-26 Conditional Bob Sabich
UNDERFLOOR PLUMBING 2022-09-15 Passed Bob Sabich
FOUNDATION 2022-09-19 Cancelled Antonio Torrez
UNDERFLOOR INSULATION 2022-09-19 Cancelled Antonio Torrez
UNDERFLOOR FRAMING 2022-09-15 Passed Bob Sabich
FOUNDATION 2022-09-15 Failed Bob Sabich
FOUNDATION 2022-09-21 Passed Bob Sabich
UNDERFLOOR INSULATION 2022-09-21 Passed Bob Sabich
RE-ROOF - PLYWOOD NAIL 2022-11-04 Conditional Bob Sabich
INSULATION 2022-11-08 Passed Bob Sabich
ROUGH FRAME 2022-12-05 Failed Antonio Torrez
ROUGH ELECTRICAL 2022-12-05 Failed Antonio Torrez
ROUGH PLUMBING 2022-12-05 Passed Antonio Torrez
ROUGH MECHANICAL 2022-12-05 Failed Antonio Torrez
INTERIOR SHEAR 2022-12-05 Conditional Antonio Torrez
INTERIOR SHEAR 2022-12-08 Conditional Antonio Torrez
EXTERIOR SHEAR 2022-12-08 Conditional Antonio Torrez
ROUGH MECHANICAL 2022-12-08 Conditional Antonio Torrez
ROUGH ELECTRICAL 2022-12-08 Conditional Antonio Torrez
INSULATION 2022-12-12 Passed Antonio Torrez
SHEETROCK 2023-01-05 Failed Rodney Weathers
SHOWER PAN 2023-01-05 Failed Rodney Weathers
GAS METER RELEASE 2023-01-18 Cancelled
SHEETROCK 2023-01-18 Failed Rodney Weathers
SHOWER PAN 2023-01-18 Passed Rodney Weathers
GAS TEST 2023-01-18 Passed Rodney Weathers
ROUGH MECHANICAL 2023-01-18 Conditional Rodney Weathers
INTERIOR LATH 2023-01-18 Passed Rodney Weathers
ROUGH ELECTRICAL 2023-01-18 Conditional Rodney Weathers
INTERIOR LATH 2023-02-01 Cancelled
SHEETROCK 2023-02-01 Passed Antonio Torrez
EXTERIOR LATH 2023-05-17 Passed Bob Sabich
FURNACE 2023-05-17 Passed Bob Sabich
SCRATCH COAT 2023-06-06 Passed Antonio Torrez
SCRATCH COAT 2023-06-06 Passed Antonio Torrez
FINAL BUILDING 2023-11-30 Failed Rodney Weathers
FINAL ELECTRICAL 2023-11-30 Failed Rodney Weathers
FINAL MECHANICAL 2023-11-30 Failed Rodney Weathers
FINAL PLUMBING 2023-11-30 Passed Rodney Weathers
FINAL ELECTRICAL 2024-04-05 Failed Rodney Weathers
FINAL BUILDING 2024-04-05 Failed Rodney Weathers
FINAL MECHANICAL 2024-04-05 Failed Rodney Weathers
FINAL PLUMBING 2024-04-05 Passed Rodney Weathers
FINAL BUILDING 2024-05-28 Passed Antonio Torrez
EV CHARGING STATION 2024-05-28 Passed Antonio Torrez
FINAL ELECTRICAL 2024-05-28 Passed Antonio Torrez
FINAL MECHANICAL 2024-05-28 Passed Antonio Torrez