Loading...
BLD-2023-2555InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10273 MINER PL Cupertino APN: 316 46 034 PERMIT NO: BLD-2023-2555 OWNER'S NAME: BHADRICHA CHETAN PARSHOTTAM TRUSTEE & ET AL OWNER'S PHONE: 408-306-0969 CONTRACTOR: LEVEL CONSTRUCTION LLC, 14451 BRANHAM LANE SAN JOSE CONTRACTOR PHONE: 4086288958 DATE ISSUED 5/2/2024 11:04:33 AM ISSUED BY:VALUATION: $25000 JOB DESCRIPTION REMODEL - KITCHEN REMODEL (194 SF) - DEMO WALLS; MASTER BEDROOM REMODEL (387 SF) AND MASTER BATH REMODEL (93 SF) - NEW WALK-IN CLOSET; NEW SKYLIGHT; NEW MASTER BATH WINDOW - NOT IN BIRD SENSITIVE ZONE REVISION - LOWER LEVEL BATHROOM REMODEL (40 SF); SUBPANEL UPGRADE (125 AMP) - GARAGE; REPLACE HVAC DUCT; REMOVE WINDOW ADDITION TO 2ND FLOOR BATHROOM-APPROVED 3/4/2024 INSPECTION TYPE DATE STATUS INSPECTOR ROUGH ELECTRICAL 2024-02-26 Failed James Lee ROUGH PLUMBING 2024-02-26 Failed James Lee ROUGH FRAME 2024-02-26 Failed James Lee ROUGH MECHANICAL 2024-02-26 Failed James Lee SHOWER PAN 2024-02-28 Failed Danielle Carriedo INSULATION 2024-02-28 Failed Danielle Carriedo SHEETROCK 2024-03-01 Rescheduled   SHEETROCK 2024-03-04 Rescheduled   SHEETROCK 2024-03-05 Passed James Lee INSULATION 2024-03-06 Passed James Lee INTERIOR LATH 2024-03-06 Passed James Lee ROUGH ELECTRICAL 2024-03-06 Passed James Lee ROUGH FRAME 2024-03-06 Passed James Lee ROUGH MECHANICAL 2024-03-06 Passed James Lee ROUGH PLUMBING 2024-03-06 Passed James Lee SHOWER PAN 2024-03-06 Passed James Lee ELECTRIC METER RELEASE 2024-03-20 Cancelled Antonio Torrez ELECTRIC METER RELEASE 2024-04-02 Passed Antonio Torrez PROPERTY LINE CLEANOUT 2024-04-11 Rescheduled Danielle Carriedo PROPERTY LINE CLEANOUT 2024-04-12 Passed James Lee SANITARY - VISUAL 2024-04-12 Passed cupsanitary SANITARY - FINAL 2024-04-18 Passed cupsanitary FINAL BUILDING 2024-05-02 Passed James Lee FINAL BUILDING 2024-05-01 Failed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.