BLD-2023-2555InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10273 MINER PL Cupertino APN: 316 46 034 PERMIT NO: BLD-2023-2555
OWNER'S NAME: BHADRICHA CHETAN PARSHOTTAM TRUSTEE & ET AL OWNER'S PHONE: 408-306-0969
CONTRACTOR: LEVEL CONSTRUCTION LLC, 14451 BRANHAM LANE SAN JOSE CONTRACTOR PHONE: 4086288958
DATE ISSUED 5/2/2024 11:04:33 AM ISSUED BY:VALUATION: $25000
JOB DESCRIPTION
REMODEL - KITCHEN REMODEL (194 SF) - DEMO WALLS; MASTER BEDROOM REMODEL (387 SF) AND MASTER BATH REMODEL (93 SF) - NEW WALK-IN CLOSET; NEW SKYLIGHT; NEW
MASTER BATH WINDOW - NOT IN BIRD SENSITIVE ZONE REVISION - LOWER LEVEL BATHROOM REMODEL (40 SF); SUBPANEL UPGRADE (125 AMP) - GARAGE; REPLACE HVAC DUCT;
REMOVE WINDOW ADDITION TO 2ND FLOOR BATHROOM-APPROVED 3/4/2024
INSPECTION TYPE DATE STATUS INSPECTOR
ROUGH ELECTRICAL 2024-02-26 Failed James Lee
ROUGH PLUMBING 2024-02-26 Failed James Lee
ROUGH FRAME 2024-02-26 Failed James Lee
ROUGH MECHANICAL 2024-02-26 Failed James Lee
SHOWER PAN 2024-02-28 Failed Danielle Carriedo
INSULATION 2024-02-28 Failed Danielle Carriedo
SHEETROCK 2024-03-01 Rescheduled
SHEETROCK 2024-03-04 Rescheduled
SHEETROCK 2024-03-05 Passed James Lee
INSULATION 2024-03-06 Passed James Lee
INTERIOR LATH 2024-03-06 Passed James Lee
ROUGH ELECTRICAL 2024-03-06 Passed James Lee
ROUGH FRAME 2024-03-06 Passed James Lee
ROUGH MECHANICAL 2024-03-06 Passed James Lee
ROUGH PLUMBING 2024-03-06 Passed James Lee
SHOWER PAN 2024-03-06 Passed James Lee
ELECTRIC METER RELEASE 2024-03-20 Cancelled Antonio Torrez
ELECTRIC METER RELEASE 2024-04-02 Passed Antonio Torrez
PROPERTY LINE CLEANOUT 2024-04-11 Rescheduled Danielle Carriedo
PROPERTY LINE CLEANOUT 2024-04-12 Passed James Lee
SANITARY - VISUAL 2024-04-12 Passed cupsanitary
SANITARY - FINAL 2024-04-18 Passed cupsanitary
FINAL BUILDING 2024-05-02 Passed James Lee
FINAL BUILDING 2024-05-01 Failed James Lee
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.