Loading...
BLD-2023-2252InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10341 GLENVIEW AVE Cupertino APN: 369 11 025 PERMIT NO: BLD-2023-2252 OWNER'S NAME: RATEGH HAMID AND ESTAKI LEILA TRUSTEE OWNER'S PHONE: 650-281-3795 CONTRACTOR: SEYED CONSTRUCTION, 18930 CONGRESS JUNCTION CT SARATOGA CONTRACTOR PHONE: 650 505-0277 DATE ISSUED 6/27/2024 9:52:56 AM ISSUED BY:VALUATION: $98000 JOB DESCRIPTION REMODEL OF ONE-STORY SFD (1,295 SF) - RELOCATE GUEST SUITE (172 SF), GUEST BATHROOM (61 SF) AND KITCHEN (251 SF); NEW VAULTED CEILING; BATHROOM REMODEL (46 SF); MASTER BATHROOM REMODEL (63 SF); NEW FURNACE IN ATTIC; NEW AIR HANDLER UNIT IN ATTIC; DEMO (E) FIREPLACE REV # 1 - REVISE FIELD FRAMING TO ADJUST FOR TRUSS REPAIR/REPLACE TO CONVENTIONAL FRAMING ON S-2.0 - APPROVEDD 2/27/2024 REV #2 - INTERIOR RECESSED ELECTRICAL SUB PANEL MOVED TO GARAGE.100A PANEL; 8 NEW RECESSED LIGHTS IN GARAGE; REPLACED 13 RECESSED LIGHTS IN BEDROOM; ADDED EXTERIOR LIGHTS AND REPLACED EXTERIOR LIGHTS (9 TOTAL) - APPROVED 6/20/2024 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2024-02-16 Passed James Lee ROUGH ELECTRICAL 2024-04-04 Cancelled James Lee ROUGH FRAME 2024-04-08 Conditional James Lee SANITARY - VISUAL 2024-04-09 Passed cupsanitary UNDERGROUND SEWER 2024-04-11 Passed James Lee INSULATION 2024-04-16 Passed Antonio Torrez ROUGH FRAME 2024-04-16 Passed Antonio Torrez ROUGH ELECTRICAL 2024-04-16 Passed James Lee ROUGH MECHANICAL 2024-04-16 Passed James Lee ROUGH PLUMBING 2024-04-16 Passed James Lee INTERIOR SHEAR 2024-04-19 Failed James Lee SHEETROCK 2024-04-24 Rescheduled   SHEETROCK 2024-04-25 Passed James Lee INTERIOR LATH 2024-04-25 Passed James Lee SHOWER PAN 2024-04-25 Passed James Lee GAS TEST 2024-04-25 Passed James Lee FINAL BUILDING 2024-06-20 Rescheduled   FINAL BUILDING 2024-06-21 Failed Danielle Carriedo FINAL BUILDING 2024-06-20 Failed James Lee INTERIOR SHEAR 2024-06-20 Passed James Lee SANITARY - VISUAL 2024-06-20 Passed cupsanitary FINAL BUILDING 2024-06-28 Scheduled   SANITARY - FINAL 2024-06-25 Passed cupsanitary FINAL BUILDING 2024-06-27 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.