BLD-2023-2252InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10341 GLENVIEW AVE Cupertino APN: 369 11 025 PERMIT NO: BLD-2023-2252
OWNER'S NAME: RATEGH HAMID AND ESTAKI LEILA TRUSTEE OWNER'S PHONE: 650-281-3795
CONTRACTOR: SEYED CONSTRUCTION, 18930 CONGRESS JUNCTION CT SARATOGA CONTRACTOR PHONE: 650 505-0277
DATE ISSUED 6/27/2024 9:52:56 AM ISSUED BY:VALUATION: $98000
JOB DESCRIPTION
REMODEL OF ONE-STORY SFD (1,295 SF) - RELOCATE GUEST SUITE (172 SF), GUEST BATHROOM (61 SF) AND KITCHEN (251 SF); NEW VAULTED CEILING; BATHROOM REMODEL (46 SF);
MASTER BATHROOM REMODEL (63 SF); NEW FURNACE IN ATTIC; NEW AIR HANDLER UNIT IN ATTIC; DEMO (E) FIREPLACE REV # 1 - REVISE FIELD FRAMING TO ADJUST FOR TRUSS
REPAIR/REPLACE TO CONVENTIONAL FRAMING ON S-2.0 - APPROVEDD 2/27/2024 REV #2 - INTERIOR RECESSED ELECTRICAL SUB PANEL MOVED TO GARAGE.100A PANEL; 8 NEW
RECESSED LIGHTS IN GARAGE; REPLACED 13 RECESSED LIGHTS IN BEDROOM; ADDED EXTERIOR LIGHTS AND REPLACED EXTERIOR LIGHTS (9 TOTAL) - APPROVED 6/20/2024
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2024-02-16 Passed James Lee
ROUGH ELECTRICAL 2024-04-04 Cancelled James Lee
ROUGH FRAME 2024-04-08 Conditional James Lee
SANITARY - VISUAL 2024-04-09 Passed cupsanitary
UNDERGROUND SEWER 2024-04-11 Passed James Lee
INSULATION 2024-04-16 Passed Antonio Torrez
ROUGH FRAME 2024-04-16 Passed Antonio Torrez
ROUGH ELECTRICAL 2024-04-16 Passed James Lee
ROUGH MECHANICAL 2024-04-16 Passed James Lee
ROUGH PLUMBING 2024-04-16 Passed James Lee
INTERIOR SHEAR 2024-04-19 Failed James Lee
SHEETROCK 2024-04-24 Rescheduled
SHEETROCK 2024-04-25 Passed James Lee
INTERIOR LATH 2024-04-25 Passed James Lee
SHOWER PAN 2024-04-25 Passed James Lee
GAS TEST 2024-04-25 Passed James Lee
FINAL BUILDING 2024-06-20 Rescheduled
FINAL BUILDING 2024-06-21 Failed Danielle Carriedo
FINAL BUILDING 2024-06-20 Failed James Lee
INTERIOR SHEAR 2024-06-20 Passed James Lee
SANITARY - VISUAL 2024-06-20 Passed cupsanitary
FINAL BUILDING 2024-06-28 Scheduled
SANITARY - FINAL 2024-06-25 Passed cupsanitary
FINAL BUILDING 2024-06-27 Passed James Lee
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.