Loading...
23-041 SO #10 dated 9-30-24 Alvernaz for Roof Eaves and Post Replacement - PO 2025-245Contract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 09.25.2024 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation McClellan Ranch Nature Shop Roof Eaves and Post Replacement Quote.pdf Service Order Amount $4,400.00 Master Agreement Number 2023-010 Start Date 05/30/2023 End Date 06/30/2025 Firm Name Alvernaz Construction Address P.O. Box 366 San Martin, CA 95046 Phone (408) 595-2817 Consultant/Contractor Name Michael Alvernaz Consultant/Contractor Email michaelalvernaz@alvernazconstruction.com Project Name SO 10 Roof Eaves and Post Replacement Project Location McClellan Ranch - Gift Shop Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $175,000.00 Total Previously Encumbered to Date $135,600.00 Encumbrance this Service Order $4,400.00 Master Agreement Unencumbered Balance $35,000.00 SO GL #100-87-832 700-702 Signature       09/26/2024 PDT  Consultant/Contractor Signature Date       09/30/2024 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.    09/30/2024 PDT  Date: 09/26/2024 PDT Email: michaelalvernaz@alvernazconstruction.com Date: 09/30/2024 PDT Email: nathanv@cupertino.gov    Management Analyst Signature DateDate: 09/30/2024 PDT Email: jindyg@cupertino.org Quote September 24 , 2024 Alvernaz Construction Po Box 366 San Martin CA 95046 Lic# 711435 408-595-2817 To Nathan Job Name: The City of Cupertino - McClellan Ranch Nature Shop Roof Eaves and Post Replacement includes the following: 1. Support the existing header to remove the post and install footing. 2. Excavate soil to 24 inches for new post footing. 3. Install the post bracket, reinstall the existing post, and remove dry rot. 4. Remove shingles and two boards in roof eaves (~12 feet) with dry rot. 5. Install new boards in the roof eaves. 6. Repair a roof hole in the corner. 7. Install new felt underlayment and composite roof shingles (with a possible mismatch in appearance). 8. Clean and keep unnecessary materials on-site. The total cost for materials and labor is $4,400.00 Thank you, Michael Alvernaz SO 10 Roof Eaves and Post Replacement - Service Request Created:09/26/2024 Status:Signed Transaction ID:8af09095-03e6-42f3-8279-ecab9a66ddea "SO 10 Roof Eaves and Post Replacement - Service Request" history Jindy Gonzalez created the document. 09/26/2024 12:21:51 PM PDT - IP address 174.85.102.16 Document was emailed to Michael Alvernaz 09/26/2024 12:21:52 PM PDT Michael Alvernaz signed the document. 09/26/2024 1:26:50 PM PDT - IP address 166.205.87.55:36678 Document was emailed to nathanv@cupertino.gov 09/26/2024 1:26:51 PM PDT nathanv@cupertino.gov signed the document. 09/30/2024 5:29:17 AM PDT - IP address 64.165.34.3:15177 Document was emailed to Jindy Gonzalez 09/30/2024 5:29:18 AM PDT Jindy Gonzalez signed the document. 09/30/2024 6:29:05 AM PDT - IP address 174.85.102.16:60054 Document was successfully signed and filed 09/30/2024 6:29:06 AM PDT