Loading...
BLD-2021-0721InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 7453 STANFORD PL Cupertino APN: 359 32 039 PERMIT NO: BLD-2021-0721 OWNER'S NAME: PHADKE SHAILESH AND PATWARDHAN VAISHALI OWNER'S PHONE: 4084316879 CONTRACTOR: DANNY TRAN CONSTRUCTION CORP, 2446 VERWOOD DR SAN JOSE CONTRACTOR PHONE: 408-781-2450 DATE ISSUED 6/14/2024 10:54:28 AM ISSUED BY:VALUATION: $150000 JOB DESCRIPTION (N) FRONT ADDITION (2 BATHROOMS AND 1 BEDROOM) (420 SF); (N) REAR ADDITION (BEDROOM) (209 SF); REMODEL KITCHEN (195 SF); REMODEL OTHER (90 SF); UPGRADE MAIN ELECTRICAL PANEL (200 AMPS); (N) A/C UNIT; (N) FURNACE REV # 1 REVISE FRONT ADDITION TO INCLUDE (2) BATHROOMS AND LIVING ROOM; REVISE THE LOCATION OF THE GARAGE DOOR - APPROVED 06-10-2024 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2022-02-23 Cancelled Antonio Torrez FOUNDATION 2022-02-23 Conditional Antonio Torrez SANITARY - VISUAL 2022-03-04 Passed cupsanitary UNDERFLOOR PLUMBING 2022-03-08 Conditional Bob Sabich UNDERFLOOR FRAMING 2022-03-08 Passed Bob Sabich PIERS 2022-03-08 Passed Bob Sabich SANITARY - FINAL 2022-03-09 Passed cupsanitary FOUNDATION 2022-03-08 Passed Bob Sabich UNDERFLOOR INSULATION 2022-03-08 Passed Bob Sabich ROOF NAIL 2022-03-25 Failed Rodney Weathers EXTERIOR SHEAR 2022-03-25 Failed Rodney Weathers INTERIOR SHEAR 2022-04-12 Passed Rodney Weathers ROUGH ELECTRICAL 2022-04-12 Passed Rodney Weathers ROUGH PLUMBING 2022-04-12 Conditional Rodney Weathers ROUGH FRAME 2022-04-12 Passed Rodney Weathers ROUGH MECHANICAL 2022-04-12 Conditional Rodney Weathers SHOWER PAN 2022-04-12 Passed Rodney Weathers EXTERIOR SHEAR 2022-04-12 Passed Rodney Weathers ROOF NAIL 2022-04-12 Passed Rodney Weathers INSULATION 2022-04-15 Passed Antonio Torrez EXTERIOR LATH 2022-04-15 Cancelled Antonio Torrez SHEETROCK 2022-04-26 Passed Antonio Torrez INTERIOR LATH 2022-04-26 Passed Antonio Torrez ROUGH PLUMBING 2022-04-26 Passed Antonio Torrez EXTERIOR LATH 2022-08-02 Passed Bob Sabich SCRATCH COAT 2022-08-15 Passed Antonio Torrez ELECTRIC METER RELEASE 2022-11-18 Passed Paul O'Sullivan GAS TEST 2022-11-18 Passed Paul O'Sullivan FINAL BUILDING 2024-03-22 Failed James Lee FINAL BUILDING 2024-06-14 Rescheduled   FINAL BUILDING 2024-06-12 Failed Danielle Carriedo FINAL BUILDING 2024-06-14 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.