Loading...
BLD-2021-1281InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10173 RIEDEL PL Cupertino APN: 316 21 058 PERMIT NO: BLD-2021-1281 OWNER'S NAME: GOODMAN PAMELA TRUSTEE OWNER'S PHONE: 489218507 CONTRACTOR: GPI BUILDERS INC, 325 ALTA VISTA DR SANTA CRUZ CONTRACTOR PHONE: (408) 368 6133 DATE ISSUED 6/6/2024 12:19:03 PM ISSUED BY:VALUATION: $100000 JOB DESCRIPTION KITCHEN REMODEL (297 SF); REMODEL (4) BATHROOMS (272 SF); OTHER REMODEL (1153 SF); ELECTRICAL UPGRADES IN UPSTAIRS BEDROOMS/HALLWAY (24) LIGHTS AND (22) OUTLETS; RELOCATE FURNACE AND WATER HEATER TO GARAGE. REV #1 - PANEL UPGRADE (100 AMP); RELOCATE AND INSTALL (N) ELECTRIC WATER HEATER IN GARAGE; RELOCATE FURNACE FROM GARAGE TO ATTIC - APPROVED 07/05/2023 INSPECTION TYPE DATE STATUS INSPECTOR ROUGH PLUMBING 2021-10-01 Failed Rodney Weathers ROUGH ELECTRICAL 2021-10-01 Failed Rodney Weathers ROUGH ELECTRICAL 2021-10-08 Conditional Rodney Weathers ROUGH PLUMBING 2021-10-09 Failed Rodney Weathers ROUGH MECHANICAL 2021-10-09 Conditional Rodney Weathers ROUGH PLUMBING 2021-10-15 Conditional Rodney Weathers ROUGH ELECTRICAL 2021-10-15 Conditional Rodney Weathers INSULATION 2021-10-20 Passed James Lee ROUGH FRAME 2021-10-20 Conditional James Lee FOUNDATION 2021-10-20 Passed James Lee SHEETROCK 2021-10-28 Rescheduled James Lee SHEETROCK 2021-10-29 Passed Rodney Weathers SHOWER PAN 2021-11-01 Conditional James Lee SHOWER PAN 2021-11-04 Passed Rodney Weathers GAS TEST 2021-12-03 Failed Rodney Weathers GAS TEST 2021-12-06 Passed Rodney Weathers FINAL BUILDING 2023-01-17 Failed James Lee FINAL BUILDING 2023-07-19 Rescheduled   FINAL BUILDING 2023-07-24 Failed James Lee ELECTRIC METER RELEASE 2023-07-24 Passed James Lee PROPERTY LINE CLEANOUT 2024-02-13 Passed James Lee SANITARY - VISUAL 2024-02-09 Passed cupsanitary SANITARY - FINAL 2024-02-14 Passed cupsanitary FINAL BUILDING 2024-05-28 Failed James Lee FINAL BUILDING 2024-06-04 Rescheduled   FINAL BUILDING 2024-06-06 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.