Loading...
B-2018-1257 InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21821 WOODBURY DR CUPERTINO, CA 95014-1147 CUPERTINO APN: 326 19 121 PERMIT NO: B-2018-1257 OWNER'S NAME: OWNER INFO MISSING FROM RECORD OWNER'S PHONE: 408-252-4451 CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE: DATE ISSUED 6/3/2024 11:07:07 AM ISSUED BY:VALUATION: $350000 JOB DESCRIPTION REMODEL BATHROOMS (2) (160 SF) ; REMODEL KITCHEN (88 SF); RE-ROOF; TEAR-OFF; INSTALL CDX; COMP SHINGLES - (17 SQ) REV #1 - REMOVE KITCHEN REMODEL FROM SCOPE OF WORK - ISSUED 2/25/19 INSPECTION TYPE DATE STATUS INSPECTOR INTERIOR LATH 2019-03-07 Passed   ROOF NAIL 2018-12-13 Failed   ROOF TEAR OFF 2018-12-12 Failed   ROOF TEAR OFF 2018-12-13 Passed   ROUGH ELECTRICAL 2019-07-12 Passed   ROUGH FRAME 2019-07-12 Passed   ROUGH MECHANICAL 2019-07-12 Passed   ROUGH PLUMBING 2019-07-12 Passed   SHEETROCK 2019-03-07 Passed   SHEETROCK 2019-07-17 Partial   SHOWER PAN 2019-03-07 Passed   INTERIOR LATH 2019-07-23 Passed Antonio Torrez FINAL BUILDING 2019-11-12 Scheduled Antonio Torrez FINAL ELECTRICAL 2019-11-12 Scheduled Antonio Torrez FINAL PLUMBING 2019-11-12 Scheduled Antonio Torrez FINAL MECHANICAL 2019-11-12 Scheduled Antonio Torrez FINAL BUILDING 2019-11-19 Failed James Lee FINAL ELECTRICAL 2019-11-19 Failed James Lee FINAL MECHANICAL 2019-11-19 Passed James Lee FINAL PLUMBING 2019-11-19 Passed James Lee ROUGH MECHANICAL 2019-07-12 Scheduled LARRY SQUARCIA SHEETROCK 2019-07-17 Scheduled Antonio Torrez ROUGH FRAME 2019-07-12 Scheduled LARRY SQUARCIA SHEETROCK 2019-03-07 Scheduled Bob Sabich SHOWER PAN 2019-03-07 Scheduled Bob Sabich ROUGH PLUMBING 2019-07-12 Scheduled LARRY SQUARCIA INTERIOR LATH 2019-03-07 Scheduled Bob Sabich ROUGH ELECTRICAL 2019-07-12 Scheduled LARRY SQUARCIA FINAL BUILDING 2024-06-03 Passed Antonio Torrez FINAL ELECTRICAL 2024-06-03 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.