Loading...
91-002 Royston, Hanamoto, Alley & Abey 91-002 ROYSTON, HANAMOTO, ALLEY & ABEY t.. AGREEMENT Project No. 9102 off, (hot to exceed $16,000) ko ,, o ,CITY O 0rt���,,,���,,,,s F CUPERTINVO f P.O. Box 580 00 Cupertino, CA 95015 252-4505 NO. 2 3 7 24 BY THIS AGREEMENT made and entered into on the 15th dayof December 14 90 by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY)and Name (1) Royston, Hanam4to, A11ey & Abey (2) Address 225 Miller Avenue C:ty_ Mitt va>>e4 zip 94942 Phone — —7900 (Hereinafter referred as CONTRACTOR),in consideration of their,mutual covenants, the parties hereto agree as follows: CONTRACTOR Shall provide or furnish the following specified services and/ot r?,eterials: Design and co,.struction Phase services for the renovation of Somerset SrTuare Park EXHIBITS:The following attached exhibits hereby are made part of this Agreement: a. scope of work n. fee proposal TERMS The services and/or materials furnished under this Agreement shall commence on December 15, 1990 and shall be completed before April 15. 1921 COMPENSATION For the full performance of this Agreement,CITY shall pay CONTRACTOR: As per attiached schedule (fee proposal, p.3) GENERAL TERMS,AND CONDITIONS Clot.;Harmless. Contractor agrees to save and hold harmless the City, its officers,agents and employees from any and all damage and liability of every nature, including ail costs of defending any claim,caused by or arising out of the per- formance of this agreement.City shall not bt liable for acts of Contractor in performing services described herein. Insurance, Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance before commencing arty services under this agreement.Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non-Discrimination. No discrimination shall be made in the employment of persons under this agreement because of the race,color,national origin,ancestry,religion or sex of such person. Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in the sense ulat the relation of master and servant exists between City and undersigned. At all times Contractor shall be deemed to be an independent.contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement.Contractor certifies that no one who has or will have any financial interest under this agreement is an officer or employee of City. Changes. This agreement shall not be assined or transferred without the written consent of the City.No changes or variations of any kind are authorized without the written consent of tole City. CONTRACT CO-ORDINATOR ani representat"ve for CITY shall be: iQAl�t� STEPHEN G Dc�'J)aINC DEFARTMENT pARKS ANn RRr'RF.ATTnN This Agreement shall become effe%tive upon its execution by CITY,in witness thereof,the parties have executed this Agreement the day and year first written above. CO ACTOR: CITY OF CUPERTIN B By Q T le G .� � - � _ APPROVALS Head Date e I B C tMtdte-City Clerk Cagy Green-Flnencl Conmy-Contmotoes Copy Pink-Receivin®Copy Goldenrod-Department Copy lb 1 Cit4 of Cuperti"o 10300 Torre Avenue P.U.Box 580 Cupertino,CA 95014-3255 Cupertino,CA 95015-0580 Telephone: (4081 252-4505 FAX;1408)252-0753 DEPARTMENT OF THE CITY CLERK January 9, 1991 Royston, Hanamoto, Alley & Abey 225 Miller Avenue Mill Valley, CA 94942 We are enclosing to you for your files and information one f1) copy of the Agreement by and bebmm the City of Capertiro and Rcr,(ston, Hanamto, Alley & Abey which has been fully executed by City officials. Your agreement shall begin on 12/15/90 and shall be ompleted before 04/15/91. Thank you for your services. Sincerely, a� �Lius Dorothy City Clerk JC/cs Encl. oc> Department of Parks and Ration Rovston I andsiapc Archttci;1 225 M`Iler Avenue [[�� land Planning Mill Valley Hanamoto I roan Design CA 94942-0917 Park Plr.nnmg 415 383-7900 Alley & l maonmewal Planning FAX 415 183 1413 Abey November 8, 1990 Mr. Steve Dowling Director, Parks & Recreation City of Cupertino P.P, Box 580 Cupertino, CA 95015 RE: SOMERSET PARK Dear Steve: Pursuant to our meeting and discussion last month, we are submitting an outline of our :icope of Work and `'ee Proposal related to professional services for the rehabilitation of Somerset Park. In general, the rehabilitation plan will incorporate the following improvements: 1. Upgrade and design of children's play area. 2. Design of west end of park, removing basketball, volleyball and picnic areas. Add low and dense planting. 3. Provide picnic tables towards center and front end of park. 4. Provide basketball and "handball" wall toward center of park. 5. Provide volleyball area in turf. 6. Install additional security lighting. 7. Consider access to south side of railroad right-of-way. 8. Adjust existing and install new irrigation systems. 9 Install new planting 10. Repair chainlink fence. Principals: Associates: Robert N Royston FASLA Craig B.Hanchett ASLA Asa Kanamoto FASLA Laura J.LaRer ASLA Kazuo Abey ASLA William E.Fee ASLA Louis G.Alley AIA Manuela Anne King ASLA Patricia A.Carlislc ASLA Harry D.Brown ASLA Harold N,Kobayashi ASLA Eric G.Story ASLA Barbara D,Lundburg ASLA Robert S.Sena ASLA 1 Mr. Steve Dowling -2- November 8, 1990 1 understand approximately $100,000 is budgeted for this project. However, based on the input received from members of the community and Park and Recreation Commission, a cost estimate will be prepared to determine the extent of park improvements. Park rehabilitation work is an area of great interest to us, and we !ook forward to working with you on this project. Sincerely, ROYSTON HANAMOTO ALLEY & ASEY ia ;o /be , ASLA bas ,` � enc. SOMERSET PARK City of Cupertino SCOPE OF WORK and FEE PROPOSAL A. PRELIMINARY DESIGN PHASE SITE ANALYSIS 1. Meetings with City staff and community members to review park use and site analysis. 2. Prepare conceptual studies of park plan. 3. Meet wiin City staff to review studies and receive input and directions. PRELIMINARY PLAN 1. Prepare preliminary plan incorporating input received from the City indicating: a. Picnic facilities b. Children's play area C. Pathways d. Game courts 2. Review preliminary plan with City staff. 3. Prepare preliminary cost estimate. 4. Attend Park and Recreation Commission meeting to review preliminary plan. Receive input. 5. Revise preliminary plan. 6. Prepare colored renderings of plan. 7. Attend City Council meeting to review preliminary p13n. R. CONSTRUCTION DOCUMENT PHASE DESIGN DEVELOPMENT 1 . Prepare preliminary working drawings and establish final design directions including detail,, planting and lighting. 2. Review preliminary working drawings with City staff. Receive input. CONSTRUCTION DOCUMENTS 1. Prepare final working drawings, specifications and bid documents including grading and drainage plans, construction plans, construction details, electrical plan and details, irrigation plan and details, and planting plan and details. 2. Review working drawings with City staff at 50% and 90% completion of drawings. 3. Prepare cost estimate. 4. Submit three (3) sets working drawings to the City for review. 5. Incorporate City comments and complete final set of working drawings and specifications. 6. Provide City with original reproducible tracings and contract documents for bidding and construction purposes. -2- C. BIDDING; AND CONSTRICTION ?HASE BIDDING PERIOD 1. Assist the City in obtaining competitive bids by responding to questions by the Contractor. Prepare addendum, if necessary. CONSTRUCTION PERIOD 1. Attend pre-construction meeting. 2. Review and approve shop drawings and other submittals by the Contractor. 3. Make periodic visits to the site (approximately once per week) to review progress and quality of work to determine, in general, if the work is proceeding in accordance with the Contrzct Documents. 4. Attend preliminar; and final inspection meeting. S. Review "as-built" drawings prepared by the Contractor. -3- FEES FOR PROFESSIONAL SERVICES: A. Preliminary Design Phase Site Analysis Lump Sum $2,000.00 Preliminary Plan Lump Sum 2,500.00 B. Construction Document Phase Design Development Construction Documents, including all Alternate Bid Items: Estimated andlor Construction Costs Percentage Fee $ 50,000 - $165,000 8.00% 166,000 - 275,000 7.i 5% C. Bidding and Construction Phase Hourly basis. -4- The City ,will provide all information as to the requrements of the project, and furnish the ' andscape Architect with the following information: 1. Certified survey of the site, giving grades and lines of streets, pavements and adjoining property; right$-of-way, restrictions, easements, encroachments, zoning, deed restrictions, 'rounddries and contours of the site. 2. Other improvements and full information as to available service and utility lines; test borings and soil analysis necessary for determining subsoil conditions and soil fer.,lity. All additi )nal services including meetings with the Park and Recreation Commission and City Council and revisions to the drawings required due to a change in the scope-of-work will be provided on an hourly basis in accordance with the following hourly rates: Principals $90.00/hour Associates 50.00/hour Assistants 40.00/hour Technical Staff 30.00/hour Office/clerical 2 0/00.hou r Statements will be submitted monthly in proportion to the amourt of work completed. Reimbursable expense for automobile travel during the period of review and observation of construction will be at $0.25 per mile. o� c U p,*�� AGREEMENT CITY OF CUPERTINO 10300 Torre Ave. • Cupertino, CA 95014 0.1#_ v .1 25:2-4505 NO. 027541 FOIL BY THIS AGREEMENT made and entered into on the day of by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Name (1) Royston, Hanamoto, Ailey, Abe, (2) _ Address 225 Miller Avenue City 'Kill Valley zip 94942_ Phone 415-383-7900 (Hereinafter referred as CONTRACTOR),in consideration of their mutual covenants,the parties hereto agree as follows: CONTRACTOR Shall provide or fumish the following specified services and/or materials: LAndscape Architectural Services for Somerset Square Park. Fee Schedule (Attachment A) EXHIBITS:The following attached exhibits hereby are made part of this Agreement: Scope of Work (Attachmen` B) TERMS The services and/or materials furnished under this Agreement shall commence on April 3, 1995 and shall be completed before September 1995 COMPENSATION For the full performance of this Agreement, CITY shall pay CONTRACTOR: As per professional Services Schedule GENERAL TERMS ANO CONDITIONS Hold Harmless.Contractor agrees to save and hold harmless the City,its officers,agents and employees from any and all damage and liability of every nature, including all costs of defending any claim, caused by or arising out of the performance of this agreement. City shall not'.ae liable for acts of Contractor in performing services described herein. Insurance.Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance before commencing any services under this agreement. Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non-Discrimination.No discrimination shall be made in the employment of persons under this agreement because of the race,color, national origin, ancestry, religion or sex of such person. Interest of Contractor. It is understood and agreed that this agreement is not a contract of employment in the sense that the relation of master and servant exists between City and undersigned. At all times Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement. Contractor certifies that n..- one who has or w0l have any financial interest under this agreement is an officer or employee of City. Changes. This agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO-ORDINATOR and representative for CITY shall be: NAME Travice Whitten DEPARTMENT Parks and Recreation This Agreement shall become effective upon its execution by CITY, in witness thereof,the parties have executed this Agreement the day and year first written above. CONT CTOri: CITY OF CUPERTINO: 4z) By By Stephen G. Dowling Title 1/e _ /'L ?n= __Title__ D►t�£��'�- Soc. Sec.# APPROVALS EXPENDITURE DISTRIBUTION DEPARTMENT HEAD DATE ACCOUNT NUMBER _ AMOUNT _ -qA 1.20-9102- 9SS_ $16,000.00 CITY CL DATE ----- CITY CLERK COPY CITY OF CUPERTINO SOMERSET SQUARE PARK WAS" 995 FEES FOR PROFESSIONAL_ SERVICES January '16, 1995 �_ _ ... .._..,_ Rt A. Design Development Phase Services during this phase of work, including attendance at public meetings (if required) will be provided on an Hourly Basis. We estimate the range of fees for this phase to be $2,000 to $2,500. B. Construction Document Phase Services during this phase of work w be provided on a percentage of estimated and/or actual construction costs, including alternate bid items. Percentage fee 8%. C. Bidding and Construction Phase Services during this phase of work will be provided as requested on an Hourly Basis. We estimate the range of fees for this phase to be $3,000 to $4,000. The City will provide all information as to the requirements of the project and furnish the Landscape Architect with the following information: 1 . Certified surrey of the site, giving grades and lines of streets, pavements, and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site. 2. Other improvements and full information as to available service and utility lines; test borings and soil analysis necessary for determining subsoil condition and soil fertility. All services during the Design Development Phase, Bidding and Construction Phase of work, and additional services, including meetings with the Park and Recreation Commission and City Council and revisions to the drawings required due to a change in the scope of work, will be provided on an hourly basis in accordance with the following hourly rates: Principal $125.00/hour Associate 90.00/hour Assistant 65.00/hour Technical Staff 50.00/hour Office/Clerical 35.00/hour Consultants at cost plus 100,10 Invoices will be submitted monthly in proportion to the amount of work completed. Reimbursable expenses for automobile travel during the bidding and construction phase of work will be at $.275 per mile. Drawings required for review, bidding, and construction will be provided at cost of printing and delivery. CITY OF CUPERTINO SOMERSET SQUARE PARK SCOPE OF WORK AND FEE PROPOSAL January 16, 1995 A. Design Development Phase 1. Review conceptual plan and update costs of the park components and facility. 2. Identify possible improvement options within the allocated budget amount. 3. Meet with City staff to review options. Discuss pros and cons and issues related to the plan, and establish the list of the preferred facilities and improvements. 4. Prepare revised conceptual plan indicating Phase I improvements. Prepare opinion of improvement cost. 5. Submit revised Phase I plan and estimate to City. B. Construction Document Phase 1. Prepare working drawings, specifications, and bid documents, including grading and drainage plans, construction plans, construction details, electrical plan and details, irrigation plan and details, and planting plan and details, as identified during the Design Development Phase of work. 2. Review working drawings with City staff at 50 percent and 90 percent completion of drawings. 3. Prepare cost estimate. 4. Submit 'three (3) sets working drawings to the City for review. 5. Incorporate City comments and complete final set of working drawings specifications. 6. Provide City with original reproducible tracings and contract documents for bidding and construction purposes. C. Bidding and Construction Phases Bidding Period 1. Assist the City in obtaining competitive bids by responding to questi,­-- by the Contractor. Prepare addendum, if necessary. Construction Period 1. Attend pre-construction meeting. 2. Review and approve shop drawings and other submittals by the Contractor. 3. Make periodic visits to the site (approximately once per week) to review progress and quality of work to determine, in general, if the work is proceeding in accordance with the contract documents. 4. Attend preliminary and final inspection meeting. 5. Review "as-built" drawings prepared by the Contractor. City Hall 10300 Tome Avenue Cupertino,CA 95014-.3202 C i t v t►f Telephone: (409)777-3223 Cape i t�0 FAX: (409)777-3366 OFFICE OF THE CITY CLERK April21, 1995 Royston, Hanamoto, Alley, Abey 225 Miller Avenue Mill Valley,California 94042 We are enclosing to you for your files and information one (1) copy of the agreement by and between the City of Cupertino and Royston, Hanamoto, Alley, Abey, which has been fully executed by city officials. Your agreement shall begin on 04/04/95,and shall be completed by September, 1995. Thank you for your services. Sincerely, v KIMBERLY SMITH CITY CLERK KS/cs Encl. cc: Department of Parks& Recreation Ponied on Recycled Paper