BLD-2024-2072_JobCard.pdfCUPERTINO
CITY OF CUPERTINO - BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
PHONE 408-777-3228 • WWW.CUPERTINO.ORG/ACCELA
JOB CARD
THIS CARD MUST BE POSTED AT A LOCATION VISIBLE FROM THE STREET FRONTAGE ON SITE OF THE STRUCTURE
BEING PERMITTED AND IS NOT TO BE REMOVED UNTIL BUILDING FINAL.
A HARD -COPY OF THE APPROVED PLANS AND DOCUMENTS SHALL BE KEPT AT THE SITE OF WORK.
Permit No: BLD-2024-2072
Building Address: 7455 DUMAS DR Cupertino
Job Description:
Issued Date: 02/10/2025
Contractor: HAPPY CONSTRUCTION GROUP INC
NEW FRONT ADDITION (224 SF); NEW FRONT PORCH (107 SF); REMODEL HOUSE (1,851 SF); NEW MINISPLIT HEAT PUMP
SYSTEM (2 TOTAL); RELOCATE WASHER/ DRYER; RE -ROOF COMP SHINGLES (780 SF); NEW SKYLIGHTS (4 TOTAL); RE -
STUCCO HOUSE (614 SF); NEW TANKLESS WATER HEATER; NEW SUB -PANEL (100 AMPS); UGPRADE MAIN PANEL (200
AMPS); NEW EV CHARGER; REPLACE WINDOWS (16 TOTAL) - FULLY SPRINKLER BUILDING;
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE
WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.
*PLEASE REFER TO QR CODE FOR ANY REVISIONS OR UPDATED INFORMATION