Loading...
21-091 SO #17 dated 2-10-25 Street Light Foundation Installation - PO 2025-404Contract/Purchasing Action Personnel Information Name Brad Alexander Department Public Works  Division Streets Date 01.30.2025 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Finch Ave Tilson Ave- SL FND.pdf Service Order Amount $8,000.00 Master Agreement Number 2022-003 Start Date 08/04/2021 End Date 06/30/2025 Firm Name BEAR Electrical Solutions Address 1341 Archer St, Alviso, CA 95002, USA Phone (408) 449-5178 Consultant/Contractor Name Brittney Sandy Consultant/Contractor Email brittney.s@bear- electrical.com Project Name SO 17 Street Light Foundation Installation Project Location Tilson Ave-Finch Ave Cupertino Project Manager Name Brad Alexander Cupertino Project Manager Email brada@cupertino.gov Master Agreement Maximum Compensation $170,000.00 Total Previously Encumbered to Date $124,247.50 Encumbrance this Service Order $8,000.00 Master Agreement Unencumbered Balance $37,752.50 SO GL #100-85-848 700-702 Signature       02/05/2025 PST  Consultant/Contractor Signature Date       02/05/2025 PST  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       02/05/2025 PST  Management Analyst Signature Date Date: 02/05/2025 PST Email: brittney.s@bear-electrical.com Date: 02/05/2025 PST Email: brada@cupertino.gov Date: 02/05/2025 PST Email: SundariP@cupertino.org Contractors License No. 982079 A - General Engineering C-10 High Voltage Electrical C-31 - Work Zone Traffic Control D-31 Pole Installation and Maintenance DIR# 1000002158 1341 Archer Street, PO Box 924, Alviso, CA 95002-0924 Tel: 408-449-5178 Fax: 408-449-5147 Terms and Conditions of this proposal are per the existing maintenance agreement. BES would like to thank you for the opportunity to provide you with this proposal. Please give us a call with any questions or concerns. Date:____________________________Customer Signature: ____________________________ $8,000.00Subtotal  Nights- Weekend- Holiday- PermitsExclusions Finch Ave & Tilson Ave SL FND - Mobilize to site -Set up traffic control -Remove 1 flag of concrete and Stop sign post -Furnish & install regar cage, type 15 foundation,N9 pull box & conduit to connect pull box and SL foundation for future. -City to furnish & install solar streetlight & fixture. Scope Summary Cupertino SL otherLocation We are pleased to offer our quotation for the above referenced project as follows: 2/28/2025Quote Expiration 14082044220Phone City of CupertinoAccount Name Brad AlexanderContact Name 00002256Quote Number Finch Ave & Tilson Ave- SL FNDBid/Project (408) 449-5178Phone Brittney SandyPrepared By 1/29/2025Created Date Product Quantity Sales Price Total Price Total Labor, Equipment, Material 1.00 $8,000.00 $8,000.00 Terms And Conditions SO 17 Street Light Foundation Installation - Service Request Created:02/05/2025 Status:Signed Transaction ID:6c63107e-6410-4395-908a-987d15cc142b "SO 17 Street Light Foundation Installation - Service Request" history Sundari Pilaka created the document. 02/05/2025 1:51:27 PM PST - IP address 98.207.177.162 Document was emailed to Brittney Sandy 02/05/2025 1:51:28 PM PST Brittney Sandy signed the document. 02/05/2025 2:28:08 PM PST - IP address 24.113.230.164:52103 Document was emailed to brada@cupertino.gov 02/05/2025 2:28:09 PM PST brada@cupertino.gov signed the document. 02/05/2025 2:31:33 PM PST - IP address 64.165.34.3:44013 Document was emailed to Sundari Pilaka 02/05/2025 2:31:34 PM PST Sundari Pilaka signed the document. 02/05/2025 5:23:54 PM PST - IP address 98.207.177.162:63695 Document was successfully signed and filed 02/05/2025 5:23:55 PM PST