Vallco Implementation - 09-24-24 The Rise Agreement and COAs TrackerThe Rise - Agreement & Condion Tracker - Next 6 Months 24-Sep-24 Future Agreements (City prepares inial dra)City Lead VPO Lead Required Prior to Target Compleon Date Timing Notes Status Priority (High / Medium / Low) Open / Closed / Ongoing Subdivision Improvement Agreement (COA 77) (includes Street Improvement Agreement - COA 43) Master Affordable Housing Agreement - covers enre project (COA 5) Form Regulatory Agreement - for individual buildings (COA 5) Below Market Rate Housing Migaon Program Procedural Manual (COA 5) Future Modificaon Framework Offsite Design Monthly skilled and trained workforce Public Access Easement and Maintenance Agreement Operaons and Maintenance Agreement - Storm Water Facilies (COA 60) Jenn / CAO Reed / Laura With Final Map approval 12/31/2024 Form of agreement to be finalized in 2024, so it is ready to be executed with Final Map. Some exhibits (offsites, bonding), etc. will be completed closer to me of Final Map. VPO provided updated dra of SIA to City on 9/16 for City review. Open Nicky / CAO Candice / Reed Recorded prior to the issuance of the first building permit for vercal construcon. 12/31/2024 Agreement to be completed this year. VPO to provided updated MAHA dra for City review on 9/16. Meeng scheduled for 9/24 to review MAHA dra and process with CAO/outside counsel. Open Nicky / CAO Candice / Reed Recorded prior to the issuance of the first building permit for vercal construcon. 12/31/2024 To be completed with Master Affordable Housing Agreement above. Exhibit to Master Affordable Housing Agreement above. Open Nicky / CAO Candice / Reed Prior to the issuance of the first building permit for vercal construcon. 12/31/2024 Manual to be determined in tandem with Master Affordable Housing Agreement above. VPO to provide City overview of previous discussions with City on one manual for all unit types. VPO to set up meeng with City to review background and approach. Open Craig / CAO Laura / Reed N/A 12/31/2024 Framework to be completed this year. VPO to provide term sheet for City review.Open - including Bus Stop Locaons (COA 65), Street Trees (COA 68), Street Lighng Installaon (COA 76), Loading & Waste Management Entrances (COA 80), Frontage Road Design (COA 81), Traffic Signalizaon (COA 82) Jenn Steve / Laura / Reed Various 12/31/2024 All offsite design to be reviewed and agreed to in 2024 VPO and City to meet at 10am on 9/30 to review offsite design for offsites on West side of Wolfe. Open Piu Steve Ongoing Ongoing Submit monthly.VPO to connue to submit forms monthly to Piu via email. Last submission made on 07/29/24. Form for August work to be submied by VPO by end of September. Ongoing Jenn / Rachelle / CAO Reed / Laura Prior to Public Works permit issuance of improvements (Phase 1B horizontal work) 2025 Agreement to be completed with Phase 1B horizontal work permit package that will include hardscape and landscape improvements for Phase 1. Agreement is expected to be negoated in 2025, unless design progression allows a sooner negoaon. Term sheet to be done in advance of agreement. VPO to review previous dra proposal and determine if can be updated. Open Jenn / CAO Steve / Reed Prior to Public Works sign off on construcon of improvements 12/31/2024 Agreement required prior to final inspecon of related facilies. Discussions to occur once work is permied (likely September 2024 as plans were submied to City for review in July) City to provide dra Operaons and Maintenace Agreement to begin discussions. No term sheet required. Open High High High High High High High High Medium The Rise - Agreement & Condion Tracker - Next 6 Months 24-Sep-24 Future Agreements (City prepares inial dra)City Lead VPO Lead Required Prior to Target Compleon Date Timing Notes Status Priority (High / Medium / Low) Open / Closed / Ongoing Operaons and Maintenance Agreement - Right of Way (COA 60) Reimbursement Agreement (for project management costs) Building Standards Code Implementaon Agreement Signage (COA 31) & Sign Program (COA 32) Public Art (COA 23) Work Schedule (COA 59) Selement Agreement Annual Report CC&Rs Review (COA 10) Private Road Maintenance Agreement (COA 11) Final Subdivision Map (COA 78) Landscape Maintenance Plan (COA 26) Dedicaon of Underground Water Rights (COA 71) Fire Department and Emergency Response (COA 19) Jenn / CAO Steve / Reed Prior to Public Works sign off on construcon of improvements 12/31/2024 Open Astrid / CAO Reed N/A 10/31/2024 City to confirm ming.City preparing amendment to Reimbursement Agreement for VPO review. Open Sean / CAO Laura / Steve / Reed Prior to submission of first building permit for vercal construcon 12/31/2024 Agreement to be completed this year. VPO to respond to City's inial term sheet.Open Piu Laura / Reed Prior to issuance of sign permits 12/31/2024 Master Sign Program to be completed this year. Master Sign Program kickoff took place on 9/16. VPO to submit program in November. Open Piu Reed Within 365 days of Modificaon #2 approval leer 2/14/2025 February 2025, pending further discussions with City VPO to provide City and Fire data needs list to complete study. City/County in discussions on alternate soluon to response study. City to provide feedback. If alternate soluon is not viable, pares to discuss extending from February 2025. Open Piu Laura / Reed Final occupancy for the last structure/improvements that causes the cumulave valuaon of the constructed porons of the project to reach $40M 3/1/2025 VPO prefers to have public art plans approved by 1Q25 City to provide any previous public art examples and process informaon. Open Jenn Steve / Reed Within 60 days of project approval, and every 6 months therefater 3/5/2024 Next report due by 3/5/2024 VPO submied last work schedule on 09/05/24.Ongoing CAO Reed March 1 each year 3/1/2025 First annual report required by March 1, 2025 per agreement. VPO to provide first annual report by March 1, 2025 Ongoing Piu / Jenn / CAO Laura / Reed Prior to 1) recordaon of CC&Rs and 2) prior to issuance of first building permit for vercal construcon. 2025 VPO will likely provide dra in late 2024. VPO to submit CC&Rs to City Aorney, Director of Community Development, and Director of Public Works for confirmaon review that items listed in COA 10 are included. Open Piu / CAO Steve / Reed Recorded prior to issuance of building permit for vercal construcon of the phase in which private roadways are proposed. 2025 Agreement will likely be reviewed in late 2024 with CC&Rs (COA 10) above. City does not have form agreement. VPO to review City ’s standard maintenance form. Open Jenn / CAO Reed / Laura Recorded prior to issuance of builder permits for vercal construcon 2025 VPO plans to submit in early 2025 VPO to submit Final Map for review Open Piu / CAO Steve / Reed Prior to issuance of building permits for each phase where associated landscape improvements are required 2025 First landscape permit submission ancipated in 2025. VPO to provide landscape maintenance plan with first landscape permit submission. Open Jenn Reed N/A 2025 To be completed in early 2025 City to provide form of authorizaon.Open Agreement required prior to final inspecon of related facilies. City to provide dra Operaons and Maintenace Agreement to begin discussions. Medium Medium Medium Medium Medium Medium Low Low Low Low Low Low Low Needs to also be addressed in CC&Rs. The Rise - Agreement & Condion Tracker - Next 6 Months 24-Sep-24 Future Agreements (City prepares inial dra)City Lead VPO Lead Required Prior to Target Compleon Date Timing Notes Status Priority (High / Medium / Low) Open / Closed / Ongoing Trash Management Plan (COA 34) Selement Agreement Addional Floor Plan Details (COA 4) Grading Outside of Dry Season (COA 16a) California Water Service Company Clearance (COA 7 Ursula / CAO Steve / Reed Prior to issuance of building permits for each phase/building. TBD TBD City to confirm overall site waste management program was approved with Modificaon #2 and this COA is just a per building approval of each building's trash management plan. If so, remove from tracking. Jenn Steve / Reed Prior to issuance of any building permit that would require the construcon of water facilies TBD TBD VPO to determine horizontal work versus building permit work requirements with CalWater. Open CAO Reed / Laura Impact fee payment 9/6/2024 Executed agreement has been recorded.Closed Piu Reed 90 days from February 16, 2024 Modifcaon #2 approval leer Complete Addional Floor Plans were submied by VPO (Reed Moulds) to City on 04/24/2024 via email. City (Piu Ghosh) provided confirmaon via email that this condion was sasfied on 05/06/2024. Item closed. Closed Jenn Steve Ongoing, prior to ground disturbance during winter months at City sole discreon 9/30/2024 Approval prior to horizontal work Phase 1A grading permit issuance With issuance of the grading permit in September, City provided permission for grading to proceed ousde of dry season. No further permission required. Closed Complete Complete Complete *Note: Addional condions of approval (tree protecon plan, ulity structure plan, erosion control plan, geotechinal report, traffic control plans, etc.) are required for individual permits but are not tracked above. These items will be submied by VPO with applicable buildig