CC 03-04-2025 Item No. 8. Amended Attachment G – Competitive and Non-Competitive Citywide Grants TrackingFY 2024-25 Mid-Year Special Projects Attachment G
FY Added Department Program Base And Detail Account
With Detail Description
Full Org Set Code And
Description
Amended
Budget
Actual Amount
(Expenses)
Encumbrances Status Estimated
Completion
Outside
Funding
Sources
(Grant,
Other, or
None)
Grant or Outside
Funding Source
Notes (e.g., carried over
to next fiscal year)
FY24 Administration 120 City Manager 750.239 ‐ PR & Strategic Comm
Strategy
100‐12‐120 ‐ General Fund‐City Manager‐
City Manager
127,400.00 0.00 0.00 In Progress 6/30/2026 None N/A
FY24 Administration 120 City Manager 750.245 ‐ CWP Rise Const
Stakeholder Engmt
100‐12‐120 ‐ General Fund‐City Manager‐
City Manager
100,000.00 0.00 0.00 In Progress 6/30/2025 None N/A The City will continue engagement
with The Rise on an ongoing basis.
Expenses may occur after Q2.
FY20 Administration 632 Comm Outreach &
Neigh Watch
750.056 ‐ Neighborhood
Engagement
100‐12‐632 ‐ General Fund‐City Manager‐
Comm Outreach & Neigh Watch
56,781.00 23,562.29 0.00 Completed 9/30/2024 Grant California Volunteers Local
Governments: Connecting
Neighbors to Neighbors
(This specific GL is only the
materials portion of the
grant)
The Neighbor to Neighbor grant
ended on 9/30/24. Final
encumbrance of $19,481 processed
in Q2.
FY24 Administration 632 Comm Outreach &
Neigh Watch
750.227 ‐ CWP Public Safety res/com
areas
100‐12‐632 ‐ General Fund‐City Manager‐
Comm Outreach & Neigh Watch
10,000.00 0.00 0.00 In Progress 6/30/2025 None N/A The Block Leader outreach program
has started and staff will continue to
promote the programs until the end
of this fiscal year.
FY24 Administration 633 Disaster
Preparedness
750.230 ‐ Business Continuity
Resilience
100‐12‐633 ‐ General Fund‐City Manager‐
Disaster Preparedness
500,000.00 0.00 0.00 Not Started 6/30/2024 Grant This is the Cal OES grant
that was received in 2022,
which was originally
$1million. This grant does
not appear on the grants
tracking sheet.
Staff is considering making
improvements to the EOC later this
fiscal year.
FY23 Administration 633 Disaster
Preparedness
750.240 ‐ MRC Rise 100‐12‐633 ‐ General Fund‐City Manager‐
Disaster Preparedness
2,194.00 1,176.24 0.00 Completed 9/30/2024 Grant National Association of City
and County Health Officials
(NACCHO) Respond,
Innovate, Sustain, and
Equip (RISE) Awards
Additional supplies purchased for
MRC Rise in July 2024. Project is now
complete.
FY24 Administration 705 Economic
Development
750.230 ‐ Business Continuity
Resilience
100‐12‐705 ‐ General Fund‐City Manager‐
Economic Development
310,487.00 0.00 0.00 In Progress 6/30/2025 Grant This is the Cal OES grant
that was received in 2022,
which was originally
$1million. This grant does
not appear on the grants
tracking sheet.
Funds were carried over for the
ongoing support for Small to
Medium Business Resiliency. This
was a Budget allocation from the
State of California
FY23 Administration 705 Economic
Development
750.179 ‐ Econ Dev Strategy
Outreach
100‐12‐705 ‐ General Fund‐City Manager‐
Economic Development
20,000.00 0.00 0.00 Not Started None N/A Defund at Q3
FY17 Community development 701 Current Planning 750.007 ‐ The Hamptons 100‐71‐701 ‐ General Fund‐Planning‐Current
Planning
108,640.00 0.00 0.00 Not Started None N/A Waiting for building submittal.
Project approval expries in 2026
FY21 Community development 701 Current Planning 750.009 ‐ Marina Plaza 100‐71‐701 ‐ General Fund‐Planning‐Current
Planning
23,317.00 0.00 0.00 Not Started None N/A Waiting for building submittal.
Project approval expries in
December 2026.
FY22 Community development 701 Current Planning 750.029 ‐ Vallco SB35/Rise 100‐71‐701 ‐ General Fund‐Planning‐Current
Planning
109,207.00 0.00 0.00 In Progress Ongoing None N/A Waiting for building permit. Some
permits for grading and site
preparation work issued.
FY20 Community development 702 Mid Long Term
Planning
750.032 ‐ General Plan 100‐71‐702 ‐ General Fund‐Planning‐Mid
Long Term Planning
239,805.00 0.00 0.00 In Progress Ongoing None N/A Operational item, no completion
date
FY17 Community development 702 Mid Long Term
Planning
750.090 ‐ Residential/Mixed Use
Design
100‐71‐702 ‐ General Fund‐Planning‐Mid
Long Term Planning
194,922.00 0.00 0.00 In Progress Summer 2025 None N/A Delays in prjoect due to previous
contractor/consultant and Housing
Element. First community meeting
to be held on Feb 10, in hybrid
format.
FY22 Community development 702 Mid Long Term
Planning
750.101 ‐ CWP RHNA and Gen Plan
Update
100‐71‐702 ‐ General Fund‐Planning‐Mid
Long Term Planning
422,564.00 46,095.75 378,394.22 Completed Sep 2024 None N/A Completed in September, when the
City received notice from HCD that
the Housing Element complies with
State law. Housing Element
implementation policies will be
presented for Commission and
Council input as project progesses.
FY 2024-25 Mid-Year Special Projects Attachment G
FY Added Department Program Base And Detail Account
With Detail Description
Full Org Set Code And
Description
Amended
Budget
Actual Amount
(Expenses)
Encumbrances Status Estimated
Completion
Outside
Funding
Sources
(Grant,
Other, or
None)
Grant or Outside
Funding Source
Notes (e.g., carried over
to next fiscal year)
Community development 702 Mid Long Term
Planning
750.102 ‐ CWP Sign Ordinance
Update
100‐71‐702 ‐ General Fund‐Planning‐Mid
Long Term Planning
200,000.00 0.00 0.00 Not Started Spring 2025 None N/A RFP was released Winter 2024 to
obtain consultant. Pending adoption
of CWP by Council to determine
budget and which projects can move
forward.
FY22 Community development 702 Mid Long Term
Planning
750.135 ‐ Laserfiche planning map
scanning
100‐71‐702 ‐ General Fund‐Planning‐Mid
Long Term Planning
726.00 0.00 0.00 In Progress Winter 2024 None N/A Ongoing Operational Item
FY24 Community development 702 Mid Long Term
Planning
750.235 ‐ CWP Tree List 100‐71‐702 ‐ General Fund‐Planning‐Mid
Long Term Planning
50,000.00 0.00 0.00 In Progress June 2025 None N/A Joing project with Public Works, RFP
released to obtain consultant.
FY20 Community development 711 BMR Affordable
Housing Fund
750.052 ‐ Develop ELI Housing 265‐72‐711 ‐ BMR Housing‐Housing Services‐
BMR Affordable Housing Fund
238,301.00 0.00 3,005.00 In Progress Winter 2025 None N/A Pending development of Mary Ave,
then operational. Project is under
review in compliance with Exclusive
Negotiation Agreement (ENA).
Following the Negotiation period,
staff will present the Council with a
Disposition and Development
Agreement (DDA) and Lease
agreement for the project and the
project will also concurrently go
through entitlement hearings.
FY22 Community development 714 Construction Plan
Check
750.031 ‐ Westport 100‐73‐714 ‐ General Fund‐Building‐
Construction Plan Check
89,621.00 1,087.50 33,194.23 In Progress 2026 None N/A Pending building permit status. The
timeline is uncertain, however, staff
estimates the townhome portion
should be fully occupied within the
first quarter of 2025. The Senior
BMR apartment building is complete
and fully occupied. The assisted
living parcel is currently under
redesign and will be submitted for
review in Fall 2025.
FY20 Community development 714 Construction Plan
Check
750.067 ‐ VTC 100‐73‐714 ‐ General Fund‐Building‐
Construction Plan Check
14,595,179.00 580.00 2,594,599.46 In Progress Ongoing None N/A This pertains to building permits and
staff estimates that the developer
will submit additional building
permits in 2025
FY20 Community development 715 Building Inspection 750.067 ‐ VTC 100‐73‐715 ‐ General Fund‐Building‐Building
Inspection
5,406,634.00 0.00 0.00 Not Started None N/A This pertains to building inspections
required for this project. It is
estimated that permits will be
submitted this year for permitting
and possible inspections starting in
2026.
FY22 Information Services 308 Applications 750.123 ‐ Redesign of City Website 100‐32‐308 ‐ General Fund‐I&T Applications‐
Applications
3,481.00 0.00 3,481.31 Completed 12/30/2024 None N/A Proposed to defund at midyear
FY23 Information Services 308 Applications 750.183 ‐ ACA Guide & Wrapper 100‐32‐308 ‐ General Fund‐I&T Applications‐
Applications
25,000.00 0.00 25,000.00 In Progress 6/30/2025 None N/A
FY23 Information Services 308 Applications 750.184 ‐ Accela Roadmap 100‐32‐308 ‐ General Fund‐I&T Applications‐
Applications
23,000.00 0.00 23,000.00 In Progress 6/30/2025 None N/A
FY21 Information Services 308 Applications 750.236 ‐ Project Dox 100‐32‐308 ‐ General Fund‐I&T Applications‐
Applications
394.00 393.75 0.00 Completed 8/1/2024 None N/A
FY23 Information Services 310 Infrastructure 750.199 ‐ City Facilities Video
Capture
610‐34‐310 ‐ Innovation & Technology‐I&T
Infrastructure‐Infrastructure
6,079.00 0.00 0.00 Completed 6/30/2024 None N/A Proposed to defund at midyear
FY22 Information Services 986 GIS 750.166 ‐ AR McClellan Ranch 610‐35‐986 ‐ Innovation & Technology‐I&T
GIS‐GIS
11,333.00 11,333.32 0.00 Completed 12/30/2024 None N/A
FY23 Information Services 986 GIS 750.212 ‐ Laserfiche Scanning 610‐35‐986 ‐ Innovation & Technology‐I&T
GIS‐GIS
4,099.00 0.00 4,098.54 Completed 9/30/2024 None N/A
FY24 Information Services 986 GIS 750.238 ‐ VR Decarb 610‐35‐986 ‐ Innovation & Technology‐I&T
GIS‐GIS
112,002.00 38,249.70 73,750.25 In Progress 6/30/2025 Grant Silcon Valley Clean Energy
(fully funded by Grant)
FY23 Law enforcement 200 Law Enforcement SC
Sherif
750.227 ‐ CWP Public Safety res/com
areas
100‐20‐200 ‐ General Fund‐Law Enforcement‐
Law Enforcement SC Sherif
60,000.00 62,250.00 62,250.00 In Progress 3/30/2025 None N/A
FY 2024-25 Mid-Year Special Projects Attachment G
FY Added Department Program Base And Detail Account
With Detail Description
Full Org Set Code And
Description
Amended
Budget
Actual Amount
(Expenses)
Encumbrances Status Estimated
Completion
Outside
Funding
Sources
(Grant,
Other, or
None)
Grant or Outside
Funding Source
Notes (e.g., carried over
to next fiscal year)
FY24 Public works 122 Sustainability
Division
750.025 ‐ Special Maintenance 100‐81‐122 ‐ General Fund‐Environmental
Programs‐Sustainability Division
10,000.00 0.00 0.00 Not Started 6/30/25 None N/A Carried over from earlier years ‐ idea
was to use to fund energy efficiency
auditing at city facilities.
FY22 Public works 122 Sustainability
Division
750.106 ‐ Electric Cooking Workshop
Series
100‐81‐122 ‐ General Fund‐Environmental
Programs‐Sustainability Division
6,400.00 0.00 0.00 In Progress 6/30/2025 None N/A Carried over from 23‐24 after County
paid for Martin Yan celebrity chef
demo that year.
FY24 Public works 122 Sustainability
Division
750.176 ‐ Climate AP Vision
Summary Doc
100‐81‐122 ‐ General Fund‐Environmental
Programs‐Sustainability Division
10,000.00 0.00 0.00 In Progress 6/30/2025 None N/A Carried over from last FY
FY24 Public works 122 Sustainability
Division
750.223 ‐ CWP Electrification Study 100‐81‐122 ‐ General Fund‐Environmental
Programs‐Sustainability Division
96,057.00 21,002.79 15,104.88 In Progress 6/30/2025 None N/A Budget shown is more than needed.
We have an agreement for $40,000
with Raimi & Assoc to develop a
strategy for decarbonization of
existing buildings. First executed
10/16/2023, extended to
12/31/2025.
FY25 Public works 800 Public Works Admin 750.244 ‐ CWP Recycled Water
Feasibility
100‐80‐800 ‐ General Fund‐PW
Administration‐Public Works Admin
200,000.00 0.00 0.00 In Progress 6/30/2025 None N/A
FY25 Public works 801 Resources Recovery 750.025 ‐ Special Maintenance 520‐81‐801 ‐ Resource Recovery‐
Environmental Programs‐Resources Recovery
20,000.00 0.00 0.00 In Progress 6/30/2025 None This amount comes from
Fund 520 with no impact to
General Fund.
CAP dashboard pilot
FY24 Public works 801 Resources Recovery 750.041 ‐ HHW and PaintCare 520‐81‐801 ‐ Resource Recovery‐
Environmental Programs‐Resources Recovery
161,010.00 66,540.50 0.00 In Progress Ongoing annual
project
Other In previous years received
funding from landfill fees
which are earmarked for
this supplementation use
in 303‐312. No impact to
General Fund.
SCC Household Hazardous Waste
program. Annual on‐going program
to cover residential drop off of items
that cannot be accepted by
Recology.
FY21 Public works 801 Resources Recovery 750.084 ‐ Single Use Plastics
Ordinance
520‐81‐801 ‐ Resource Recovery‐
Environmental Programs‐Resources Recovery
94,544.00 (1,205.00) 0.00 In Progress 1/31/2026 None No impact to General
Fund.
Ordinance implementation still in
progress and on schedule. Contract
term extended.
FY22 Public works 801 Resources Recovery 750.137 ‐ SB1383 Procurement
Requirements
520‐81‐801 ‐ Resource Recovery‐
Environmental Programs‐Resources Recovery
205,653.00 0.00 0.00 In Progress Ongoing annual
project
Grant CalRecycle grant funds are
paying for compost
brokering to meet the
SB1383 procurement
requirement.
No completion date
FY22 Public works 801 Resources Recovery 750.174 ‐ New Lndfill Agrmnt/Solid
Wst con
520‐81‐801 ‐ Resource Recovery‐
Environmental Programs‐Resources Recovery
103,542.00 24,660.00 47,266.25 In Progress 8/31/2025 None No impact to General
Fund.
Current agreement with consusltant
was extended to 8/31/2026
FY20 Public works 802 Non Point Source 750.064 ‐ Low Income Cost Share 230‐81‐802 ‐ Env Mgmt Cln Crk Strm Drain‐
Environmental Programs‐Non Point Source
2,000.00 0.00 0.00 In Progress Ongoing None N/A Ongoing item will be moved to base
budget in FY26
FY20 Public works 802 Non Point Source 750.065 ‐ CUSD Joint Use Cost Share 230‐81‐802 ‐ Env Mgmt Cln Crk Strm Drain‐
Environmental Programs‐Non Point Source
8,707.00 0.00 0.00 In Progress Ongoing None N/A Ongoing item will be moved to base
budget in FY26
FY19 Public works 804 Plan Review 750.039 ‐ PW Scanning Project 100‐82‐804 ‐ General Fund‐Developmental
Services‐Plan Review
9,310.00 0.00 9,310.29 Completed Ongoing None N/A Funds are encumbered in Q1 for PW.
Remaining project will be funded by
IT.
FY20 Public works 804 Plan Review 750.067 ‐ VTC 100‐82‐804 ‐ General Fund‐Developmental
Services‐Plan Review
1,961,366.00 14,065.00 1,182,523.68 In Progress Anticipated 2030 Other These are pass through
funds from the developer.
No City funds are
associated with this budget
item.
FY 2024-25 Mid-Year Special Projects Attachment G
FY Added Department Program Base And Detail Account
With Detail Description
Full Org Set Code And
Description
Amended
Budget
Actual Amount
(Expenses)
Encumbrances Status Estimated
Completion
Outside
Funding
Sources
(Grant,
Other, or
None)
Grant or Outside
Funding Source
Notes (e.g., carried over
to next fiscal year)
FY22 Public works 804 Plan Review 750.105 ‐ CWP Revisit 5G 100‐82‐804 ‐ General Fund‐Developmental
Services‐Plan Review
250,000.00 0.00 0.00 In Progress 6/30/2025 None N/A Most of the work to date has been
completed in‐house. Ongoing
changes to related laws, limited
staffing resources, and other
priorities have resulted in delays to
finalization.
FY20 Public works 807 Service Center
Administration
750.043 ‐ Office Reconfiguration 100‐83‐807 ‐ General Fund‐Service Center‐
Service Center Administration
111,416.00 9,109.11 0.00 In Progress Ongoing None N/A Partial Defund at Q3, included in
base budget
FY25 Public works 812 School Site
Maintenance
750.025 ‐ Special Maintenance 100‐84‐812 ‐ General Fund‐Grounds‐School
Site Maintenance
10,500.00 0.00 0.00 In Progress 06/30/2025 None N/A Dugout roof replacement ‐ Hyde
FY25 Public works 814 Sport Fields Jollyman
CRK
750.025 ‐ Special Maintenance 100‐84‐814 ‐ General Fund‐Grounds‐Sport
Fields Jollyman CRK
10,500.00 0.00 8,500.00 In Progress 06/30/2025 None N/A Dugout roof replacement ‐ Jollyman
FY19 Public works 820 Sidewalk Curb and
Gutter
750.020 ‐ Annual Sidewalk Curb &
Gutter
270‐85‐820 ‐ Transportation Fund‐Streets‐
Sidewalk Curb and Gutter
2,776,484.00 0.00 1,588,567.91 In Progress 6/30/2025 None N/A Annual project
FY24 Public works 825 Street Tree
Maintenance
750.235 ‐ CWP Tree List 100‐86‐825 ‐ General Fund‐Trees and Right
of Way‐Street Tree Maintenance
60,000.00 0.00 0.00 In Progress 6/30/2025 None N/A Collaborating with CDD. Project
currently awaiting CDD's completion
of RFP. RFP just went out
10/21/2024. CWP update from
Council may turn this into a Urban
Forest Master Plan.
FY25 Public works 827 Bldg Maint City Hall 750.025 ‐ Special Maintenance 100‐87‐827 ‐ General Fund‐Facilities and
Fleet‐Bldg Maint City Hall
2,000.00 0.00 0.00 Not Started 6/30/2025 None N/A Burglar Alarm Upgrades
FY25 Public works 828 Bldg Maint Library 750.025 ‐ Special Maintenance 100‐87‐828 ‐ General Fund‐Facilities and
Fleet‐Bldg Maint Library
45,000.00 0.00 0.00 In Progress 6/30/2025 None N/A Library HVAC
FY25 Public works 829 Bldg Maint Service
Center
750.025 ‐ Special Maintenance 100‐87‐829 ‐ General Fund‐Facilities and
Fleet‐Bldg Maint Service Center
2,000.00 297.09 0.00 Not Started 6/30/2025 None N/A Burglar Alarm Upgrades
FY24 Public works 830 Bldg Maint Quinlan
Center
750.025 ‐ Special Maintenance 100‐87‐830 ‐ General Fund‐Facilities and
Fleet‐Bldg Maint Quinlan Center
79,174.00 8,955.65 0.00 Not Started 6/30/2025 None N/A Security project
FY24 Public works 831 Bldg Maint Senior
Center
750.025 ‐ Special Maintenance 100‐87‐831 ‐ General Fund‐Facilities and
Fleet‐Bldg Maint Senior Center
123,675.00 0.00 0.00 Not Started 12/31/2025 None N/A Funds are allocated to replace
kitchen HVAC unit.
FY25 Public works 832 Bldg Maint
McClellan Ranch
750.025 ‐ Special Maintenance 100‐87‐832 ‐ General Fund‐Facilities and
Fleet‐Bldg Maint McClellan Ranch
2,000.00 0.00 0.00 Not Started 12/31/2024 None N/A Burglar Alarm Upgrades
FY25 Public works 833 Bldg Maint Monta
Vista Ct
750.025 ‐ Special Maintenance 100‐87‐833 ‐ General Fund‐Facilities and
Fleet‐Bldg Maint Monta Vista Ct
2,000.00 0.00 0.00 Not Started 6/30/2025 None N/A Burglar Alarm Upgrades
FY23 Public works 836 Bldg Maint Sports
Center
750.025 ‐ Special Maintenance 570‐87‐836 ‐ Sports Center‐Facilities and
Fleet‐Bldg Maint Sports Center
45,705.00 20,169.00 0.00 In Progress 12/31/2025 None N/A HVAC repair (in progress), raquetball
court (November 2024)
FY25 Public works 838 Comm Hall Bldg
Maint
750.025 ‐ Special Maintenance 100‐87‐838 ‐ General Fund‐Facilities and
Fleet‐Comm Hall Bldg Maint
2,000.00 0.00 0.00 Not Started 6/30/2025 None N/A Burglar Alarm Upgrades
FY22 Public works 844 Traffic Engineering 750.163 ‐ VMT to LOS Standards 100‐88‐844 ‐ General Fund‐Transportation‐
Traffic Engineering
30,637.00 10,800.26 19,776.97 In Progress 6/30/2025
FY23 Public works 844 Traffic Engineering 750.219 ‐ CWP Bicycle Facilities 100‐88‐844 ‐ General Fund‐Transportation‐
Traffic Engineering
50,000.00 0.00 0.00 In Progress 6/30/2025 None N/A No progress since last quarterly
report.
FY23 Public works 844 Traffic Engineering 750.231 ‐ SC Corridor Vision Study 100‐88‐844 ‐ General Fund‐Transportation‐
Traffic Engineering
154,079.00 151,968.63 0.00 In Progress 6/30/2025 None N/A
FY23 Public works 844 Traffic Engineering 750.242 ‐ AC2 Traffic Monitoring 100‐88‐844 ‐ General Fund‐Transportation‐
Traffic Engineering
42,975.00 0.00 42,975.00 Completed 6/30/2026 Other Apple Donation Funds encumbered. Waiting for
invoices. Completed for this FY.
FY25 Public works 844 Traffic Engineering 750.243 ‐ CWP Active Transportation
Plan
100‐88‐844 ‐ General Fund‐Transportation‐
Traffic Engineering
330,000.00 0.00 0.00 In Progress 6/30/2025 Grant TDA3
FY23 Public works 853 Storm Drain Fee 750.063 ‐ Rainwater Capture 230‐81‐853 ‐ Env Mgmt Cln Crk Strm Drain‐
Environmental Programs‐Storm Drain Fee
28,207.00 6,634.62 9,072.44 In Progress Ongoing annual
project
Other Funded by 2019 Clean
Water and Storm
Protection parcel fee.
This will be going away after this FY
due to expiration of rebate matching
agreement with Valley Water as part
of cost cutting to allow parcel fee
revenues to fund more of the basic
compliance and infrstructure
maintenance needs.
FY20 Public works 854 General Fund
Subsidy
750.065 ‐ CUSD Joint Use Cost Share 230‐81‐854 ‐ Env Mgmt Cln Crk Strm Drain‐
Environmental Programs‐General Fund
Subsidy
0.00 17,672.77 0.00 In Progress Ongoing annual
purchase
None N/A This funds line 45 ‐ 750.065 ‐ CUSD
Joint Use Cost Share. We cannot use
collected APN fees to offset costs for
another fee‐payer.