Loading...
CC 05-06-2025 Item No. 10. FY 2025-26 Fee Schedule_Staff PresentationMay 06, 2025 FY 2025 -26 Fee Schedule Update •Background •What is a Fee? •Fee Study •Fee Rates •Fiscal Impact •Staff Recommendation Agenda A fee or rate charged to an individual or group that receives a private benefit from services provided by the City. Background -What is a Fee? 2016 & 2023 Fee Studies Cost Allocation Plan User Fee Cost Recovery Policy •Adopted in 2024 •Cost of Services -Sets the cap on city- provided services Background –Fee Study Background -Fees for City Services Fee Schedule Description Schedule A -General Fees Miscellaneous fees not associated with one department(abatement fees, false alarms, PRA request, etc.) Schedule B -Engineering Fees Public Works –Engineering: Design and Inspection Services Schedule C -Planning Fees Community Development –Planning: Current, Mid, and Long-Term Planning Schedule D -Building Fees Community Development –Building: General Building, Construction Plan Check, and Building Code Enforcement Fiscal Impact Fee Schedule Estimated Additional Revenue Factor and Basis Schedule A –General Fees $971 Cost-recovery plus 2.7% CPI Schedule B –Engineering Fees $136,082 Cost-recovery plus -0.79% CCI,9.7% Labor Schedule C –Planning Fees $106,255 Cost-recovery plus2.7% CPI,9.7% Labor Schedule D –Building Fees $542,175 Cost-recovery plus9.7% Labor Staff Recommendation Adopt Resolution approving FY 2025‐26 Fee Schedules, effective July 6, 2025 Effective Date: July 19, 2023 Teen Center •Removed from the schedule due to permanent closure Security Staff •Update rate to: $43 Schedule E –Parks & Recreation Fees Consumer Price Index (CPI) Construction Cost Index (CCI) Labor Cost 5.3%7.1%9.0% Background –Fee Rates Background –Fee Rates Fiscal Year Schedule A – General Fees Schedule B – Engineering Fees Schedule C – Planning Fees Schedule D – Building Fees 2023-24 (proposed)5.3% CPI 7.1% CCI 9.0% Labor 5.3% CPI 9.0% Labor 9.0% Labor 2022-23 5.2% CPI 9.8% CCI 1.0% Labor 5.2% CPI 1.0% Labor 1.0% Labor 2021-22 1.6% CPI 2.5% CCI 5.7% Labor 1.6% CPI 5.7% Labor 5.7% Labor 2020-21 2.9% CPI 6.3% CCI 17.3% Labor 17.3% Labor 17.3% Labor Incorporated Elements •Cost Allocation Plan and User Fee Study Cycle •Annual update mechanism •Phase-in period •Target Cost Recovery Ranges User Fee Cost Recovery Policy Cost Recovery Range User Fee Cost Recovery Policy Schedule/Service Area Target Cost Recovery Range Schedule A – General 100% Schedule B – Engineering (PW)75-100% Schedule C – Building 80-100% Schedule D – Planning 50-80% Schedule E – Recreation*Market-driven