Loading...
23-041 Alvernaz_Service Order #13 dated 5-5-25 Nature Shop Concrete Pad InstallationCITY OF CUPERTINO Contract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works Division Facilities Date 05.02.2025 Service Order Upload Quote McClellan Ranch Nature Shop Concrete Pad Quote Updated 032625.docx Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Service Order Amount $21,600.00 Master Agreement 2023-010 Contract 05/30/2023 Contract End Date 06/30/2025 Number Start Date Firm Name Alvernaz Address Po Box 366, San Martin, CA 95046 Construction Phone (408) 595-2817 Consultant/Contractor Michael Consultant/Contractor michaelalvernaz@alvernazconstruction.com Name Alvernaz Email Project Name SO 13 Nature Project Location McClellan Ranch Shop Concrete Pad Installation Cupertino Project Nathan Cupertino Project nathanv@cupertino.org Manager Name Vasquez Manager Email Master Agreement $175,000.00 Total Previously $152,050.00 Maximum Encumbered to Date Compensation Encumbrance this $21,600.00 Master Agreement $1,350.00 Service Order Unencumbered Balance SO GL # 100-87-832 NWS Project Code 700-702 Comments Doing this work under CUPCCAA. Signature 05/02/2025 PDT Consu/taf7Y,YC6i)YdTCtorSignature Date /V"mow 05/05/2025 PDT ManageiiSV,MM�or Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature. iu" Cw 05/05/2025 PDT ManageftfiMdlyst Signature Date Quote Alvernaz Construction Po Box 366 San Martin, CA 95046 Lic# 711435 408-595-2817 Attn. Nathan V City of Cupertino Concrete Slab 10300 Torre Ave March,18 2025 Job Name McClellan Ranch 1—Remove the existing A/C unit's freon, replace it after the concrete is completed, and recharge the freon. 2- Excavate existing soil approximately 21' x 15' 3- Install metal flashing at existing wood siding, and install base rock and forms for new concrete pad. 4-Install new % rebar every 18-inches. 5-- Install new 4 inches of six sack of concrete with a broom finish. 6- Clean all unnecessary materials, and dump fees are included. Total cost of materials and labor $ 21,600.00 Thank you, Michael Alvernaz SO 13 Nature Shop Concrete Pad Installation - Service Request Created: 05/02/2025 Status: Signed Transaction ID: 6079ff72-bdb2-4d1f-ac81-17fb4c06bb59 "SO 13 Nature Shop Concrete Pad Installation - Service Request" history 0► Sundari Pilaka created the document. 05/02/2025 3:04:26 PM PDT - IP address 73.202.170.100 Q/ Document was emailed to Michael Alvernaz 05/02/2025 3:04:27 PM PDT Michael Alvernaz signed the document. 05/02/2025 3:14:39 PM PDT - IP address 174.87.177.71:55535 Document was emailed to nathanv@cupertino.gov 05/02/2025 3:14:40 PM PDT v9 nathanv@cupertino.gov signed the document. 05/05/2025 6:36:39 AM PDT - IP address 64.165.34.3:33701 Document was emailed to Public Works Management Analyst 05/05/2025 6:36:40 AM PDT (i9 Public Works Management Analyst signed the document. 05/05/202511:17:46 AM PDT - IP address 64.165.34.3:40033 Document was successfully signed and filed 05/05/202511:17:49 AM PDT