23-041 Alvernaz_Service Order #13 dated 5-5-25 Nature Shop Concrete Pad InstallationCITY OF
CUPERTINO
Contract/Purchasing Action
Personnel Information
Name
Nathan Vasquez
Department
Public Works
Division
Facilities
Date
05.02.2025
Service Order
Upload Quote
McClellan Ranch Nature Shop Concrete
Pad Quote Updated 032625.docx
Quote, Description of
Project, Scope of Service,
Schedule of Performance
and Compensation
Service Order Amount
$21,600.00
Master Agreement
2023-010
Contract
05/30/2023
Contract End Date
06/30/2025
Number
Start Date
Firm Name
Alvernaz
Address
Po Box 366, San Martin, CA 95046
Construction
Phone
(408) 595-2817
Consultant/Contractor
Michael
Consultant/Contractor
michaelalvernaz@alvernazconstruction.com
Name
Alvernaz
Email
Project Name
SO 13 Nature
Project Location
McClellan Ranch
Shop
Concrete
Pad
Installation
Cupertino Project
Nathan
Cupertino Project
nathanv@cupertino.org
Manager Name
Vasquez
Manager Email
Master Agreement
$175,000.00
Total Previously
$152,050.00
Maximum
Encumbered to Date
Compensation
Encumbrance this
$21,600.00
Master Agreement
$1,350.00
Service Order
Unencumbered
Balance
SO GL #
100-87-832
NWS Project Code
700-702
Comments
Doing this work under CUPCCAA.
Signature
05/02/2025 PDT
Consu/taf7Y,YC6i)YdTCtorSignature
Date
/V"mow
05/05/2025 PDT
ManageiiSV,MM�or Signature
Date
Appropriation Certification:
I hereby certify that an unexpended appropriation is available in the above
fund for the above contract as estimated and that fund are available as of this date of signature.
iu" Cw 05/05/2025 PDT
ManageftfiMdlyst Signature Date
Quote
Alvernaz Construction
Po Box 366
San Martin, CA 95046
Lic# 711435
408-595-2817
Attn.
Nathan V
City of Cupertino Concrete Slab
10300 Torre Ave
March,18 2025
Job Name
McClellan Ranch
1—Remove the existing A/C unit's freon, replace it after the concrete is completed, and
recharge the freon.
2- Excavate existing soil approximately 21' x 15'
3- Install metal flashing at existing wood siding, and install base rock and forms for new
concrete pad.
4-Install new % rebar every 18-inches.
5-- Install new 4 inches of six sack of concrete with a broom finish.
6- Clean all unnecessary materials, and dump fees are included.
Total cost of materials and labor $ 21,600.00
Thank you,
Michael Alvernaz
SO 13 Nature Shop Concrete Pad Installation -
Service Request
Created: 05/02/2025
Status: Signed
Transaction ID: 6079ff72-bdb2-4d1f-ac81-17fb4c06bb59
"SO 13 Nature Shop Concrete Pad Installation - Service
Request" history
0► Sundari Pilaka created the document.
05/02/2025 3:04:26 PM PDT - IP address 73.202.170.100
Q/ Document was emailed to Michael Alvernaz
05/02/2025 3:04:27 PM PDT
Michael Alvernaz signed the document.
05/02/2025 3:14:39 PM PDT - IP address 174.87.177.71:55535
Document was emailed to nathanv@cupertino.gov
05/02/2025 3:14:40 PM PDT
v9 nathanv@cupertino.gov signed the document.
05/05/2025 6:36:39 AM PDT - IP address 64.165.34.3:33701
Document was emailed to Public Works Management Analyst
05/05/2025 6:36:40 AM PDT
(i9 Public Works Management Analyst signed the document.
05/05/202511:17:46 AM PDT - IP address 64.165.34.3:40033
Document was successfully signed and filed
05/05/202511:17:49 AM PDT