07 - July 24, 2025 - Fourth Quarter Update for Year Two of the FY 23-25 City Work Program CITY COUNCIL INFORMATIONAL MEMORANDUM Date: July 18, 2025 To: Cupertino City Council From: Kirsten Squarcia, Interim Deputy City Manager Re: Fourth Quarterly Update for Year Two of the Fiscal Year (FY) 23-25 City Work Program Purpose This report focuses on City Work Program (CWP) updates from the fourth quarter (April – June) for FY 2024-2025. Background On April 4, 2023, the City Council adopted its first two-year CWP with the expectation of reevaluation on an annual basis. On April 3, 2024, Council reaffirmed a total of 22 projects for the second year of the two-year CWP, which makes up the FY24-25 adopted CWP (Attachment A), which can be viewed on the city webpage at cupertino.org/cityworkprogram. Updates for each of the 22 projects are included in Attachment B. As done with previous quarterly updates, these can be found on the dashboard at cupertino.org/cityworkprogram. As of June 30, 2025, 10 of all 22 FY2024-25 CWP projects have been completed, and 12 projects are in progress and will be continued in the FY 2025-2027 CWP. The breakdown is shown on the table below. Completed In Progress / Cont. to FY25-27 CWP • License Plate Readers • Block Leader & Neighborhood Watch • Whole City Policy Review • Fiscal Procedures and Policies Handbook • Municipal Water System • Homestead Bike Lane Study and Safe Routes to School • Poet Laureate Playbook Update • Tree List – CDD (Consolidated under “Urban Forest Program”) • Tree List – Public Works (Consolidated under “Urban Forest Program”) • Preserve Existing and Develop New BMR/ELI Housing • 5G Ordinance • Residential and Mixed-Use Design Standards • Speed Limit Lowering • Sign Ordinance 2 • Recycled Water Feasibility Study • The Rise: Construction Stakeholder Engagement • Commission Governance Reform Package • Active Transportation Plan • Bicycle Facilities • Art in Public and Private Areas • Electrification Study • Support for the Unhoused Next Steps The projects for FY 2025-27 (Attachment C) will be added to the CWP Dashboard in August. Staff will continue to provide regular quarterly updates on City Work Program items, with the first update scheduled for October 2025. Sustainability Impact There are no sustainability impacts associated with this update. Fiscal Impact To see the budget for each project and the total funds spent on the entire City Work Program, visit the City Work Program Dashboard. California Environmental Quality Act Not applicable. City Work Program Item/Description None Council Goals None Prepared by: Astrid Robles, Senior Management Analyst Reviewed by: Kirsten Squarcia, Interim Deputy City Manager Approved by: Tina Kapoor, Interim City Manager Attachments: A – FY 24-25 Adopted City Work Program B – FY 24-25 City Work Program Q4 Dashboard Printout C – FY 25-27 Adopted City Work Program Adopted April 3, 2024 #Project Description Goal 1 Tree List (CDD) Review and revise development tree list (per Ch. 14.18: Protected Trees) with an emphasis on appropriate trees and native species. Sustainability and Fiscal  Strategy 2 Tree List (PW) Project Phases: 1)Review, revise, and communicate street tree list with an emphasis on appropriate trees and na ve species. 2)Develop an Urban Forest program scope and cost for future considera on. Sustainability and Fiscal  Strategy 3 Public Safety (License Plate Readers) Deploy city‐owned license plate readers and implement policies to allow neighborhood‐owned ones. Quality of Life 4 Public Safety (Block Leader) Strengthen Block Leader/Neighborhood Watch programs to ensure the leaders are active and expand the coverage of active  neighborhoods.  Quality of Life 5 Preserve existing and develop new BMR/ELI Housing Explore opportunities to preserve existing expiring BMR housing. Develop ELI (Extremely Low Income) and BMR housing units for Developmentally Disabled individuals (IDD) on City‐owned property as  well as the County‐owned sites. Housing 6 Whole City Policy Review Repeat the 2013 process of compiling and reviewing all City Policies including 1) Administrative and 2) Council policies and provide  recommendations/updates, e.g. Green Purchasing, Property Acquisition  Public Engagement and  Transparency 7 Fiscal Procedures and Policies Handbook Develop the handbook to ensure standardization of accounting, budget, investment, procurement policies, procedures, rules and  regulations.  Sustainability and Fiscal  Strategy 8 Support for the unhoused Collaborate and fund jointly with West Valley efforts to address regional needs and find workable support for the Unhoused. Housing 9 Municipal Water System To analyze and recommend options for the continued operation of the system currently and at the end of lease with San Jose Water  Company in September 2024. Sustainability and Fiscal  Strategy 10 5G Ordinance Update 5G Ordinance Quality of Life 11 Residential and Mixed Use Residential Design Standards Create objective design standards for residential projects, including ensuring adequate buffers from neighborhood low‐density  residential development Quality of Life 12 Art in Public and Private Areas  (Proposed by Arts & Culture Commission) Revisit Municipal Code standards for art in public and private development, including the standards in the Municipal Code and  developing an Art‐in‐lieu fee policy. Quality of Life 13 Speed Limit Lowering (AB 43) (Proposed by Bike Ped Commission) Lower speed limits where feasible pursuant to state adopted Assembly Bill 43 Transportation 14 Homestead Bike Lane Study & Safe Routes to School (Proposed by Bike Ped Commission) Support collaboration efforts on multi‐jurisdictional projects along Homestead Road that include upgrading pedestrian and bicycle  infrastructure. (The current project phase is focused on preliminary design and is funded to 35%. Future phases, when funded, will  focus on 100% plan design construction) Transportation 15 Poet Laureate Playbook Update (Proposed by Library Commission) Update the Cupertino Poet Laureate Playbook to streamline processes, outline clear expectations, and expand applicant qualifications.  The playbook has not been updated since 2016. Quality of Life 16 Electrification Study (Proposed by Sustainability Commission) Conduct public outreach, policy research, and coordinate with regional efforts to develop policy options for electrification of  Cupertino's buildings in light of recent legal rulings inhibiting certain electrification efforts. Sustainability and Fiscal  Strategy 17 Recycled Water Feasibility Study (Proposed by Library and Sustainability Commissions) Develop Recycled Water Feasibility Study.  Include Blackberry Farm focus and extension of recycled water from SCVWD.Sustainability and Fiscal  Strategy 18 Sign Ordinance Update Sign Ordinance Quality of Life 19 The Rise: Construction stakeholder engagement Improve engagement with stakeholders to ensure progress with construction and reduce barriers. Quality of Life 20 Active Transportation Plan (Proposed by Teen, Bike Ped, and Planning Commission) This item is a consolidation of existing and new transportation efforts aiming to further goals outlined in the City's Vision Zero Initiative,  including: 1) Review and update the bike plan 2) Review and update the pedestrian plan 3) Review current Complete Streets Policy and propose adjustments to create a better interface between all modes of transportation Transportation Adopted FY 24‐25 City Work Program  Ongoing Projects New Projects* *Budget for new items will be considered in May 2024 ATTACHMENT A Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $50,000.00 $50,000.00 $0.00 $50,000.00 7/24/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.2 Procurement Phase Complete 9/1/2024 7/15/2025 Staff worked with Public Works on an RFP that was finalized & advertised on the City's webpage in Nov 2024. This project is being rolled into the FY 25-27 CWP as part of the Urban Forest Plan. 100.00 1.3 Execution Phase Future 7/15/2025 9/30/2025 Staff will work with Public Works and consultant as project continues. Scheduled community outreach and public meetings to take place in 2025. 0.00 1) Review and revise development tree list (per Ch. 14.18: Protected Trees) with an emphasis on appropriate trees and native species. Sustainability and Fiscal Strategy Tree List - Community Development 1 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $60,000.00 $60,000.00 $0.00 $60,000.00 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.2 Planning Phase Complete 4/30/2023 7/30/2023 Staff developed a plan to revise the City's street tree list. 100.00 1.3 Procurement Phase Future 7/30/2023 6/30/2025 This project is being rolled into the FY 25-27 CWP as part of the Urban Forest Plan 0.00 1) Review, revise, and communicate street tree list with an emphasis on appropriate trees and native species.2) Develop an Urban Forest program scope and cost for future consideration. Sustainability and Fiscal Strategy Tree List - Public Works 2 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $60,000.00 $60,000.00 $62,250.00 ($2,250.00)7/24/2025 Parks and Recreation Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2022 4/1/2024 The Santa Clara County Sheriff's Office and the Santa Clara County Board of Supervisors approved the Automated License Plate Readers policy in January 2024 that allows data sharing among law enforcement agencies. 100.00 1.3 Outreach Complete 2/1/2024 9/30/2024 Staff conducted public meetings with the TICC and Public Safety Commissions in March 2023. Staff returned to the Pub Safety Comm on 9/12/24 for a final recommendation. City Council adopted the Policy, authorized the MOU, and deployment model on 10/1/24. 100.00 1.4 Procurement Phase Complete 5/1/2024 12/30/2024 Staff executed an agreement with Flock Safety to purchase and install cameras in collaboration with the County Sheriff's Office. 100.00 1.5 Execution Phase Complete 9/30/2024 6/30/2025 The County approved the MOU in March. Flock Safety has installed 15 cameras throughout the City and the Sheriff's Office is monitoring thm. 100.00 1.6 Closing Processes Complete 6/1/2025 6/30/2025 Project complete.100.00 Deploy city-owned license plate readers and implement policies to allow neighborhood-owned ones. Quality of Life License Plate Readers 3 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $10,000.00 $10,000.00 $300.00 $9,700.00 7/24/2025 Parks and Recreation Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2023 1/31/2024 Staff secured a grant opportunity with CA Volunteers to support expansion of the Block Leader program. Staff researched and submitted a proposal with best practices to encourage engagement with Block Leaders, which is modeled from the City of Saratoga. 100.00 1.3 Planning Phase Complete 7/1/2023 6/1/2024 Staff have developed a framework to engage with community members and encourage recruitment of the Block Leader Program. Staff have scheduled bi-monthly focus groups to engage volunteers and community members. 100.00 1.4 Execution Phase Complete 4/1/2024 6/30/2025 Staff is continuing ongoing promotion of community engagement programs such as Block Leader organized Personal and Family Preparedness classes and $300 Block Party grants. 100.00 1.5 Closing Processes Complete 6/1/2025 6/30/2025 Council has continued the funding for this project so this work will continue operationally. 100.00 Strengthen Block Leader/Neighborhood Watch programs to ensure the leaders are active and expand the coverage of active neighborhoods. Quality of Life Public Safety - Block Leader and Neighborhood Watch 4 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $238,000.00 $238,000.00 $2,704.00 $235,296.00 7/24/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2019 10/30/2019 Researched need for ELI developmentally disabled housing and moderate income housing and determined possible City locations. 100.00 1.3 Planning Phase Complete 7/1/2021 8/16/2022 Scoped affordable housing project with non- profits/developers and worked with Public Works to determine feasibility of project on City sites. Had Council study session March 15. RFP was released in August . 100.00 1.4 Procurement Phase Complete 2/9/2021 4/15/2025 Two responses to the NOFA were received in Feb 2025 for the Mary Ave and Wolf Rd projects. On Mar 27, 2025 the Housing Commission recommended providing funding assistance to both projects. On April 15, Council approved funding for both projects. 100.00 1.5 Design Phase In Progress 12/19/2024 9/30/2025 Staff studied opportunities for preserving expiring BMR housing and presented options in June 2025. Preserving BMRs through acquisition was found to be infeasible with current BMR funds. Mary Ave Villas submitted development application and study session was held in July. 75.00 1.6 Execution Phase In Progress 1/31/2023 9/30/2025 Council selected developer through approval of an ENA for the Mary Avenue Site in February. Developer to continue community outreach efforts and submit application. Final step includes entering into Disposition and Development Agreement by end of 2025. City Council has authorized $4million in funding for the development. 50.00 1.7 Closing Processes Future 9/30/2025 12/31/2025 Will present final DDA to Council at the end of 2025. Construction will commence. 0.00 Explore opportunities to preserve existing expiring BMR housing. Develop ELI (Extremely Low Income) and BMR housing units for Developmentally Disabled individuals (IDD) on City-owned property as well as the County-owned sites. Housing Preserve existing and develop new BMR/ELI Housing 5 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $10,000.00 $10,000.00 $10,000.00 $0.00 7/24/2025 Administrative Services Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 11/1/2023 9/11/2024 Staff gathered and submitted policies to the City's internal auditor, Moss Adams, for review. The auditor issued a report with recommendations. 100.00 1.3 Execution Phase Complete 10/7/2024 3/30/2025 Administrative policies have been approved by Audit Committee and City Council. In March, Council directed staff for Moss Adams to conduct a gap analysis for Council policies as part of the FY 26 Internal Audit Work Plan. 100.00 1.4 Closing Processes Complete 11/30/2024 6/30/2025 Whole City Policy document was finalized, compiled, and made available to Council in April 2025. 100.00 Repeat the 2013 process of compiling and reviewing all City Policies including 1) Administrative and 2) Council policies and provide recommendations/ updates, e.g. Green Purchasing, Property Acquisition Public Engagement and Transparency Whole City Policy Review 6 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $45,000.00 $45,000.00 $45,000.00 $0.00 7/24/2025 Administrative Services Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2023 8/30/2023 Staff reviewed Moss Adams' observations and recommendations identified in the fiscal policy inventory gap analysis report. 100.00 1.3 Execution Phase Complete 9/1/2023 4/30/2024 All high-risk policies identified in the fiscal policy inventory gap analysis report by the City's internal auditor have been revised and adopted. Staff will continue to finalize edits to existing policies identified as medium to low risk. 100.00 1.4 Closing Processes Complete 6/30/2024 6/30/2024 Project is complete.100.00 Develop the handbook to ensure standardization of accounting, budget, investment, procurement policies, procedures, rules and regulations. Sustainability and Fiscal Strategy Fiscal Procedures and Policies Handbook 7 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $50,000.00 $50,000.00 $50,000.00 $0.00 7/24/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.2 Procurement Phase Complete 7/1/2023 9/30/2024 The City partnered with Santa Clara County and West Valley Community Services in order to provide support for the Unhoused with case management, social services, and with their vehicle needs. The agreement was fully expended as of 9/30/2024. 100.00 1.3 Execution Phase Complete 7/18/2023 9/30/2024 Throughout FY23-24 the Haven to Home program gave supportive services and case management to 97 clients and gave transportation services to 36 clients. The Rotating Safe Car Park program served a total of 27 clients at 2 approved Cupertino sites. 100.00 1.4 Research In Progress 10/1/2024 11/30/2025 The City of Cupertino has joined with other West Valley Cities to jointly study opportunities to address issues faced by the unhoused and will execute a group contract with GoodCity to conduct the study. 50.00 1.5 Execution Phase Complete 10/1/2024 4/2/2025 The City Manager was authorized to sign a Memorandum of Understanding to execute the agreement to join the West Valley Cities joint feasibility study during the April 2, 2025 City Council meeting. 100.00 1.6 Closing Processes In Progress 6/30/2025 11/30/2025 The feasibility study continues to be underway and is expected to be completed by Fall 2025. Upon completion, the results will be presented to the City Council for study session. 50.00 Collaborate and fund jointly with West Valley efforts to address regional needs and find workable support for the Unhoused. Housing Support for the Unhoused 8 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $181,500.00 $181,500.00 $168,500.00 $13,000.00 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 11/2/2020 7/1/2021 Researched Legal and other requirements if system is leased, sold or City Operated in the future. 100.00 1.3 Planning Phase Complete 9/21/2021 9/30/2024 Original RFP issued on 12/14/21. RFP process was canceled on 3/3/22 and then re-issued in July 2023. Staff presented a new lease agreement to the City Council in July 2024. 100.00 1.4 Closing Processes Complete 8/6/2024 9/30/2024 City Council approved a new 12-year lease agreement in July. Project is now Complete. 100.00 To analyze and recommend options for the continued operation of the system currently and at the end of lease with San Jose Water Company in September 2024. Sustainability and Fiscal Strategy Municipal Water System FY 23 9 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2022 9/30/2022 Researched 5G ordinance regulations in other cities. 100.00 1.3 Planning Phase In Progress 4/1/2023 8/30/2025 Staff is finalizing a muni code update based on input from City Council. This update will govern the installation of wireless small cell facilities within the Public Right of Way. This will go to Council by September 2025. 90.00 1.4 Closing Processes Future 8/30/2025 8/30/2025 Adopt ordinance 0.00 Update 5G Ordinance Quality of Life 5G Ordinance 10 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $240,000.00 $240,000.00 $80,834.00 $159,166.00 7/24/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.2 Procurement Phase Complete 10/9/2020 4/30/2024 RFP sent out in Oct 2020. Proposals evaluated and RRM Design Group was selected for this project, but was put on hold in October 2023. RRM Design Group contract terminated in late 2023. Council approved a new agreement with Placeworks in April 2024. 100.00 1.3 Outreach In Progress 12/1/2024 7/31/2025 A community meeting was held on 2/10/2025 in hybrid format to discuss why we need objective standards, how they are different from subjective standards and how the community can continue to engage on this subject. Over 20 participants were in attendance. 80.00 1.4 Design Phase Future 7/31/2025 8/30/2025 Prepare and review draft documents internally. 0.00 1.5 Execution Phase Future 9/1/2025 10/31/2025 Project review and approval by Planning Commission and City Council. 0.00 1.6 Closing Processes Future 11/1/2025 11/30/2025 Complete project, publish final documents on website etc. 0.00 Create objective design standards for residential projects, including ensuring adequate buffers from neighborhood low‐density residential development Quality of Life Residential and Mixed Use Residential Design Standards FY 23 11 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 7/24/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.1 Research Complete 1/30/2024 8/30/2024 CIP and CDD staff completed the research phase by examining multiple Bay Area jurisdictions. 100.00 1.2 Outreach Complete 9/1/2024 5/31/2025 Study session held at the 9/23/24 Arts and Culture Commission meeting. Staff will return in early 2025 with modifications to the existing policy and Municipal Code for the Commission's review. Staff will engage with SVCREATES to review Commission recommendation. 100.00 1.3 Execution Phase In Progress 5/19/2025 7/28/2025 Arts and Culture Commission finalizing recommendations in Spring 2025. Afterwards, this will be brought to the City Council for a First and Second Reading. Last revision to be approved by ACC on July 28, 2025. 75.00 1.4 Closing Processes Future 9/30/2025 9/30/2025 Muni Code will be updated based on Council direction. 0.00 Revisit Municipal Code standards for art in public and private development, including the standards in the Municipal Code and developing an Art‐in‐lieu fee policy. Quality of Life Art in Public and Private Areas 12 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Planning Phase Complete 7/1/2024 7/1/2024 Staff completed studies on designated corridors with potentially high concentration of bikes and peds due to recent bike or ped related improvements (Blaney, Bubb, Mary, Prospect, McClellan). 100.00 1.2 Execution Phase Complete 7/1/2024 12/31/2024 Staff made adjustment of posted speed limits in the field for initial streets listed above. 100.00 1.3 Closing Processes In Progress 1/1/2025 11/30/2025 Municipal Code Amendments to be adopted upon completion of more comprehensive City-wide study. 30.00 Lower speed limits where feasible pursuant to state adopted Assembly Bill 43. Transportation Speed Limit Lowering (AB 43) 13 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Complete d 1.1 Outreach Complete 7/1/2024 7/1/2024 Staff has been coordinating with VTA, Sunnyvale, Los Altos, Santa Clara County, Schools and other stakeholder groups since 12/2023. Project currently funded for 35% design drawings. 100.00 1.2 Planning Phase Complete 7/1/2024 9/11/2024 Completion of current project includes 35% design drawings. Final comment submittal of 35% design completed. 100.00 1.3 Closing Processes Complete 9/11/2024 1/31/2025 35% drawings completed. VTA is searching for funding to advance design to the next phase. Completion of construction is anticipated 2028. This Work Plan Item is complete. 100.00 Support collaboration efforts on multi‐jurisdictional projects along Homestead Road that include upgrading pedestrian and bicycle infrastructure. (The current project phase is focused on preliminary design and is funded to 35%. Future phases, when funded, will focus on 100% plan design construction). Transportation Homestead Bike Lane Study & Safe Routes to School 14 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 7/24/2025 Parks and Recreation Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2024 8/1/2024 City Staff researched similar Poet Laureate programs from other Bay Area agencies. 100.00 1.3 Execution Phase Complete 8/7/2024 12/4/2024 City Staff presented the updated Poet Laureate Playbook to the Library Commission and current Poet Laureate for approval. 100.00 1.4 Closing Processes Complete 2/5/2025 6/30/2025 The Library Commission appointed a Poet Laureate Sub-Committee to facilitate the recruitment and selection process for next Poet Laureate using the updated Poet Laureate Playbook. 100.00 Update the Cupertino Poet Laureate Playbook to streamline processes, outline clear expectations, and expand applicant qualifications. The playbook has not been updated since 2016. Quality of Life Poet Laureate Playbook Update 15 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $50,000.00 $50,000.00 $33,369.45 $16,630.55 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 1/31/2024 6/1/2025 Staff has completed research and coordination with neighboring jurisdictions about policy options for new buildings. Policy options for existing buildings are currently being assessed in partnership with regional jurisdictions and contractors. 100.00 1.3 Outreach In Progress 8/1/2024 7/31/2025 Workshops and stakeholder calls with local businesses on existing building policies have been completed. Residential outreach campaign and survey in progress with the support of a contractor. 95.00 1.4 Execution Phase Complete 5/1/2024 4/30/2025 Due to recent legal rulings, a Reach Code replacement for new building electrification was approved by Council in September 2024. The code became effective in April 2025, following CEC an CBSC approval. 100.00 1.5 Planning Phase In Progress 3/1/2025 8/31/2025 Draft policy options for existing buildings electrification will be developed based on feedback from community and regional approach. 75.00 Conduct public outreach, policy research, and coordinate with regional efforts to develop policy options for electrification of Cupertino's buildings in light of recent legal rulings inhibiting certain electrification efforts. Sustainability and Fiscal Strategy Electrification Study 16 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $200,000.00 $200,000.00 $0.00 $200,000.00 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Planning Phase Complete 10/15/2024 2/7/2025 Staff have finalized internal study 100.00 1.2 Execution Phase Complete 2/7/2025 2/28/2025 Staff released the study in February as an informational memo. 100.00 Develop Recycled Water Feasibility Study. Include Blackberry Farm focus and extension of recycled water from SCVWD. Sustainability and Fiscal Strategy Recycled Water Feasibility Study 17 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $25,000.00 $25,000.00 $0.00 $25,000.00 7/24/2025 Community Development Updates #  Task Status Task Start Task End Update % Completed 1.1 Research Future 1/1/2026 2/28/2026 Staff will do research to determine what needs to be changed. 0.00 1.2 Procurement Phase Future 3/1/2026 4/15/2026 Staff will prepare an RFP for services and based on responses may need to request budget amendment from Council to complete scope of work. 0.00 1.3 Design Phase Future 5/15/2026 6/15/2026 Staff will refine contract and scope of work with selected consultant. 0.00 1.4 Outreach Future 7/1/2026 7/31/2026 Outreach to the public, including the business community. 0.00 1.5 Design Phase Future 8/1/2026 8/31/2026 Staff will work with consultant to determine what changes may be proposed. 0.00 1.6 Execution Phase Future 9/1/2026 11/30/2026 Staff will work with consultant to draft Ordinances and bring for Council consideration at a public hearing. 0.00 1.7 Closing Processes Future 12/1/2026 1/31/2027 Ordinance may be updated upon Council direction. 0.00 Update Sign Ordinance. Quality of Life Sign Ordinance 18 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $100,000.00 $100,000.00 $0.00 $100,000.00 7/24/2025 City Manager's Office Updates #  Task Status Task Start Task End Update % Completed 1.1 Procurement Phase Complete 5/1/2024 5/14/2024 The City executed an agreement for Real Estate Project Management Support to support staff's efforts related to The Rise construction project. 100.00 1.2 Execution Phase Complete 5/15/2024 6/30/2025 The Rise, in coordination with the City Manager’s Office, is continuing to keep the community informed as it moves forward with the next construction phases. Updates since April have included the import of over 200,000 cubic yards of clean soil, enabling final grading work to prepare the site for roads, infrastructure, and vertical buildings, daily street sweeping, dust and noise control, and strict adherence to environmental and safety standards to minimize disruption to the surrounding Cupertino community. 100.00 1.3 Closing Processes Complete 6/30/2025 7/24/2025 The City will continue engagement with this project on an operational basis. 100.00 Improve engagement with stakeholders to ensure progress with construction and reduce barriers. Quality of Life The Rise Construction Stakeholder Engagement 19 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $330,000.00 $330,000.00 $282.50 $329,717.50 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.1 Procurement Phase Complete 7/1/2024 12/31/2024 Agreement executed December 2024.100.00 1.2 Execution Phase In Progress 1/1/2025 5/31/2026 Phase 1 is complete. Project recommendations are being developed and Phase 2 outreach to begin summer 2025. 50.00 1.3 Closing Processes Future 6/1/2026 6/30/2026 City Council adoption of plan expected June 2026. 0.00 This item is a consolidation of existing and new transportation efforts aiming to further goals outlined in the City's Vision Zero Initiative, including:1) Review and update the bike plan2) Review and update the pedestrian plan3) Review current Complete Streets Policy and propose adjustments to create a better interface between all modes of transportation Transportation Active Transportation Plan 20 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $0.00 $0.00 $0.00 $0.00 7/24/2025 City Manager's Office Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 7/1/2023 3/30/2024 Staff researched commission info from other cities. 100.00 1.3 Outreach Complete 3/5/2024 9/30/2024 Staff surveyed commissioners on new criteria questions for new applicants. 100.00 1.4 Execution Phase Complete 2/1/2024 5/30/2024 Staff presented this item to the City Council at the 3/5 City Council meeting. At this meeting, Council adopted amendments to the Muni Code, Commission resolution, and Commissioners Handbook. 100.00 1.5 Closing Processes Complete 10/1/2024 1/27/2025 New applications were available for new commissioners with new criteria questions. This project was completed with a staff report published for the commission recruitment on January 27, 2025. 100.00 1. Revised Commissioner’s Handbook to align it with Council Procedures Manual 2. Investigate & report back on incidents of violations of the Muni Code re: the Commission-Staff relationship 3. Realignment of Commissioner terms of office 4. Establishment/revision of commissioner qualifications Public Engagement and Transparency Commission Governance Reform Package 21 Details Estimated Budget Allocated Budget Budget Expended / Encumbered Budget Remaining Last Updated Lead Department $50,000.00 $50,000.00 $0.00 $50,000.00 7/24/2025 Public Works Updates #  Task Status Task Start Task End Update % Completed 1.2 Research Complete 10/5/2022 2/15/2023 Staff completed research on bike rack and installation requirements 100.00 1.3 Outreach Complete 10/19/2022 4/16/2025 Staff gathered feedback and recommendations from commissions 100.00 1.4 Planning Phase Complete 9/4/2023 4/30/2025 BPC Subcommittee and Rotary finalized locations for bike racks at parks. 100.00 1.5 Execution Phase In Progress 5/1/2025 9/30/2025 Decorative bike racks purchased by Rotary, to be installed summer 2025. U-shape racks to be purchased and installed following installation of decorative racks. 35.00 1.6 Closing Processes Future 9/30/2025 12/31/2025 Project will be complete once bike racks are installed. 0.00 Increase the inventory of bicycle facilities and amenities, such as bike racks, citywide. Transportation Bicycle Facilities FY 23 22 #Project Title Project Description Council Goal Est budget (Not including staff costs)Project Size Lead Department(s)Estimated Timeline 1 Economic Development for Retail and Small Businesses 1.1 Streamline permitting process for small businesses 1.2 Retention and recruitment of retail and small businesses: Explore options to support small businesses/startups, fill empty storefronts, and encourage entry of new forms of retail to promote revitalization • Explore more themed events like restaurant week, and other festivals to bring vitality to Cupertino businesses • Improve placemaking in the city and the city's revenue stream 1.3 Create a small business council, provide regulatory support. 1.4 Restore the EDC 1.5 Explore a Grants Analyst Position Quality of Life, Fiscal Strategy 0.5 FTE will be requested during proposed budget 1.1: $100,000 1.2: $100,000 1.3: $0 1.4: $0 1.5: $0 100-71-705 750-260 Large Community Development Year 1 start 2 Permit Streamlining and Simplification for Small Home Upgrades Develop a suite of improvements to (1) improve access to, and (2) speed the processing of permits for small home upgrades so as to enhance compliance and improve overall efficiency. Improve turnaround times. Set SLA' s for staff and outsourced reviewers, customer service KPI' s, templates to reduce back and forth, internal staff expertise to reduce consulting expenses. Quality of Life $250,000 100-71-701 750-261 Medium Community Development Year 1 start Year 2 end 3 Financial, Investment, and Cashflow Policy Review Review and assess the City’s investment policy and best practices with an analysis of quarterly treasurers report. Establish a cashflow management policy with the goal to reduce the total percentage in cash from 20% to 2% and to reduce the total percentage in cash and cash-equivalent to at most 10%, on par with other cities. Fiscal Strategy $25,000 100-40-400 700-702 Small Administrative Services Year 1 4 Defensible Impact Fee Nexus Study for Traffic Impact Fee, Retail Impact Fee, BMR Impact Fee, and Parkland Impact Fee Conduct nexus studies to review a range of impact fees, such as Traffic Impact Fee, Retail Impact Fee, BMR Impact Fee, and Parkland Impact Fee, and other means of offsetting conversion of commercial land uses to residential to ensure the impact fees are defensible against legal challenges. Fiscal Strategy $1 Million 100-71-705 750-263 265-72-711 750-263 100-80-800 750-263 100-88-844 750-263 Large City Attorney's Office Year 2 Start 5 Water Conservation Policies Reduce irrigation while increasing pollinator supporting vegetation (turf conversion). Optimize irrigation systems including CUSD use agreement sites. Environmental Sustainability $250,000 100-84-813 750-264 Medium Public Works Year 1 start Year 2 end Final FY 2025-2027 City Work Program ATTACHMENT C 1 6 Enhance Senior Services 6.1 Due to the high cost of senior centers, many seniors have to "age in place", but do still need services typically provided in senior centers, in addition to common home maintenance. 6.2 Utilizing the survey results conducted in 2022 and 2023 to meet the needs of Cupertino seniors 6.3 Consider consultant services similar to Palo Alto or Saratoga Senior Center to enhance services, while reducing cost to the city. NOTE: Cupertino Age-Friendly could make a presentation on the result of 2023 survey, in collaboration with the city staff. NOTE: Successful Aging Solutions & Community Consulting (SASCC), who runs the Saratoga Senior Center could provide a free gap analysis and feasibility analysis Quality of Life $65,000 100-60-601 750-265 Large Parks & Recreation Year 1 start Year 2 end 7 City Properties: Planning for Optimal Use Future planning strategies for Stocklmeir house/garages, Blech House, Blue Pheasant. Goal of judicial use of city-owned properties. Investigate potential purchase of CUSD Finch/Phil property. Include the McClellan Barn and the house at the entrance of Blackberry Farm. Quality of Life $200,000 100-80-800 750-266 Medium Public Works Year 1 start Year 2 end 8 5G Ordinance Prepare an ordinance that regulates small cellular facilities in the public right of way. Quality of Life $0 Small Public Works Year 1 9 Emergency Operations Readiness Review fire, earthquake tornado, active shooter, Tsunami, hazardous transport accident policies; and ensure EOC is active and functioning with a permanent position not consultant running the program. Quality of Life $40,000 100-60-601 750-267 Medium Parks & Recreation Year 1 start Beyond for completion. 10 Urban Forest Program Create an Urban Forest Master Plan that includes an updated and expanded tree list which will increase the number of trees, enhance the City's tree canopy, and promote landscaping throughout the City. Environmental Sustainability $250,000 ($110,000 is already allocated for the tree list item under the current CWP.) 100-86-825 750-235 Medium Public Works Year 1 start Year 2 end 11 Add notifications for SB 330 and other projects during the application and approval process 11.1 Consider a community meeting requirement for any major project application, especially those requiring a general plan amendment, as some other cities have adopted. 11.2 Consider increasing notification radius from 300 feet to 500 feet (or even1000 feet for major projects) for any project application, especially those requiring a general plan amendment. 11.3 Improve notification methods for SB 330 preliminary applications, streamlined projects, not requiring planning/council approval and other projects Public Engagement and Transparency, Housing $10,000 100-71-701 750-268 Small Community Development/CMO Year 1 start ATTACHMENT C 2 12 Unhoused Policies Determine best practices for limited budget smaller cities to manage the unhoused. Review RV practices in surrounding cities for impacts and potential adoption. Review transitional housing outcomes in surrounding cities. Policies to include nimble contingency plans. Quality of Life $100,000 100-72-720 750-269 Large Community Development Year 1 start Year 2 end 13 City Hall Retrofit and City Hall Annex Renovation including the EOC Implement the previously approved 2022 Council plan with EOC migration Quality of Life $0 Small Public Works Year 1 $2,280,000 #Project Title Project Description Council Goal Est budget (Not including staff costs)Project Size Lead Department(s)Estimated Timeline 14 Preserve existing and develop new BMR/ELI Housing Ongoing CWP Item Housing $250,000 (Previously Allocated) 100-71-702 750-235 N/A CDD Year 1 start Year 2 end 15 Residential and Mixed Use Residential Design Standards Ongoing CWP Item Housing, Quality of Life $240,000 (Previously Allocated) 100-71-702 750-090 N/A CDD Year 1 16 Speed Limit Lowering (AB 43) Ongoing CWP Item Transportation $0 N/A Public Works Year 1 17 Sign Ordinance Ongoing CWP Item Quality of Life $200,000 (Previously Allocated) 100-71-702 750-102 N/A CDD Year 1 Start, Year 2 end 18 Active Transportation Plan Ongoing CWP Item Transportation $330,000 (Previously Allocated) 100-88-844 750-243 N/A Public Works Year 1 Ongoing CWP Items Explore opportunities to preserve existing expiring BMR housing. Develop ELI (Extremely Low Income) and BMR housing units for Developmentally Disabled individuals (IDD) on City-owned property as well as the County-owned sites. Create objective design standards for residential projects, including ensuring adequate buffers from neighborhood low-density residential development Lower speed limits where feasible pursuant to state adopted Assembly Bill 43 Update Sign Ordinance This item is a consolidation of existing and new transportation efforts aiming to further goals outlined in the City's Vision Zero Initiative, including: 18.1 Review and update the bike plan 18.2 Review and update the pedestrian plan 18.3 Review current Complete Streets Policy and propose adjustments to create a better interface between all modes of transportation Total Funding for New Projects ATTACHMENT C 3 19 Bicycle Facilities Ongoing CWP Item Transportation $50,000 (Previously Allocated) 100-88-844 750-219 N/A Public Works Year 1 1,070,000 3,350,000 Increase the inventory of bicycle facilities and amenities, such as bike racks, citywide. Total Funding for Ongoing Projects Total Combined ATTACHMENT C 4