.01 Z-2009-01 James Fowler (Apple Inc)
COMMUNITY DEVELOPMENT DEPARTMENT
CITY HALL
10300 TORRE AVENUE. CUPERTINO, CA 95014-3255
(408) 777-3308. FAX (408) 777-3333
CUPERTINO
SUMMARY
Agenda Item No. _
Application: Z-2009-01
Applicant(s): James Fowler on behalf of Apple, Inc.
Property Location: 19310 & 19320 Pruneridge Avenue
Agenda Date: April 28, 2009
Application Summary:
REZONING of 7.78 acres from Planned Residential, P{Res), to Planned Industrial and
Residential, P{MP, Res).
RECOMMENDATION
Staff recommends that the Planning Commission recommend that the City Council:
1. Approve the Mitigated Negative Declaration; and
2. Approve the Rezoning, Z-2009-01, in accordance with the model resolution.
Project Data:
General Plan Designation:
Specific Plan Area:
Existing Zoning Designation:
Proposed Zoning Designation:
Acreage (Gross) for rezoning:
Existing Land Use:
Total Existing Building SF:
Project Consistency with:
General Plan:
North Vallco Master Plan
Environmental Assessment:
Industrial/Residential
North Valleo Park Special Center
P{Res)
P{MP, Res)
7.78 acres
Office /Industrial
126,528 (two buildings)
Yes
Yes
Mitigated Negative Declaration
BACKGROUND:
The project site consists of two properties that are currently developed with two office
buildings, including a three-story office building facing Prune ridge Avenue and a two-
story office building to the south. Both buildings are vacant at this time. The site is
located on the south side of Prune ridge Avenue, east of Wolfe Road, surrounded by the
HP campus to the north across Prune ridge Avenue, the 4-story Hamptons Apartments
compl~x to the west, office and industrial buildings to the east, and Interstate 280 to the
south (See Figure 1).
1-1
Z-2009-01
19310 & 19320 Pruneridge
Apple Rezoning
April 28, 2009
Page 2
Figure 1
On November 15, 2005, the City CouncIl approvea a rezoning
of the project site from Planned Industrial, P(MP), to Planned
Residential, P(Res), and Public Park/Recreation, PR, U1
conjunction with the approval of a development application by
Morley Bros. for a 130-unit townhome/condominium
development. The rezoning allowed for a 7.78 acre portion of
the project site to be zoned P(Res) for the residential, and the
remaining approximately one acre area to be zoned PR for
dedication and construction of a public park (see Figure 2).
Due to the acquis~tion of the project site by Apple, Inc. U1 2006, .
the residential project was never subdivided or developed.
DISCUSSION:
Rezoning Application
. . The applicant, James Fowler on behalf of Apple, Inc., is
requestu1g approval to rezone the project site from Planned
Residential P(Res) to Planned Industrial and'Residential P(MP,
Res). Essentially, this would add the PI~ed Industrial P(MP)
zone back onto the 7.78 acre project site, while retau1ing the
existing planned residential zoning (see Figure 3). The
approximately one acre portion of the properties on the
northeast corner of the site that was zoned for public park is
not a part of this application and will retain its PR zone. Apple
has not indicated any development plans for this site at this
time.
1-2
......~
Figure 2
-------
Figure 3
Z-2009-01
19310 & 19320 Pruneridge
Apple Rezoning
April 28, 2009
Page 3
Apple indicates that the rezoning would allow either industrial office or residential uses
as prescribed by the General Plan (See Exhibit B). Additionally, it would allow the
current office development on site to be consistent with the General Plan and zoning.
Conformance with the General Plan and North Vallco Master Plan
The proposed rezoning is consistent with the General Plan land use designation
(Industrial/Residential) and with the North Valleo Master Plan. In accordance with the
General Plan for the North Valleo Special Center area, the residential uses may develop
up to 25 units per gross acre.
Environmental Review Committee
On April 16, 2009, the Environmental Review Committee (ERC) reviewed the project
and recommended that the City Council grant the Mitigated Negative Declaration (See
Exhibit C). The Mitigated Negative Declaration includes mitigation measures related to
air quality, storm water flows, conservation measures, noise, recycling and energy that
will be required of any future development projects on this site.
Housing Element/ Office Allocation
At the April 14, 2009 Planning Commission meeting, the Commission discussed
proposed General Plan amendments to update the City's Housing Element and to
increase office allocations in the City. The Commission also discussed the potential of
increasing the allowable residential intensity in the North Valleo area from 25 units per
gross acre to 35 units per gross acre. At the conclusion of the meeting, the Commission
voted to recommend that the City Council amend the General Plan to increase office
allocations only for use by major corporate campuses. However, further discussion on
the Housing Element and the discussion on residential intensity in the North Valleo
area was continued to the meeting of April 28, 2009.
ENCLOSURES
Model Resolution
Exhibit A: Zoning Plat Map
Exhibit B: Rezoning Request by Apple
Exhibit C: Mitigated Negative Declaration
Prepared by: Aki Honda Snelling, Senior Planner ALIL-
Approved by: Aarti Shrivastava, Community Development Director ~
G:\P lanning\P DREPO RTYJCZreports'Z_2009 _01. doc
1-3
Z- 2009-01
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
MODEL RESOLUTION
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
RECOMMENDING THE RE-ZONING OF 7.78 ACRES FROM P(Res), PLANNED
RESIDENTIAL, TO P(MP, Res), PLANNED INDUSTRIAL AND RESIDENTIAL
SECTION I: PROTECT DESCRIPTION
Application No.:
Applicant:
Location:
Z-2009-01
Apple, Inc. (James Fowler)
19310 & 19320 Pruneridge Avenue
SECTION II: FINDINGS FOR REZONING
WHEREAS, the Planning Commission of the City of Cupertino received an application
for the rezoning of property, as described in this Resolution; and
WHEREAS, the necessary public notices have been given in accordance with the
Procedural Ordinance of the City of Cupertino, and the Planning Commission has held
one or more public hearings on this matter; and
WHEREAS, the Planning Commission finds that the subject rezonmg meets the
following requirements:
1) That the rezoning is in conformance with the General Plan of the City of Cupertino.
2) That the property involved is adequate in size and shape to conform to the new
zoning designation.
3) That the new zoning encourages the most appropriate use of land.
4) That the proposed-rezoning is otherwise not detrimental to the health, safety, peace,
morals and general welfare of persons residing or working in the neighborhood of
subject parcels.
5) That the rezoning promotes the orderly development of the city.
1-4
Model Resolution
Page 2
Z-2009-01
April2B/2009
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence
submitted in this matter, application no. Z-2009-01 is hereby recommended for
approval; and
That the subconclusions upon which the findings and conditions specified in this
Resolution are based and contained in the Public Hearing record concerning
Application Z-2009-01, as set forth in the Minutes of the Planning Commission Meeting
of April 28, 2009, and are incorporated by reference herein.
SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY
DEVELOPMENT DEPT.
1. APPROVED EXHIBITS
The recommendation of approval is based on Exhibit A: Zoning Plot Map and
Legal Description, except as may be amended by the Conditions contained in this
Resolution.
PASSED AND ADOPTED this 28th day of April 2009, at a Regular Meeting of the
Planning Commission of the City of Cupertino, State of California, by the following roll
call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
COMMISSIONERS:
ATTEST:
APPROVED:
Aarti Shrivastava
Director of Community Development
Lisa Giefer, Chair
Cupertino Planning Commission
G: \Planning\PDREPORT\RES\2008\Z-2009-0l res.doc
1-5
:::E
Q.
~
I"l
,;;
m
o
~
N
~
-
\ --------
\ ~- --^v-
~~
\~
\~
\l;
\
......
I
en
~
~
'I
10 30 :JO
,,--
--
o 20 40 100
GRAPHIC SCALE
,- = 150'
----
D=6'59 '54 "
R=600.00
L=76.29
~
----' ~
- ~ ~~E~~ ~
----r-;:.--~"9~'20..E:l" A~NlIE t?
1 ~ JOS50--~J~.Jl9TAL ~
]51.82 --I
~I I
~I I
'l~: I
1;::)/ 01
~ ~I
~: gl
~ EX ZONE PR I
~I
~I
1
"~1
,~
I";) 1
;O,JI
~I
7 549'06'20"E 49.00
1 N40'53'40"E 27. 17
N49'06'20''W 36.00~ -:&.
1 ~
N40'53'40"E 65.00-----L <& -1S
----
Q. N49'O --
-...J . 6'20=w1
~ ~ 757.25 1
~~ 1
8~ I try
"Q: 'co
~~ 'C\j
~~ I;;
n..-...J 14J
.....~ ,::
~~ I~
~~ ~
~~ 1!'J
~f# I ~ P.M. 329-M-49
~ ~
, PCL. 3, 4, 5 & 6
,
~ ,r-r-l
8/ L549'06'20"E 46.01
~~I
, ,
0,
51
01
~,
2: L "-''':>0'
~, O<9~ D=32'35 '44 "
',Os~. R=300.01
CJA. " Jf/ L= 170.68
-,.~ ',<'52'~
, ,~<9<
0~~
1b ......
~
:B
l{)1:::>
"'Il-<:::)
"
~"'Il-
H~
~~
I.r) ~'"
. C)
~s::>
<: ~.
<:
u
~
V)
f5
S~
Q..!:4:
~I:i:
,.. <:::)
D=43.14 '25" 'oJ
R=41.00 L=30.94 I ~
N59'S9'32"W 192.00': <:
--------K
: ~ T.P.D.B.
18 PR
:~
I~
IQ::
I
I::J
I~
10
F::'
I()')
i~
()')IO
001"-
~,~
1'1(0
IN
0)
~
I
~t'--.
I
0)'
-..J
~~
~
Q
P.M. 329-M-49
PCL. 2
e
..,J
o
~
{5
~
u
~ ~~
0, ~ !:4:
~ g~
~
~
~
l~ ~
& ~
f( ~
~ I)::
...- ~ ~
JUN/PCRO ~~P.O.B.
FREEWAY (1-280)
REZONE 1. 78 ACRES
FROM: P(RES)
TO: P(MP,RES)
N52'40'11 "W
98.37
200
.'
j!:1-
-:5
~Q.
m
~~
Q.d
0:
"Q.
~~
o~
~~
EXHIBIT A
ZONING PLA T MAP
PRUNER/DGE A VE. AT
R/DGEV/EW CT.
CUPERTINO, CA
DATE: 1-22-09
SCALE: 1" = 150'
DRAWN BY: ,M'jE)
CHECKED BY: ,~5:5
JOB NO.: 1699 PL 1
~ (l(}- 2'~ ~.
A CALIFORNIA CORPORATION
CONSUL TlNG CIVIL ENGINEERS
255 W. . JULIAN ST. #200, SAN JOSE, CA.
PH. (408) 295-9162
~
-.
cr
-.
...
~
ZONING PLAT DESCRIPTION
PRUNERIDEGE AVENUE AT RIDGEVIEW COURT
CUPERTINO, CALIFORNIA
Areato be rezoned from peRes) to PCMP, Res)
Beginning at the most southerly corner of Parcel 6 as shown on that certain
Parcel Map recorded in book 329 of Maps at Page 49, Santa Clara County
'Records, said point being on the northeasterly right-of-way line of the Junipero
Serra Freeway (1280); thence along said northeasterly right-of-way line North
52040'11" West 98.37 feet to the beginning of a non-tangent curve; thence on a
curve to the right, the radial point of which bears North 37031'27" West through
a central angel of 32035'44" having a radius of 300.01 feet, an'arc distance of
170.68 feet; thence North 20008'05" West 247.82 feet; thence North 40053'40" East
203.00 feet; thence South 49006'20" East 46.01 feet; thence North 40053'40" East
,312.83 feet; thence North 49006'20" West 151.25 feet; thence North 40053'40" East
65.00 feet; thence North 4,0006'20" West 36.00 feet; thence North 40053'40" East
261.00feet to a point on the centerline of Pruneridge Avenue, 92 feet wide;
thence along said centerline of Pruneridge Avenue South 49006'20" East 303.50
feet; thence South 40053'40" West 235.83 feet; thence North 40006'20" West 49.00
feet; thence South 40053'40" West 27.17 feet to the beginning of a tangent curve;
thence on a curve to the right through a central angel of 43014'25" having a
radius of 41.00 feet, an arc distance of 30.94 feet; thence South 59059'32" East
45.55 feet; thence South 30000'28" West 47.00 feet; thence south 59059'32" East
192,00 feet; thence South 39051'28" West 713.89 feet to the point of beginning.
Containing an area of 7.78:1: acres, more or less.
1-7
Exhibit B
Apple is requesting a conforming rezoning of the site from PeRes) to
P(MP, Res). The property was rezoned from P(MP) to PeRes) in
connection with t~e approval of a housing project that has since b~en
abandoned. This conforming rezoning is consistent with the current .
Industrial/Residential General Plan Land Use Designation, will permit
either the industrial or re~ideptial uses envisioned by t~e General'~lan
Land Use Designation and ensures that the current industrial use of the
site is not inappropriately classified ~s a lega.l non-l;onforming use. A
zoning plat map is attached as Exhibit A and a legal description is
attached as Exhibit B. Appl~ Inc. is. not at this. time requesting' a
rezoning of the property shown on Exhibit A .as PRo
1-8
Exhibit C
II
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
(408) 777-3251
FAX (408) 777-3333
Community Development Department
CUPERTINO
$ta-ff Us~ Only
EA File No.EA-2000-01
Case File No.Z-2009-01
PROJECT DESCRIPTION:
Project Title: Rezonina of 7.78 acres from Planned Residential (P(Res)) to Planned
Industrial and Residential (P(MP. Res)).
Project Location: 19310-19320 Pruneridae Avenue. on the south side of Pruneridae
Avenue. east of Wolfe Road.
Project Despription: Rezonina to add Planned Industrial P(MP) to the existina Planned
Residential peRes) zonina desianation on the properties. The remainina portions of the
subiect properties that are zoned PRo Public Park/Recreation. will retain this zonina
desionation and are not affected bv the rezonina application. No development proiect is
proposed at this time.
Environmental Setting:
Existina industrial park containina two office buildina bounded bv Pruneridae Avenue.
the HP Campus to the north. Interstate 280 to the south. a 342-unit apartment complex
(Hamptons) to the west and office/industrial buildinas to the east.
PROJECT PESCRIPTION:
Site Area (ac.) - 7.78 Building Coverage - N/A Exist. Building -126.528 s.f. Proposed
Bldg. - N/A s.f. Zone - peRes) G.P. Designation - Industrial/Residential
Assessor's Parcel No. - 316-06-050 and 316-06-051
If Residential, Units/Gross Acre . N/A
Applicable Special Area Plans: (Check)
X North Vallco Park Special Center
o Monta Vista Design Guidelines
o
S. De Anza Conceptual
o
N. De Anza Conceptual
D
D
. S. Sara-Sunny Conceptual
o
Stevens Crk Blvd. Conceptual
Stevens Creek Blvd. SW & Landscape
If Non-Residential, Building Area - N/A s.f. FAR. N/A Max.
Employees/Shift - N/A Parking Required N/A Parking Provided N/A
Project Site is Within Cupertino Urban Service Area - YES ffi] NO 0
1-9
.~~~~!~:~il~~;t}':~;',":f;'i'\"L.;'.';~~iii;iOJ:':[~J?:Z.Y~:)?l,
A. CUPERTINO GENERAL. PLAN SOURCES
1. Land Use Element
2. Public Safety Element
3. Housing Element
4. Transportation Element
5. Environmental Resources
6. Appendix A- Hillside Development
7. Land Use Map
8. Noise Element Amendment
9. City Ridgeline Policy
10. Constrai!1t Maps
27. County Parks and Recreation Department
28. Cupertino Sanitary District
29. Fremont Union High School District
30. Cupertino Union School District
31. Pacific Gas and Electric
32. Santa Clara County Fire Department
33. County Sheriff
34. CAL TRANS
35. County Transportation Agency
36. Santa Clara Valley Water District
36b Santa Clara Valley Urban Runoff Pollution
Prevention Program
36c San Jose Water Company
B. CUPERTINO SOURCE DOCUMENTS
11. Tree PreselVation ordinance 778
12. City Aerial Photography Maps
13. "Cupertino Chronicle" (California History
Center, 1976)
14. GeologIcal Report (site specific)
15. Parking Ordinance 1277
16. Zoning Map
17. Zoning Code/Specific Plan Documents
18. City Noise Ordinance
18b Qity of Cupertino Urban ,Runoff Pollution
Prevention Plan
E. OUTSIDE AGENCY DOCUMENTS
37. BAAQMD SUlVey of ContamInant Excesses
38. FEMA Flood Maps/SCVWD Flood Maps
39. USDA, "Soils of Santa Clara County"
40. County Hazardous Waste Management Plan
41. County Heritage Resources Inventory
42. Santa Clara Valley Water District Fuel Leak
Site
43. CalEPA Hazardous Waste and Substances
Site
43b National Pollutant Discharge Elimination
System (NPDES) Municipal Stormwater
, Discharge Permit Issued to the City of
Cupertino by the San Francisco Bay
Regional Water Quality Control Board
43c Hydromodification Plan
C. CITY AGENCIES Site
19. Community Development Dept. List
20. Public Works Dept. '
21. Parks & Recreation Department
22. Cupertino Water Utility
D. OUTSIDE AGENCIES
23. County Planning Department
24. Adjacent Cities' Plannil:l9 Departments
25. CountY Departmental of Environmental
Health
D. OUTSIDE AGENCIES (Continued)
26. Midpeninsula Regional Open Space District
F. OTHER SOURCES
44. Project Plan SeVAppHcation Materials
45. Field ReconnaIssance
46. Experience w/project of similar
scope/characteristics
47. ABAG Projection Series
A. Complete all information requested on the Initial Study Cover page. LEAVE BLANK SPACES
ONLY WHEN A SPECIFIC ITEM IS NOT APPLICABLE.
B. Consult the Initial Study Source List; use the materials listed therein to complete, the checklist
information in Categories A through O.
C. You are encouraged to cite other relevant sources; jf such sources are used, job in their title(s)
in the "Source" column next to the question to which they relate.
D. If you check any of the "YES" response to any questions, you must attach a sheet explaining the
potential impact and suggest mitigation jf needed.
E. When explaining 'any yes response, label your answer clearly (Example "N - 3 Historical") Please
t~ to respond concisely, and plac~ as many explanatory responses as possible on each Daoe.
F. Upon completing the checklist, sign and date the Preparer's Affidavit.
G. Please attach the following materials before submItting the Initial Study to the City.
.......Project Plan Set of Legislative Document
.......Location map with site clearly marked
(when applicable)
1-10
BE SURE YOUR INITIAL STUDY SUBMITTAL
IS COMPLETE - INCOMPLETE MATERIALS
MAY CAUSE PROCESSING DELAYS
EVALUATION OF ENVIRONMENTAL IMPACTS:
The project involves the rezoning of a 7.78 acre portion of the subject properties from P(Res),
Planned Residential, to P(MP, Res), Planned Industrial and Residential. Essentially, the
application involves adding the P(MP) zoning designation back onto the properties, and
retaining the existing P(Res)) Planned Residential, zoning designation. These properties were
zoned P(MP) at the time of the 2005 General Plan update, prior to the rezoning of these
properties to P(Res). The remaining portions of the properties that are zoned PR, Public
Park/Recreation, will retain this zoning designation and are not affected by the rezoning
application.
The rezoning to P(MP, Res) is consistent with the 2005 General Plan and its policies, since the
General Plan land use designation for this portion of the properties is IndustrlaVResidential.
Therefore, both industrial and residential uses were studied as part of the EIR for the 2005
General Plan update for this area. The project is also consistent with the General Plan policies
for the North Vallco Park Special Center and the North Vallco Master Plan. Additionally, the
rezoning application does not allow for land uses that would exceed the office and residential
allocations studied in the EIR for the 2005 General Plan update.
No development application is proposed at this time; however, a separate environmental
assessment will be required at the time a development application is submitted to the City for
these properties.
>>""'" 0 c'"
c 1: c .-
_c eaea o1iS c
-ea""'" eaea'" t)
.~ u u .c u.c'- 1.0 .cuu
ISSUES: ....- & 1-tj:...1iSo I- .- ea o ea
c:t::: en .-'- en c. en :t::: c.. zc.
[and Supporting Information Sources] (1) c E en c ;:.- 1.0 en c E .5
ci.~ - (1) en .:t::: 0 (1) .~-
....I .-. a: U
a.rn en .5 ....I en
I. AESTHETICS -- Would the project:
a) Have a substantial adverse effect on a 0 0 0 ffil
scenic vista? [5,9,24,41,44]
b) Substantially damage scenic resources, 0 0 0 ffil
including, but not Iiniited to, trees, rock
outcroppings, and historic buildings within a
state scenic highway? [5,9,11,24,34,41,44]
c) Substantial.ly degrade the existing visual 0 0 0 ffil
character or quality of the site and it~
surroundings? [1,17,19,44]
d) Create a new source of substantial light or 0 0 0 ffil
glare, which would adversely affect day or
nighttime views in the area? [1 J 16,44]
Items a throuQh d - No Impact
There are no scenic vistas or scenic resources on the project site; therefore, the project will
have no adverse effects on scenic vistas or scenic resources. The project involves only a
rezoning application; therefore, the project will not degrade the existing visual character or
quality of the site and its surroundings, or create a new source of light or glare. No
development is proposed at this time. 1-11
Any subsequent development project will require design review to reduce visual impacts on
>>- 0 cE
-c c E c~
-ca- caca oca caca.... '0
.! u u .c u..c'- I.. .cUO
ISSUES: -= ~ 1-=_1iio I- .- ca o ca
c._ rn .-'- D) a. rn :!:: c. zc.
[and Supporting Information Sources] (1)cE rn c :S:.- I.. rn C E oS
c),2'- CI) en .~ 8 CI) .2'-
c.cn ..J .- :is ..Jcn
rn .5
II. AGRICULTURE RESOURCES: In
determining whether impacts to agricultural
resources are significant environmental
effects, lead agencies may refer to the
California Agricultural Land Evaluation and
Site Assessment Model (1997) prepared by
the California Dept. of Conservation as an
optional model to use in assessing impacts
on agriculture and farmland. Would the .
project:
a) Convert Prime Farmland, Unique 0 0 0 [R]
Farmland, or Farmland of Statewide
Importance (Farmland), as shown on the
maps prepared pursuant to the Farmland
Mapping and Monitoring Program of the
California Resources Agency, to non-
agricultural use? [5,7,39]
b) Conflict with existing zoning for 0 0 0 [R]
agricultural use, or a Williamson Act
contract? [5,7,23]
c) Involve other changes in the existing 0 0 0 [R]
environment which, due to their location or
nature, CQuld result in conversion of
Farmland, to non-agricultural use? [5,7,39]
Items a throuah c -- No Impact
The project site is currently developed with two office buildings; therefore, the project will
not impact agricultural land or resources. Additionally, the project involves only a rezoning
application. No development is proposed at this time.
III. AIR QUALITY - Where available, the
significance criteria established by the
applicable air quality management or air
pollution control district may be relied upon
to make the following determinations. Would
the project: .
a) Conflict with or obstruct implementation of 0 0 0 IRI
the applicable air quality plan? [5,37,42,44]
b) Violate any air quality standard or 0 0 0 [R]
contribute substantially to an existing or
projected air quality violation? [5,37,42,44] 1 ~12
c) Result in a cumulatively considerable net
increase of any criteria pollutant for which
the project region Is non-attainment under an
applicable federal or state ambient air quality
standard (including releasing emissions
which exceed quantitative thresholds for
ozone precursors)? [4,37,44]
d) Expose sensitive receptors to substantial
pollutant concentrations? [4,37,44]
e) Create objectionable odors affecting aDD 0 [8]
substantial number of people? [4,37,44]
Items a throuah e - No Impact
The rezoning to P(MP, Res) is consistent with the Industrial/Residential land use
designation of the site per the 2005 General Plan EIR. The 2005 General Plan EIR
indicated that there are no significant sources of toxic air pollutants in the Cupertino area
and that there would be no adverse air quality impacts from surrounding traffic or other
sources.
ISSUES:
[and Supporting Information Sources]
>>+-' 0 c'"
c 1: c .-
-c asas ota c
-as1j as as'" t)
.~ u .c u .c'- Lo .cuu
...- ~ I-q:...tao I- .- as o as
c:t: (1)'-'- enD.. II) :t: 0. zo.
Q) C E m c ;:.- 1.0 II) c E ~
cL~- C'l :t: 0 Q) .~-
..J .- a: U
a..cn CJ) .5 ..Jcn
0 0 0 [8]
o
00
o
o
No development is proposed at this time; therefore, the rezoning application does not
conflict with any applicable air quality plan, violate any air quality standards, result in
cumulative increases in any criteria pollutant, expose sensitive receptors to po.llutant
concentrations or create objectionable odors.
However, a separate environmental assessment will be required at the time a development
application is submitted to the City for these properties to review air quality impacts. The
EIR prepared for the 2005 General Plan includes the "following mitigation measure that will
be required of any development ap.plication for this site: Screen new uses locating near
sensitive receptors to ensure that they are not potential sources of air pollutants.
IV. BIOLOGICAL RESOURCES -- Would
the project:
a) Have a substantial adverse effect, either
directly or th rough habitat modifications, on
any species identified as a candidate,
sensitive, or special status species in local or
regional plans, policies, or regulations, or by
the California Department of Fish and Game
or U.S. Fish and Wildlife Service?
[5,10,27,44]
o
o
o
[8]
1-13
>>.... 0 c1:
-c c1: c~
-ca'" caca oca caca... 1:)
.! U U .c U .c'- a.;, .cUI.)
ISSUES: ....- ~ 1-;j:;....1ao 1-.- tU o tU
c:t:: en'-'- enl:1. en:t:: c. zl:1.
[and Supporting Information Sources] Q) c E en c ;:.- "- :acE .5
o.~- Q) en :!:: 0 tn_
..J .- :E U ..J~
D.CI) CI) .E
b) Have a substantial adverse effect on any 0 0 0 00
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, regulations or by the
California Department of Fish and Game or
US Fish and Wildlife Service? [5,10,27,44]
c) Have a substantial adverse effect on 0 0 0 00
federally protected wetlands as defined by
Section 404 of the Clean Water Act
(incILJding, but not limited to, marsh, vernal
pool, coastal, etc.) through direct removal,
filling, hydrological interruption, or other
means? [20,36,44]
d) Interfere substantially with the movement 0 0 0 00
of any native resident or migratory fish or
wildlife species or with established native'
resident or migratory wildlife corridors, or
impede the use of native wildlife nursery
sites? [5,10,12,21,26]
e) Conflict with any local policies or 0 0 0 00
ordinances protecting biological resources,
such as a tree preservation policy or
ordinance? [11,12,41]
f) Conflict with the provisions of an adopted'
Habitat Conservation Plan, Natural D D D IRJ
Community Conservation Plan, or other -'
approved local, regional, or state habitat
conservation plan? [5,10.26,27] ,
Items a throuah f - No Impact
No development application is proposed at this time; therefore, the project as a rezoning
application will not have any adverse effects on threatened or endangered resources.
Additionally, the project site is currently developed with two office buildings.
However, a separate environmental assessment will be required at the time a development
application is submitted to the City for review of biological resources. For any protected or
heritage trees proposed to be removed in conjunction with a development application, the
application shall comply with the City's Protected Trees Ordinance.
V. CUl rURAL RESOURCES -- Would the
project:
a) Cause a substantial adverse change in D 0 0 00
the significance of a historical resource as 1 14
defined in !315064.5? [5,13,41]
>O+' 0 c+'
c 1: c .-
-c asas om as c
-asn .cB"O t)
.! Co) .c Co) .c'- 100
ISSUES: +,.- a 1-'-+,lQ 0 I- .- as o as
c:t: CI) :t: 'i tn Q. CI) :t: C. zc.
[and Supporting Information Sources] Cl)CE CI) c .- 100 m c E .5
cLE>> - Cl) en :t:: 8 tn_
a. en ...J .- :ae ...Je;;
en .5
b) Cause a substantial adverse change in D D 0 [8]
the significance of an archaeological
resource pursuant to 915064.5? [5,13,41]
c) Directly or indirectly destroy a unique D D 0 [8]
paleontological resource or site or unique
geologic feature? [5,13,41]
d) Disturb any human remains, including 0 0 0 [8]
those interred outside of formal cemeteries?
[1,5]
Items a throuQh d - No Impact
The project site is not within a s~nsitive archa~ological area of the city and has no
historical, archaeological, paleontological or geologic resources. Therefore, the rezoning
application will not have any adverse effects on cultural resources. However, an
environmental assessment will be required at the time a development application is
submitted to review the possibility of sensitive historical, archaeological, paleontological or
g~ologic resources on the subject properties.
VI. GEOLOGY AND SOILS - Would the
project:
a) Expose people or structures to potential
substantial adverse effects, including the risk
of loss, injury, or death involving:.
i) Rupture of a known earthquake fault, as D D 0 00
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on
other substantial evidence of a known fault?
Refer to Division of Mines and Geology
Special Publication 42. [2,14,44]
ii) Strong seismic ground shaking? D D 0 00
[2,5,10,44]
iii) Seismic-related ground failure, including 0 D 0 00
liquefaction? [2,5,10,39,44]
iv) Landslides? [2,5,10,39,44] D 0 0 00
b) Result in substantial soil erosion or the D D 0 00
loss of topsoil? [2,5,10,44]
1-15
>-+< 0 c1:
c 1: c .-
-c ClSCU o'S
-CU'" CUCUO t)
.! u u .c U.c'- L. .cu
ISSUES: ....- ! I- .- +< 1'; 0 1-.- ctI o CU
c- . CI) ~ .- Cl Q. CI) ~ Q. zc.
[and Supporting Information Sources] U)'c E CI) c a:.- L. Cl)cE .5
15 .!:>>- U)Cl '~8 U) .!:>>-
D.rJ) ..J .- :a: ..JrJ)
rJ) .5
c) Be located on a geologic unit or soil that is 0 0 0 [8]
unstable, or that would become unstable as
a result of the project, and potentially result
in on- or off-site landslide, lateral spreading,
sub,sidence, liquefaction or collapse?
[2,5,10,39]
d) Be located on expansive soil, as defined 0 0 0 [8]
in Table 18-1-B of the Uniform Building Code
(1997), creating substantial risks to life or
property? [2,5,10]
e) Have soils incapable of adequately 0 0 0 [8]
supporting the use of septic tanks or
alternative waste water disposal systems
where sewers are not availab[e for the
disposal of waste water? [6,9,36,39]
Items a throuah e - No Impact
No development is proposed at this time; therefore, the rezoning application will not expose
people or structures to rupture of a known earthquake fault, seismic ground shaking, or
landslides. Additionally, according to the Geologic and Seismic Hazard Map of the
Cupertino General Plan, the project site is located in a VF, Valley F[oor, zone. The VF zone
includes all relative[y level valley floor terrain with relatively [ow levels Of georogic haZard
risk.
However, a separate environmental assessment will be required at the time a development
application is submitted to review the geo[ogical and soil stability of the properties for
development. The E[R prepared for the 2005 General Plan includes the following mitigation
measures that will be required of any development application for this site:
1. Both the State and Local codes address the issue of seismic resistance design for new
construction. The General Plan also includes policies that would reduce potential impacts
to acceptable levels.
A Phase I environmental assessment at a minimum will be required of the properties at the
time a development application is submitted. The project shall also be conditioned to
comply with all structural requirements during construction of the development project.
VII. HAZARDS AND HAZARDOUS
MATERIALS - Would the project:
o
o
o
IRI
a) Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous 1 1 6
materials? [32,40,42,43,441
>O*"' 0 c*"'
c t: c .-
-c caca 0'S c
cacaO caca*"' 0
.- (,) ca ~ (,) .c..t:! ... .c(,)(,)
ISSUES: *"' .- g. ~....tlSo I- .- ca o ca
c:t: II) .-.- en c. CI) :t: c. zc.
[and Supporting Information Sources] ,acE :g c ;:.-... Cl)cE .5
o .!2'- en =:0 G) en_
D..cn ...I .- :E (,) ...Ie;;
(J) ..5
b) Create a significant hazard to the public or 0 0 0 00
the environment through reasonably
foreseeable upset and accident 'conditions
involving the release of hazardous materials
into the environment? [32,40,42,43,44]
c) Emit hazardous emissions or handle 0 0 0 00
hazardous or acutely hazardous materials,
substances, or waste within one-quarter mile
of an existing or proposed school?
[2,29,30,40,44]
d) Be located on a site which is included on a 0 0 0 00
list of hazardous materials sites compiled
pursuant to Government Code Section
65962.5 and, as a result, would it create a
significant hazard to the public or the
environment? [2,42,40,43] .
e) For a project located within an airport land 0 0 0 00
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project result
in a safety hazard for people residing or
working in the project area? [ ]
f) For a project within the vicinity of a private 0 0 0 00
airstrip, would the project result in a safety
hazard for people residing or working in the
project area? [ ]
g) Impair implementation of or physically 0 0 0 00
interfere with an adopted emergency
response plan or emergency evacuation
plan? [2,32,33,44]
h) Expose people or structures to a 0 0 0 00
significant risk of loss, injury or death
involving wildland fires, including where
wildlands are adjacent to urbanized areas or
where residences are intermixed with
wildlands?[1,2,44]
1-17
ISSUES:
[and Supporting Information Sources]
:>.-
-C
-CU'"
.~ 0 0
-.- ~
C:!:~
f%)CE
'0 Ol_
a. en
o
C -C C .-
CUcu o'S
.c 0 .c'- I-
.....~...'SO
CI)'-'- Ole.
CI) C :5:.- l-
f%) Ol .1:: 0
-J .- Ii::! 0
en -==-s
C't:
CUCU'"
.cOO
......- ctS
CI) :!: e.
Cl)cE
f%) Ol_
-Jen
...
o
o ctS
Ze.
'.5
Items a throuah h - No Impact
No development application is proposed at this time; therefore, the rezoning application will
not generate hazardous waste, increase the risk of accidental explosion, release hazardous
substances, intertere with emergency services, increase exposure of people to hazardous
waste or increase fire hazard in areas with flammable brush, grass or trees.
However, a separate environmental assessment will be required at the time a development
application is submitted to review possible hazard risks. A Phase I environmental
assessment at a minimum will be required of the properties at the time a development
application is submitted.
The project site is not within a two-mile radius of the nearest airport (Moffett Airfield/San
Jose Airport) and is not listed as a contaminated site in the State of California Hazardous
Waste and Substances Site List.
VIII. HYDROLOGY AND WATER QUALITY
-- Would the project:
a) Violate any water quality standards or 0 0 0 [8]
waste discharge requirements? [20,36,37]
b) Substantially deplete groundwater tJ 0 0 [8]
,supplies or interfere substantially with
groundwater recharge such that there would
be a net deficit in aquifer volume or a
lowering of the local groundwater table level
(e.g., the production rate of pre-existing
nearby wells would drop to a level
which wbuld not support existing land uses
or planned uses for Which permits have been
granted)? [20,36,42]
e) Create or contribute runoff water which 0 lEI 0 0
would exceed the capacity of existing or
planned stormwater 'drainage systems or
provide substantial additional sources of
polluted runoff? [20,36,42]
f) Otherwise substantially degrade water 0 0 0 [8]
quality? [20,36,37]
g) Place housing within a 1 DO-year flood 0 0 0 I:&J
hazard area as mapped on a federal Flood
Hazard Boundary or Frood Insurance Rate
Map or other frood hazard delineation map?
[2,38]
h) Place within a 1 DO-year flood hazard area 1 180 0 0 lEI
structures which would impede or redirect
ISSUES:
[and Supporting Information Sources]
>-~
-c
-CIS+!'
.~ U u
~.- ~
c~ ~
'scE
o 0')_
c.cn
o
c ~c c .-
CISCIS 01;
.c U.c'- ...
I- .- .... 1; 0
C/) ~ .- 0') c.
C/) c ;:.-...
t1) 0') :t:= ~
...I .- -==...
Cf) -=-,5
c....
c
CIS~~
.cUU
1-.- CIS
U):!:: C.
U) C E
(l) Cl_
...lei)
'0
o ~
zc.
.E
i) Expose people or structures to a significant
risk of loss, injury or death involving flooding,
including flooding as a result of the failure of
a levee or dam? [2,36,38]
j) Inundation by seiche, tsunami, or 0 0 0 00
mudf[ow? [2,36,38]
Items a throuoh i-No Impact
No development is proposed at this time; therefore, the rezoning application to include
Planned Industrial to the existing zoning designation will not violate any water quality
standards or water discharge requirements, create runoff, substantially deplete ground
water supplies, degrade water quality, place housing in a 100-year floor zone, or expose
people or structures to risks involving flooding or tsunamis.
o
o
o
00
However, a separate environmental assessment will be required at the time a development
appfication is submitted to the City for review of water-related risks. The EIR prepared for
the 2005 General Plan includes the followin"g mitigation measures that will be required of
any development application for this site:
1. Encourage industrial . projects to have long-term conservation measures including
recycling equipment for manufacturing and pooling water supplies in the plant. . Work with
the Cupertino Sanitary District to carry out this policy.
2. Minimize storm water flow and erosion impacts resulting from development.
The project site is currently developed with two office buildings and is located within a B
flood zone per the Flood Insurance Rate Map, Community Panel Number 060339-0004C,
dated May 1, 1980.
IX. LAND USE AND PLANNING - Would
the project:
a) Physically divide ~n established 0 0 D. 00
community? [7,12,22,41]
b) Conflict with any applicable land use plan, 0 0 00 0
policy, or regulation of an agency with
jurisdiction over the project (including, but
not limited to the general plan, specific plan,
local coastal program, or zoning ordinance)
adopted for the purpose of avoiding or "
mitigating an environmental effect?
[1,7,8,16,17,18,44]
c) Conflict with any applicable habitat 0 0 0 00
conservation plan or natural community
conservation plan? [1,5,6,9,26]
1-19
ISSUES:
[and Supporting Information Sources]
~t:
-C'CS~
.~ U u
"'" .- Sl
c:t:~
In c E
'5 .!;!)-
Q.en
o
c "'c c .-
C'CSC'CS o'S
.c u .c'- ...
1-lf:""''SO
U)'-'- Ole.
U) c ;:.- ...
In Ol :t:: 0
..J .- ~ u
en 0::;.5
c'"
c
C'CSC'CS...
.cUU
1-.- C'CS
U) :t: e.
U) c E
In .!;!)-
..Jen
"'"
U
o C'CS
Ze.
.5
Items a and c - No Impact
The rezoning application will not physically divIde an established community or conflict with
any applicable habitat conservation plan or natural community conservation plan. The site
is currently developed with two office buildings and is surrounded by both residential
(Hamptons Apartment complex) and office/industrial buildings. The rezoning application
involves inclusion of the Planned Industrial zoning designation to the existing Planned
Residential zoning designation.
Item b - Less than Sianificant Impact
The rezoning application conflicts with the existing land use plan by adding the Planned
Industrial zoning classification to the existing Planned Residential zonIng designation that
would allow for a"P(MP, Res) zoning designation.
The project involves the rezoning of a 7.78 acre portion of the subject properties from
PeRes), Planned Residential, to P(MP, Res), Planned Industrial and Residential
Essentially, the application involves adding the P(MP) zoning designation back onto the
properties, and retaining the existing PeRes), Planned Residential, zoning designation.
These properties w!3re zoned P(MP) at the time of the 2005 General Plan update, prior to
the rezoning of these properties to PeRes). The remaining portions of the properties that
are zoned PR, Public Park/Recreation, will retain this zoning designation and are not .
affected by the rezoning application.
The rezoning application is considered less than significant since the" property previously
had a P(MP) zoning designation that preceded the Planned Residential zoning designation,
and had a P(MP) designation that was studied under the EIR for the 2005 General Plan
update. Therefore, the rezoning is consistent with the General Plan that allows for
Industrial/Residential within the North Vallco Special Genter area in which the project site is
located. The project is also consistent with the North Vallco Master Plan. Additionally, the
rezoning application does not allow for 'and uses that would exceed the office and
residential allocations studied in the EIR for the 2005 General Plan update.
X. MINERAL RESQURCES -- Would the
project:
a) Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state?
[5,10]
o
o
o
IRI
b) Result in the loss of availability of a
locally-important mineral resource recovery
site delineated on a local general plan,
specific plan or other land use plan? [5,10]
o
o
o
IRI
Items a and b
There are no known mineral resources on th" ~~ct site. Additionally, no development
application is proposed at this time; therefore, the rezoning application will not result in the
loss of mineral resources.
>0'" 0 c'"
c C c.-
-c CUcu D'S c
-CU'" CUC'CS... 13
.~ u u .c u .c.- ... .cuU
ISSUES: ....- S 1-;;:...1iSo I- .- C'CS o C'CS
C:1: U).-.- mo. U) :1: 0. Z 0.'
[and Supporting Information Sources] G) C E U) c :::.-... U) C E E
o.~- G)m .'!::O G) .EJ-
..J .- :e u
a. en en .5 ..JCJ)
XI. NOISE -- Would the project result in:
a) Exposure of persons to, or generation of, 0 0 0 00
noise levels in excess of standards
established in the local general plan or noise
ordinance, or applicable standards of other
agencies? [8,18,44]
b) Exposure of persons to or generation of 0 0 0 00
excessive groundborne vibration or
groundborne noise levels? [8,18,44]
c) A substantial permanent increase in 0 0 0 00
ambient noise levels in the project vicinity
above levels existing without the project?
[8,18]
d) A substantial temporary or periodic 0 [8] 0 0
increase in ambient noise levels in the
project vicinity above levels existing without
the project? [8,18,44]
e) For a project located within an airport land 0 0 0 [RJ
use plan or, where such a plan has not been
adopted, within two miles of a public airport
or public use airport, would the project
expose people residing or working in the
project area to excessive noise levels?
[8,18,44] .
f) For a project within the vicinity of a private 0 0 0 [RJ
airstrip, would the project expose people
residing or working in the project area to
excessive noise levels? [8,18]
1-21
ISSUES:
[and Supporting Information Sources]
>>"""
-C
caCClt)
.- u _
""";:~
C._ ~
'scE
o Cl_
a..Ci)
o
C ....C C .-
ct:Sas O'ta
.c u .c.- ...
I- .- """ 'ta 0
(I) :t:: .;: lj) c.
(I) C ... +:I "'0
(1) lj) .-
..J .- "=:! U
en -==.5
t)
o CCI
zc.
E
-
Ct:
CClas....
.cUU
1-;:CC1
(1).- c.
(l)cE
(1) .2'-
..Jen
Items a throuah f - No Impact
No development is proposed at this time; therefore, the rezoning application will not expose
people to noise in excess of noise standards or ambient noise levels, and excessive
groundborne vibration or noise levels.
However, a separate environmental assessment will be required at the time a development
application is subniitted to the City for review of possible noise impacfs. Conditions of
approval shall be required of any development applications for these properties to mitigate
noise impacts related to permanent noise sources and construction activities on the project
site. The EI R prepared for the 2005 General Plan includes the following mitigation
measures that will be required of any development application for this site:
1. Be sure new commercial or industrial developments plan their delivery areaq away. from
existing homes.
2. Require analysis and implementation of techniques to control the effects of noise from
industrial equipment and processes from projects neat homes. .
Additionally, the project site is not located within an airport land use plan area or private
airstrip.
XII. POPULATION AND HOUSING -- Would
.the proiect:
a) Induce substantial population growth in an
area, either directly (for example, by
proposing new homes and businesses) or
indirectly (for example, through extension of
roads or other infrastructure)? [3,16,47,441
b) Displace substantial numbers of existing
housing, necessitating the construction of
replacement housing elsewhere? [3,16,441
c) Displace substantial numbers of people, 0 0 0 [8]
necessitating the construction of
replacement housing elsewhere? [3,16,441
Items a throuah c - No Impact
The project site is currently developed with two office buildings. Therefore, the rezoning
application will not displace existing housing and would not necessitate' replacement
housing elsewhere.
XIII. PUBLIC SERVICES
o
o
o
[8]
o
o
o
[8]
1-22
~1: 0 e1:
e 1: e .-
-ctl~ ctlctl o'S ctlctl.... '0
.~ u u .c u .c'- ... .cuu
ISSUES: .....- 8 t- .- .... 'S 0 t-.- ctl o ctl
c:t: en :t:.~ Ij) c.. en:t: c.. zc..
[and Supporting Information Sources] ,SeE en e .-... ~eE .5
o Ij)- Q)1j) ~o Ij)-
.- -I .- :s u -IU)
o..cn en .5
a) Would the project result in substantial
adverse physical impacts associated with the
provision of new or physically altered
governmental facilities. need for new or
physically altered governmental facilities. the
construction of which could cause significant
environmental impacts. in order to maintain
acceptable service ratios. response times or
other performance objectives for any of the
'public services:
Fire protection? [19,32,44] 0 0 0 00
Police protection? [33,44] 0 0 0 00
Schools? [29,30,44] 0 0 0 00
Parks? [5,17.19,21,26,27,44] 0 0 0 00
Other pU,blic facilities? [19,20,44] 0 00 0 0
Items a - No Impact
The project site is currently developed with two office buildings within an urbanized area
that is served by municipal services. including fire. police and public facilities. Additionally.
no development is proposed at this time. Therefore. the rezoning application will not create
additional impacts onto existing public services.
Any future development project will undergo review to determine the exact nature of any
impacts to public services and the project will be required to incorporate specific mitigations
to address them.
A. separate environmental assessment will be required at the time a development
application is submitted to the City for public service impacts. The EIR prepared for the
2005 General Plan includes the following mitigation measures that will be required of any
development application for this site:
1. Expand existing commercial and industrial recycling programs to meet and surpass
AB939 waste stream reduction goals.
2. Encourage the recycling and reuse of building materials. including recycling materials
generated by demolitions and remodeling of buildings.
3. Encourage the maximum feasible conservation and efficient use of electrical power and
natural gas resources.
4. Encourage the design and construction of energy and resource conserving/efficient
buildings.
XIV. RECREATION--
I
I
-1
1-23
... -
.,
>-- 0 c-
c1: c;:;
-c CUca Oca c
-CU.... cam.... U
.~ u U .c U .c'- ... .cuU
ISSUES: .....- ~ I-q::_tao I- .- ca o ca
c:c en'-'- ene. en :c Q. zo.
[and Supporting Information Sources] SCE U)cS':;:;15 en c E .5
o en_ a) r:n .- CD en_
.- ..J .- :i: U ..Ju;
a. en en .5
a) Would the project increase the use of 0 0 0 IRI
existing neighborhood and regional parks or
other recreational facilities such that
substantial physical deterioration of the
facility would occur or be accelerated?
[5,17,19,21,26,27,44]
b) Does the project include recreational 0 0 0 IRI
facilities or require the construction or
expansion of recreational facilities which
might have an adverse physical effect on the
environment? [5,44]
Items a and b - No Impact
The project involves a rezoning of the properties. No development is proposed at this time.
Therefore, the project would not increase the use of existing neighborhood and regional
parks. . Approximately a one-acre portion of the existing properties is zoned for a park area;
this area will remain as a Public Park! Recreation zone and is anticipated to be developed
in accordance with the any future development of the project site.
XV. TRANSPORTATIONffRAFFIC--
Would the project:
a) Cause an increase in traffic which is 0 0 0 IRI
substantial in relation to the existing traffic
load and capacity of the street system (i.e.,
result in a substantial increase in either the
number of vehicle trips, the volume to
capacity ratio on roads, or congestion at
intersections)? [4,20,35,44]
b) Exceed, either individually or cumulatively, 0 0 CJ [B]
a level of service standard established by the
county congestion management agency for
designated roads or highways? [4,20,44]
c) Result in a change in air traffic patterns, 0 0 0 [B]
including either an increase in traffic levels or
a change in loc~tion that results in
substantial safety risks? [4,1]
d) Substantially increase hazards due to a 0 0 0 [B]
design feature (e.g., sharp curves or
dangerous intersections) or incompatible
uses (e.g., farm equipment)? [20,35,44]
e) Result in inadequate emergency access? 0 0 .0 [B]
[2,19,32,33,44] 1 -24
>-- 0 Cc
~ c C.-
-C ca 0 m
tacan cacan '0
.- (,) ca .c (,) .c .- ... .cu
ISSUES: -= a f-=_mo f- .- ca o ca
C._ (1)'-'- mQ. (I)~Q. zQ.
[and Supporting Information Sources] SCE (I) C 3:.-... (I) 6>> E. .5
0.2'- cu m :!:: 0
..J .- :5 (,) G)._ -
D..en en .5 ..Jen
f) Result in inadequate parking capacity? 0 0 0 llil
[17,44]
g) Conflict with adopted policies, plans, or 0 0 0 llil
programs supporting alternative
transportation (e.g., bus turnouts, bicycle
racks)? [4.34]
Items a throuoh 0 - No Impact
No development application is proposed at this time; therefore, the rezoning application will
not create substantial increased traffic, result in a change in air traffic patterns, substantially
increase hazards due to design features, result in inadequate emergency access and/or
parking capacity, or Conflict with adopted policies/plans on alternative transportation.
The rezoning application involves reinstating and adding the Planned Industrial (P(MP))
zoning designation to the existing Planned Residential (P(Res)) zoning designation to allow
for a P(MP, Res) zoning designation. The P(MP) zoning preceded the P(Res) zoning on the
properties, and is still consistent with the Industrial/Residential land use designation of the
General Plan for the North Vallco Special Center area and the North Vallco Master Plan.
Therefore, traffic loads and capacity of the street system for industrial use in accordance
with the North Vallco Special Center on these properties are consistent with the General
Plan as studied in the EIR prepared for the 2005 General Plan update. The 2005 General
Plan EIR studied the maximum development potential that allows for the combined
industrial/residential use of these properties in the North Vallco Park SpecIal Center.
XVI. UTILITIES AND SERVICE SYSTEMS -
Would the project:
a) Exceed wastewater treatment
requirements of the applicable Regional
Water Quality Control Board? [5,22.28,36,44]
b) Require or result in the construction of
new water or wastewater treatment facilities
or expansion of existing facilities, the
construction of which could cause significant
environmental effects? [36,22,28.36]
c) Require or result in the construction of
new storm water drainage facilities or
expansion of existing facilities, the
construction of which could cause significant
environmental effects? [5,22,28,36,44]
o
o
o
llil
o
o
o
llil
o
o
o
llil
1-25
>.- 0 C1::
C 1:: C .-
-C ttIttI o'S
cattlt) ttlttI_ t)
.- U .c U.c.- J.. .cuu
ISSUES: -~~ I-~_'So 1-.- ttI o CIS
c._ U).-.i OlD. U):!:: D. zD.
[and Supporting Information Sources] (1)CE U) C ._ J.. U) C E oS
b .~- (1) Ol :t:: 0 (1) .~-
a.cn ...I .- ::s u ...I en
en .5.
e) Result in a determination by the 0 0 0 r&:J
wastewater treatment provider which serves
or may serve the project that it has adequate
capacity to serve the project's projected
demand in addition to the provider's existing
commitments? [5,22,28,36,44]
f) Be served by a landfill with sufficient 0 0 0 r&:J
permitted capacity to accommodate the
project's solid waste disposal needs?
g) Comply with federal, state, and local 0 0 0 r&:J
statutes and regulations related to solid
waste?
Items a throuah a - No Impact
No development application is proposed at this time; thereforej the rezoning application will
not exceed waste water treatment requirements, require construction of new or expanded
water! waste water/storm water treatment facilities, or be served by a landfill.
In addition, any future development project will undergo review to determine the exact
nature of any impacts to utilities and service systems and the project will be required to
incorporate specific mitigations to address them.
A separate environmental assessment will be required at the time a development
application is submitted to the City. The EIR prepared for the 2005 General Plan includes
the following mitigation measures that will be required of any development application for
this site: .
1. Policies incorporated into the/General Plan regarding energy have been designed to
reduce energy consumption. In addition, the State has adopted measures that address
energy consumption. Title 22 and Title 24 include energy conservation requirements
that must be applied to all new construction.
2. Encourage the maximum feasible conservation and efficient use of electrical power and
natural gas resources.
3. Encourage the design and construction of energy and resource conserving/efficient
building!?
The project site is currently developed with two office buildings that are served by sanitary
sewer service.
1-26
ISSUES:
[and Supporting Information Sources]
>>...
-c
-ea~
.~ u u
....- S1!
c~ ~
,ScE
o.~-
Q.U)
o
c "'c c .-
ctSea o'S
.c u .c'- ...
1-li:"''SO
(11'-';: tnD.
(11 C ....- i;""
Q)tn ~O
..J .- -= U
U) 0::;.5
c'"
ea c
.cBu
I- .- ctS
II) ~ CI..
(11 C E
... 0)_
.:nn
'0
o ctS
Za.
,g
.... 3 .',....,~:,'.'T.t~6,;:~~!~~~~tiJ~{~~i~'~i~i~~i~~f~ .
a) Does the project have the potential to 0 0
degrade the quality of the environment,
substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife
population to drop below self-sustaining levels,
threaten to eliminate a plant or animal
community, reduce the number or restrict the
range of a rare or endangered plant or animal
or elimir)ate important examples of the major
periods of California history or prehistory?
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? ("Cumulatively considerable"
means that the incremental effects of a project
are considerable when viewed in connection
with the effects Qf past projects, the effects of
other current projects, and the effects of
probable future proiects)?
. .........\....
..'- :".: ....
. ::.:.1' '.' ;::}'
..
. ,.-.
o lliJ
o
o
o
lliJ
c) Does the project have environmental effects
which will cause substantial adverse effects on
human beings, either directly or indirectly?
o
o
o
[8]
PREPARE..f\'~ ~F.FIDAVIT
I ,',
I hereby certify that the information provided in this Initial Study is true and correct to the
best of my knowledge and belief; I certify that I have used proper diligence in responding
accurately to all questions herein, and have consulted appropriate source references
when necessary to ensure full and 'complete disclosure of relevant environmental data. I
hereby acknowledge than any substantial errors dated within this Initial Study may cause
delay or discontinuance of related project review procedures, and hereby agree to hold
harmless the City of Cupertino, its staff and authorized agents, from the consequences of
such delay or discontinuance. a ~.
Prepare~s Signature ~ ~
Print Preparer's Name-A-~/' fl. Snellt'1J
1-27
E~VIRONMENTAL .EVALUATION (To be Completed by City Staff)
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED:
The environ,mental factors checked below would be potentially affected by this project, involving
at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the
following pages~
0 Aesthetics 0 Agriculture Resources 0 Air Quality
0 Biological Resources D Cultural Resources D Geology /Soils
0 Hazards & Hazardous 0 Hydrology / Water 0 Land Use / Planning
Materials Quality
0 Mineral Resources D Noise 0 Population / Housing
0 Public Services 0 Recreation 0 Transportation/Traffic
0 Utilities / Service 0 Mandatory Findings of
Systems Significance
DETERMINATION:
On the basis of thi?initial evaluation the Environmental Review Committee (ERC) finds that:
o The proposed project COULD NOT have a significant effect on the environment, and
a NEGATIVE DECLARATION will be prepared.
llil Although the proposed project courd have a significant effect on the environment,
there will not be a significant effect in this case because revisions in the project have
been made by or agreed to by the project proponent. A MlrlGATED NEGATIVE
DECLARATION will be prepared.
o The proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
o The propose~ project MAY have a "potentially significant impact" or "potentially
significant unless mitigated" impact on the environment, but at least one effect 1) has
been adequately analyzed in an earlier document pursuant to applicable legal
standards, and 2) has been addressed by mitigation measures based on the earlier
analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT
is required, but it must analyze only the effects that remain to be addressed.
o Although the proposed project could have a significant effect on the environment,
because all potentially significant effects (a) have been analyzed adequately in an
earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b)
have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE
DECLARATION, including revisions or mitigation measures that are imposed upon the
proposed project, nothing further is required.
tJ4j;6/69
Date ,-
ntJ(i~/o1