Loading...
00-088 DeSilva Gates Construction~~~ , AGREEMENT CITY OF CUPERTINO 10300 Torre Avenue C}T'l pj^ ~~~ upertino, CA 95014 C U P E ~T I N O ~/ (408) 77'7-3200 BY THIS AGREEMENT, made and entered into on the by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Name (1) DeSILVA GATES _ (2) Address 11555 DUBLIN BOULEVARD City DUBLIN Zip 94568 Phone (925) 829-9220 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR shall provide or furnish the following specified services and/or materials: RUBBERIZED A. C . OVERLAY ON FOOTHILL BLVD. FROM NORTH CITY LIMIT TO SANTA LUCIA RD. & ON S.C.B. FROM FOOTHILL TO W. OF RIDGEWAY DR. EXHIBITS: The following attached exhibits hereby are made part of this Agreement: EXHIBIT "A" PROPOSAL TERMS: The services and/or materials furnished under this Agreement shall commence on ~g$X~i>E$ JULY 24, 2000 ~Y' and shall be completed before E TF[E EXPIRATION OF 35 WORKING DAYS. COMPENSATION: For the full performance of this Agreement, CITY shall pay CONTRACTOR: $579,433.00 (ACTUAL AMOUNT SHALL BE BASED ON UNIT PRICES IN PROPOSAL) California Labor Code, Section 1771 requires the payment of prevailing wages to all workers employed on a Public Works contract in excess of $1,000.00. GENERAL TERMS AND CONDITIONS Hold Harmless: Contractor agrees to save and hold harmless the Ci~:y, its officers, agents and employees from any and all damage and liability, including all costs of defending any claim, caused by or arising out of the performance of this Agreement. City shall not be liable for acts of Contractor in performing services described herein. Insurance: Should the City require evidence of insurability, Contract~~r shall file with Ciry a Certificate of Insurance before commencing any services under this Agreement. Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non-Discrimination: No discrimination shall be made in the employment of persons under this Agreement because of the race, color, national origin, ancestry, religion or sex of such person. Interest of Contractor: It is understood and agreed that this Ag~eement is not a contract of employment in the sense that the relationship of master and servant exists between City and undersigned. At all times, Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement. Contractor certifies that no one who has or will have any financial interest under this Agreement is an officer or employee of City. Changes: This Agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO-ORDINATOR and representative for CITY stall be: NAME CARMEN LYNAUGH _ DEPARTMENT PUBLIC WORKS This Agreement shall become effective upon its execution by CITY, in witness thereof, the parties have executed this Agreement the day and year first written above. CONTR~AC~T~O~ R: DEIISI/L~'VA GATES CONSTRUCTION LP CITY OF PERTINO: By r 1 lA.(M /~ 2X~ Ut ~`~~~ ~lY~ E3y Title MICHAEL A. KLOOS, VICE PRESIDENT Title P LIC WORY.S PR ECT ER Soc. Sec. # N/A APPROVALS ~(~~ EXPENDITURE DISTRIBUTION DEPARTMENT HE DATE PCCOUNT NUMBER AMOUNT CITYC ERK ATE 270-8404-7016 579,433.00 ~ '. NO.~~ ~~ C ~' day of , 20 , White: City Clerk ~ Green: Finance Yellow: Contractor ~~nk: R~eiv~irfg Gold: Department C O N S T R U C T 1 O N Contract Exhibit "A" 11555 Dublin Boulevard P. 0. Box 2909 Dublin, California 94568.2909 925/829-9220 CONTRACTORS LICENSE N0.704t95 A Date: June 27, 2000 TO: City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 ATTN: Carmen Lynaugh Public Works Project Manager RE: Foothill/Stevens Creek Rubberized Elsphalt Overlay Proposal Estimate #000609 Gentlemen; DeSilva Gates Construction LP is pleased to submit: for your consideration and review this proposal for work on the above referenced project. Our bid is based upon 20 and 40 scale aerial photos and quantities provided by the City of Cupertino. Our proposal is a unit price proposal and final contract will be based on field measured quantities of the work actually installed. Our prices are based on the County of Santa Clara specificatio~is for the adjacent Foothill Expressway project that we are currently performing except as specifically changed in this proposal.\ Our Unit Prices and Approximate Quantities are as follows: ~XHI~~sT A Contract Exhibit "A" City of Cupertino Foothill/Stevens Creek Overlay Proposal June 27, 2000 Page 2 of 4 Bid Bid Description Bid Units Bid Total U.P. Bid Total Item # Quantity 1 TRAFFIC CONTROL SYSTEM 1 LS $ 98,966.00 $ 98,966.00 2 ADJUST EXISTING MANHOLES TO GRADE 65 EA 325.00 21,125.00 3 ADJUST EXISTING WATER VALVES TO GRADE 45 EA 250.00 11,250.00 4 ADJUST EXISTING MONUMENTS TO GRADE 10 EA 250.00 2,500.00 5 ADJUST DETECTOR HANDHOLE TO GRADE 6 EA 150.00 900.00 6 TYPE G-MB ASPHALT CONCRETE RESURFACING 6,100 TON 61.00 372,100.00 7 COLD PLANE AC 6' WEDGE CUTS 111,600 SF 0.30 33,480.00 9 THERMOPLASTIC TRAFFIC STRIPES 50,490 LF 0.20 10,098.00 10 THERMOPLASTIC PAVEMENT MARKINGS 2,015 SF 2.00 4,030.00 11 PAVEMENT MARKERS 5,332 EA 2.00 10,664.00 12 PAVEMENT MARKERS (REEL) 1,030 EA 4.00 4,120.00 13 DETECTOR LOOP 24 EA 350.00 8,400.00 14 F&I DETECTOR HANDHOLE 5 EA 200.00 1,000.00 15 F&I CONDUIT 50 LF 16.00 800.00 $ 579,433.00 And include the following specific items of work: SPECIFIC INCLUSIONS: 1. Furnish and install 1-1 /2" AC overlay using Type G-MB rubberized asphalt per County of Santa Clara Foothill Expressway Specifications including SS-1 tack coat. 2. Cold plane longitudinal conforms from 1-1/2" deep at the gutter lip to 0" at 6' from the gutter lip. 3. Cold plane transverse conforms 12' Wide 0•-1-1/2" deep. 4. Offhaul and dispose of all AC millings generated by the cold planning operations. 5. Reference and replace existing striping after overlay is complete. All striping to be thermoplastic. 6. Replace existing traffic signal loops that are damaged by cold planing operations. New loops to be installed after planning operatio~ls and prior to overlay paving. 7. Removal and disposal of existing pavement markers prior to installation of the new overlay. EXHIBIT A Contract Exhibit "A" City of Cupertino Foothill/Stevens Creek Overlay Proposal June 27, 2000 Page 3 of 4 8. Adjust existing manholes, water valves and monuments using metal adjustment rings per Caltrans specifications. 9. Clean-up for our work only. 10. Traffic control is included for all of our work. We will provide lane closures and/or detour signing per the Caltrans traffic control manual. 11. A standard payment and performance bond will be provided to the City. 12. Overlay will be placed against the median curb or dike. SPECIFIC EXCLUSIONS: 1. Any fees, permits, surveying and testing. ~Ve will provide third party testing and inspection on a time and materials basis if rf;quired by the City. 2. Offsite construction water -our bid is based on using onsite water from City fire hydrants. We include the cost of any construction water that we use. 3. Removal, modifications or relocation of exi~~ting utilities. Any conflicting utilities shall be relocated prior to the start of our work. 4. Handling and/or removal of contaminated aaid/or hazardous materials. 5. Uniformed police officers for traffic control. At our option we may choose to obtain the services of uniformed police officers to assi:~t with the traffic control in the major intersections. 6. Crack sealing or patching of existing pavement prior to overlay. 7. Trimming or pruning of existing trees along the roadway by an arborist or specialized tree company. We will trim low-hanging brancr-es that interfere with our operations. 8. Shoulder backing or grading of any kind. 9. AC dike removal and/or replacement. 10. Project Funding signs or any other special notice signs or changeable message signs. 11. Removal of existing thermoplastic marking:.. STANDARD CONDITIONS: 1. One initial move-in and one continuous operation. Notice to proceed shall be issued no earlier than August 1, 2000, and 35 working days will be provided to complete the work. We will receive a contract for the work at least two weeks before the notice to proceed. 2. Our prices are based on working during the hours of 7:00 AM to 5:00 PM. Lane closures in the southbound direction shall be allowed. from 7:00 AM to 3:30 PM and in the northbound direction from 9:00 AM to 5:00 PM. 3. Our prices are based on not paving around the returns on the side streets. We plan to have the conform run in a straight line from gutter lip to gutter lip along Foothill or Stevens Creek. 4. Any phasing of work will result in additional costs due to reduction in production and additional move-ins. 5. Any work requested by the City to be performed in inclement weather or over optimum moisture conditions, will result in additional costs and will be billed as Time and Material. Contract Exhibit "A" XH~B~~ A Ctty of Cupertino ~/~ Foothill/Stevens Creek Overlay Proposal June 27, 2000 Page 4 of 4 6. Any overtime requested by the City to expedite completion of this project must be approved prior to the work being done and ~Nill be billed as an extra. 7. This proposal is based upon the City and De~Silva Gates Construction reaching mutual agreement in the Terms and Conditions of a Contract for this project. 8. This proposal remains in effect for thirty (30) days from receipt. 9. The inclusions, exclusion and conditions in this letter shall be made a part of any subsequent contract. We ~fdok forwa~,d to working with you on this proje~~t. If you have any questions, please call me. ~v ery truty~urs, --~ DESILVA GATES CONSTRUCTION, L.P. Tom Gunther Estimator