PC Summary 06-09-09City of Cupertino
10300 Torre Avenue, Cupertino, California 95014 (408) 777-3308
To: Mayor and City Council Members
From: Aarti Shrivastava, Director of Community Development
Date: June 11, 2009
Subj: REPORT OF PLANNING COMMISSION DECISIONS MADE
June 9, 2009
Chapter 19.32 of the Cupertino Municipal code provides for
appeal of decisions made by the Planning Commission
1. Application
CP-2009-01, City of Cupertino, citywide
Description
Review of the Five Year Capital Improvements Program (FY2009-10 to 2013-14)
for conformity to the City of Cupertino's General Plan
Action
The Planning Commission approved the application on a 5-0 vote.
The fourteen day-calendar day appeal will expire on June 23, 2009.
Enclosures:
Planning Commission Report of June 9, 2009
Planning Commission Resolution No. 6558
CIP Program
g:planning/Post Hearing/summary to cc060909
CITY OF
CUPERTINO
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
(408) 777-3251
FAX (408) 777-3333
Community Development Department
SUMMARY
Application: CP-2009-01, EA-2009-04 Agenda Date: June 9, 2009
Applicant: City of Cupertino
Property Location: Citywide
Environmental Determination: Negative Declaration
APPLICATION SUMMARY:
Review of the 5-Year Capital Improvement Program, Fiscal Years 2009-10 to 2013-14, for
General Plan Consistency
RECOMMENDATION:
Staff recommends that the Commission:
1. Recommend a Negative Declaration for the proposed 5-Year Capital
Improvement Program (CIP), file no. CP-2009-01; and
2. Find that the proposed CIP is consistent with the General Plan.
BACKGROUND:
Each year the City Council adopts afive-year spending plan for capital improvements
throughout the City. The CIP is critical because it prioritizes significant city
expenditures on capital projects of importance to the City. Funding is not fixed or
committed during the five year term. Typically, funding may shift in the second
through fifth years as priorities change and project schedules accelerate or decelerate
during the lifetime of the project.
State law and the Cupertino Municipal Code (Section 2.32.070.C) require the Planning
Commission to review the CIP for consistency with the General Plan and make a
recommendation on the environmental assessment. The Planning Commission is not
responsible for setting or recommending CIP funding priorities.
Attachment 1 is the draft CIP that has already been presented to the City Council on
May 27, 2009. Attachment 2 is staff's environmental analysis of the CIP. The
Capital Improvement Program CP-2009-01 June 9, 2009
Page 2
environmental review of the CIP is focused on the first year funded projects as new
projects funded in the 2nd through 5~ years are not committed to be implemented
because of potential changes in City priorities. Attachment 3 lists the proposed capital
projects and staff notes describing how the project relates to the General Plan.
DISCUSSION:
Environmental Determination
This year the one ongoing project that had mitigated, significant environmental
impacts, is the Stevens Creek Corridor Park project, which was assessed in a previous
year. The remaining CIP projects are focused on:
• Funding repairs, renovations and relatively minor improvements
• Small additions to existing City infrastructure: streets and public facilities
• Feasibility study and data collection
Individually, these types of projects are considered categorically exempt from
environmental review under Sections 15301,15303,15304 and 15306 of the California
Environmental Quality Act (CEQA) Guidelines. However, CEQA also requires
cumulative environmental analysis of the program. The Environmental Review
Committee (ERC) examined the cumulative project list and recommended the granting
of a Negative Declaration for the entire CIP program.
Subsequent to the ERC's determination, the following minor park repair projects were
added to the CIP:
1) Replace bleacher seats at Memorial Park softball field
2) Replace Aerobic Room floor at the Quinlan Center
3) New vinyl flooring, asbestos abatement, and new storage cabinets
For the Monta Vista Community Building
4) HVAC replacement and air filtration system at Wilson Park Building
5) HVAC replacement at Portal Park Building
These additional projects are categorically exempt from environmental review (Section
15301: Existing Facilities) and will not affect the final environmental determination of
the entire CIP program.
General Plan Consistence
The General Plan consistency findings are summarized below:
1. Projects that improve the safety and functioning of the City's primary circulation
system. See general plan policies 4-1, 4-3, 4-6, 4-7 and 4-8
Capital Improvement Program CP-2009-01 June 9, 2009
Page 3
Projects in this category include: Pavement Management (Prop. 42, ARRA and
General Funds), Rancho Rinconada Street Study, Safe Routes to School project for
Garden Gate, Countdown Ped. Heads, and De Anza Blvd./McClellan/Pacifica
Ave. Signal Modifications.
2. Transportation Projects that manage neighborhood traffic, decrease reliance on
usage of private cars and promote pedestrian activity. See general plan policies
4-2, 4-3, 4-4, general plan text pages 2-51.
Projects in this category include: Stevens Creek Corridor Park, Sidewalk Repairs
and Safe Routes to School project for Garden Gate.
3. Projects that maintain the usability of the City's parks and recreation inventory.
While much of the Parks section of the General Plan focuses on acquiring and
developing new parkland, the plan also recognizes that awell-managed park
system enhances the quality of life for its citizens. See general plan policies 2-69
and 2-86, text pages 2-46, 2-51 and 2-52.
Projects in this category include: Blackberry Farm infrastructure upgrades, Park
tennis court resurfacing, Wilson Park irrigation renovation, Linda Vista Pond
restoration study, McClellan Ranch Blacksmith Shop replacement, Quinlan Center
Fountain replacement, McClellan Ranch painting, Memorial Park softball field
bleacher seat replacement, Quinlan Center aerobic floor replacement, Monta Vista
Community Building renovations, and Portal Park and Wilson Park HVAC
replacements.
4. Projects that increase the inventory of parklands, particularly in neighborhoods
that are deficient in parks. See general plan policies 2-74, 2-82 and 2-83
Projects in this category include: the Lawrence & Mitty Park (Saratoga Creek)
feasibility study.
5. Projects that reduce flood risks. See Flood Hazards General Plan text, starting
page 6-25.
The projects in this category include: gutter & curb repairs, minor storm drainage
improvements, Monta Vista storm drainage system and master storm drain plan
update.
6. Projects that reduce nonpoint source pollution. See general plan policies 5-32, 5-
33.
There is one project in this category -Service Center equipment wash rack.
Capital Improvement Program CP-2009-01 June 9, 2009
Page 4
7. Other projects that are not addressed in the General Plan, but do not conflict
with the text, policy or goals of the General Plan.
There are no specific policies or general plan language that discusses the
importance of maintaining existing public facilities and structures for public access
and execution of general plan policies. There is one project in the above category:
AM radio station relocation.
Attachments:
Attachment 1: Five Year Capital Improvement Program, FY 2008-09 to 2012-13
Attachment 2: Matrix of CIP projects and Environmental Analysis notes
Attachment 3: Matrix of CIP projects and General Plan Consistency notes
Attachment 4: ERC Recommendation, Initial Study
Attachment 5: Model Resolution
Prepared by: Colin Jung, AICP Senior Planner
Reviewed by:
J
,--- ~~
' --Chao
`~ City Planner
Approved by:
Aarti Shrivastava
Community Development Director
G:planning/ pdreport/ pcCPreports/ 2009CPreports/ CP-2009-O1
CITY OF CUPERTINO
10300 Torre Avenue
Cupertino, California 95014
RESOLUTION N0.6558
CP-2009-01
OF THE PLANNING COMMISSION OF THE CITY OF CUPERTINO
FINDING THE PROPOSED FIVE YEAR CAPITAL IMPROVEMENT PROGRAM, FISCAL YEARS 2009-
10 TO 2013-14 CONSISTENT WITH THE CITY OF CUPERTINO GENERAL PLAN
SECTION I: PROTECT DESCRIPTION
Application No.: CP-2009-01
Applicant: City of Cupertino
Location: Citywide
SECTION II: FINDINGS
WHEREAS, the Planning Commission of the City of Cupertino received the proposed five-year capital
improvement program, fiscal years 2009-10 to 2013-14, as described in Section I of this Resolution; and
WHEREAS, the Planning Commission has held at least one public hearing in regard to the application;
NOW, THEREFORE, BE IT RESOLVED:
That after careful consideration of maps, facts, exhibits, testimony and other evidence submitted in this
matter, the Planning Commission finds in accordance with CMC Section 2.32.070C, that application CP-
2009-01 is consistent with the City of Cupertino's General Plan and a negative declaration of no significant
environmental impacts is recommended to the City Council under the California Environmental Quality
Act Guidelines.
That the subconclusions upon which the findings and conditions specified in this Resolution are based
and contained in the Public Hearing record concerning Application CP-2009-O1 as set forth in the Minutes
of Planning Commission Meeting of June 9, 2009, and are incorporated by reference as though fully set
forth herein.
PASSED AND ADOPTED this 9th day of June 2009, at a Regular Meeting of the Planning Commission of
the City of Cupertino by the following roll call vote:
AYES: COMMISSIONERS: Chairperson Giefer,
NOES: COMMISSIONERS: none
ABSTAIN: COMMISSIONERS: none
ABSENT: COMMISSIONERS: none
Vice Chair Brophy, Miller, Kaneda, Lee
ATTEST:
/s/Aarti Shrivastava
Aarti Shrivastava
Director of Community Development
APPROVED:
/s/Lisa Giefer
Lisa Giefer, Chair
Cupertino Planning Commission
g/planning/pdreport/res/2009/CP-2009-01 res
Proposed Five Year Capital Improvement Program
Current
Fund Description 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14
9100 Parks
580-9121 Memorial Park Softball Field Renovation 250,000 25,000
580-9123 Library Field Irrigation 100,000
420-9126 Sterling Barnhart Park Design & Construction 700,000
420-9127 Lawrence & Mitty Park (Saratoga Creek) 15,000 50,000 1,300,000
580-9132 Park Tennis Court Resurfacing 225,000
420-9130 Wilson Park Irrigation System Renovation 150,000
420-9131 Linda Vista Pond Restoration Study 30,000
New Projects
Stevens Creek Corridor Park Phase II 200,000 1,100,000
Blackberry Farm Infrastructure Upgrades 800,000
McClellan Ranch Blacksmith Shop 250,000
Total 1,065,000 1,730,000 1,100,000 0 1,300,000 0
9200 Buildings
420-9229 City Hall Emergency Power/Electrical System 211,660
420-9240 Library Stair and Seatwall Modifications 26,395
420-9237 Quinlan Center Fountain Replacement 300,000
420-9241 Community Hall Fountain 370,530
420-9244 Community Hall Lighting Upgrade 25,000
420-9245 City Hall Office Improvements 50,000
580-9246 Monta Vista Community Bldg. Re-roof 405,000
New Projects
Service Center Equipment Wash Rack 150,000
McClellan Ranch Painting 85,000
AM Radio Station Relocation 10,000
580-9247 Quinlan Center Aerobic Room Floor 30,000
580-9248 Monta Vista Community Bldg Repairs 28,000
580-9249 Wilson Park Building Repairs 15,000
580-9250 Portal Park Building Repairs 10,000
Total 1,088,585 628,000 0 0 0 0
9400 Streets
270-9450 Pavement Management 2,668,000 750,000 750,000 750,000 750,000 750,000
270-9451 Curb, Gutter and Sidewalk Repairs & ADA Ramps 972,267 750,000 750,000 750,000 750,000 750,000
270-9452 Rancho Rinconada Street Study 100,000
270-9450 Pavement Management - Prop. 1 B 890,000 800,000
270-9450 Pavement Management -Prop. 42 530,000 500,000
270-9454 Route 85 Soundwall Repairs 30,000
New Projects
Pavement Management - ARRA 800,000
Total 5,090,267 2,900,000 2,300,000 1,500,000 1,500,000 1,500,000
Proposed Five Year Capital Improvement Program
Current
Fund Description 2008-09 2009-10 2010-11 2011-12 2012-13 2013-1~
9500 Traffic Facilities
420-9545 T/S Upgrade Stelling/Greenleaf 25,000
420-9549 Safe Routes to School-Garden Gate 442,000
420-9547 Countdown Ped Heads 65,527 50,000
420-9557 DeAnza Blvd./McClellan/Pacifica Signal Modification 200,000
Total 85,527 717,000 0 0 0 0
9700 Storm Drainage
210-9612 Minor Storm Drain Improvements 90,623 75,000 75,000 75,000 75,000 75,000
215-9620 Monta Vista Storm Drainage Syst. 93,046 400,000 400,000
210-9612 Master Storm Drain Plan Update 30,000
270-9443 Bollinger Bike Lanes/Calabazas Cr. Bridge 256,363
Total 440,032 505,000 475,000 75,000 75,000 75,000
Major Projects
428-9449 Mary Avenue Bicycle Footbridge
427-9112 Stevens Creek Corridor Park (Phase I)
Total
Total Capital Improvement Program
Total Outside Revenue Share
Net City General Fund Funding
6,560,000
10,827,000
17,387,000 0 0 0 0 0
25,138,411 8,480,000 3,875,000 1,575,000 2,875,000 1,575,000
13,027,299 3,833,000 3,125,000 825,000 2,125,000 825,000
12,109,112 2,847,000 750,000 750,000 750,000 750,000
REVENUE
Proposed Five Year Capital Improvement Program
Current
Fund Description Funding Source 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14
9100 Parks
580-9121 Memorial Park Softball Field Renovation
580-9123 Library Field Irrigation
420-9127 Lawrence 8~ Mitty Park (Saratoga Creek)
580-9132 Park Tennis Court Resurfacing
Stevens Creek Corridor Park Phase II
Total
Recreation
Recreation
Park Dedication Funds
Recreation
Park Dedication Funds
250,000 25,000
100,000
1,300,000
225,000
200,000 1,100,000
350,000 425,000 1,100,000 0 1,300,000 0
9200 Buildings
580-9246 Monta Vista Community Bldg. Re-roof
Service Center Equipment Wash Rack
580-9247 Quinlan Center Aerobic Room Floor
580-9248 Monta Vista Community Bldg Repairs
580-9249 Wilson Park Building Repairs
580-9250 Portal Park Building Repairs
Total
9400 Streets
270-9452 Rancho Rinconada Street Study
270-9451 Curb, Gutter and Sidewalk Repairs
270-9450 Pavement Management
270-9450 Pavement Management
270-9454 Route 85 Soundwall Repairs
270-9450 Pavement Management
Total
Recreation
Strom Drain Account
Recreation
Recreation
Recreation
Recreation
VTA Local Streets & County Roads
Gas Tax
Prop. 1 B
Prop. 42
Gas Tax
ARRA -Fed. Stimulus Package
9500 Traffic Facilities
420-9549 Safe Routes to School-Garden Gate SR2S
420-9557 DeAnza/McClellan/Pacifica Sig. Mod. Developer
Total
9800 Storm Drainage
210-9612 Minor Storm Drain Improvements Storm Drain Account
215-9620 Monta Vista Storm Drainage Syst. Storm Drain Account
215-9612 Master Storm Drain Plan Update Storm Drain Account
270-9443 Bollinger Bike Lanes/Calabazas Crk Brdge Storm Drain/Gas Tax
Total
405,000
60,000
30,000
28,000
15,000
10,000
405,000 143,000 0 0 0 0
100,000
972,267 750,000 750,000
890,000 800,000
530,000 500,000
30,000
750,000 750,000 750,000
800,000
2,422,267 2,150,000 1,550,000 750,000 750,000 750,000
410,000
200,000
0 610,000 0 0 0 _
90,623 75,000 75,000 75,000 75,000 75,000
93,046 400,000 400,000
30,000
256,363
440,032 505,000 475,000 75,000 75,000 75,000
REVENUE
Proposed Five Year Capital Improvement Program
Current
Fund Description Funding Source 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14
Major Projects
427-9112 Stevens Creek Corridor Park
427-9112 Stevens Creek Corridor Park (EF)"
427-9112 Stevens Creek Corridor Park
427-9112 Stevens Creek Corridor Park
428-9449 Mary Avenue Bicycle Footbridge
428-9449 Mary Avenue Bicycle Footbridge
428-9449 Mary Avenue Bicycle Footbridge
428-9449 Mary Avenue Bicycle Footbridge
Total
TOTAL OUTSIDE REVENUE SHARE
Urban Park Act, Land&Water Conservation,
Roberti-Z'Berg-Harris, SCVWD FACHE Settlement,
Dept. of Water Resources, SCVWD Collaborative
Blackbeny Farm Revenue Account
Park Dedication
Green Projects Fund
VTA Measure B/TFCA/TDA
City of Sunnyvale
Caltrans 304/BTA - 2005/2006
VTA Measure B Fund Augmentation
3,448,000
680,000
200,000
440,000
802,000
190,000
300,000
3,350,000
9,410,000 0 0 0 0
13,027,299 3,833,000 3,125,000 .825,000 2,125,000 825,000
SUMMARY FIVE YEAR 'PRGGRAM - ~ivE YEAR
09-10 ' 10-11 11-12 12-13 73-14 - TOTAL
SUMMARY OF FUNDING S+DURCES
GF=GENERAL FUND 2,572,000 750,000 750,000 750,000 750,000 5,572,000
RC=RECREATION FUND 333,000 0 0 0 0 333,000
GT=GAS TAX 750,000 750,000 750,000 750,000 750,000 3,750,000
EI=ENVIRONMENTAL IMPACT 0 0 0 0 0 0
PD=PARK DEDICATION 250,000 1,100,000 0 1,300,000 0 2,650,0
SD=STORM DRAIN 565,000 475,000 75,000 75,000 75,000 1,265,OOu
RA=RESERVE ACCOUNT 0 0 0 0 0 0
TG=TRANSPORTATION GRANT FUND 1,810,000 800,000 0 0 0 2,610,000
PG=PARK GRANT 0 0 0 0 0 0
DV=DEVELOPER CONTRIBUTION 200,000 0 0 0 0 200,000
SC=SPORTS CENTER 0 0 0 0 0 0
SP=SALE OF PROPERTY 0 0 0 0 0 0
TOTALS 6,480,000 3,875,000 1,575,000 2,875,000 1,575,000 16,380,000
SUMMAI7Y OF PROGRAMS
PARKS 1,730,000 1,100,000 0 1,300,000 0 4,130,000
BUILDINGS 628,000 0 0 0 0 628,000
STREETS 2,900,000 2,300,000 1,500,000 1,500,000 1,500,000 9,700,00^
TRAFFIC FACILITIES 717,000 0 0 0 0 717,0.
STORM DRAIN 505,000 475,000 75,000 75,000 75,000 1,205,000
TOTALS 6,480,000 3,875,000 1,575,000 2,875,000 1,575,000 16,380,000
SUMMARY OF OPERATLNG .MAINTEN ANCE
OM=OPERATING MAINTENANCE 0 0 0 0 0
SUMMARY
PARKS SUMMARY - _ FIVE YEAR PROGRAM uNPF20GRAMMED
09-10 10-11 11-12 12-13 13-14 CURRENT DOLLARS
SUMMARY' ©F FUNDING SOURCES
__ ___
GF=GENERAL FUND 1,230,000
RC=RECREATION FUND 250,000
GT=GAS TAX
EI=ENVIRONMENTAL IMPACT
PD=PARK DEDICATION 250,000 1,100,000 1,300,000
SD=STORM DRAIN
TG=TRANSPORTATION GRANT FUND
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION
SP=SALE OF PROPERTY
PARKS TOTAL 1,730,000 1,100,000 1,300,000
SUMMARY OP'PROGRAMS
MEMORIAL PARK SOFTBALL FIELD RENOVATION 25,000
LAWRENCE 8 MITTY PARK (SARATOGA CK.) 50,000 1,300,000
PARK TENNIS COURT RESURFACING 225,000
WILSON PARK IRRIGATION SYSTEM RENOVATION 150,000
LINDA VISTA POND RESTORATION STUDY 30,000
STEVENS CREEK CORRIDOR PARK PHASE II 200,000 1,100,000
BLACKBERRY FARM INFRASTRUCTURE UPGRADE 800,000
MCCLELLAN RANCH BLACKSMITH SHOP 250,000
TOTAL 1,730,000 1,100,000 1,300,000
SUMMARY OF OPERATING MAINTENAN CE
OM=OPERATING MAINTENANCE
PARKS
PARKS FIVE YEAR PROGRAM
D9-10 Fb 10-11 FD 11-12 FD 12-1'3 Fb 13-14 FtS uNPRQGRAMMED
CUFtR~N'T QOLLPii2
MEMORIAL PARK SOFTBALL FIELD RENOVATION
Renovation of existing softball field.
Project Cost 25,000 RC
LAWRENCE ~ MITTY PARK (Saratoga Creek)
Acquire property and design end construct park al the North end of the
San Thomas Aquino Saratoga Creek hail.
Project Cost 50,000 PD 1,300,000 PD
PARK TENNIS COURT RESURFACING
This project will resurface the 6 tennis courts in Memorial Perk and 2 at
Varian Park and 2 at Monta Ysta.
Total Project Cost 225,000 RC
WILSON PARK IRRIGATION SYSTEM RENOVATION
Renovation of existing irrigation system to keep turf in good condition.
Total Project Cost 150,000 GF
LINDA VISTA POND RESTORATION STUDY
Study to determine the feasiebility of restoring the existing pond to make
operational. 30,000 GF
PARKS
PARKS FIVE YEAR PROGRAM
fl9-10 FD 10-11 FD 11-12 'FD 12-13 FD 13-14 FD UNPROGRAMMED
CURRENT DOLLAR
STEVENS CREEK CORRIDOR PARK PHASE II
This phase of the project will install a bridge and extend the trail thru the
Slodklemier property end conned to Steven Creek Blvd.
Total Project Cost 200,000 PD 1,100,000 PD
BLACKBERRY FARM INFRASTRUCTURE UPGRADES
Continuing renovations of existing facilities, concession stand, pool
dressing rooms, etc.
Total Project Cost 800,000 GF
McClellan Ranch Blacksmith Shop
Build a new Bladkamith Shop in McClellan Ranch for the Blacksmith
equipment end demostretions.
Total Project Cost 250,000 GF
PARKS
BUILaINCS SUMMARY FIVE YEAR PRO-GRAM.. UNPROGRAMMED
09-1b 10-11 11-12 12-13 13-14 CURRENT DOLLARS
~l1MMARY OF FUNDING SOURCES
GF=GENERAL FUND 485,000
RC=RECREATION FUND 83,000
GT=GAS TAX
EI=ENVIRONMENTAL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN 60,000
RA=RESERVE ACCOUNT
TG=TRANSPORTATION GRANT FUND
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION
SC=SPORTS CENTER
BUILDINGS TOTAL 628,000 0 0 0 0
SUMMARY OF PROGRAMS
QUINLAN CENTER FOUNTAIN REPLACEMENT 300,000
SERVICE CENTER EQUIPMENT WASH RACK 150,000
MCCLELLAN RANCH PAINTING 85,000
AM RADIO STATION RELOCATION 10,000
QUINLAN CENTER AEROBIC ROOM FLOOR 30,000
MONTA VISTA COMMUNITY BLDG. REPAIRS 28,000
WILSON PARK BUILDING REPAIRS 15,000
PORTAL PARK BUILDING REPAIRS 10,000
TOTAL 628,000 0 0 0 0
SUMMARY OF OPERATING MAINTENA NCE -
OM=OPERATING MAINTENANCE
BUILDINGS
~UILaINGS -:FIVE YEAR PROC'RAM
09-10 FD 10-11 FD 11-1~ FD 12-13 FD 13-14 FD UNPROG~MMED
CURRENT DOLLARS
QUINLAN CENTER FOUNTAIN REPLACEMENT
9237
Demolition end removal of nonfunctional fountain behind the Quinlan Community
Center, with reconfiguration of the space for community events and private rentals.
Carty over from 08-09
Project Cost 300,000 GF
SERVICE CENTER EQUIPMENT WASH RACK
Install an equipment wash rack et the service center for City owner equipment.
Cost Tota15150,000 60,000 SD
90,000 GF
McCLELLAN RANCH PAINTING
Exiting strictures are in need of painting to restor them.
Project Cost 85,000 GF
AM RADIO STATION RELOCATION
Relocate the existing AM radio station to eliminate RF interference at City Hall.
This will also enhance radio signal coverage in the western half of Cupertino.
Project Cost 10,000 GF
BUILDINGS
ST`REE 1 S ~UMMAF~Y F~V~'1~E~-R PROGRAM UNPROGRAMMED
09-10 10-11 11-12 12-13 13-14 CURRENT DOLLARS
SUMMARY OF ~'UNDIN~ SOURCES
GF=GENERAL FUND 750,000 750,000 750,000 750,000 750,000
RC=RECREATION FUND
GT=GAS TAX 750,000 750,000 750,000 750,000 750,000
EI=ENVIRONMENTAL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN
RA=RESERVE ACCOUNT
TG=TRANSPORTATION GRANT FUND 1,400,000 800,000
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION
STREETS TOTAL 2,900,000 2,300,000 1,500,000 1,500,000 1,500,000
SUMMARY OF PROGRAMS
PAVEMENT MANAGEMENT 750,000 750,000 750,000 750,000 750,000
CURB, GUTTER AND SIDEWALK REPAIRS 750,000 750,000 750,000 750,000 750,000
RANCHO RINCONADA STREET STUDY 100,000
PAVEMENT MANAGEMENT -Prop . 1 B 0 800,000
PAVEMENT MANAGEMENT -Prop . 42 500,000
PAVEMENT MANAGEMENT - ARRA 800,000
TOTAL
2,900,000 2,300,000 1,500,000 1,500,000 1,500,000
STREETS
STREETS FIVE YEAR PR+DGRAM
09-10 FD 10-11 FD 11-12 FD 12-13 FD 13-1d FD uNFROGRAN(MED
CURRENT DOLLARS
PAVEMENT MANAGEMENT 9450
Annual City funding of 5750,1)00 (maintenance of effort). Actual PMS
bedklog is 51,540,000. Additional GreM Funding will be sought on an
annual basis for the short fall in the backlog.
Project Cost
750,000 GF 750,000 GF 750,000 GF 750,000 GF 750,000 GF
CURB, GUTTER AND SIDEWALK REPAIRS
9451
These funds ere for the repair of curb, putter and sidewalks
when they meet repair criteria. This may include akxesaibility upgrades.
Project Cost 750,000 GT 750,000 GT 750,000 GT 750,000 GT 750,000 GT
RANCHO RINCONADA STREET STUDY
VfA Local Streets and County Roads money for the neighborhood
street circulation study, funded by VGA
Project Cost 100000 TG
PAVEMENT MANAGEMENT - PROP. 1 B
Curtently allocated funds from local transportation facilities maintenance
and improvement Proposition 1 B will be used for pavement maintenance
projects in the Pavement Management Program.
Project Cost 800,000 TG
PAVEMENT MANAGEMENT -PROP. 42
Proposition 42 of gasoline sale tax allocation will be used for pavement
maintenance projects in the Pavement Management Program.
Project Cost 500,000 TG
STREETS
TRAFFIC FACILITIES SUMMARY FIVE YEAR PRCJGRAM uNPROGRAMMEo
09-10 10-11 11-12 12-13 13-1d CURRENT DOLLARS
SUMMARY OF FUND'IN+~ SOURCES
GF=GENERAL FUND 107,000 0
RC=RECREATION FUND
GT=GAS TAX
EI=ENVIRONMENTAL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN
RA=RESERVE ACCOUNT
TG=TRANSPORTATION GRANT FUND 410,000
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION 200,000
STREETS TOTAL 717,000 0 0 0 0
SUMMARY O~ PROGRAMS
T/S UPGRADES STEELING/GREENLEAF 25,000
SAFE ROUTES TO SCHOOL-GARDEN GATE 8 SIG. 442,000
COUNTDOWN PED HEADS 50,000 0
DeANZA BL./McCLELLAN SIGNAL MODS. 200,000
TOTAL 717,000 0 0 0 0
SUMMARY ~F OPERATING MAINTENANCE
OM=OPERATING MAINTENANCE
TRAFFIC FACILITIES
TF~AFFtC;:~A~1~1T1~~....."........~........~........• .
... .............•........~........• .:::F11f~ YEAR::PRC~~:FiAM
::.~1:_..•. :::::::1._14.:. ..
:...~09=10 .F~...:~..... •:10-11~:~Fia..... .•:..1..12 F~ .... ~.~..12:13: FD". uN~a~~wa~a~~d ~~:
.::. R
R. Nfi:~~"":
. U DOLLA. S.
SIGNAL UPGRADE AT STEELING/GREENLEAF
Upgrades to Stelling/Greenleaf signal that were not covered in the Safe Route
to School grant.
Project Cost 25,000 GF
SAFE ROUTES TO SCHOOL -GARDEN GATE 8~
9549
Install sidewalks where gaps exist on Stelling Rd., Greenleaf Dr. and
on Ann Arbor Ave. to provide a safe route to Garden School.
Included some work to the Stelling/Greenleafsigml.
This is a Grant project yet to be funded.
City Share of Project Cost 32,000 GF
Grant Share of Project Cost 410,000 TG
Total Project Cost 442,000
COUNTDOWN PED HEADS 9547
The Countdown feature advises pedestrian time provided and/or
remaining to cross the street
50 intersections remain to be completed. These funds will complete 10
more intersections.
Cost 50,000 GF
DeANZA BLVD./McCLELLAN SIGNAL MODS.
This project would involve relocating two 55' mast anus and poles from the
near side to the far side of the intersection, and related electrical,
concrete and striping work. Funding from adjacent developments.
Project Cost 200,000 DV
TRAFFIC FACILITIES
NORM GRAIN SUMMARY FIVE YEAR PROGRAM UNPROGRAMMED
09-10 10-11 11-12 12-13 13-14 CURRENT DOLLARS'.
SUMMARY OF FUND'lNG SOUROES
GF=GENERAL FUND
RC=RECREATION FUND
GT=GAS TAX
EI=ENVIRONMENTAL IMPACT
PD=PARK DEDICATION
SD=STORM DRAIN 505,000 475,000 75,000 75,000 75,000
RA=RESERVE ACCOUNT
TG=TRANSPORTATION GRANT FUND
PG=PARK GRANT
DV=DEVELOPER CONTRIBUTION
STREETS TOTAL 505,000 475,000 75,000 75,000 75,000
SUMMARY dF PRCyGRAMS -
MINOR STORM DRAIN IMPROVEMENTS 75,000 75,000 75,000 75,000 75,000
MONTA VISTA STORM DRAINAGE SYSTEM 400,000 400,000
MASTER STROM DRAIN PLAN UPDATE 30,000
TOTAL 505,000 475,000 75,000 75,000 75,000
SUMMARY OF OPERATING MAINTENANCE
_.
OM=OPERATING MAINTENANCE
STORM DRAIN
NORM DRAIN FIVE YEAR PROG'RAM'
09-1b FD '- 10-11 FD 11-12 FD 12-13 FD 13-14 FD urvp~ocr~-nnnnrrD
CURRENT DOLI}iR$'
MINOR STORM DRAIN IMPROVEMENTS 9612
Funding for emergenq drainage repairs as needed in various
locations
Project Cost 75,000 SD 75,000 SD 75,000 SD 75,000 SD 75,000 SD
MONTA VISTA STORM DRAINAGE SYST.
9620
Installation of stone dreinage system in Monta vela Area.
Lines to ba installed on Orange Avenue end Byrne Avenue.
Design and Construction 400,000 SD 400,000 SD
MASTER STORM DRAIN PLAN UPDATE
The Master Stone Drein Plan was last updated in 1993, this update
would evaluate the existing system and make recommendations,
including fee updates.
Cost 30,000 SD
STORM DRAIN
Attachment 2
Environmental Assessment of File No. CP-2009-01
City of Cupertino First Year Programmed Projects
5-Year Capital Improvement Program
Fiscal Years 2009-10 to 2013-14
Pro'ect Title Pro'ect Descri tion Environmental Review Notes
Stevens Creek Install bridge and extend multi- Separate environmental analysis
Corridor Park use trail thru the Stocklemier was completed. Mitigated
(Phase II) Property and connect to Stevens negative declaration adopted by
Creek Blvd. the City Council.
Blackberry Farm Continuing renovations of Separate environmental analysis
Infrastructure existing facilities, concession was completed. Mitigated
Upgrades stand, pool dressing rooms, etc. negative declaration adopted by
the Ci Council.
Library Field Renovate irrigation system at Categorically Exempt. CEQA
Irrigation sports field south of Library section 15301, Class ld:
restoration of deteriorated
facilities.
Lawrence & Mitty Funds for feasibility study of Categorically Exempt. CEQA
Park (Saratoga Creek) relocating County facilities from section 15306, class 6: data
creek land collection/feasibility study
Park Tennis Court Resurfacing of deteriorating tennis Categorically Exempt. CEQA
Resurfacing courts: 6 Memorial Park, 2 Varian section 15301, Class ld:
Park, and 2 at Monta Vista restoration of deteriorated
facilities.
Wilson Park Renovation of park irrigation Categorically Exempt. CEQA
Irrigation System system to keep turf in good section 15301, Class ld:
Renovation condition. restoration of deteriorated
facilities.
Linda Vista Pond Feasibility study of restoring Categorically Exempt. CEQA
Restoration Study existing pond to working condition section 15306, class 6: data
collection/feasibility study
McClellan Ranch Build a new Blacksmith Shop in Categorically Exempt. CEQA
Blacksmith Shop McClellan Ranch for the section 15302, Class 2:
Blacksmith equipment and reconstruction of existing
demonstrations structures on the same site.
Quinlan Center Demolition and removal of Categorically Exempt. CEQA
Fountain nonfunctional fountain and section 15304, Class 4: Minor
Replacement redesign of the space for alterations to land condition, such
community events and private as grading and landscaping.
rentals.
Attachment 2
~~ Pro'ect Title Pro'ect Descri tion Environmental Review Notes
Service Center Install an equipment wash rack for Categorically Exempt. CEQA
Equipment Wash City-owned equipment section 15301, Class lc: minor
Rack alteration of existin facilities.
McClellan Ranch Repaint existing buildings Categorically Exempt. CEQA
Painting section 15301, Class lc: minor
alteration of existin facilities.
AM Radio Station Relocate the existing AM radio Categorically Exempt. CEQA
Relocation station antenna to eliminate RF section 15301, Class lc: minor
interference at City Hall. alteration of existing facilities,
which includes streets.
Pavement Ongoing maintenance of street Categorically Exempt. CEQA
Management pavement, which may include section 15301, Class lc: minor
pothole filling, slurry sealing and alteration of existing facilities,
overlayment. which includes streets.
Curb, Gutter, Funds for the repair of curb, gutter Categorically Exempt. CEQA
Sidewalk & ADA and sidewalks when they meet section 15301, Class lc: minor
am.Repairs repair criteria alteration of existing facilities,
which includes streets.
Rancho Rinconada Neighborhood street circulation Categorically Exempt: CEQA
Street Study study. section 15306, Class 6: data coll.
Pavement Mgmt. Ongoing maintenance of street Categorically Exempt. CEQA
Prop. 42 pavement, which may include section 15301, Class lc: minor
pothole filling, slurry sealing and alteration of existing facilities,
overlayment. which includes streets.
Pavement Federal Stimulus Package monies Categorically Exempt. CEQA
Management-ARRA to be used for pavement section 15301, Class lc: minor
maintenance alteration of existing facilities,
which includes streets.
T/S upgrade at Traffic signal upgrade. Categorically Exempt. CEQA
Stelling section 15301, Class lc: minor
Rd./Greenleaf alteration of existing facilities,
which includes streets.
Safe Routes to School Install sidewalks on Stelling Road, Categorically Exempt. CEQA
Garden Gate Greenleaf Dr & Ann Arbor Ave. to section 15301, Class lc: minor
provide safe route to school. alteration of existing facilities,
which includes streets.
Countdown Ped Re-lamp existing ped traffic Categorically Exempt. CEQA
Heads signals with LED countdown units section 15301, Class lc: minor
throughout the City. Funds will alteration of existing facilities
complete,2~~ intersections.
to
De Anza Relocate two 55' mast arms and Categorically Exempt. CEQA
Blvd./McClellan/ poles, related electrical, concrete section 15301, Class lc: minor
Pacifica Signal Mod. and striping work. alteration of existing facilities
Attachment 2
Pro'ect Title Pro'ect Descri tion Environmental Review Notes
Minor Storm Drain Funding for emergency repairs as Categorically Exempt. CEQA
Improvements needed in various locations. section 15301, Class lc: minor
alteration of existing facilities
Monta Vista Storm Installation of new storm drainage Categorically Exempt. CEQA
Drainage System system in Monta Vista area. Lines section 15303, Class 3d: utility
to be installed on Orange Ave and extensions to service existing
Byrne Avenue develo ment.
Master Storm Drain Update 1993 Plan by evaluating Categorically Exempt: CEQA
Plan Update existing system and make section 15306, Class 6: data
recommendations, including fee collection
update
Attachment 3
City of Cupertino Programmed Projects
5-Year Capital Improvement Program
Fiscal Years 2009-10 to 20013-14
And General Plan Consistency Notes
Pro'ect Title Pro'ect Descri tion General Plan Consistency Notes
Memorial Park Renovation of existing softball Maintains usability of City parks
Softball Field field and rec. facilities. See g.p. text
a es 2-46, 2-51 & 2-52
Lawrence & Mitty Funds for feasibility study of May increase the inventory of
Park (Saratoga relocating County facilities from parklands, particularly in
Creek) creek land neighborhoods that are deficient in
parks. See general plan policies 2-
74, 2-82 and 2-83
Park Tennis Court Restoration of deteriorating tennis Maintains usability of City parks
Resurfacings courts and rec. facilities. See general plan
olic 2-86.
Wilson Park Repair of park irrigation system Maintains usability of City parks
Irrigation System and rec. facilities. See general plan
text a es 2-51 & 2-52.
Linda Vista Pond Feasibility study of restoring Maintains usability of City parks
Restoration Study existing pond to working condition and rec. facilities. See general plan
text ages 2-51 & 2-52.
Stevens Creek Install bridge and extend multi-use Decreases reliance on private autos
Corridor Park trail thru the Stocklemier property by implementing trail plan.
(Phase II) and connect to Stevens Creek Policies 4-2, 4-3, 4-4. Implement
Blvd. Blackberry Farm Master Plan,
policy 2-69, text pgs. 2-49 & 2-50.
Blackberry Farm Continuing renovations of existing Maintains usability of City parks
Infrastructure facilities, concession stand, pool and rec. facilities. See general plan
Up rades dressin rooms, etc. text a es 2-51 & 2-52.
McClellan Ranch Build a new blacksmith shop in Maintains usability of City parks
Blacksmith Shop McClellan Ranch for blacksmith and rec. facilities. See general plan
e ui ment and demonstrations text a es 2-51 & 2-52.
Quinlan Center Demolition and removal of Maintains usability of City parks
Fountain nonfunctional fountain and and rec. facilities. See general plan
Replacement redesign of the space for text pages 2-51 & 2-52.
community events, rivate rentals
Service Center Install an equipment wash rack for Projects that reduce nonpoint
Equipmt Wash Rack City-owned equipment source pollution. See general plan
olicies 5-32, 5-33.
McClellan Ranch Repaint existing buildings Maintains usability of City parks
Painting and rec. facilities. See general plan
text a es 2-51 & 2-52.
AM Radio Station Relocate the existing AM radio Maintains usability of City facility.
Relocation station antenna to eliminate RF No direct policy connection to
interference at City Hall. General Plan. No conflicts w/ plan.
Pro'ect Title Pro'ect Descri tiara General Plan Consistenc Notes
Quinlan Center Replace floor. Maintains usability of City parks
Aerobic Room Floor and rec. facilities. See general plan
text a es 2-51 & 2-52.
Monta Vista Comm. New vinyl flooring, asbestos Maintains usability of City parks
Bldg Repairs abatement, and new storage and rec. facilities. See general plan
cabinets text ages 2-51 & 2-52.
Wilson Park Bldg HVAC replacement and air Maintains usability of City parks
Repairs filtration system and rec. facilities. See general plan
text a es 2-51 & 2-52.
Portal Park Bldg HVAC replacement Maintains usability of City parks
Repairs and rec. facilities. See general plan
text a es 2-51 & 2-52.
Pavement Ongoing maintenance of street Maintains safety and functioning
Management pavement: pothole filling, slurry of the City's circulation system.
sealing and overlayment. See g. .policies 4-1 & 4-8
Curb, Gutter & Funds for the repair of curb, gutter Manages neighborhood traffic and
Sidewalk Repairs & and sidewalks when they meet decreases reliance on private autos.
ADA ramps repair criteria Policies 4-2, 4-3, 4-8. Reduce
flooding risks. See Flood Hazard
text a es 6-27 & 6-28.
Rancho Rinconada Neighborhood street circulation Maintains safety and functioning
Street Study study. of the circulation system. See
olicies 4-3, 4-6, 4-7 and 4-12
Pavement Ongoing maintenance of street Maintains safety and functioning
Management Prop. pavement, which may include of the City's circulation system.
42 pothole filling, slurry sealing and See g.p. policies 4-1 & 4-8
overlayment.
Pavement Ongoing maintenance of street Maintains safety and functioning
Management ARRA pavement, which may include of the City's circulation system.
pothole filling, slurry sealing and See g.p. policies 4-1 & 4-8
overlayment.
Traffic Signal Traffic signal upgrade Safety and functioning of the
Upgrade at Stelling circulation system. Policies 4-3, 4-
Rd./Greenleaf 7.
Safe Routes to Install sidewalks where gaps exist Safety and functioning of the
School- Garden Gate on Stelling Road, Greenleaf Dr & circulation system. Policies 4-3, 4-
on Ann Arbor Ave. to provide safe 7. Manages neighborhood traffic
route to Garden Gate School. and decreases reliance on private
autos. Policies 4-2, 4-3, 4-8.
Countdown Ped Re-lamp existing ped traffic Safety and functioning of the
Heads signals with LED countdown units circulation system. Policies 4-3, 4-
throughout the Cit 7.
De Anza Relocate two 55' mast arms and Maintains safety and functioning
Blvd./McClellan/ poles, related electrical, concrete of the circulation system. See
Pacifica Signal Mod. and stri in work. olicies 4-3, 4-6 and 4-7
Minor Storm Drain Funding for emergency repairs as Reduces flooding risks. See Flood
Improvements needed in various locations. Hazard text page 6-27 & 6-28.