Loading...
04-111 Storm Catch Basin Cleaning Bids NO AGREEMENT IN FILE r+ 1 ;i City Hall 10300 Torre Avenue Cupertino, CA 95014-3255 (408) 777-3354 FAX (408) 777-3333 PUBLIC WORKS DEPARTMENT Summary AGENDA ITEM ~ ~ AGENDA DATE October 4, 2004 SUBJECT AND ISSUE Review and reject all bids submitted for the Storm Drain Catch Basin Cleaning Project No.2004- 07. BACKGROUND In order to comply with Non-Point Source requirements, specifically the minimum performance conditions of the National Pollution Discharge Elimination System (NPDES) permit, the City is required to clean 50% of the total catch basins ~Nithin the City every year. The City currently maintains and has made it a practice to maintain all catch basins in the City, which is a total of 1780 of these drain facilities. In the past the City's operating budget has included approximately $50,000 annually from the Environmental Management Non Point Source Account for this work, which is performed by an outside contractor. Since the project contract amount, estimated to lie $52,000, is below $100,000 the project was competitively bid for award by the Director of Public Works. The bid was based on cleaning 100% of the City owned catch basins. The following is a summary of the bids received for the referenced project: Bidder Base I3id Engineer's Estimate $ 52,000.00 National Plant Services, Inc. $ 115,700.00 George Bianchi Construction Inc. $ 133,500.00 The low bid of $115,700.00 submitted by National Plant Service, Inc. is unfortunately higher by over 200% than the amount estimated or budgeted. Staff is recommending that the bids be rejected and that the project be re-evaluated and., if necessary, re-scoped to clean the minimum required 50% of the catch basins with a bid alternate to clean additional catch basins at the bid price as additional funding may become available. Because the bids received are over $100,000 a Council action is required to reject the bids and staff will immediately re-bid the project to ensure that the work is completed before the storm season begins in December. Printed on Recycled Paper ~~ FISCAL IMPACT There will be no immediate fiscal impact if the bids are rejected. STAFF RECOMMENDATION That the City Council reject all bids received an~j authorize the Director of Public Works to re- advertise for bids for the Storm Drain Catch Basin Cleaning, Project No.2004-07. Submitted by: Attest as to bids received Approved for submission: Ralph A. Qualls, Jr. Kimberly Smith Director of Public Works City Clerk David W. Knapp City Manager ~~