01-038 Community PlaygroundsAGREEMENT ,
CITY OF CUPERTINO
City of 10300 Torre Avenue
Cupertino Cupertino, CA 95014
408 -77 "7 -3200 NO. ery',-� / WS
BY THIS AGREEMENT made and entered into on the day of
by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and
Name (1) 00MMLLN:Ty arc, (2)
Address &-1 c54 h7 i' 9l 1 ;66 _r City —Ab46 i v Zip9 Phone(Y-/ -C $`fa -17d7
(Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as
follows:
CONTRACTOR shall provide or furnish the following specified services and /or materials: 7:5 i�rIeais'4 .4t4..
M 4TC12(4 -f 191Y0 L #8&L -1-1D /N .qLG, Pay 6j,u.(t)-*0Vr ,fir- ili&Jr 0.1&.1 AL P44.t ,
1) PLAY t /) <Stvr�r6 -s4FT-
EXHIBITS: The following attacph�edd,,exhibits hereby are made part of this Agreement: 7;4's- ttuY.�,r7- As
bi¢SCA off CY> MUIVtrr �ynvc«uns WP -vrM)J Pn.oPos.44S 0-Y q /F%1c0I
TERMS: The services and /or materials furnished under this Agreement shall commence one . ZLZJ
and shall be completed before stpT�m�E2 zgg 2..001 '
COMPENSATION: For the full performance of this Agreement, CITY shall pay CONTRACTOR: r
PtA lfT g 96
7Sl -7--) � ca�L x, A 35; 3s-6
GENERAL TERMS AND CONDITIONS
Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees from any
and all damage and liability of every nature, including all costs of defending any claim, caused by or arising out of the
performance of this Agreement. City shall not be liable for acts of Contractor in performing services described herein.
Insurance. Should the City require evidence of insurability Contractor shall file with City a Certificate of Insurance
before commencing any services under this Agreement. Said Certificate shall be subject to the approval of City's
Director of Administrative Services.
Non - Discrimination. No discrimination shall be made in the employment of persons under this Agreement because
of the race, color, national origin, ancestry, religion or sex Df such person.
Interest of Contractor. It is understood and agreed that this Agreement is not a contract of employment in the sense
that the relation of master and servant exists between City and undersigned. At all times Contractor shall be deemed
to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations
in executing this Agreement. Contractor certifies that no one who has or will have any financial interest under this
Agreement is an officer or employee of City.
Changes. This Agreement shall not be assigned or transferred without the written consent of the City. No changes
or variations of any kind are authorized without the written consent of the City.
CONTRACT CO- ORDINATOR and representative for CITY shall be:
NAME -&6 RzZE) DEPARTMENT
This Agreement shall become effective upon its execution by CITY, in witness thereof, the parties have executed this
Agreement the day and ypaf4irst-mritten above.
CO
By
Title t i0 rr�
Soc. Sec. #
d0- - Ay.a&go-
APPROVALS
CITY OF CUPERTINO:
By �fLr1J
Titletes� TZ'7L �%1/lsrL
EXPENDITURE DISTRIBUTION
DEPA N HE �� DATE
G (
ACCOUNT NUMBER
AMOUNT
Y20 / D - 9*`0 b
`f Q�
CITY CLERK AATE
3161
CITY CLERK COPY
CITY OF CUPERTINO
BID SUMMARY
BID SPECIFICATION: rnEnrT OF PIA(i L0WL,2vr«-�,[7– %
Quantity
Bid prices must include sales tax and freight cost
VENDOR
UNIT
EXTENDED
SALES
PHONE NO.
PRICE
BID PRICE
TAX
FREIGHT
TOTAL
CONTACT NAME
%lus Sa..ws t qsr-c-
940 4(;26-5-,00/
3s3s6, �.b I
(Pzr.) (/:24 - �7os
Sr
24,oil. sS
S
Tvh� �awarvs
["?,7 Sao 9.41 °I
toss i2..zn[��v
�
707 S�8 - 3f3oc7
j
� '
1
391 SIB . a�)j
If low bid is acceptable no further discussion is necessary
DISCUSSION: * _Sr;Z�� -�.,. �ny0[ % ; ,_TE k c�v�. LV4!C 6t<an
n bCST D0-L6'0V 2%Ar-- /hL3T 7-A,--X
OG Tl,� Ti9Q r= rcz� A 6ri cc.�
J
RECOMMENDATION: Vendor Number 1. E>—� 2. 3. 4.
APPROVAL
S
Date
Purchasing Officer ( Finance Department ) Date
CITY OF CLPERTINO
BID SUMv1ARY
BID SPECIFICATION: ��,,; 4F,y�
Quantity
Bid prices must include sales tax and freight cost
VENDOR
UNIT
EXTENDED
SALES
PHONE NO.
PRICE
BID PRICE
TAX
FREIGHT
TOTAL
CONTACT NAME
frtou� aj "s v
y2r yzc -��o�-
831-Gs'f -7.zlZ
I
I
,� ao
�
�.0 &t vft q-r
I /S 7ya.
list 2�.c�►r�c•✓
I
1171.>Q
oaf
If low bid is acceptable no further discussion is necessary
DISCUSSION: *
RECOMMENDATION: Vendor Number
APPROVAL
Purchasing Officer ( Finance Department )
1.0 ?_= 3.= 4.=
E A�e
Date
Date
COMMWITY PLAYGROUNDS INC.
1620 Grant Ave Suite 5
Novato, CA 94945
TEL. (415) 892 -1707 - FAX (415) 892 -3132
LIC. #362950
Project: City of Cupertino
Location: 10555 Mary Avenue, Cupertino
Contact: Public Works Service Center
lum SCOPE OF WORK
Joilyman Park:
1) dicap Access Ramp
2) Furnis I Wood Fiber
3) F ish Ga ime Play Structure
(Includes Freigh nd Sales Tax)
Receive and Instal Structure
i Memorial Park Play Areas
1) Handicap Access Ramp 10'x 5'
2) Furnish & Install Wood Fiber
3) Furnish Game Time Play Structure
(Includes Freight and Sales Tax)
4) Receive and Install Play Structure
Quinlan Com<Rubb ter:
1) Demo lay cture, Curb &Sand
2) Fu islass II Base Rock (Compacted)
3) Furnisme Play Structure
(Inclu and Sales Tax)
4) Re iv11 Play Structure
5) Poured ubb
Alternate:
Memorial Park Swing Area:
1) Form and Pour Concr ete Curb 6" x 12" - 36"
2) Install Only Four Seat Swing Set
3) Furnish & Install Wood Fiber
Bonds included in Pricing.
Estimator: Jana Phimister
Date: April 17, 2001
Phone:
(408) 777 -3350
UNIT
Fax: (408) 777 -3399
QUANTITY UNIT PRICE
LS
TOTAL
$1,008
CY
100
$5,231
EA
1
$16,472
EA
1
$6,110
Sub -Total
$28,821
LS
$2,264
CY
64
$3,348
EA
1
$22,752
EA
1
$6,993
Sub -Total
mm
LS
$4,346
SF
300
$1,369
EA
1
$12,643
EA
1
$4,062
SF
928
$10,125
Sub -Total
$32,545
LF
140
$6,626
EA
1
$1,199
CY
58
$4,815
Sub -Total
$12,640,.,
COMMUNITY PLAYGROUNDS INC.
ATTACHMENT "A" GENERAL NOTES
Installation Excludes:
Engineering, Permits, Protection, Concrete Sawing, Core Drilling.
Erosion Control or Repairs, Security Patrol, Warranty of Equipment
Rcmuval or disposal of rubber tires, or any other materials deemed toxic waste.
Excludes Federal or State prevailing wage requirements if not stated in writing at time ol' the request for quotation.
If any of the following are encountered
additional charges will be required as change orders:
Digging in rock. Hard rock, or Unstable soils
Existing Ground cover materials interfering with installation
Play Equipment shortages and/or damage causing delays or requiring a return trip or a separate mobilization
Customer requirement to work over 10 hours per day or 40 hours per week.
this proposal is based on 4 days per week 10 hours per day (40 hour week). at our standard rates. it mutually jtgrcc:thlc
schedule, and is valid for 60 days unless extended by written statement from Community Playgrounds Inc.
Thank you Ibr contacting Comnaunity Playgrounds Inc.
Ii* you have any questions or need additional information please call
Jana Phimister or Curt Wcar at (415) 892 -1707.
Community Playgrounds
Date
A,61Z -efll I A
�L
Owrkr. Signatur V 4; Dad
• It the enclosed proposal is accepted a signed copy of this form will be reyurred prior it) commencing work on the project
2/00
MEMORIAL PARK
CUPERTINO, CALIFORNIA
5 -12 YEARS
18047
TRANSITION STEP LINK
10570
SPRIAL TUBE SLIDE
10113
BARRIER
ENCLOSURE
0
10424
CONTOURED
SEAT PANEL
15005
TREESCAPE DECK w /CLIMBER
10989
FAT PIPE
CLIMBER
y �
10457
SLIDE & GLIDE SLIDE
w /TUNNEL
10335
90' HORIZONTAL LOOP LADDER
4'
15071
RAINFOREST
CANOPY
10051
RUNG LADDER
3'
10177
36" HANDHOLD PACKAGE
w /KICKPLATE
10037
TREE CLIMBER
/ 4' %
10172
CRUNCH
10620 BAR
Z00 PANEL
10619
METAL STOREFRONT
PANEL (BELOW)
18014
FUNNEL BRIDGE
w /GUARDRAIL
18006
TRANSFER PLATFORM
e:
J
AUM A s
AMW-
•
'
L-
EDWARDS & ASSOCIATES
PARK & PLAYGROUND EQUIPMENT
800 -303 -7529
P.O. BOX 909
CARMEL VALLEY, CA 93924
TO: BOB RIZZO ET. AL.
CITY OF CUPERTINO
831 - 659 -7212
831 - 659 -7226 (FAX)
THANK YOU FOR THE OPPORTUNITY TO PROVIDE YOU WITH THE
FOLLOWING PROPOSAL FOR PLAYGROUND EQUIPMENT AND
INSTALLATION AT QUINLAN COMMUNITY CENTER.
PLAYGROUND EQUIPMENT PER ATTACHED DRAWING
EQUIPMENT INSTALLATION $2,750
SAWCUT ELLIPSE 1,100
SUB GRADE PREPARATION FOR RUBBER 1,630
460 S.F. COLORED RUBBER 1.75" THICK 3,450
RUBBER INSTALLATION 1,840
TOTAL CONSTRUCTION $11,770
LIST PRICE
7,693
DISCOUNT
<1,154>
SUBTOTAL
6,539
TAX
523
TOTAL
$ 7,062
TOTAL FOR THIS PROJECT $18,832
NOTES:
PLAYSTRUCTURE IS TOTS CHOICE EQUIPMENT BY MIRACLE RECREATION.
PLAYSTRUCTURE IS AGE APPROPRIATE FOR 2 -5 YEAR OLDS
ELEVATED COMPONENTS = 3 GROUND LEVEL COMPONENTS = 4
1 SLIDE 2 CLIMBERS
CIRCULAR PLAY AREA SAND, CONCRE'T'E & EQUIPMENT TO BE TAKEN TO
CORP YARD FOR DISPOSAL.
SHADE STRUCTURE 16'X 16' IS INCLUDED. LEGS OUTSIDE FALL ZONE
PERIMETER PLAY PANELS AND FUN FONE HAVE NO FALL ZONE AND ARE
LEGAL AS SHOWN.
AS AN ALTERNATE YOU MAY WANT TO CONSIDER HAGS MODEL 607218
CALLED ZERMATT. HAGS IS A SWEDISH COMPANY THAT MIRACLE
RECENTLY PURCHASED. THE PRICE WOULD REMAIN THE SAME BUT
WITHOUT THE SUN SHADE OR OTHER EQUIPMENT. PICTURE ENCLOSED
QU N LAN COMMUNITY CENTER
CITY OF CUPERT NO
TOTS CHOICE EQUIPMENT
BY MIRACLE RECREATION
� -S 18 -81L
Sol 8�
�j�� M
Wi
LU
J�
�LU
Q
y w
a.
#' Ll
1'
1�' #jyM�M 4R dyS Yf,'�
q� �,"yfi*ydr s
MMM tIR y �_
f,IT
e «�7
n r u
J
Y�yi4t
vF r� T�Q
r k L4
0
mo'�,
\ \�! \� %
54
MOM
-44
■
QU N LAN COMMUNITY CENTER
CITY OF CUPERTINO
ZERMATT BY HAGS
71MIRACLE
RECREATION EQUIPMENT COMPANY
Sales Representative
John Edwards
Prepared CITY OF CUPERTINO
For: 1055 MARY AVENUE
CUPERTINO, CA 95014
Payment/ BOB RIZZO (408) 777 -3350
Accounting
Contact:
Equipment Quotation
Quote Number:
51016433
Quote Date:
04/17/2001
Customer Number
95011304
Terms of Sale:
Net 30
Customer Class:
1. Parks & Rec
Shipping Method:
Miracle
Freight Terms:
Prepaid
Approximate Ship Date:
$648.00
Cust PO Num:
FREESTANDING PAINT EASEL PANEL, INGROUND
Location: CITY OF CUPERTINO
1055 MARY AVENUE
CUPERTINO, CA 95014
Shipping/ BOB RIZZO (408) 777 -3350 O.1lt 1 O i—A-f'I
Delivery 11
Contact: 1 6
Quantity Item Number
Description
Price Each
Price Total
1 33016RF
FUNSHADE 16'X 16'X 10' RAIN FOREST
$2,100.00
$2,100.00
1 1807132
PUPPET STAGE PANEL W/3 -1/2" OD :POSTS
$549.00
$549.00
1 1807142
FIRE TRUCK PANEL W /WHEEL W/3 -1/2" OD POSTS
$648.00
$648.00
1 435
FREESTANDING PAINT EASEL PANEL, INGROUND
$726.00
$726.00
1 718502
SQUARE DECK (ATTACHES TO 4 POSTS)
$434.00
$434.00
4 718552
3 1/2" OD X 130" POST (3' TO 5' DECKS)
$93.00
$372.00
1 718700
5' SIDE -BY -SIDE SLIDE W /CANOPY (3' DECK)
$745.00
$745.00
1 7188153
VERTICAL LADDER CLIMBER (3' DECK)
$190.00
$190.00
1 718965
TRANSFER PT W /OPEN HNDRL (3' DECK)
$1,080.00
$1,080.00
1 7189941
FUN FONE PAIR (2 FONES) W /ONE (1) POST
$509.00
$509.00
1 7189941X
FUN FONE PRICE INCLUDED IN 7185941
$0.00
$0.00
1 7189961
CARGO CLIMBER W /HANDRAILS (3' DECK)
$340.00
$340.00
Color List:
Equipment Total:
$7,693.00
System: P Item Number:
1807132 Quantity: 1
Freight:
$0.00
Installation:
$0.00
System: P Item Number: 1807142 Quantity: 1
Discount:
$1,154.00
System: TC
CIA Discount:
$0.00
Other Charge:
$0.00
SubTotal:
$6,539.00
Tax:
$523.12
Grand Total:
$7,062.12
Thank you for the opportunity to provide this quote!
Rep #: 51 Order #: 51016433 Pagel of 2
SpectraPour' Safety Surfacing
Murphy Park • Springdale, Arkansas
A Cushion of Quality
SpectraPour protective surfacing is your most creative cushion of
quality under playgrounds and components. With our unique
Poured -in -place system, SpectraPour delivers unmatched
design potential, safety and durability to any play environment.
• A precise blend of synthetic rubber granules and our proprietary
polyurethane binder
• On -site mixing and installation by our factory professionals
• Standard thickness ranging from: 1 3/4" to 5"
• Superior athletic performance
• Entirely porous play surface
• Installed over asphalt, concrete or aggregate
• Unlimited color combinations
Designer Graphics
If you want special graphics or color combinations to enhance your
playground, we have you covered with SpectraPour, a safety,
surface system that can be poured -in -place directly over a compacted
stone base, offering unmatched design potential. As installation
requirements vary, we want you to know all available options point
directly to the industry leader in safety surfacing... SpectraTurf.
Meets current ASTM, CPSC
and ADA requirements
a
urfaeing Systems
310 Reed Circle • Corona, CA 91719 • (909)- 734 -5617 • (800) 875 -5788 • Fax (909) 734 -3630 • www.spectraturf.com
PART 1 - GENERAL
III I �l
rfacing Systems
PRODUCT SPECIFICATIONS
PLAYGROUND SAFETY SURFACING
Spectrapour Safety Surfacing
1.1 Section includes: Resilient playground surfacing poured -in -place system.
1.2 Related work: Playground equipment and resilient playground surfacing sub base.
1.3 Description: Provide all necessary materials, labor, tools, and equipment to perform the work included in the section for
the installation of the poured -in -place resilient playground surfacing.
1.4 Quality Assurance: Manufacturer shall have manufactured and installed playground poured -in -place surfacing systems
to current ASTM 1292 Test Criteria for a minimum of 5 years. The installation of the poured -in -place product shall be
completed by Manufacturer Certified Contractors or by direct employees of the Manufacturer's Installation Division.
Manufacturer's detailed installation procedures shall be submitted to the Architect and made a part of the Bid
Specifications.
PART 2 - SUBMITTALS
2.1 Manufacturer's Product Literature and Specification Data.
2.2 ASTM F1292 Impact Attenuation Test Certification for the poured -in -place system to be installed in compliance with
the Critical Fall Height as determined by the Playground Equipment to be installed in conjunction with the poured -in-
place surfacing system.
2.3 ASTM E108 Fire Test. Product shall exhibit a minimum result of a Class A Rating.
2.4 ASTM E303 Skid Resistant Test Data.
2.5 Statement of Warranty for a minimum five year period with detailed Warranty Claim requirements of the owner and
specific procedures to be followed by the manufacturer in terms of response and repair of warranty claims.
PART 3 - PRODUCTS
3.1 Product: Spectrapour (formerly known as Miracle Surfaces PLAYSAFE) or approved equal.
3.2 Description: A dual durometer poured -in -place system with a wearing layer upper membrane and an underlying impact
attenuation cushion layer. The finished surface shall be porous, and capable of being installed at varying thickness to
comply with Critical Fall Height requirements of playground equipment installed in conjunction with the surface.
3.3 Materials: The Spectrapour surface shall be manufactured from EPDM and SBR rubber compounds mixed with a
100% MDI based Polyurethane Resin. Polyurethane containing any TDI shall not be allowed due to environmental
regulations.
3.4 Cushion Course shall be a mixture of 3/8" shredded and a 1 -3mm SBR rubber particles of heterogeneous distribution
(50/50 mixture) bonded by a polyurethane binder applied to 100% of the rubber and installed to a designated thickness
as required by the Consumer Product Safety's Commission's Guidelines and ASTM 1292 Test Criteria.
3.5 Wearing Surface shall be a mixture of black or colored EPDM granules bonded by a polyurethane binder applied to
100% of the granules and applied to a thickness of 3/8" over the cushion layer. Color choice and blend ratios to be of
color selected by the owner.
3.6 Finish Texture: Pebble grain.
3.7 Color: Selected from Manufacturer's Color Chart. Choice by owner to be determined prior to bid.
11/24/97
5of'Fall Crushed Wood 5urfacing
Meets criteria for A5TM P5&3 -97 *, determination of accessibility of Surface systems
under and around playground equipment
For more information on 5of'fall and 100% surface accessibility, call uo
TOLL FREE 1 -800- 523 -8690 9 FAX 1- 888 -5of -Fall (1- 888 -763 -3255)
I� Or visit our website at WWW,50E- FALL.COM
�. i
13 Is there a product I�-
that is resilient enough to
cushion falls from high equipment,
yet stable and slip resistant for
users with disabilities?
Sof'Fall Incorporated is
proud to answer "YES!"
" Test summary and data available
THE HIGHEST
STAN DARL) OF CARE
SOF'FALL crushed wood surfacing is manufactured
from nature's renewable resource, wood. The fibers
are all new material manufactured to meet strict
standards for use under
and around playgrounds
as set by ASTM, CPSC, Sof Fall
the ADA Access Board, INCORPORATED
and you.
"the natural choice ""
JJ
" � A ph'i?
•M
APA ... COMPLIANCE 155UE
ADA Compliance may be as simple as replacing your current surfacing,
(sand or gravel) with Sof'Fall crushed wood surfacing. Here's what Frank
P. Bernarducci, Ed.D, Executive Director, Resource Connection has to
say about Sof'Fall crushed wood surfacing.
"This summer our organization was involved in the renovation of five playground
areas in Lawrence, Massachusetts. For these projects we used Sof'Fall and found
it to be an excellent surfacing product. Since we are a human service agency
dedicated to individuals with permanent physical disabilities, we were particularly
impressed that Sof'Fall allows safe and easy wheelchair accessibility to the play
structures"
- -- Frank P. Bernarducci, Ed.D
Executive Director Resource Connection
SOFFALL"the natural choiceTM"
IMPACT ATTENUATION
Children of all ability levels who access
a playground deserve a safe play envi-
ronment.
SOFTALL is "the natural choice" for its
impact attenuating properties. In fact,
SOFTALL crushed wood is the highest
rated of any safety surfacing that does
not diminish over time because it can
be replenished. (critical height, 13 feet
see test results for ASTM F1292 -95)
The critical height of rubber products is
usually correlated to a new installation.
Both rubber mat and poured in place
surfacing tend to lose their resiliency
over time when debris such as dirt and
sand get trapped in it. UV rays can also
break down the material, cause it to
weaken and edges to curl. Poured in
Place and Rubber Tiles critical fall
height does not protect children on high
The Last''
Word In
Playground
Surfacingl
equipment as does Sof'Fall (13 ft.),
even at initial installation.
C05T
SOFTALL is "the natural choice"
because it's safe and economical. For
less than 1/3 the cost of rubber (includ-
ing the cost of installation) you can sur-
face yyour entire playground with
SOFVALLL crushed wood surfacing.
Delivery and installation are simple. It
can usually be completed in one day
and does not require any special skills
or tools. The initial cost of rubber can be
as much as $16 per square foot. This
price does not include the cost to build
a concrete pad to which the rubber
must adhere to. Additionally, poured in
place rubber requires a factory installer,
and when in liquid form is considered
extremely toxic if inhaled.
FOR MORE INFORMATION,
CALL YOUR AREA REPRESENTATIVE
EDWARDS & ASSOCIATES
PARK & PLAYGROUND EQUIPMENT
800 -3011 -7529
P.O. BOX 909
CARMEL VALLEY, CA 93924
TO: BOB RIZZO ET. AL.
CITY OF CUPERTINO
831 - 659 -7212
831 - 659 -7226 (FAX)
THANK YOU FOR THE OPPORTUNITY TO PROVIDE YOU WITH THE
FOLLOWING PROPOSAL FOR PLAYGROUND EQUIPMENT AND
INSTALLATION AT JOLLYMANPARK
PLAYGROUND EQUIPMENT PER ATTACHED DRAWING LIST PRICE 29,861
DISCOUNT <4,480>
SUBTOTAL 25,381
TAX 2,031
TOTAL $27,412
EQUIPMENT INSTALLATION $8,400
SMALL CONCRETE RAMP INSIDE CURB 450
12" WOOD FIBER INSTALLED 3,400
TOTAL CONSTRUCTION $12,250
TO'T'AL FOR THIS PROJECT $39,662
NOTES:
PLAYSTRUCTURE IS KIDS CHOICE EQUIPMENT BY MIRACLE RECREATION.
PLAYSTRUCTURE IS AGE APPROPRIATE FOR 2 -5 YEAR OLDS BUT STILL
INTERESTING TO KIDS UP TO 8 YRS OLD.
ELEVATED COMPONENTS = 9 GROUND LEVEL COMPONENTS = 9
3 PERFED METAL SQUARE ROOFS
3 SLIDES 6 CLIMBERS 1 SUSPENSION BRIDGE
CIRCULAR PLAY AREA EQUIPMENT AND SAND TO BE REMOVED BY CITY.
SWING IS SINGLE POST TO MINIMIZE FALL ZONE WITH 2 BUCKET SEATS
ELEVATED SAND BOX INCLUDED
PIROUETTE SPINNER INCLUDED
THANKS AGAIN,
JOHN EDWARDS
ItJ'. "F
eV {. { J. 1 • n
r I i { l
r z:'J� Y� H � t �' ,�•' ,
t�ryy I7° i, ° JW kn' 7 r\ 'iR /T` b< � �': y � y •:dt �J.,'y
Iik1`IYw�;�
i ) }
t�
rr{K v t.s"f�1, 'fv'� �C 1•>i in L1 t i r *•. xk �y ,' � '' >J�E� '.
f�,Ji�Ji fi 7e�Y,*4e{,y�
Ol
�J�,,,t;�i,�wk*�a{,,y.t�t�•�3{r r't �y,,,r�,t r °r� ;,, a �.; • ,.;
,p' M
a'faln p4 JY
1y Y •f /1 ti.!pTd -
'4 �*'•k frail
.(
fl"W j 11'!•t
W
gyp:
All,
^ta '' 1W 4W aok tJ,R i M/i y'4 t,
9
Nfk,
6.�.14�.r i';y �L uhf Y J?Y�• 4\ :.iy
� MW
7
�-•5;� +[�fp
t ,• .!`M yy�Taa'.' ��¢,,F4` JIY`iai i t ri!'f
` �4'� .�;'� �`7'j•.l f` F�"" ceJ+7��N': �,7/j� I�a .:'S', i -'. )+ Ili F
w{ y w 1 z Y1'° rr q
T'+{�tfJE�r6)- 5 �iJf NI
'7��{J�,p4r'�, ��Y�'% tY:ar erij +, r} � ✓�v'1a� 1� I' .+`.'�rJ 7i 1 - K '� — – _� �y _ :.
�� "isa}�Ji9�'� •S :.,. �R�
r +�,T,
,r,P' =�,'d6 �}'�'l��
J'Ui+, ar��`� �(� f' �7 � JS: 'i�FF {ji ti' ,� .. 1 / { + -•y � ` rt ?;+�1 r ,� J t r' j
i ^.',�Uyi,,,,,,,,}}'r r}A+ H�s �4 h�i�,�t:: F 1 V a , aT r' ;•+i .y .` A i.- { ,f, 'f H
e' :h"�•, v r� Jl',K `7 \' }, 2 .t' J! 1'+.n 4�.k1 y .r'.y� Y.
•'7 � .n4'4 �e.��,�,V1,,,� yin'a"n�;`54 � f � �j� Y �fy't-v'4J
,J"?y; "�,Y
�'� �`i°iF
IJ, py�{+srf•� \ v Y v � . ,U '� i t .L X :•' sa ti , ! It °I
ni. /rnt'}d.,avaJr�'`�t
'dfflilYri] /f'£Ijfpa�M� �rJ >�Yf�r ;�''{��t f z 14. y� ry� , Yyt b,� Z E�1 T .t•l j \e�.`.
f
v�
Ar
n
D
_V p
0
A O
10
, r
Ln m
.Zl
JOLLYMAN PARK
CITY OF CUPERTINO
KIDS CHOICE EQUIPMENT
BY MIRACLE RECREATION
BONGO PERCH
714-862-4
PERF STEEL SQUARE ROOF
3' TRANSFER POINT
W \SINGLE STEP
714- 965
Wp
00
za
ORIZONTL "L" LADDER.
714 -914 -5
m
a m Woo
mm
I
OUn
Wym
zu-n
a ui I
ao
x
00 1 00 I
o J p
Nm
J m
mw -D
U Q I
uaa
a �
o^
J I
On
W �
ml
r�
O
PIROUETTE
592- 415
ZBL- N0Nna0
p10114 15
N
r
6
NN
V_ N S
1
20 �
N
C10�5pN0 BS4NEP
4,
MIRACLE
RECREATION EQUIPMENT COMPANY
Sales Representative
John Edwards
Prepared CITY OF CUPERTINO
For: 1055 MARY AVENUE
CUPERTINO, CA 95014
Payment/ BOB RIZZO (408) 777 -3350
Accounting
Contact:
Equipment Quotation
Quote Number:
51016432
Quote Date:
04/17/2001
Customer Number
95011304
Terms of Sale:
Net 30
Customer Class: 1.
Parks & Rec
Shipping Method:
Miracle
Freight Terms:
Prepaid
Approximate Ship Date:
$1,134.00
Cust PO Num:
5" OD X 144" POST FOR ROOF (3' DECKS OR LESS)
Location: CITY OF CUPERTINO
1055 MARY AVENUE
CUPERTINO, CA 95014
Shipping/ BOB RIZZO (408) 777 -3350
Delivery
Contact: � )L- Ll {�
Quantity Item Number Description Price Each Price Total
1 592415
PIROUETTE
$744.00
$744.00
1 714501
TRIANGLE DECK (ATTACHES TO 3 POSTS)
$419.00
$419.00
3 714502
SQUARE DECK (ATTACHES TO 4 POSTS)
$574.00
$1,722.00
7 714552
5" OD X 136" POST (3' TO 5' DECKS)
$162.00
$1,134.00
8 714572
5" OD X 144" POST FOR ROOF (3' DECKS OR LESS)
$155.00
$1,240.00
4 714573
5" OD X 168" POST FOR ROOF (3'6 " -5 DECK)
$184.00
$736.00
1 7147133B
WINDOW PANEL (BELOW DECK ONLY)
$573.00
$573.00
1 7147137B
STORE FRONT PANEL (BELOW DECK ONLY)
$573.00
$573.00
1 7147141B
PARK RANGER PANEL W /WHEEL (BELOW DECK)
$642.00
$642.00
1 7147285
BUMP & GLIDE SLIDE, ONE PIECE (Y DECK)
$1,159.00
$1,159.00
1 7147393W
30" ID STRAIGHT TUBE SLIDE W /WDW (3' DECK)
$1,407.00
$1,407.00
1 7147485
67" TYPHOON 11 SLIDE 360 DEG (5' DECK)
$2,870.00
$2,870.00
1 714760B
MAGIC BALL POPPER PANEL (BELOW DECK)
$915.00
$915.00
3 7147721
BONGO POD, SINGLE
$84.00
$252.00
1 714782
CRUNCH STATION
$54.00
$54.00
1 7148153
VERTICAL LADDER CLIMBER (3' DECK)
$332.00
$332.00
2 7148155
END LADDER FOR OVERHEAD CLIMBERS (ONLY)
$231.00
$462.00
1 714817B
WALL ENCLOSURE W /SEAT (BELOW DECK)
$420.00
$420.00
1 714855
& SUSPENSION BRIDGE W /FULL BARRIER
$2,681.00
$2,681.00
3 7148624
SQUARE ROOF, PERF STEEL
$1,052.00
$3,156.00
1 7149145
HORIZONTAL "L" LADDER (ONLY)
$332.00
$332.00
1 714959
ADA STAIRS BETWEEN DECKS W /2' RISE
$1,578.00
$1,578.00
1 714965
TRANSFER POINT W /SINGLE STEP (3' DECK)
$1,262.00
$1,262.00
1 714968
CURVED LOOP CLIMBER (3' DECK)
$469.00
$469.00
1 7149715
90 DEG SWING RINGS (ONLY)
$963.00
$963.00
1 7149935
ADA MIRATHERM STAIR W /1'6" RISE OPEN HNDRL
$918.00
$918.00
1 714994
FUN FONE PAIR (2 FONES)
$506.00
$506.00
Rep #: 51 Order #: 51016432 Pagel of 2
Quantity Item Number
Description
Price Each
Price Total
1 714994X
FUN FONE PRICE INCLUDED IN 714994
$0.00
$0.00
1 714995
CLIMBER CARGO (5' DECK)
$423.00
$423.00
1 418154
CLOVER LEAF THERAPEUTIC SAND BOX
$1,099.00
$1,099.00
1 7147352T
SINGLE FRAME 5" OD W/2 TOT 360 DEG SEATS
$820.00
$820.00
Color List:
Equipment Total:
$29,861.00
System: KC
Freight:
$0.00
Installation:
$0.00
System: SWG Item Number: 7147352T Quantity: 1
Discount:
$4,480.00
CIA Discount:
$0.00
Other Charge:
$0.00
SubTotal: $25,381.00
Tax: $2,030.48
Grand Total: $27,411.48
Thank you for the opportunity to provide this quote!
Your Exclusive Sales Representative
I hereby authorize Miracle Recreation Equipment Company to ship the equipment listed above for which 1 agree to pay the total amount specified I
will be responsible for receiving all merchandise from the Miracle truck. Payment terms are Net -30 days from invoice date with approved credit. Non-
taxable customers will provide proper tax exemption certificate to Miracle Recreation. Purchase orders and payments should be made payable to the
order of Miracle Recreation Equipment Company.
Accepted By
Printed Name
Date
Rep #: 51 Order #: 51016432 Page 2 of 2