20. Council Work ProgramOFFICE OF THE CITY MANAGER
CUPERTINO
CITY HALL
10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255
TELEPHONE: (408) 777 -3212 • FAX: (408) 777 -3366
davidk @cupertino.org
STAFF REPORT
Agenda Item Number
2 0 Agenda Date: March 16, 2010
SUBJECT AND ISSUE
Review and adopt 2009 -10 City Council work program.
BACKGROUND
On February 23, 2010, City Council held a meeting to consider the work program for 2010 -11.
Staff has updated last year's work program to reflect Council's desires.
In addition, Council Members listed several items for further discussion and possible
incorporation into next year's work program. I have provided a table listing those wish list items,
together with some comments on each.
RECOMMENDATION
Adopt City Council work plan for 2010- 2011.
Respectfully submitted:
;�W_-
David W. Knapp, City Manager
Council Wish List for Work Program
Wish
SROs - details for budget discussion
Go Green - Presentation
Solar Panels at City Hall / Library
Review Simms & Stocklmeir
!Staff will provide a report to the City Council on current programs and initiatives
involving the community and the city itself. As an outcome of the presentation, staff
,seeks continued direction from Council as to how city efforts may be best directed
in order to address community environmental priorities.
Wong We are participating in a countywide solicitation of a power purchase agreement as
authorized by Council in February of this year. In conjunction with this effort we
have hired a consulting firm to survey the most productive sites on which to install
photovoltaic systems including the Civic Center, Quinlan Community Center, and
,the Service Center. An updated report outlining the findings and alternatives is
scheduled to come back to Council before the end of summer.
Wong ,Council voted to make the Simms property a nature preserve. Staff will return with
the cost of doing so during budget discussions. Council approved a vision for
Stockimeir as a legacy farm. Currently, there is no budget, however, a task force is
working on developing a more detailed plan.
Council
Member
Wang
Staff Comments
School Resource Officers (SROs) are assigned to 14 schools to address school and
student issues, such as: drugs, violence, suicide, child abuse, sexual abuse, and
habitual truancy issues. The City budgets two part time SRO's (one at 85% and one
at 75 %) for a total general fund cost of $240,100 ($360,100 less $100,000 COP grant
monies, $10,000 from CUSD and $10,000 from FUHSD). We anticipate the COP
grant and the school contributions to continue in FY 10/11.
i Wang
Page 1 of 4 (3/10/2010)
Council Wish List o -. Work Program
Development Agreement w /new Wong (Since Development Agreements (DAs) limit the the power of a government to apply
Vallco Owner newly enacted ordinances to a project for a period of time, municipalities have the
opportunity to require public benefits beyond those typically required. In order to
appropriately evaluate the impacts of a DA and determine what public benefits
should be required, staff recommends that any DA be accompanied by a
conceptual, master or development plan. A DA would be processed concurrently
with the project application. Once the Council determines the terms of a DA along
with the project approvals, drafting an agreement can take up to 3 months
depending on the complexity of issues.
Crossing Guards Wong There are 10 crossing guards. Annual cost is $145,000. The school district
determines the times and locations they are deployed.
Marsha leaving - fulltime replacement Wong Marsha has been rehired by County Fire at 20 hours per week to support Cupertino.
I will be working with the Chief to see if we can get a fulltime replacement, who,
;with Marsha's 20 hours, can continue her work and help bring the other West Valley
j cities up to our level.
Ice Rink I Wong /Mahoney
Mike Rohde confirmed that there are no plans to remove the ice rink. Options to
require that the ice rink remain could be tied to future permits or a Development
Agreement.
I
Multi City Trail Project Wong /Mahoney
A four city task force (Mountain View, Sunnyvale, Cupertino, Los Altos) is seeking a
j
jgrant for a consultant to recommend where the Stevens Creek Trail should go
between Cupertino and Mountain View.
Google Fiber i Wong /Mahoney
We will be submitting an application for the Google fiber project. On March 3rd the
'Technology, Information, and Communication Commission reviewed this item and
unanimously voted to make the Google fiber application a priority. We expect that
Google will receive thousands of applications.
Quarry trucks Wong /Chang
Legal opinion is being prepared and will be circulated in March /April.
Page 2 of 4 (3/10/2010)
Council Wish List for Work Program
R -1 Slope Lots Uniform rules
Wong
Beginning in 2006, the City went through an extensive process to determine hillside
Spot Zoning
(for Santoro)
development standards for all R1 lots on steep slopes. Nearly 300 properties were
identified and, in 2007, the Council decided to include only 15 properties in a special
zoning overlay in which a hybrid of R1 and hillside standards would apply.
Currently, all R1 lots, not in the special zoning overlay, that propose development/
grading of over 500 sq.ft. on slopes of 30% or greater, are required to comply with
stricter RHS (Hillside standards).
Wa / Bike to School
Chang
Te Commission working to encou more t o walk and bike to school.
Cooperate with Non - Profit re: pollution
Chang
These issues raise jurisdictional problems. The City Attorney is preparing a
Collect more health info - cancer
preliminary response to be submitted in April.
_Ai Mo
Chang
Chang
Arsenic testing - neither Water or
Air Distri - take r
Chang
Fireworks cost $31,800 in 2009. We are moving ahead to provide fireworks this 4th
Not fund Fireworks
of July.
Not fund Leadership Cupertino
Chang
There is an active planning group. The curriculum has been developed. Tentative
kick off is planned for September.
Funding for environmental studies Chang
Barbara Banfield, City Naturalist, spends a substantial amount of her time working
in our sc hools
with students from local schools on environmental issues.
The parking capacity at the Library is adequate most of the time, although at times
Library Parking Mahoney
some patrons may have to park further away from the front door than they would
like. However, occasional concurrent events create a parking shortage from time to
time.
The most recent suggestion was to expand parking by occupying a portion of Library
Field adjacent to the existing row across from the Memorial Grove on the south
side of the building. An evaluation and cost estimate completed by Public Works,
concluded that such a project would add about 50 stalls and cost approximately
$500,000. Another idea was to add 10 parallel spaces on the north side of
Rodrigues, across from City Hall. This would eliminate the westbound left turn lane
from Rodrigues at Torre and substantially increase congestion at the intersection.
Page 3 of 4 (3/10/2010)
Council Wish List Work Program
Euphrat Museum of Art Mahoney The Euphrat Museum Director position is at risk because of college budget cuts.
Without cutting existing city positions or services, the City is unable to fund the
j Director's position. However, Cupertino currently contracts with the Euphrat for
labout $40,000 - $50,000 for various classes provided at Quinlan. City Council,
'through grants from the Fine Arts Commission, also supports the museum with a
grant of $4,000. This year the Fine Arts Commission will request an additional
$2,000, to raise the Euphrat grant to a total of $6,000. This is an acknowledgement
of the Euphrat Director's collaboration with the city and San Jose's Zero1 arts
festival this fall, which may bring retail sales tax and transient occupancy tax dollars
into the community.
Online Support to Block Leaders Mahoney We continue to aggressively pursue technologies and other tools to support and
expand the block leader and other community programs.
Staff has met with software companies with products at various stages of
development. The expansion of social media and potential applications to block
leader programs are abundant. Many companies have approached us interested in
commercializing or monetizing the online interactive environment used by our
community programs. Staff will continue to pursue virtual interactive solutions and
invironments that protect the independent, private and noncommercial
relationship we have with our residents. However, the core of our program is that
it involves personal, human, face -to -face interaction among neighbors in a world
which is becoming increasingly impersonal, remote and digital.
Page 4 of 4 (3/10/2010)
2010/2011 City Council Work Program
Project Status Comments
(for a full list of development activity go to www.cgpertino.org/develol2ment )
A. Cupertino Square.
Owners of Cupertino Square are pursuing
The developer has put the plans for the Penney's
the private revitalization of the center as
retail frontage on hold until the economy
1. Periodic updates to City Council
follows:
improves.
from property owners.
Construction Underway:
1. International Food Court (Partial
In September, 2009, Grammercy sold the mall to
2. Periodic reports regarding
opening) with several tenants,
an investment group for $64M. San Jose
development approvals.
including Chiaramonte's Deli, Tutti
developer Lap Tang is directing local operations,
Frutti and Teriyaki Experience.
and Mike Rohde has returned as General
3. Adherence, if possible, to artist
Approved but construction hasn't
Manager. The new ownership group plans to
renderings presented to Council.
started
change the mall name back to "Vallco" from
1. Retail adjacent to Penney's —
"Cupertino Square ". The leasing approach will
4. Analyze the impacts of the
43,000+ square feet of multi -tenant
have an entertainment orientation
development agreement's expiration.
retail space facing Wolfe Road and
Vallco Parkway, adjacent to the new
garage
Completed:
1. Benihana Restaurant renovation.
2. Remodeled the Northeast Entrance.
3. Staff provided an update to the
Council in May 2009 regarding the
DA expiration.
4. Re- opening of T.G.I. Friday's on
July 13, 2009.
2010/2011 Council Work Program (Mar. 10, 2010) Page 1 of 24
2010/2011 City Cou. -A Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 20 10) Page 2 of 24
B. Sand Hill Properties Site
City Council approved the Master Use
This mixed use lifestyle center is located on a 17-
(Main Street Project)
Permit, Architectural & Site Approval,
acre site and consists of up to 150,000 sf of retail
Tentative Map, Tree Removal Permit,
shops; a 145,000 sf athletic club or alternate option
and EIR on January 20, 2009.
of an additional 36,000 sf of retail; up to a 250
room hotel (w /a 400 - person banquet facility if over
Sand Hill Properties and its brokerage
160 rooms); 160 senior housing units; 100,000 sf of
team are aggressively marketing the site
office; .75 acre park; a town square; and five -level
to retail tenants. Project funding is
parking garage.
contingent on firm commitments from
project anchors.
The Master Use Permit, Architectural & Site
Approval and Tree Removal Permits expire on
January 20, 2014.
C. The Oaks
City Council approved a Use Permit,
Council has approved a four story 122 -room hotel,
Architectural & Site and Tentative Map
and a 3- story, 56,200 square foot mixed use
applications to construct a retail/hotel
building with retail, office, and banquet uses.
project on September 2, 2008.
The Use Permit and Architectural and Site
Sand Hill Properties has not indicated a
approvals expire on September 2, 2012.
time to start for construction of the
hotel.
The Oaks Theater re- opened on
11/20/09 as "Blue Light Cinemas" — a
family discount theater. Additionally,
the "Oaks Event Center" has opened up
next to the theater as a caterer/banquet
hall which can accommodate groups of
up to 200.
D. Rose Bowl and Out - parcels
• KCR/Evershine, the new owner
Amended plans for the Rose Bowl were brought
2010/2011 Council Work Program (Mar. 10, 20 10) Page 2 of 24
2010/2011 City Council Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 3 of 24
of the Rose Bowl, has developed
back to City Council as an information item in
slightly modified plans with 204
March, 2008. The Council confirmed that the plans
residential units and 70,000 sq.
conform to the approval.
ft. of retail. The project broke
ground in the Summer of 2009,
and the foundation and podium
work is underway. Super-
structure plans have been
submitted.
• The two out - parcels adjacent to
Highway 280 are on hold
because the developer has not
submitted any plans.
E. Shashi Corporation Hotel
Property owner is working with
138 room Hotel
potential operator. The building permit
Approved Jan. 2009, expires in Jan 2011.
package and subsequent construction
Construction, once begun, will take one year.
will follow project financing.
F. Embareadero Park/Results Way
On 7/21/09, the City Council approved
Former Measurex site.
the applicant's request to extend the
Three new office buildings totaling 155,500 sq. ft.
expiration date by five years to allow
Demolish five buildings totaling 139,632 sq. ft.
phasing of construction, clarify
Approved Sept. 2008, the extended expiration date
conditions approval, and modify the
is July 21, 2014.
traffic and signal improvement
condition.
2010/2011 Council Work Program (Mar. 10, 2010) Page 3 of 24
2010/2011 City Cou L --tl Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 20 10) Page 4 of 24
A. Bridge
Completed and opened April 30, 2009.
The Mary Avenue bridge p roJ ect adds
Mary Avenue Pedestrian Footbridge
approximately 12 acres of landscape open space.
The individual quail sculptures have been either
recast (the two small ones that were stolen) or
retrofitted with much stronger stainless steel
reinforced legs and support struts. We have had
difficulty getting our electrical contractor for the
bridge to develop and procure an acceptable
I
specification for the video surveillance system. We
now have that material together and expect to have
it installed in early May 2010 with the Quail family
being re- installed on the boulders shortly thereafter.
B. Parks
1. Stevens Creek Corridor Park
Completed and opened July 4, 2009.
(Phase 1— McClellan Road to BBF
Golf Course maintenance building)
a. This project includes park and trail
improvements.
2. Stevens Creek Corridor Park
Design contract awarded by Council
The Phase 2 Project generally consists of extending
(Phase 2 — Completion of trail to
January 19, 2010.
the trail from the location of the old golf
Stevens Creek Blvd.)
maintenance building across a new bridge to the
west side of Stevens Creek through the east side of
Develop Conceptual Plan
the Stocklmeir Orchard, past the Stocklmeir house
and ending at Stevens Creek Boulevard.
CIP proposes $1.1 million FY 2010 -2011.
2010/2011 Council Work Program (Mar. 10, 20 10) Page 4 of 24
2010/2011 City Council Work Program
-7 Project Status Comments
3. Sterling Park
Construction contract awarded by
KaBoom project tabled at the February 16 Council
Council Nov. 2009.
meeting.
Completion scheduled for June 2010.
4. Lawrence — Mitty Park
Santa Clara County Department of
Staff has approached the San Jose Water Company
a. Work with County to come up with
Roads and Airports owns a parcel west
about the potential for acquiring land immediately
a plan to move the County Roads
of Lawrence Expressway currently used
adjacent to the Roads & Airports corporation yard
and Airports activity off the site
as a materials storage site. County
at Doyle, east Lawrence Expressway. The
and develop a park
Parks has received Board of Supervisors
approximate one acre San Jose Water Company
approval for the San Tomas Aquino trail
parcel if available, could be purchased for a Roads
E `
master plan, which identifies this site as
& Airport yard expansion, freeing up the creekside
greenbelt.
parcel for park development and the extension of
Independent appraisal is $1.880 million.
the San Tomas Aquino trail. County park
At this point, the timing is uncertain for
acquisition funds may support this effort. The
acquisition and partial funding is
appraised value for the west site is $1,880,000. The
tentatively identified for FY 2009 -2010.
appraised value for the east site is $2,010,000.
b. Pursue Grants
Staff is working to obtain grant funding for
acquisition and design and construction.
However the current State budget crisis has created
a great deal of uncertainty around grant funding of
any kind.
5. Neighborhood Park Homestead Road
This area was identified during the
Planning staff worked with developers of the Villa
near Stelling Road
General Plan process as an area
Serra project to require a small 0.61 -acre
deficient in neighborhood parks.
neighborhood park approved in conjunction with
the planned expansion of the development. The
park design was reviewed by the Parks and
Recreation Commission during Spring/Summer
2008.
2010/2011 Council Work Program (Mar. 10, 20 10) Page 5 of 24
2010/2011 City Cou__.,il Work Program
Project
Status
Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 6 of 24
Council refined and approved the plan July 3, 2008.
The developer is currently planning to complete the
park by end of 2010.
C. Sports Center Upgrade
r Develop a strategy for upgrading the
Project completed.
Council decided not to do the Sports court but
Sports Center pool and bath house which
approved the tennis court lighting which has been
now includes the previously approved
completed.
upgrade to the tennis court lighting.
D. Quinlan Plaza
Construction contract award by Council
Trellis covered activity Plaza
Jan. 19, 2010.
to replace the fountain.
Completion scheduled for June 2010.
C. Civic Center Fountain
February 22 nd new filters installed. Fountain
Cryptosporidium protection Ultraviolet
filters required by County.
Filtering system installed August 2009.
completely operational and code - compliant. Water
meets drinking standards.
F. Provide report on Pavement
Tentative date May 4, 2010.
This information is presented annually and posted
Management annually in May.
on our website.
2010/2011 Council Work Program (Mar. 10, 2010) Page 6 of 24
2010/2011 City Council Work Program
Project
3. Organizational Improvements
A. E- Services
Bring City Hall to the customer and
improve efficiency of service delivery.
1. E- Services
w
Status
Applications in process:
• Working towards the ability to
accept and edit plan sets in a
digital format.
• Progress made in upgrading
Records Management system to
improve performance.
• Inspector Portal created to increase
efficiency of inspectors in the field
allowing for improved customer
service.
Applications completed in 2009/10:
• Staff continues to work with
Pentamation to enhance online
permitting.
• On -line building permits for minor
projects became available in
September 2009.
• Building permit searches from our
database (1997 onwards) for the
public were made available online
in September 2009.
i
Comments
Applications completed:
• Apply for Building Permits
• Comply with new credit card security rulings.
• Pavement Management on web
• Code Enforcement tracking system
2010/2011 Council Work Program (Mar. 10, 2010) Page 7 of 24
2010/2011 City Cou__ _d Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 8 of 24
• Completed Phase I of Online
Permitting
Customers have ability to go through the
process of applying for a permit, paying,
and scheduling a building inspection in
same transaction.
The City provides abundant public access to many
meetings and city records using state -of -the -art
software programs available through the City's
website.
Through a digital records management program and
an integrated document and video - streaming
program, all users have access to all public
document and video records. We can also provide
council reports and bid documents on disk.
2. Refine the website
Completed Dec. 2008
The City's website, www.cupertino.org won first
place in its population category for the City - County
Communications and Marketing Association
_
(3 CMA) 2009 Savvy Award.
Refine the search engine website.
Approved in `09/10 budget
Google search installed in September
2009.
_
3. Review of the development application
Matrix Consulting Group was selected
Retained a consultant to review the Planning,
process.
out of four proposals to conduct the
Building and Public Works development
study in February, 2009, and completed
application processing from initial contact through
-
the study on November 5, 2009. Staff
to completion of construction. Provide benchmarks
•
report submitted to Council December
for comparison to comparably sized communities
3,2009.
and suggest techniques to enhance the process.
Staff is making internal changes to the
Improvements to date:
development review process. Staff will
. Open counter (Building, Planning, Public
also bring for Council review and
Works) at lunchtime
discussion, items that require either
• Reviewing handout material for revisions to
funding or ordinance amendments as
simplify and improve readability
part of the FY 10 -11 budget.
2010/2011 Council Work Program (Mar. 10, 2010) Page 8 of 24
2010/2011 City Council Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 20 10) Page 9 of 24
B. Provide Support for City Attorney
Position is filled. PERS approvals have
Council hired Carol Korade as the interim City
Transition
been received so that Carol Korade can
Attorney. Staff has created a new negotiation group
unretire. New employee group has been
for the Attorney's office and has approved for an
approved by PERS and will be effective
extension of the 960 hour max for retired
March 1, 2010.
annuitants.
C. Fiscal Strategic Plan
The Plan:
Adopted each year in conjunction with
Recommendation in the past two years include:
• defines the financial problem.
the annual budget.
Substantial progress has been made in the area of:
• analyzes the structure of the
• New General Fund and CIP /Reserve Policy
organization.
Committee will finalize its
adopted.
• identifies opportwiities for decreasing
recommendations on revenue,
. Council voted 5 -0 to pursue November, 2009
expenses and areas of risk exposure.
expenditure and reserve policy
ballot measure for tax neutral utility user tax
• identifies opportunities for stabilizing
opportunities for the 2010/11 budget in
language updates. Measure passed, handily,
our revenue resources.
March 2010.
reflecting community confidence in its city
government.
•
2010/2011 Council Work Program (Mar. 10, 20 10) Page 9 of 24
2010/2011 City Coin,_ _A Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 10 of 24
A. Neighborhood Watch
Continue emphasis on Neighborhood
As of January 2010, currently have 205
Conducted 22 Neighborhood Watch presentations,
Watch
active Neighborhood Watch Leaders
11 of which were to new groups.
supporting 155 groups.
B. Emergency Preparedness
1. Continue emphasis on Emergency
.Provide ongoing training in various
In 2009:
response (ER) and Preparedness
areas of disaster preparedness.
CERT - 44 residents trained
CARES, CERT, MRC training and
CPR — 80 trained
projects.
First Aid — 34 trained
Kaleidoscope -- 34 students trained
PEP - 155 trained
ER — 99% of City staff trained
I i
2010/2011 Council Work Program (Mar. 10, 2010) Page 10 of 24
2010/2011 City Council Work Program
Project
Status
Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 11 of 24
2. Managing registered and spontaneous
Identify leadership to manage
In progress
volunteers
spontaneous volunteers.
Currently coordinating all divisions
responsible for volunteers to
standardize administrative procedures
regarding registration, skill sets and
insurance coverage.
3. Work with schools and staff for
SROs conduct Code Red Training and
14 schools trained
Active Shooter preparedness
Drills at 14 schools in Cupertino
:dft
4. Bicycle Safety Presentations to
Bicycle Safety presentations made to
2,600 students trained
students
students to help understand the rules
pertaining to bicyclists
S. Internet Safety /ID theft presentations
Internet safety /ID theft presentations
7 schools trained
made to students to better understand
the dangers.
6. Update the Stevens Creek Reservoir
Draft is complete.
dam failure evacuation plan
Tabletop exercise completed in Oct.
2009 and final draft being prepared
which incorporates the results of the
exercise.
2010/2011 Council Work Program (Mar. 10, 2010) Page 11 of 24
2010/2011 City Cou._ -J Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 20 10) Page 12 of 24
C. Traffic Safety
Ensure that the concept is present in
Examples of recently approved walkable
1. Walkability
all City development /redevelopment
developments include:
Implement "walkable city" concept.
projects.
• Oak Park (North De Anza Blvd.)
• Tantau office building
• Whole Foods
• Las Palmas (Stelling Road)
• Rockwell Homes (Stevens Canyon Road)
• Mary Avenue Bicycle Pedestrian
Footbridge
• Stevens Creek Corridor
• Embarcadero proposed traffic
improvements
In 2007 the annual budget was increased by
$250,000 for sidewalk repair for a total of
$750,000.
2010/2011 Council Work Program (Mar. 10, 20 10) Page 12 of 24
2010/2011 City Council Work Program
Project
Status
Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 13 of 24
2. Review traffic safety issues
a. Safe routes to school program
Due to State funding issues, Safe Routes
to School program deferred to 2010-
2011.
_
b. Traffic Improvements around
The Sheriffs Office, the City, the
Consultant completed the report back to Council on
Schools
School District, and the residents
- safety concerns around various schools in the City.
continue to work together to improve the
There were five recommendations made to
safety of vehicle, pedestrian, students
Council, and were accepted. Sheriff's Office is in
and reduced traffic congestion on the
the process of implementing some of the
primary roadways around the school.
suggestions with Public Works and the City.
4LIL
Presentation completed in June 2009.
Traffic Consultant evaluated and
-
reported back to City Council with
Embarcadero project developer required to dedicate
suggested actions. -- Completed
right of way and widen McClellan Rd. or, in lieu of
that, developer will contribute funds towards
Sheriff reported back on consultant
making operational improvements at Bubb &
progress in June '09. -- Completed
McClellan intersection.
c. Bring proposal to Council on best
Presentation made to Council on May
Council approved funding of traffic safety around
use for $300,000 earmarked for
20, 2008. Council approved use of
schools and a second school resource officer.
traffic safety around schools (e.g.
$300,000 for SRO, Traffic Safety, and
Report presented, and traffic safety matters were
red light running, lighted
Traffic Consultant to establish a Safe
addressed. Changes made to the Tri- school area
crosswalks, flashing speed limit
Routes to School Program.
and near Sedgwick Elementary School. Further
signs, public education, etc.)
studies to be conducted. Several suggested changes
Teen/Public Safety Commissions
were implemented and improvements noticeable.
looking into a walk/bike /carpool to
Further evaluation in the process and information
school program to be commented on in
presented to Public Safety Commission.
January.
Preparation being made to present suggested
proposals to Council by April 2009. Many
recommendations and actions are complete.
Directed enforcement continues throughout 2010
Walk one Week (WOW) is a Teen
school year.
2010/2011 Council Work Program (Mar. 10, 2010) Page 13 of 24
2010/2011 City Coup_ Al Work Program
Project
Status
Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 14 of 24
j
Commission and Lawson School
program to get as many Cupertino
students as possible to walk to school
April 19 -23, the week before Earth Day.
The funds Council set aside for safety
around schools will help provide
incentives for those participating. Two
Teen Commissioners are presenting the
program at the February 16 meeting.
Teen Commission recommendations
went to Council last Spring 2008.
3. Provide pedestrian ramps at required
City has met all current obligations.
We continue to install ramps as new development
intersections
occurs and as part of our annual street paving
program.
D. Non -City Projects
1. Monitor the Santa Clara Valley
In process as managed by the Santa
Water District's detention pond
Clara Valley Water District.
project
2. Monitor the Lehigh
Stevens Creek Elementary School is
Currently working with Bay Area Air Quality
reclamation/expansion project.
being monitored by the Air District per
Management District to locate a monitoring station
EPA directive.
at Monta Vista Park.
2010/2011 Council Work Program (Mar. 10, 2010) Page 14 of 24
2010/2011 City Council Work Program
Project Status Comments
A. Provide housing opportunities for The General Plan update acid Housing The Santa Clara County Housing Trust Hoene
Cupertino workers Element identified sites for additional Ownership Assistance Program is applicable to
housing units. Cupertino teachers and other public service
employees.
The Cupertino Below Market Rate (BMR)
program also gives priority to Cupertino teachers,
aublic service emplovees and Cupertino workers.
B. Cleo Avenue Affordable Housing
Habitat for Humanity was having
City Council authorized purchase of a
difficulty fundraising for this and other
1 /4 acre site on Cleo Avenue from Cal Trans. Staff
projects with the slow economy. The
completed negotiations and the site has been
slow fundraising may delayed the
purchased in August 2005.
project into 2010.
In October 2007, staff issued a Request for
Preliminary design has been developed
Proposals and received one proposal from Habitat
and Habitat for Humanity has begun
for Humanity. The City Council reviewed and
recruiting potential applicants and will
accepted the proposal at its December 18, 2007
be filing for a Use Permit by February
meeting. The site can accommodate up to four
2010. Construction is slated for 2011.
units.
C. BMR Manual Update
Staff contracted with Keyser Marston
The Housing Commission found the existing
Associates to update the City's Housing
mitigation fees are insufficient to offset the
Mitigation Manual as well as recreate an
impacts of development and recommended
administrative manual for the City's
increasing housing fees for non - residential
BMR program administrator. The
developments, including commercial development
administrative manual will be finalized
and residential developments that are too small (6
in February 2010. The Housing
or fewer units) to require a BMR unit. The current
Mitigation manual will be brought for
fee structure was approved in 2007.
'
City Council review in March 2010.
2010/2011 Council Work Program (Mar. 10, 2010) Page 15 of 24
2010/2011 City Coui...tI Work Program
Project Status Comments
A. Encourage, retain and support healthy
environment for retail growth
There were twenty -six retail
openings for the 2009 calendar year
including Staples, Blue Light
Cinemas, Massage Envy, Bonjour
Crepe, and Wingstop. This is on par
with 2008.
•
95 "New Business Welcome •
Packages" were distributed in 2009
in partnership with the Chamber of
Commerce. •
The Economic Development
Committee is meeting regularly and
providing input on the economic
development work plan.
Active outreach to landlords and
brokers to facilitate re- tenanting, and
the leasing of new mixed use space.
"Cupertino Commercial News ", the
Quarterly electronic newsletter continues
to highlight business and development
activity. The distribution list has grown
to over 900 real estate professionals and
community stakeholders.
Assisted new business openings with
planning/building facilitation (signage,
etc.)
New leases include Aqui at the former
Flames/Harvest site which opened in
March, 2010.
2010/2011 Council Work Program (Mar. 10, 20 10) Page 16 of 24
2010/2011 City Council Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 2410) Page 17 of 24
Retention efforts include active outreach
• The Cupertino Restaurant Association is
to business owners through direct
flourishing. The dining guide, which highlights
meetings, and Chamber participation.
Cupertino's 150+ eateries continued to be
widely distributed. Multiple collaborative
marketing efforts have been completed,
Actively facilitated Business Input on
including a Cinema Ad Campaign at the AMC -
Planning Documents and Green
16 Theaters at Cupertino Square.
Programs
• Facilitated business - friendly changes to the Sign
w
Ordinance. (see update under Planning).
• Continued outreach to the Asian business
community through the Chamber's AABC,
including creation of a Mandarin version of the
-
"Should I Start My Own Business" class offered
-
by NOVA. Class was offered in October 2009
at Community Hall to a standing -room only
audience.
B. Consider retail in reviewing new
Advise on/facilitate new development
• Facilitated planning process for multiple
development
projects.
projects including Main Street Cupertino, the
Learning Game, and the PW Market Center.
• Provided input on Housing Element Site
Inventory.
2010/2011 Council Work Program (Mar. 10, 2410) Page 17 of 24
2010/2011 City Cou._A Work Program
Project
Status
Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 18 of 24
A. Reviciv the Heart of the City
The Council approved the Heart of the
City Specific Plan on February 16,
2010. The second reading is scheduled
for March 16, 2010.
B. Prepare a historic preservation
Council review of the Historic
Staff worked with the ad hoc Historic Committee in
policy
Committee recommendations is
2009 to develop a draft policy and recommend
scheduled for April 6, 2010.
processes for historic buildings and sites.
Planning Commission and Council
review of the related General Plan
amendment is expected in April /May
2010.
C. Put sign code review (to look at
The Sign Ordinance was approved by
In September 2008, the City Council approved
being more business friendly) on
the City Council in October 2009. The
amendments to the sign ordinance relating to
the Planning Commission work
second reading was conducted in
temporary signs (A- Frames and Banners). The
program
November 2009. The ordinance went
ordinance went into effect in November 2008.
into effect in December 2009.
2010/2011 Council Work Program (Mar. 10, 2010) Page 18 of 24
2010/2011 City Council Work Program
Project Status Comments
2010/2011 Council Work Program (Mar. 10, 2010) Page 19 of 24
D. Update the General Plan Housing
Council approved the Draft Housing
RFP's were sent to consultants in February 2008 to
Element
Element in June 2009. The Housing
prepare the Housing Element. Bay Area
Element was submitted to the State
Economics (BAE) was selected to prepare the
Department of Housing and Community
Housing Element.
Development in late June 2009.
BAE conducted interviews of prospective
Staff plans to return to the Planning
stakeholders on July 10, 2008 and held stakeholder
Commission in March and the City
focus group meetings on August 21, September 25,
Council in April to address the HCD
October 23, and November 21, 2008.
comments and bring the Housing
Element for adoption.
E. Review of ratio between first and
Approved. New Ordinance went in to
second stories in the R -1 ordinance.
effect on May 8, 2009.
F. Update the General Plan with
On July 21, 2009, Council approved the
respect to office allocation
General Plan amendment to add an
office allocation of 483,053 square feet
analyzed in the 2005 General Plan to the
category of major companies.
2010/2011 Council Work Program (Mar. 10, 2010) Page 19 of 24
2010/2011 City Cou. —d Work Program
Project Status Comments
A. Continue to offer opportunities and Neighborhood block leader program Block leaders were provided a City bus tour last
programs to promote cultural supports 334 leaders. The block leaders' Fall.
understanding and address the annual recognition occurred February
needs of our diverse community 25.
The Community Improvement Grant
program is ongoing.
City continues to work with De Anza's
Institute for Community & Civic
Engagement.
"Around the Block," an on -line
quarterly newsletter for block leaders,
was launched last summer.
One grant was awarded in Summer 2009 to the
Cupertino Knolls neighborhood to purchase shelter
for gatherings and emergencies.
The ICCE Program helped block leaders to
coordinate and promote a regional meeting, to
develop a neighborhood playgroup for young
children, generate interest and volunteers for the
playground build at Blackberry Farm and
disseminate information to neighbors about park
studies.
Two issues have been produced.
2010/2011 Council Work Program (Mar. 10, 20 10) Page 20 of 24
2010/2011 City Council Work Program
Project Status Comments
B. Community Service Day
Council authorized a Community
Service Day on May 17, 2009. Don
Allen & Barbara Nunes directed the
effort.
Projects included —
• Stained outside benches at Senior
Center
• Planted landscape area at corner of
Stevens Creek Blvd. & Stelling
• Installed plants in the Quinlan
Center parking lot.
C. Leadership Cupertino
Explore incorporating Leadership
Formed planning team.
Bring proposals for restarting program
Cupertino into the Institute for
Tentative kickoff is September 2010.
as part of 2009/2010 budget.
Community & Civic Engagement
(ICCE)
2010/2011 Council Work Program (Mar. 10, 2010) Page 21 of 24
2010/2011 City CoLA Work Program
Project Status Comments
nill ���ILIUI
A. Support the Cupertino Historical
Staff and the Parks and Recreation
The City re- roofed the Stocklmeir house in 2008.
Society in its effort to create a
Commission met with the Historical
The Historical Society has sent a letter to the City
Center for Living History
Society to define a project a majority of
Manager expressing support for the trail connecting
the Cupertino Historical Society Board
to Stevens Creek Blvd. so long as the multi use trail
will endorse.
is kept close to the creek with a footpath through
the orchard.
Cupertino Historical Society is no
longer pursuing the Center for Living
In June 2008, Council referred Stocklmeir project
History or the Stocklmeir project.
to Parks and Recreation Commission to study
options. Went to Council on August 4, 2009.
Council supported the vision of a legacy farm.
Issue will return to Council when a more detailed
p lan is developed.
B. Pursue partnership opportunities
with the three school districts:
1. Traffic and parking
The Safe Routes to Schools projects
Teen Commission sponsoring a Walk One Week
have proceeded with excellent
(WOW) for Cupertino schools in April 2010.
cooperation between the City and Monta
Vista, Cupertino and Garden Gate.
Added three crossing guards in 2008.
2010/2011 Council Work Program (Mar. 10, 20 10) Page 22 of 24
2010/2011 City Council Work Program
Project Status Comments
2. Teacher housing
See Section 5A (Housing)
3. School Resource Officers
Funded second SRO in FY 2009/10 with
CUSD & FUHSD now contribute $10,000 each to
COPS grant from the State.
this program.
4. Juvenile Intervention Program
Contracting with Linda Rios for
CUSD contributes 50% of the cost of this program.
Outreach Services
' 5. Recycling
De Anza/City recycling program — the
City gives De Anza used computers and
De Anza refurbishes them.
_ 6. Summer School Program
Worked in partnership with FUHSD to
provide summer school in 2009.
Program will be expanded in 2010.
7. Placement of Arks (emergency
Arks are currently located at Garden
supplies) at school sites.
Gate, Lawson, Hyde and De Anza
College with a cooperative agreement
with the schools for mutual use &
storage of supplies. Each Ark costs
approximately $10,000 to purchase
equipment.
Staff will continue to look for additional
school sites that can accommodate and
support these Arks.
2010/2011 Council Work Program (Mar. 10, 2010) Page 23 of 24
2010/2011 City Cou_ Al Work Program
Project
Status
Comments
2010/2011 Council Work Program (Mar. 10, 20 10) Page 24 of 24
A. Develop Green Building Standards
\Vorking with 1CLEI — Local
ICLEI — Completed Municipal Greenhouse Gas
and develop list of possible projects
Governments for Sustainability USA,
Emissions Inventory. Next steps will be to (1)
Inc. (International Council for Local
complete community -wide inventory (2) develop
Environmental Initiatives) to create a
reduction targets and (3) create a climate action
green house gas inventory soon to be
plan. Staff is working with local jurisdictions to
required by the California Air Resources
create a climate action plan template to lower the
Board
cost of developing this report.
Form a Green Ribbon Task Force to
Solar — On January th , 2010 Council passed the
�'3' P
propose policies
resolutions required to join the CSCDA California
First program, a property assessed clean energy
financing district that will allow residents to install
and finance solar installations through their
property tax bill. The program awarded a CEC
grant. Initial program offerings anticipated before
'
year end.
Environmental Stewardship Task Force to be in
place by Summer 2010, to be facilitated in
partnership with the Kirsch Center at De Anza
College.
2010/2011 Council Work Program (Mar. 10, 20 10) Page 24 of 24