Loading...
10-027 Testing Engineers, Inc., Michael Parker AGREEMENT CITY OF CUPERTINO 10300 Torre Avenue Cupertino, CA 95014 , 408-777-3200 NO. G' - - 7 7 / • BY THIS AGREEMENT, made and entered into this 29 day of March , 201Q by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Testing Engineers, Inc.; Michael Parker; Address: 2811 Teagarden Street, San Leandro, CA 94577; Phone: 510 - 835 -9142; e-mail: michael @testing - engineers.com Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR shall provide or furnish the following specified services and /or materials: Testing and Special Inspections for Quinlan Center Plaza Renovation Project EXHIBITS: The following attached exhibits hereby are made part of this Agreement: Proposal marked "EXHIBIT A" TERMS: The services and/or materials furnished under this Agreement shall commence on March 29, 2010 and shall be completed before June 30, 2010 COMPENSATION: For the full performance of this Agreement, CITY shall pay CONTRACTOR: Time and Materials Not to Exceed $ 7,450.00 Without City Approval California Labor Code, Section 1771 requires the payment of prevailing wages to all workers employed on a Public Works contract in excess of $1,000.00. GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees from any and all damage and liability due to negligence, errors and omissions, including all costs of defending any claim, caused by or arising out of the performance of this Agreement. City shall not be liable for acts of Contractor in performing services described herein. Insurance. Should the City require evidence of insurability, Contractor shalt file with City a Certificate of Insurance before commencing any services under this Agreement. Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non - Discrimination. No discrimination shall be made in the employment of persons under this Agreement because of the race, color, national origin, ancestry, religion or sex of such person. Interest of Contractor. It is understood and agreed that this Agreement s not a contract of employment in the sense that the relationship of master and servant exists between City and undersigned. At all times, Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in execu:ing this agreement. Contractor certifies that no one who has or will have any financial interest under this Agreement is an officer or employee of Chy. Changes. This Agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO- ORDINATOR and representative for CITY shall be: aTE.P1'7 NAME: Terry Greene DEPARTMENT: Public Works Department This Agreement shall become effective upon its execution by CITY, in witness thereof, the parties have executed this Agreement the day and year first written above. CONTRACTOR: CITY OF CUPERTINO: Ti rP t / a f Title: Terry Greene, AIA, City Architect APPROVALS EXPENDITURE DISTRIBUTION T H. v ' AT ACCOUNT NUMBE AMOUNT a / „Le • !� 420- 9237 - • .61 ' T $ 7,450.00 CITY CLERK ` S ATE !O I NIZIM�M 7 9 ��I t Quality Assurance Services IL; Materials Consulting TESTING ENGINEERS, INC. Since 1954 TESTING AND INSPECTION SERVICES - Testing Engineers, Inc. EXHIBIT ii Quinlin Center Plaza Improvements 10185 Sterling Rd, Cupertino, CA March 18, 2010 A. CONCRETE Slabs & Grade Beams Mix Design Review No: 3 Rate/ea: 150.00 $ 450.00 Reinforcing Steel Placement Inspection No. days: 1 No. hrs: 4 Rate/hr: 80.00 $ 320.00 Concrete Placement Inspection No. days: I No. hrs: 4 Rate/hr: 80.00 $ 320.00 Concrete Compression Tests Cast in Place - I set of 4 cylinders every 150 cubic yards No.: I Rate /ea: 30.00 $ 30.00 Pick Up of Samples No. trips: I Rate/ea: 80.00 $ 80.00 SUB -TOTAL S 1,200.00 B. STRUCTURAL STEEL • Assumes 3 Welders Shop Welding No. days: 3 No. hrs: 12 Rate/hr 80.00 $ 960.00 Field Welding Includes High Strength Bolting No. days: 5 No. hrs: 32 Rate/hr: 80.00 $ 2,560 00 SUB -TOTAL S 3,520.00 C. CMU - Brick Veneer Masonry Placement No. days: 2 No. hrs: 12 Rate/hr: 80.00 $ 960.00 Grout / Mortar Compression Tests (I set of 4 per 100 cubic yards, average) No.: 12 Rate /ea: 33.00 $ 396.00 Pick Up of Samples No. trips: 2 Rate ea: 80.00 $ 16u.00 SUB -TOTAL S 1,516.00 E. GROUT UNDER BASE PLATES Grout Placement No. days: 2 No. hrs: 8 Rate/hr: 80.00 $ 640.00 Grout Cubes 2 x2 x 2 Cubes No.: 8 Rate/ea: 33.00 $ 264.00 Pick Up of Samples • No. trips: 2 Rate /ea: 80.00 $ 160.00 Corporate Office — 2811 Teagarden Street — San Legui$gr§It{ grnia 94577 — (510835 -3142 t,66W 834 -3777 www. Testing - Engineers. com ACCREDITED Quality Assurance Services Materials Consulting 16; TESTING ENGINEERS INC. Since 1954 MISCELLANEOUS t•. Affidavit (Principal Engineer): Required by Cupertino, CA • :, • • Upon request; please allow 10 working days for affidavit prepai ation. ; �; No hrs.: 1 Rate /ea: 150.00 S 150.00 SUB -TOTAL S 150.00 GRAND TOTAL ESTIMATE S 7,450.00 07N Corporate Office — 2811 Teagarden Street — San Leandro, California 94577 — (510) 835 -3142 — FAX (510) 834 -3777 www.Testing- Engineers.com ACCREDITED Quality Assurance Services Materials Consulting • TESTING ENGINEERS INC. Since 1954 TESTING ENGINEERS, INC. BASIS OF CHARGES 116yr ERAL Fees for tests and inspection include cost of technician, professional reports and engineer supervision. Engineering services other than supervisory will be charged at applicable rates. Inspection services are charged portal to portal from dispatch location and may be subject to mileage charges. Fees for special projects, services overseas, or elsewhere in the United States, will be quoted on request. All terms conditions and services not described within this proposal but otherwise required during the course of the project will be in accordance with the schedule of fee attached. REPORT DISTRIBUTION Fees for additional distribution (other than standard distribution of 4) will be charged $25.00 each set -up. MINIMUM HOURLY CHARGES - INSPECTION Technician personnel are members of the Operating Engineers Union (AFL -CIO) Local No. 3 and the following minimum charges are contractual commitments: One -half day or less 4 hours Over one -half day 8 hours Show -up time (no inspection performed) 2 hours WORKING HOURS AND PREMIUM TIME Regular workday is the first 8 hours between 6:00 a.m. and 6:00 p.m. Monday through Friday. Premium time is as follows: Overtime, weekdays and Saturdays (first 8 hours) Applicable rate x 1.5 Overtime, Saturdays (over 8 hours) and Sundays (first 8 hours) Applicable rate x 2.0 Overtime, Sundays (over 8 hours) and Holidays Applicable rate x 2.5 Shift differential, swing and graveyard 10.00 per hour MISCELLANEOUS CHARGES Parking fees and bridge tolls At Cost Air travel, Subsistence, Outside Services Cost plus 20% o Travel time, when required, per hour $50.00 Mileage, per mile (Outside 25 mile Radius) 0.65 TESTS Testing fees shown include normal time for performing test. Samples requiring special preparation will be charged at the laboratory technician rate. Fees for tests not listed will be furnished upon request. There will be a minimum charge of $150.00 for any test and report. (Establishing initial project file.) LETTERS OF COMPLETION AND AFFIDAVITS There is an additional charge for a Letter of Completion (required ed by most city and county building inspection departments), or an Affidavit (required by DSA and OSHPD) for schools and hospitals. ANTICIPATED COSTS Anticipated Cost: Client recognizes and agrees that any "anticipated costs ", "budget Estimates ", or like that may be prepared by Testing Engineers, Inc. are NOT "guaranteed maximums ", "lump sums ", or "not to exceed" totals. Client will be invoiced for all work preformed. PAYMENT Invoices will be submitted periodically for services performed, and are payable 30 days from date of invoice. Interest of 1'/2% per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. Attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the client. A $25.00 per check charge will be added for Insufficient Funds and may incur treble damages up to the maximum per California Laws (Chapter 522, Section 1719). 11 /AS Corporate Office — 2811 Teagarden Street — San Leandro, California 94577 — (510) 835 -3142 — FAX (510) 834 -3777 www.Testing- Engineers com ACCREDITED Quality Assurance Services le; Materials Consulting MIN TESTING ENGINEERS, INC. Since 1954 TESTING AND INSPECTION SERVICES - Testing Engineers, Inc. Quinlin Center Plaza Improvements 10185 Sterling Rd, Cupertino, CA March 18, 2010 A. CONCRETE Slabs & Grade Beams Mix Design Review No.: 3 Rate /ea: 150.00 $ 450.00 Reinforcing Steel Placement Inspection No. days: 1 No. hrs: 4 Rate /hr: 80.00 $ 320.00 Concrete Placement Inspection No. days: 1 No. hrs: 4 Rate/hr: 80.00 $ 320.00 Concrete Compression Tests Cast in Place - 1 set of 4 cylinders :very 150 cubic yards No.: 1 Rate /ea: 30.00 $ 30.00 Pick Up of Samples No. trips: 1 Rate /ea: 80.00 $ 80.00 SUB -TOTAL $ 1,200.00 B. STRUCTURAL STEEL * Assumes 3 Welders Shop Welding No. days: 3 No. hrs: 12 Rate/hr: 80.00 $ 960.00 Field Welding Includes High Strength Bolting No. days: 5 No. hrs: 32 Rate /hr: 80.00 $ 2,560.00 SUB -TOTAL $ 3,520.00 C. CMU - Brick Veneer Masonry Placement No. days: 2 No. hrs: 12 Rate/hr: 80.00 $ 960.00 Grout / Mortar Compression Tests (1 set of 4 per 100 cubic yards, average) No.: 12 Rate /ea: 33.00 $ 396.00 Pick Up of Samples No. trips: 2 Rate /ea: 80.00 $ 160.00 SUB -TOTAL $ 1,516.00 L Corporate Office — 2811 Teagarden Street — San Leandro, California 94577 — (510) 835 -3142 — FAX (510) 834 -3777 www.Testing - Engineers com ACCREDITED Quality Assurance Services le; Materials Consulting TESTING ENGINEERS, INC. Since 1954 GROUT UNDER BASE PLATES Grout Placement No. days: 2 No. hrs: 8 Rate/hr: 80.00 $ 640.00 Grout Cubes 2 x2 x 2 Cubes No.: 8 Rate /ea: 33.00 $ 264.00 Pick Up of Samples No. trips: 2 Rate /ea: 80.00 $ 160.00 SUB -TOTAL $ 1,064.00 F MISCELLANEOUS Affidavit (Principal Engineer): Required by Cupertino, CA Upon request; please allow 10 working days for affidavit preparation. No hrs.: 1 Rate /ea: 150.00 $ 150.00 SUB -TOTAL $ 150.00 GRAND TOTAL ESTIMATE $ 7,450.00 Op\ Corporate Office — 2811 Teagarden Street — San Leandro, California 94577 — (510) 835 -3142 — FAX (510) 834 -3777 www.Testing- Engineers.com ACCREDITED