Loading...
10-048 Kier and Wright Civil Engineers, Stelling Rd Sidewalk Improvements AGREEMENT 7i CITY OF CUPERTINO V;)/)/C1 10300 Torre Avenue Cupertino, CA 95014 �J 408 - 777 -3200 NO. / U _r o T BY THIS AGREEMENT, made and entered into this e- day of , 2010, by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Kier & Wright Civil Engineers, 3350 Scott Boulevard, Bldg 22, Santa Clara, CA, 95054, (408) 727 -6665 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR shall provide or furnish the following specified services and /or materials: Providing surveying services and preparing Plans, Specifications and Estimate (PS &E) package for sidewalk, driveway and curb ramp construction. EXHIBITS: The following attached exhibits hereby are made part of this Agreement: Exhibit A, "Scope of Work" Exhibit B, "Fee Estimate" TERMS: The services and /or materials furnished under this Agreement shall commence on June 15, 2010 and shall be completed before December 31, 2010. COMPENSATION: For the full performance of this Agreement, CITY shall pay CONTRACTOR: Payment to be made on an hourly basis, not to exceed $55,700. California Labor Code, Section 1771 requires the payment of prevailing wages to all workers employed on a Public Works contract in excess of $1,000.00. GENERAL TERMS AND CONDITIONS Hold Harmless. Contractor agrees to save and hold harmless the City, its officers, agents and employees from any and all damage and liability due to negligence, errors and omissions, including all costs of defending any clairn, caused by or arising out of the performance of this Agreement. City shall not be liable for acts of Contractor in performing services described herein. Insurance. Should the City require evidence of insurability, Contractor shall Tile with City a Certificate of Insurance before commencing any services under this Agreement. Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non - Discrimination. No discrimination shall be made in the employment of persons under this Agreement because of the race, color, national origin, ancestry, religion or sex of such person. Interest of Contractor. It is understood and agreed that this Agreement is not a contract of employment in the sense that the relationship of master and servant exists between City and undersigned. At all times, Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement. Contractor certifies that no one who has or will have any financial interest under this Agreement Is an officer or employee of City. Changes. This Agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO- ORDINATOR and representative for CITY shall be: JO ENTERED NAME: David Stillman DEPARTMENT: Public Works This Agreement shall become effective upon its execution by CITY, in witness thereof, the parties have executed this Agreement the day and year first written above. CONTRACT R: CITY OF CUPERTINO: • By - X1-1 1-J�?A By Ti tle Title 5EIVfoP Ctvr'rL- E d P+EER APPROVALS EXPENDITURE DISTRIBUTION - - MENT FaR-- DATE __ACCOIJNT NI IMBER AMOUNT (O 110 -8601 -7014 $30,700 ' "� d, � 270- 9451 -9300 $25,000 wirlimt„ .f 1 E if) i I A Citv of Cupertino Stelling Road Sidewalk Improvement Project February 5, 2010 David Stillman, City of Cupertino 10300 Torre Avenue Cupertino, CA 95014 RE: Request for Proposal for Stelling Road Sidewalk Improvements Dear Mr. Stillman, Thank you for considering Kier & Wright Civil Engineers & Surveyors, Inc. as a candidate for engineering consulting services. We have reviewed the preliminary drawings provided and have also walked the subject area to further evaluate field conditions. Our understanding of the project is that the City desires to improve /repair the existing street conditions within the subject area as part of a federally funded sidewalk repair project. The scope of work for Kier & Wright would include survey and design services for constructing new sidewalk, driveways and curb ramps along the subject streets, in order to comply with current accessibility regulations. Or field review of the scope has helped us develop' these key project goals: • Design new ADA compliant standard driveway details for driveway replacement. • Ensure ADA compliance at curb returns within street intersections. • Ensure ADA compliance for a continuous path of travel in compliance with The Safe Routes to Schools requirements. We propose a breakdown of the scope into three stages of design, which are further described in this proposal. An exhibit identifying specific areas of work has also been provided. This proposal includes a detailed scope of work and pricing for the project. I have also included a preliminary analysis of the existing street conditions as they relate to accessibility regulations. This does not constitute a formal comprehensive review of accessibility conditions and requirements, but will give you a better understanding of our findings to date. We pride ourselves on quality services on any project, regardless of scope or size, and look forward to this opportunity with the City. We hope this meets with your approval, please feel free to call with any questions you may have regarding our proposal. Sincerely, KIER : WRIGHT mml Nor • Noori Pro - Manager KIER & WRIGHT CIVIL ENGINEERS & SURVEYORS, INC. 3350 Scott Boulevard, Bldg. 22 • Santa Clara, California 95054 • 408- 727 -6665 • 408-727-5641 - 1 - EXHIBIT A City of Cupertino Stelling Road Sidewalk Improvement Project PHASE I — PRELIMINARY DESIGN 1. Aerial Imagery and Base Topographic Mapping The first scope of work will consist of establishing ground survey control tied into the City GIS data network, aerial photogrammetry and field topographic survey. We propose to acquire new aerial photogrammetry and supplement it with field survey data where needed. This approach provides a greater accuracy than design based on aerial imagery, and also provides the relevant data needed. Ensuring an accurate base will reduce the risk of conflicts during construction and unexpected contractor change orders. We will prepare base maps showing existing surface improvements only. Underground utilities are excluded as it is not anticipated that the project will impact existing utility infrastructure. The survey will utilize the City GIS for record right-of-way information and will also be tied to a local City benchmark. The survey will include information gathered by the aerial imagery along with field survey for data below tree canopies and supplemental information as needed. The survey will carry horizontal and vertical control as necessary and will also show surface features for curb, gutter, sidewalk, pavement, striping and other structures. In areas where curb, gutter and sidewalk improvements are needed grades will be shown as spot elevations based on field survey. 2. Project Meetings Throughout the design process, our project team will maintain a close relationship with the City to coordinate and provide updates to project status and design progress. Kier & Wright will coordinate and setup project meetings with City staff. These meetings will be held at project kick -off, review of 60% comments, review of 99% comments and for site construction visits. 3. Phase I Submittals Upon completion of Phase I, Kier & Wright will provide to the City (2) bond hard copies of the completed base topographic survey, aerial image and the electronic files in Autocad format. KIER & WRIGHT CIVIL ENGINEERS & SURVEYORS, INC. 3350 Scott Boulevard, Bldg. 22 • Santa Clara, California 95054 •408- 727 -6665 •408- 727 -5641 - 2 - EXHIBIT A City of Cupertino Stelling Road Sidewalk Improvement Project PHASE I1— CONSTRUCTION DOCUMENTS 1. Driveways — Option A In reviewing the existing street conditions, our opinion is that that one of the main driving factors in the sidewalk improvement scope will be the location of the property lines adjacent to private property. A preliminary review indicates that a 10' setback from face of curb to property line exists along the majority of the project's streets. We believe this will allow the City to reconstruct driveways without impact to private property, pending further field review. This, along with the design scope in this proposal, is based on the assumption that the City - provided GIS base map will provide accurate and sufficient right -of -way data. Our ability to determine feasibility of the improvement scope will be limited only to the level of accuracy provided by the City GIS maps. We will need to design new City Standard Driveway construction details that allow for a compliant path of travel across driveways. Typical details will be prepared that are applicable to each case and condition encountered. The goal will be to minimize the amount of unique driveway details in order to simply construction and ensure consistency. 2. Driveways — Option B An alternative approach to the driveway replacements is provided so the City can make a better determination on what level of detail they prefer to see in the construction documents. Option A is the most cost effective design approach. It carries the assumption, however, that there will be no impact to private property and minor discrepancies between the typical details and field conditions will be handled in the field between the contractor and the City. With this assumption it carries an increased risk of potential change orders and unanticipated field constraints. Option B is an alternate design approach that involves additional field survey and design review up front, in order to help minimize potential field problems and change orders. We have reviewed the driveway conditions along all the subject streets and determined that there are four general conditions that apply to any given driveway. These are: 1. Standard Driveway with no existing sidewalk adjacent to one or both sides. 2. Standard Driveway with attached existing sidewalk adjacent to one or both sides. 3. Wrap- around Driveway with no existing sidewalk adjacent to one or both sides. 4. Wrap- around Driveway with attached existing sidewalk adjacent to one or both sides. The type and quantity of driveways for the subject: streets is broken down below: Road/Type Type 1 Type 2 Type 3 Type 4 Stelling Road 15 13 15 6 Greenleaf Drive 3 2 - - Flora Vista Ave 3 - - - Knowing these quantities and types, our alternate approach would be to field survey elevations at each driveway in order to ensure compliant slopes can be met with the typical detail designs. KIER & WRIGHT CIVIL ENGINEERS & SURVEYORS, INC. 3350 Scott Boulevard, Bldg. 22 • Santa Clara, California 95054.408- 727 - 6665.408- 727 -5641 - 3 - EXHIBIT A City of Cupertino Stelling Road Sidewalk Improvement Project An elevation would be surveyed at the flowline, rnidpoint and back of each driveway along the centerline of driveway for a total of 3 points for each driveway. This information would then be used to compare existing slopes with the right -of -way information and proposed driveway designs. Should this analysis reveal that a typical detail will not provide a compliant accessible path of travel across a driveway, a special detail and design would be done for that condition. This involves a substantial amount of additional work on the design end, however, it provides a much better assurance during construction that all field conditions have been evaluated and accounted for. An alternate fee for this additional work is provided in the fee estimate at the end of the proposal. 3. Sidewalks Existing sidewalks will be checked for slope compliance via field survey to identify areas where replacement may be necessary. However, the majority of work will fall under areas where no sidewalk exists. Sidewalk details will be prepared for each typical case including dowel connections to existing walks. 4. Curb Returns At the project's street intersections curb ramps will need to be upgraded or newly constructed to comply with slope and truncated dome requirements. These will be based on our newly designed City Standard Details for curb return and perpendicular curb ramps where necessary. 5. 60% and 99% PS &E Documents The PS &E (Plans, Specifications & Estimates) will be prepared in accordance with City procedures, standards and specifications. Plans will include information and details necessary to bid and construct the project. We anticipate that the City will provide all general conditions, technical specifications and special provisions necessary. • Submittals will be made at 60 %, 99% and 100% stages. Each submittal of the "PS &E Package" will include (2) hardcopy plan sets and red -lined City markups from the previous submittal along with an itemized response letter addressing all comments. • An Itemized Engineer's Cost Estimates will also be prepared for our scope of work. 6. 100% Construction Drawings Kier & Wright will incorporate the City comments into the 100% Construction Drawing submittal and bring the plans to a complete biddable and construction -ready state. The biddable set will be stamped and signed by the engineer(s) of record. 7. Phase II Submittals • Upon completion of Phase II, Kier & Wright will provide to the City (2) bond hardcopies of the project plans and estimates at each submittal interval. KIER & WRIGHT CIVIL ENGINEERS & SURVEYORS, INC. 3350 Scott Boulevard, Bldg. 22 • Santa Clara, California 95054.408- 727 -6665 • 408-727-5641 - 4 - EXHIBIT A City of Cupertino Stelling Road Sidewalk Improvement Project PHASE III — BIDDING & CONSTRUCTION SERVICES 1. Bid Package Support Kier & Wright will coordinate the 100% PS &E documents with the City's bid requirements, provisions and processes. At this stage we will have a finalized engineer's estimate for the scope of work involved and will prepare a complete itemized bid schedule including item descriptions, unit types and quantities. 2. Bidder Questions As part of our services we will respond to any requests for information /clarification on our plans. Our primary point of contact will always be the City, not the contractors. An addendum to the bid will be prepared and issued to the City for distribution, if necessary. This addendum would include responses to all requests for information, revised plans (if needed) and other necessary documentation. All RFIs and addenda will be coordinated directly through the City. 3. Requests for Information (RFI) Kier & Wright and our team will provide the City, as our primary point of contact, with support during the construction phase. Upon receipt of an RFI we will prepare a written response in an expedient manner and respond through the City for approval and issuance to the contractor. Any design revisions or material changes necessary shall be clearly described in each RFI along with clouded revisions to the plans per City standards. 4. Meetings and Site Visits Prior to construction we will attend the pre - construction kick off meeting. We will also attend two field reviews. Upon construction close -out our team will coordinate with the City for their walkthrough and punchlist evaluation if necessary. 5. Phase III Submittals The following will be provided at this stage: • Complete wet - stamped 100% Improvement Plans. • Bid Schedules (Cost Estimate) with and without cost values. • CD -ROM containing digital copies of all work products and supporting data. • Prompt and complete responses to all Requests for Information including Addenda. 6. City Responsibilities For the purposes of this proposal, several assumptions and expectations have been made for the project. Based on our understanding of the project and discussions with the City, these items are excluded from the proposal: • City to provide electronic copy of GIS record data. • Underground utility information will not be researched or included. • Other agency work, approvals /coordination will be managed by the City such as PG &E approvals, environmental clearances or other items that may be necessary. • General Conditions, Technical Specifications, Special Provisions and Construction Management will be provided by the City. KIER & WRIGHT CIVIL ENGINEERS & SURVEYORS, INC. 3350 Scott Boulevard, Bldg. 22 • Santa Clara, California 95054.408- 727 -6665 •408- 727 -5641 - 5 - 6 n City of Cupertino Stelling Road Sidewalk Impro , 1 FEE ESTIMATE The following fee estimate is based on the information we have to date. We propose to perform the work on an hourly basis, not -to- exceed (NTE) the total contract amount. This will allow us to complete our services without risk of budget impacts and at a lower cost to the City. Additional work will only be performed after authorization from the City is received. SCOPE OF SERVICES PHASE I — PRELIMINARY DESIGN 1. Aerial Imagery & Base Topographic Mapping. 2. Meeting for Design Kick -off (1 Total). Total proposed fee for Phase I: $ 15,400 PHASE II — CONSTRUCTION DOCUMENTS 1. 60% Design Plans, Specifications & Estimates (PS &E). 2. 99% Design Plans, Specifications & Estimates (PS &E). 3. Meetings for 60% and 99% Review (2 Total). Total proposed fee for Phase II: $ 15,200 PHASE III — BIDDING & CONSTRUCTION SERVICES 1. 100% Design Plans, Specifications & Estimates ;PS &E) for Bid Issuance. 2. Support Services during bidding process. 3. Coordination and responses to RFIs. 4. Meetings for Pre - Construction Kickoff and Field Reviews. (3 Total). Total proposed fee for Phase III: $ 13,900 Total Proposed Fee for Services: $ 44,500 ADD - ALTERNATE FOR OPTION "B" SERVICES PHASE I — PRELIMINARY DESIGN 1. Additional Field Survey for approximately 60 driveways. Total proposed fee for Phase I Add: $ 5,200 PHASE II — CONSTRUCTION DOCUMENTS 1. Analysis of existing cross slopes at each driveway. 2. Design of custom details for special driveway cases (estimated at 5 total). Total proposed fee for Phase II Add: $ 6,000 Total Proposed Fee for Add - Alternate: $ 11,200 EXCLUSIONS 1. Printing, Plotting, Deliveries & Other Reimbursables (billed at cost). 2. Utility or Other Designs not outlined in proposal. 3. Exclusions outlined in City Responsibilities Section. KIER & WRIGHT CIVIL ENGINEERS & SURVEYORS, INC. 3350 Scott Boulevard, Bldg. 22 • Santa Clara, California 95054 •408- 727 - 6665.408- 727 -5641 - 6 -