Loading...
R-2010-15b �,, OFFICE OF COMMI NITY DEVELOPMENT GTY HALL 10300 TORRE AVE� UE • CUPERTINO, CA 95014-3255 C U P� RT I N t3 (408) 777-3308 • FA:; (408) 777-3333 • pianning�a�cupertino.org November 23, 2010 � Mr. Ben Engelman 11652 Bridge Park Ct. Cupertino, Ca. 95014 SUBJECT: RESIDENTIAL DESIGN REVIEW ACTION LETTER - Application R-2010-15, RM- 2010-17: This letter confirms the decision of the I)irector of Community Development, given on November 23, 2010; approving the Residenti�l Design Review for construction of a 2,878 square foot, two-story, single family residence with a second floor to first floor ratio of 61.1 %; and a Minor Residential Permit to allow a second si ory deck on the new residence, located on Lot 2 as referenced on Tract #10056, with the following conditions:, 1. APPROVED PROTECT This approval is based on a plan set E ntitled, "Blaney Homes, 790 S. Blaney Avenue, Cupertino California, Lot 2 Two Story R esidential Permit Submittal" consisting of sixteen sheets dated August 27, 2010; except as m ay be amended by conditions in this resolution. 2. PRIVACY PLANTING The final privacy-planting plan shall be �eviewed and approved by the Planning Division prior to issuance of building permits. If e Kisting tree(s) is used for privacy screening, a letter from a certified arborist shall be submitt��d confirming that the tree(s) is in good condition and is appropriate privacy protection vi any season. Trees planted for the purpose of privacy screening shall measure no less tr an eight (8) feet tall upon planting. 3. PRIVACY PROTECTION COVENANT The property owner shall record a covE nant on this property to inform future property owners of the privacy protection measures and tree protection requirements; consistent with the R-1 Ordinance, for all windows with aiews into neighboring yards and a sill height that is 5 feet or less from the second story fini �hed floor. The precise language will be subject to approval by the Director of Communiiy Development. Proof of recordation must be submitted to the Community Developx��ent Department prior to final occupancy of the residence. 4. LANDSCAPE INSTALLATION REPORT The project is subject to all provisions delineated in the Landscape Ordinance (CMC, Chapter 14.15). A landscape installation audit shall be conducted by a certified landscape professional after the landscaping and irr'.gation system have been installed. The findings of the assessment shall be consolidated into �� landscape installation report. The landscape installation report shall in�=lude, but is not limited to: inspection to confirm that the landscaping and irrigation syste: n are installed as specified in the landscape and irrigation design plan; system tune-up, s��stem test with distribution uniformity, reporting overspray or run-off that causes overland flow, and preparation of an irrigation schedule. The landscape installation report shall include the following statement: "The landscape and irrigation system have been installed as s� ecified in the landscape and irrigation design plan and complies with the criteria of the ordin ance and the permit." 5. LANDSCAPE AND IRRIGATION MAIN"ENANCE Per the Landscape Ordinance (CMC, C hapter 14.15), a maintenance schedule shall be established and submitted to the Director of Community Development or his/her designee, either with the landscape application pac�:age, with the landscape installation report, or any � time before the landscape installation repc rt is submitted. � a) Schedules should take into account water requirements for the plant establishment period and water requirements for est�►blished landscapes. b) Maintenance shall include, but not be limited to the following: routine inspection; pressure testing, adjustment and re �air of the irrigation system; aerating and de- thatching turf areas; replenishing mul�:h; fertilizing; pruning; replanting of failed plants; weeding; pest control; and removing c bstructions to emission devices. c) Failed plants shall be replaced with the same or functionally equivalent plants that may be size-adjusted as appropriate for the stage of growth of the overall installation. Failing plants shall either be replaced or be rE �vived through appropriate adjustments in water, nutrients, pest control or other factors �s recommended by a landscaping professional. 6. SUBDIVISION MAP CONDITIONS The project shall satisfy all pertinent conditions as required by TM-2010-10. 7. CONSULTATION WITH OTHER DEPAR TMENTS The applicant is responsible to consult wit h other departments and/ or agencies with regard to the proposed project for additional con�itions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 8. EXTERIOR BUILDING MATERIALS/TRF;ATMENTS Final building exterior treatrnent plan (inc luding but not limited to details on exterior color, material, architectural treatments and/or embellishments) shall be reviewed and approved by the Director of Community DevelopmE nt prior to issuance of building permits. The final building exterior plan shall closely reser.ible the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Community Development shall require a minor modification approval with neighborhood input. 9. ACCURACY OF THE PROTECT PLANS The applicant/property owner is respons:ble to verify all pertinent property data including but not limited to property boundary loc ations, building setbacks, property size, building square footage, any relevant easer. ients and/ or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 10. NOTICE OF FEES, DEDICATIONS, RESEJZVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set � orth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Government Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the � 0-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90-day period complying with all of the requirements of Sectiori 66020, you will be legally barred from later challenging such exactions. Please be aware that if this permit is not usec � within one year, it shall expire on November 23, 2011. Staff has made all the findings that are required for approval of a Two-story Residential Permit as required by the of Cupertino's Munici �al Code, Chapter 19.28.100 (D) and a Minor Residential Permit as required by Chapter 19,28.090 (B). Also, please note that an appeal of this decision can be made within 14 calendar da� �s from the date of the decision. If this happens, you will be notified of a public hearing, which will be scheduled before the Planning Commission. Since •ely, ar ao City Planner City of Cupertino Enclosure: Approved Plan Set . CC: Blaney Venture, LLC, Mike McClellan,1448 Entrad�� Verde Pl., Alamo CA 94507 B A� Y 1VI 790 S. BLANEY AYEI�tU� GUPER'T"IltiiO, GALIFOR1tiIIA P 1VI I F� B 1VI I A , PROJECT TEAM APPLICANT/OWNER CONTACT: MIKE MCCLELLAN BLANEY VENTURE, LLC 1448 ENTRADA VERDE PLACE ALAMO, CA 84507 TEL: (825) 795�4646 FAX: (925) 9449108 EMAIL: mmcclellan�abcplobal.net ALTERNATIVE CONTACT: BEN ENC3ELMAN TEL: (408) 891-8398 FAX: (408) 217-2383 EMAIL: bnplmn�yehoo.com .. .. _ K—d�! ° -- lS , : �=.;st�;;. . . _.� __ ��..•�.____.�..�._-`�`. _ .� �� � ;{°#�; ,�� r� _�- �O l � . . ►'" ..� ��1 t � , , _�..�_ �..,.,...__ , i _ .. �_ �. ---c a ±�✓1;'�f� :�i;�fk; / r � . i� i r� i ,09 : ..... I.s __ /. / � � _ _r.::. ar �.-E-- '�z t,q� }, �i����;�ir, _ ., �'. ..� . : ;_, ,._ � _ -- -- � -�� � ��a o I-�Y F� I D l�I I ARCHITECT CONTACT: JIM VEE VAN TILBURG, BANVARD & SODERBERGH, AIA 100 W. SAN FERNANDO ST. SUITE 595 SAN JOSE, CA 95113 TEL: (408) 537-0532 FAX: (40B) 537-0535 CIVIL ENGINEER CONTACT: MARIUS E. NELSEN 21B01 STEVENS CREEK BOULEVARD, STE. 8 CUPERTINO, CA 95014 TEL (4pb) 257$452 FAX: (408) 257-8821 LANDSCAPE ARCHITECT CONTACT:DONJENSEN HISTORIC NEWBOLD HOUSE 20 EAST FIFTH STREET MORGAN HILL, CA 95037 Te�: �aos� ne-zaes VICINITY MAP ASSESSOR PARCEL NUMBER 369-11-048 SHEETINDEX A0.0 COVER SHEET CIVIL C1 OVERALL GRADING PLAN C2 GRADING PLAN - LOT 2 LANDSCAPE L-1 LANDSCAPE PLANTING PLAN L-2 IRRIGATION PLAN L-3 LANDSCAPE NOTES 8� DETAILS ARCHITECTURE A0.1 COLOR ELEVATION A1.1 OVERALL SITE PLAN A1.2 ENLARGED LOT PLAN A2.1 FIRST LEVEL FLQOR PLAN A2.2 SECOND LEVEL FLOOR PLAN A2.3 EXTERIOR ELEVATIONS A2.4 EXTERIOR ELEVATIONS A2.5 SECTIONS A2.6 DETAILS vres zeoes AUGUST 27, 2010 BLAN�Y HOMES GUPERTINO, CALIFORNIA AO.O VAN TII.BURG, HANVARD & SODERBERGH, AIA _._ -- ---- _ -- - _ __ __ ---- _ _ _ _ ARCHITECTU RE • PLAN N IN G• U ABAN DfiS 1 GN www.vtbs.com ,� � ' T.P. 3 T.P.=101.0 F ��•. �.G =1 Q .1 � � EDGE OF ASPHALT � 1 ` '�' :.G.=10 ., _ � (RAISED) E.G.=100.7 � �. � .. - - - - - - - - \ \ BEGIN NEW `, �� >> F G. 100.65 i Y F.G. 101.13� CONC. CURB, ' o i • c� E F.G. 102.3 GUTTER AND --.. . E _.. 5 _. _ o^ Q .G. 100.06 E G 100 36 _ _. __ .. . ` �� . _.._. _ � m � �� . SIDEWALK � .. ..... _ . �- _. � t �_ � _. _� . _ __... _ _. _----- - _- - .._.... _._._ _ ._-- - - �--,- 20. G .. _ ., � V � W ,� ��� 40 __. - __ --- --- - HIGH PT� SWALE SBTgqCK �. . ��-'" .... ' ' F L 101 29� � FINISHED GRADE ��. F �•� � � � _ _ TOP OF CURB=99.68' \ .O . ^ FLOWLINE GUTTER=99.18' � (MATCH EXIST.) A �� � ���, \ \ � � NEW HOUSE `�XIST. JOINT FF=101.96 LOT 1 UTILITY POLE PAD=100.96 N E T A R E A . � C ` TO BE RELOCATED � � �� 6, 736.16 SQ. �T. 0 F,�.,t0�• Qs �`, � `! � BIO. SWALE 'i� 5=0.01 O� F.c.=io2. \ 0�'� P�`f- � �� \ �`�F'� '. \ � � / � GARAGE c,�, � 5- , O PAD 101 00.12 BLDG. .,--'.'"'- !" _ v � (29 D/W) SETBACK � ``� �� F G , � p1. q0 E.G.=100.7 e � _� ,.�f` F.G.=102.0 r ,.-• E.G.=100.1 -��,� � APPROXIMATE LOCAl10N OF j) NEW POWER POLE 1 � NEW CONCRETE RETAINING WALL F.G.=102.6 � MAX. HEIGHT 2.5' , E.G.=100.4 � , JOINT UTILITY F.G.=102.3 � F.G.=102.1 POLE TO BE E.G. 100.4 E.G.=100.4 RELOCATED Y U o° � , A om � � F.G.='1 \ � e _., / 5 �_--' �p1.2 = ..--- � .- _ '.- SANITARY MANHOLE � ��' 9� 4 �----''��� F G ���� � '� t RIM=100.07 C � ( 1 �'' F G.f �..--'" / /� • .�-- ''+ l .. INV.=91.67 � �� ' . ' �� �� " / ,,.- '� -. HIG PT. SWALE \ � ` �.�!' . . -'' . " ,�5$ F.L. 101.48' � �,�/�� ...� � �.. �� . p� ,�- '' � G. �° � ' oo, __--, .. \ ,- � .. ' _.�� _ - . � �-- -. ' 20 . G. . ,� _.. - gLD 5S SSMH C 0 ,. ��-- �,, S�TgpCK RIM=100.07 \ � ' V ��. ' � GP '. „ � -" ..-;��� � G \F� � �� � ,, ��,�.�° LOT 2 I Q P��� �� � � � �, ., NET AREA: I F.G.=102.( �� 6,410.27 SQ. FT. � ' E.G.=100.E �" F.G. 100.45 0� F, \ E.G. 100.1 � 1 Q J' �� \ ,.-' NEW HQl1SE ' y � FF�f 0�1.14i � � � �/+ � � �,0��. �,� � ':...:FAD=101.14 , - O`` / 9 '� eS.�gP \ `, F.G.=101.58 ',, �� d, � \ C L �� ` � . . �`. 5.00' n � \ � !.,,:; '� BLDG. -o � ` \ GARAGE '" = � ��. SETBACK �� f' \ - � � S i 0 FF=101.71 - '" ,, , ���. PAD=100.71 � , \ 5.0' � \ �` � S � (29 D/W)2 � // �� a . � ^ BLDG;.�, \ � _. . ' ; ,� , , \ �� S � / B \ � \ \ v� �,� f 61 TEMPORARY BENCHMARK ` NAIL AND SHINER G � EL.=100.0' (ASSUMED) � \ � � � �� � \ �� � \ \ /'� � 4� � \ � G `\ \ �, � � \ ` � G • C \ F.G. 1 01.0 E.G. 100.3 � \ \ .`,.,` �iP 2� � � � � � 2� ��� CONC. CURB c \ AND GUTTER SCALE: 1"=10' � ` ' , � rt ' i i . i { - � � � r �� i ; f I t _ . �.Z • �.:� w ,� ..� LE G E N D: ��. d�;�P �I����i��,;� �� .'_�o � 7 \ v . y._ _.� �i�i�,;�li �r� � X�cYli� .'°'. �.,� ...., •-----.-,~°-----�- -- -- ---------------` PROPERTY LINE �' F ' -' ' =�� � ^ ! r � fe � - - ` ` . � � _.. �- ` ,�,..s..�.,� - - CENTER LINE ^= ° �' ` � :�� ; � ...____________� __ __ .______________. RIGHT-OF-WAY LINE J . , _. . � ,� � ;; �,,_ _- , : FLOWLINE SWALE . � i- � \ 6�� �� 'r0 f' `, JT JT JOINT UTILITY TRENCH \ �' � ELEC., PHONE, CABLE TV � � � z __________________ �� ___..____________ __. SANITARY SEWER MAIN 0 i � ��, O� \ , '• �yF � FINISHED GRADE --"'-'�"�'-"�"' S� ""-""��"�""" SANITARY SEWER LATERAL \ i Pi�'�0 TOP OF CUR8=101.25� '. ��'�'� FLOWLINE GUTTER=100.75' ..__._ .............__.._.._.... �,J ___________ _._.____. WATER LINE � �' 'o � �� � � �' NEW A.D.A � WHEELCHAIR RAMP \ � COMPLIANT � ACCESS O SANITARY SEWER MANHO�E � � \ HIGH POINT � \\ C FLOWLINE \ � GUTTER=100.93' • • N V7 __ _.._.._ _____ .�. ____' '-_ _ _ _........ _..._ ......"' ""_ _ � 02.33 ` oo., � � ' � i � ' � HIGH PT. SWALE � 1 F.L.=102.16' V I �� ' �� � ' I ._... � ..,. - .. ..... ' F G =�02 26 ... Q9 .. F��10226 `. � 0 F:G.=1 �' i F.G.=102.05 E.G. 100.9 - - - _--. - � - �.�.. .�.. ._._ __.� I � �- .. � ..� I 1 HIGH PT. SWALE I F.L.=101.91' I F G.=102.13 ( � �-_ _. __. F.G 1�2,1� � � ...... ': 0 � �: Q � __ � : NEW CONCRETE I RETAINING WALL L 0 T 5 NAX. HEIGHT 2' � - 10_�m' � �� s E ��� NET AREA: ; � � � K � �,, 7,046.49 SQ. FT. ': I I ', F.�.=101 � I ' �; � �t �`, NEW HOUSE ' 1 ' FF=102.69 I - � Pao=�o�.ss °� �OT 4 � � � �, ' I ( I , N E T A R E A: �. '; � j? o ca,RacE F.G.=101.9� CJ, 7� �. � 6 SQ. r I.. I u i �'. �' i F.G.=102.13 _.. 0 FF=102.35 i�. � NEW HOUSE ` �� - '� ` " PAD=101.35 � aq � � �- _._._ (2� D�W) �' `�, � ; ', . , ' 1 FF=102.82 , � _ Y! . = PAD=101.82 � , _._._ _ � � , � _ � SE?0�1' '� '_.. .: � __... G. _ _-. �.C,`.��- 85 BL��� .� � � � �� � _ . . �� � - � �� �� � -'' � i' Il L GARAGE � i � �; ,� •-" U,��'y - a I` l n FF� 102.27 `. I I I I' I�� £ I / \FINISHED GRADE / � WATER TOP OF CURB=101.28' /� METER FLOWLINE GUTTER=100.78� - 5.00' BLDG. SEIHACK G U z oQ z3 �w � mv� �^ ( N O O o00 tl � � � � ._ .: ��w W ' �M E W MEN S SS P N� C0�' � +��� � ��Rg �,,,,,,- \ ` � • .( �, - � � S � J � \ `�\ J ��/..� i C `�� S� � �� ,� / � o ��o � � � � ( , 1 p� Q ��P \ � �,. f �,-' ? ' �\ �J� �`� _ / c�S C �� \ / / / / � ��, � `L �O � S � � � � ~ G• ,�p�• � O � � � : �� � �- �/ \ � S -'� � G �,� , S - � � F ` � � � �� , , S� - ��" SHEET INDEX -� s� �` SHEET N0. L�ESCRIPTION � `� / SHEET Ct GRADING PLAN - OVERALL VIEW / -� SHEET C2 GRADING PLAN - LOT 2 � ' SHEET C3 GRADING PLAN - LOT 3 � c �S � i i � SHEET C4 GRADING PLAN - LOT 4 �/� / SHEET C5 GRADING PLAN - LOT 5 %� ! SHEET C6 GRADING PLAN - PROFILES �' /� � SHEET C7 GRADING PLAN - PROFILES /� SHEET CB EROSION CONTROL PLAN � � REVISIONS m C 'o •- N Cd� � > « E § �o � G � U U n � C A O L C C dl x ca �►� 8 ,��'� C • m • �' a� . �� N„� o� � v W W `� vcc� � �� u � N °; z m � n 3 � W V � a � O _ �a Z > W � V � � � p � �� t7 Z, ¢ � -� �� ( - _� 0, 2 ^ W � �.I..� / � Q �.tJ � � . Z O �.1..� � / � � Q� � Z w U Q L J � � a O m Z � • � Z � � � �-�--I Q � � � o> > C.� I� U te: AUG. 2010 a!e: 1 "=10' �wn: CAD Sheet C 1 of V Sheets REVISIONS \ \ FINISHED GRADE` TOP OF CUR8=99.68� FLOWLINE GUTTER=99.18� (MATCH EXIST.) � ` ) .F � •�� � � .� , � T� \ � \ c \�XIST. JOINT `� ' UTILITY POLE `, � � ` TO BE RELOCATED ` \ o �� \ �� � PG � \ �� \ �`'�� �,� .. � e / � S� ` 5 ���\ �� \ \ �_ SANITARY MANHOLE � RIM=100.07 c � � f 1 INV.=91.67 ` ".� \ � � v� cS SSMH C � ` RIM=100.07 \ � � (> �G P . .,... ,�� St ��..,.. F.L.=-101.29� FF W101o96 E L 0 T 1 PAD=100.96 NET AREA: 6,736.16 SQ. GARAGE OFF=101.12 BLDG^ PAD=100.12 SETBACK 29 D V� ,... , 1 40 Fj �� � ': ! _. �' � BIO. SWALE ,' S=0.01 0 '�'. F.G.=102.0 F T . F.G = 10� •4� E.G. =100. t r--'' .-�'" f '" F.G. =102.0 - �"°� E.G.=100.1 �. /` . 5��� i� / �� 0 � � // . . � o � /� ` ! � ��� 2 r .--- �.-- .. \ , .�. f G' `�- �- � \ 9 F G ���p.4 ' `...,,.% � �i � ...-,. ;; �., _ / ' �- �• HIG PT. SWALE � ,. . � �"�r..o _ �, 1.- ,.,�� ` F.L. 101.48� -� J ` e , i� � - C�� � .,.� ' � J �� � � i10 O ', . 5���� �_- .� -� „ � � F G' �/ .. . '� ' _JZ - ,,i!. 2p.00' - - G. , - j/" . . ' ,,,,,. -'' �., ESgACK / ' „-- 11 C- '' � g � -��� � - LOT 2 � � �---- - - F.G.='102.33 1 B � � � r � F ' � ' __ ' ,.... F G .102•26 ` }_O Q P G \ �' � �� V � \ ��'�/ NET AREA: `,. 1 F.c.=,oz.o N' ��� '� � o o \ `' 4 ' aj E.c.=,00.a `"� 1 L0T � � F.G. 100.45 ,o��,�, 6, 410. 27 SQ. FT. O E.G. 100.1 � Q� � � NET '� \ NEW HQ.USE � F.G.-101.9� 8 7'� iP \ , , ' , FF -�eJ2.14; � �ti J � \ ♦ �y��G. G �(. � ' , , PAD=101.1�, Q ,. '/ ' NEW 9 y9�� �� 0�q0P F.G.=101.56 ' `'+ ` FF- � , ; PAD � � C ', �,: , i � �,�� \ �. � j B�DG. �g �DG• •-o'p \ :- /- SETBACK E �d�ACK � 1 �J' � 5 . __ _ � n� \ �R - • ,, ` s�, � \� \ TEMPORARY BENCHMARK , c NAIL AND SHINER EL.=100.0' (ASSUMED) ' � ' �� � \ '`'.. `r iP �� \ � �� C \ �� \ � �� � ` � � \ � � \ ` 20 10 0 10 20 SCALE: 1 "=10' . _ � . ��': �:`� �� � � 1 O S �� ,m�. _1 . _ � _ - -_t..� .� .... ,�� ' `�, � 6P',� � , ' � ,�"` ��f� k1�," � - ��J � > . �. . �� � .... �........,...�. ..,...,. .. �.. ..r _ . . � i .n, ;� : .. r f: � ��; �� �; .. �� r �'j J � ! ��� '.'�2,,J. . . __ �_ c..i� '�' _ � •:-�.�........ ..�.. .- - . �I�i°le�{fa1='; + s� . :.'� ...�.���� � �.. � ..-- - ... _ ....-_ ��� ��'v �G. a .o \ GARAGE ' 1°�• S ` � \ 1 Q FF=101.71 '' / � ��' PAD=100.71 '"" 5.0' ' � (2� D/W)� . -/ ''/ c' � SETBAC . � '. �O ' / J � � o ,. . � : \ �� S � `�. �F �'?, ,�/ � °`�!,,- . \ � ' ' '�� , . , `C ` � , /, . . / �6 Q �� � G r .c�- � . � (, (�1 �� o ,�p1 Q F � F.P / � , t - \ \ F G� . �� � � 1 �� 9 ,, .� / ' o ' , O � � '; / � � �,F • �0��� � G.��` � � f �•' \ � � Y � �� b \ � � F.G. 101.0 E.G. 100.3 /, � 6 � G � P R°� / � � ' � �(P�'(��� ,,�y , � � ,- . . ". \ �F'�. , '� ' � , HIGH PT. S`�NALE `. F.G.=1! .2 ` ' 11 �- �� F.L.=10T:96� 1 � / f f� , ,� , 1 l � / ` LOT .J GARAGE ' � ..- / : 01 �P Dz 11 � � ,,�- ' �,o`�� NET AREA: �2% � p �I +\ G• � � �"`.� 6, 498. 43 SQ. FT. � � �� ��, � � .��,�� ��..,.�� t 4 INSTALL PERCOLATION PIT ATTACHED TO 15 L.F., 24" DIA. RETENTION CHAMBER, SEE DETAIL SHEET C6 (TYPICAL PER EA. LOT) Q6 NEW 18.5' WIDE DRIVEWAY TYPICAL FOR EACH LOT. � GARAGE SLAB ELEVATION AT BACK OF GARAGE. GARAGE 5LA8 SLOPES 1.5R DOWN TOWARDS OPENING FOR DRAINAGE. Q INSTA�L 4" D.I.P. DRAIN PIPE MIN. DEPTH 2.5', MIN. SLOPE = 27 DRAINING TO PERCOLATION PIT. Qs PROVIDE ADEQUATE PIPE CONDUITS CONNECTED TO ROOF DOWNSPOUTS TO CARRY STORM DRAINAGE AWAY FROM THE FOUNDATION AND GRADED AREAS, PER SOILS REPORT. �p APPROXIMATE LOCATION OF RE-LOCATED UTILITY POLE. UNDERGROUND HERE, TO SERVE ALL 5 LOTS. tt INSTALL 65 L.F. 24" H.D.P.E. PIPE RETENTION CHAMBER, TYPICAL EACH LOT. DRAIN INLET GRATE ELEV. (18"x18") �p ,00.00 1� 100.10 � too.as � 100.5B � 101.06 �a tm.o+ � 101.14 � 100.75 Q t00.HS ABBREVIATIONS: F.G. FINISH GRADE E.G. EXISTING GRADE T.P. TOP OF PAVEMENT F.F. FINISH FLOOR F.L. FLOWLINE (DRAINAGE) S= SLOPE P.U.E. PUBLIC UTILITY EASEMENT F.G. FINISH GRADE F.G. FINISH GRADE LEGEND: .o________________ .o. .__, _._.___e__..o_o__, pROPERTY LINE -- - - -- --- CENTER LINE - - RIGHT-OF-WAY LINE FLOWLINE SWALE JT- JT JOINT UTILITY TRENCH ELEC., PHONE, CABLE TV SS SANITARY SEWER MAIN --------- SL -- - SANITARY SEWER LATERAL W WATER LINE � WFiEELCHAIR RAMP O SANITARY SEWER MANHOLE � FIRE HYDRANT m . 0 U N C N p � � G m V N E E ��� �oo C � in ° ° o ° c' � 9 NJ x � '- � �� LL �� • m • � v �p� c � .a °� w W � � � o> v � � Q 1� � � N v Z �c `� � r W V � o � O _ a� � Z > � � U � o cn v� Z, Q !) 1 - W � i� l7, z �� N6 � N Q ~ . Z O �.1..� � � � I Q LL � Z w U Q Z � � O m Z � . � Z � � � �-�--I Q 0 � ��� (.� I� U ote: AUG. 2010 cale: 1 "=10' rawn: CAD sn�et � n L of V Sheets NOJ DATE! REVISION 1 - 4l29/10 2 - 8/13/10 3-BI14I10 4-8/17I10 5-8/18110 6-8I19110 7 - 8120J10 B - 8J25I10 9-9/09/10 10-9/16l10 �-+ N � N � U � � O a a, J � ti � t C� � � � ���p�p (0 C � ti � j�Un� � �w 00�� C� E.. � m � ¢ H •— m E w Plant List: qp low water netive or nat�xalized plant ma�rial Sfle L-3 frK plantin9 details a�d notesr m�n Name Size ReplacemeM Tree� $ymboi noiaNi.ei i '--- Trees: AU ArbuWS unedo'Standard' StrawbertY Tree Std. 15gc CS Cupressus sempervire�s Malian CYP►ess 15gc 3'Dia.�3 yeHrs ED Eriobotrya deflexa Bronze Loquat �� LI LagersUOmia i.Tuscarore' NRNte Crape Myrtle 15gc Mg Maytenus b.'Green Showers' Maylen Tree 15gc pC Pishdcia chinensis Chinese Pis�che 24" 8ox PI Prunus ilicifora HoNyleaf CherrY 15gc 6'Die.�3 years (]A Uuercus agrifolia 5td' Coast Live Oak �� Box R=6 RWD SeQuoia semp.'SoqueM Coast Redwood �., Box R=1 RWD36 Sequaa se�P�'���� Coast Redwond Shrubs: CC Ceanothus'Cond�a' MountainLylac `�9� CO Cercis oocidentaus Westem Redbud � CH Cistus hydridus White Rockrose � CP Clstus purpureus Orchid Roclvo6e � DV Dietes vegeta Yellow Fortrright Li�Y `�9� HD Hemerocallis'Pink' Pink Daylily � GN Grevi�Na 'NoeIP R� ot Poker � KU Kniphofia uvaria Bio.Swale � Lomandra bngifolia Mat Rush � MT Magnolia stellata �rf O�egon Grape Sgc MA Mahonia a.'Compata' ND Nandma d: Car�pects' Cpt Heavenly Bamboo Sgc pS Pennisetum'Rubrurri FountainGmss � PF Photinia fiaseri Photinia � PN Punica g.'Nana' �rf POR�� � � RH Raphiolepis'Majestic B� India Hawthom Std. 15gc SR Strelizia � g� °f �'� � Ground Cover: CG Ceanothus gbriousus Point Reyes C�nothus 5gc H Cearrothus F�earstiorum HearCs Ceanothus Sgc F Festuca o.'Glaun' BWe Fescue �9� W Gazania'Mitsuwa White' Nllrte Gazania �g� G Geraniix� i�ca� Crane's BiN �9� �, c ,� �.�„+ �rt F�e B�oa sod J �� h Blue Carpet Juniper 1gc LA Lantana m: Purple anly Traiing Lar�ara �9� LP Limonium perezii Sea Lavender (Sfatice) 1gc M MYoporum puv�folium [�4yopocum 1 B° R Rosmxinus prostatus Dwarf Rosemary �9� Other: DI Dr�n Inlet � � P�^g Tree Replacement list: Q,q Quercus agrifoRa 5W' Coas� Live Oak 36" Box R=3 RWD Sequoia semp.'SoqueP Coast Redwood 24" Box R=6 RWD36 Sequoia semp.'SoQueP Cosst Redw°od 36" Box R=1 � O O �O O �� G � - �F \ '\� V O LANDSCAPE PLANTING PLAN S�,e:,.-,o.-0. �a 'r 3J� _ �_�� �'�� ., � � ° �'' . � �-�-'W . _ . �_� a ' '' `' ��� ' , � � ���.,� � � �� t � s � _ __ . � _,. � _1 ..�.._ 1 - —.- >-- — _.� . r������'v �� ���'; _ � �, . �- - L., �_� .� - - - -'.-3 - - -- �i� �a�u�� S .s� _ . _ . - __y.../.� ��J�:J,.�s;, �v r �'dr" ��` y �L� a •ro � � � ��� � b �'d� 0 0 Q =� ��a / c a i -,` 'N �/ C � m � � �� 0 J ,�� � � S qP � w 00 � � � ^'� M C � u � O a °' � �� � � �,��� � ���� � � w x N �'7 .b }' � c � O C N W o °O AaN�� DATE 08l24I10 sciu e 1 "=10'-0" pRp,)ECT MIWAGER DJ ow�wn JRlDJ JOB NO. AA-03 SHEET L-1 ,., z . . , � u _ � � ��^r. . � `� r � ���� �� . , i e �r �' �.. ... _ �- � _.. .. . . � _. ..__ _.,..�.-. .... .�e.. . ..►. �i4 � �''S� ' _ , �� ,� . � I r ; � �n , i1 5d 1 � w �.t: _ _ _+ . ... -_.-.. ���ir�.s�w�w�_ � - � i ..rr.--� .:_a�.c.-: i� � �� i �' �� � � m..` �� ti . _. � � � -- .�„_,_��. _.�...��_ �I�i�di�i�,,_.._— ____ *�...�.` ...:�.., , � � aMN'J �,�.�.. }� � .� r(t.r v C.� a.o C O � O G � - �F Note: Hydrazone A= La�m A2a Fydrozone B= pq tees, shn�s and groundcaver (aN 1 gc a large� Fa rdrgiirg waber consemalion irrfomiation see attad�ed sheel. LANDSCAPE IRRIGATION PLAN scale: 1 "=10'-0" Conhdler, Ran6iM ESP-SAfT4i wall mou�, add ESPSM3 module i� �re� se� (b�e i�e or yarase m out�de �I► � une, s�n ao �wan �r �, � r ��r�now�� conneet a house man ine bebre pre�re reg�labr � o� sy� v�e r�tmd tooasvF wrr r F�� poc� o� i�i s�) N� Dnp line}4' delibution �bin9 wl4' cwer aoruied io+' sch 40 pvc under paang wi12' cover Emitlers RairbiN XB-tOPC� use 1 per tgc, 2 per 5gc, 3 per 15gc (not shown) Fm�e�s Raa�6ird XB-20PC, use 2 per 24"box, 3 per 36'box (not shown) �ch emitler shall inchde sp�Ce� bu9 �P � Y' �91s� �) NO./ DATE! REVISION 7 - 8l25/10 2 - 9I09/10 3 - 9I16/10 r -+ N C � � (� � a O � Cfl N U J�ti� � N���� � � �� � C � 1` � j�Ui� U � W O� � C � E � m � Q I--- �p E w �� �` ba � a a �� � �� o 0 J ,`� 5 �(P � � � � v � � r N � o . v +-' � 1.i a� o� a> �v � y v�iU,�, y O � .--� Q� •--� � � � w � N i..., y ... d � �:i v�" ia `Gq l� � O ed O � A►-aN�° on� 08/2M10 scw� F 1 "=1 U'-0" PROJECT MANAGER oanvvr� DJ �os No. AA-03 SHEET L-2 IRRIGATION NOTES: la. Plen is diag�atic anly, Fina] location of lines az ili be determiced in the 6eld. Linea shall be in a common trench whereva poscible. b. '['I�ee point of connecti� shall be the water savice linc before buildrog pressure regulawr and i�tall dielectric uni� if material et povd of ca�ion and pipe b beckflow prevention uevice ere dissimiiar metels. 2. Head eod valve bcations sball be ataked out in the field and approved by Ownei's desigoated representetive prior w installatioa Locate bxktlow preventer 12" above highe,st irrigation head. a 3. Ele�ttical oudet for conUVller shall be provided adjacxnt to cantmller locabon by Oa�er. (verif}'1 4. The Contiacta slmll venfy the e�ci�ing sik and eosure ftttat ell local co�s ere met S. The Contractor s6all apply and pay for all permits required for t�� patioo of Ifie work. 6. Landecape Imga�on Contraacta shall prepare and issue to the ovmer (at t6e complefion of the installation), an cta anaual chart indicating ope�ating dates, cycles �d time for each valve in each syatem. 1. T6e conhactor shall not willfully install the sQrinkler syatem as shown on tlie diawiogs vrhen it is obvious in the 6dd that wlmown obstructions or diffae�es in the d'mxnsio� eASt that might have been wlmown dunng � engince�iog. Such obsauctions ar diffeiences s6all be brought ro d� att�tion of the Own�'s authrnized re�xescntabve. In the even? this notification is �t perfamed, the I►ngatian Conhactor shall asswie full no respoaribility for any revisi�oos necessary. 0 8. Nl sprinkler equipment not otberwise deteiled or spe�ified shall be instelled as per manufecturets rxommendaboos and specifice�ons. eh 9. The Irrigahon Contracror shall flu� and adjust all sprinlder heads and valves for optimum coverege with no ove�spray onto pavements, shuctures and fences and without fogging a misting. Pre,caire r�ulating devices may ng. be required even ihough �t spe�i5ed direcdy on the plans. 10, The Conhacbr shall coord'mau the inslallarion of al] sprinlder mate�ials, including pipe, with die landscape drawinga to avoid inlerfering with the planbng of Uees, shrubs or other plantings. 11. It is the intent of these d�awmgs to indicate a complete rtrigation system installed and ready for use withwt fmther caet w the Owna. 12. The Conhacta shall unconditi�ally guarantoe the irri�tion system fa a paiod of oce year fmm the date of acceptance. Manufectiuer wazram�s shall only exceed this guuant�e and Contractor shel] be liable fa repaitalreplacement of failed materiaVworkmanship. 13. The irrigaation installation shall be dcemed incompleu un61 �I sptinkler heads, valves and related irrigazion B equipm�t have been checked and adjusted to best confomi to the wnditions end requirements ttiet will prevail at tlie 6nish site. 14. Complete warranty cards for auromafic ca�roller and other icngation matenal (controller keys etc.) shall be dCliVE[!� 10 OR'�Cf. 15, All valves me to be located'm shmblground cover areas only. 16. The imgetihon system desigos are bes� on a mmimmn opeSting preasute of 30 psi (at norr,ille). The irrigation ge Contracta e6a11 verify this mfarmation pQior w mstallation � report all differenets to Landscape ArchitecL If pressute excceds 60 psi, add Wa�s U58 pressure regulatw at poiM of conna�ion. 17, All class 21� PVC late�sl lines shall be installed at a l2" depth (12" end sch 40 under pavemeet); sch 40 main lines shall be iostalle� at a 12" deptb. Sal materiel used far backfilling imgetion �eenches shell be sandy with no rocks a octe« debns. a 1 B. A minimum oF two working days bef'ore performing aay digging, call undergro�md savice ale�t at l-BOa227-2600 for inform�ion on du locaatihon of nadual gas lines, elxtric cables, etc, IPs frce and iPs the law. OC 19, In�all 4" dia sch 40 PVC slaves imder pavement fa controller wire and imgation pipe al all locations imd iadicated on plans and othawise ruprired. Document all slceve locations on Owna's set of raord diawings. 20. Backtill for trmching shall be compae�ed to a dry density equal to the undisNfied adjacent soil a�d shall confocm m edjacent geades without dipe, suuken areas, humps or other iingulari6es. 21. Lmidscape C�tractor ia respons�ble fa notifying I.andscape Arc�itect, 48 hou�s mmimum in advance, fw !he following site observetions �dlor me�tings: a Preconstraction me�g with all parties. b. Plant mataial on site, prior to installafi�., c. Open tr�ch, main line (wittih valves attached) p�essure test. d Final ptoject well; tluough. 22. The Contrector a�ell be responvble for rnmplete aad effecUve eoverege of �l plenter aress, w belance eech cireuit to optimum mveiage; adjust valves, arc iadius aad noule of each sprinkla. 23. Conttacror agrees that in aaordance with genetally accepre� conshuction prectices, Contractor will be required m an�ume �le and cmnolete resoonsibiliN for iob site contiti�ons �uin¢ the course of coostruction of the oroiec� iacluding safery of all pe�sonc and property, that this requirement shall be made to apply conrinuously and shall not be limited to noimal wo�i�ng houcs, sod ContracWr fiutha ag�ces to defend, indemnify and hold hazmless fi� any and all liability, real or alleged, in comuction with the perfortnance of work on this project, ezcepting liability arieing from tbe sole negligence of tlie design pmfessional. LOAM1' SOIL� I � BtiSE F'6iMLY WfTH FOOT I - I PRESSURE SO 7HAT ROOT eu� ooES NoT sr+�r. NffH D(ISTING SOIL. AAIt. 6Y VOLUAIE oecur�c ��� sr�c sox. LOPE ON SIDES �urrnrc r�o�. oR COMPAC7ED MOUND urro�R nie eoor BALL 7D PREVFNf sErrtoao+r. � SHRUB PLANTING DETAIL NOTE: See plantlnq notee for wA amendment speciikatwn. ■ r� ° �nw m'wn i n � ��wm fn►d m nc �aea r � .� a ,na ,� r i.c. „rF , ��.• �v. �oa�e w�u, o�o� ern s� ie ar. e nacn ff ql 10 9AL1f -; fmn� �i� ,n wcm rwc � rw � a wwen ur eom �ou„as .uoo op�a.���� b � � w�o�m m �iawi m � � a+�c wmwa t� w r w ��.�,o�.��- ¢ d i �oe� a ��saq � � � � � � ,n ._ y �. �wc n.�m wa � � r a �a Yec nom wa � � � � m�K a �ww �� � �.�. ,,.�,. K� L .. � I mac�m n r mx iar wo arn TREE PLANTING DETAIL NOTE: See plantinq note� fw aoil amendment spec�cation. 'FUSER BUG CAP: RAIN BIRD DBC-025 1/4-INCH TUBING STAKE: RAIN BIRD TS-025 -1/4-INCH TUBING: POLYETHYLENE DISTRIBUTION TUBING RAIN BIRD PT-025 OR VINYL DISTRIBUTION TU81NG RAIN BIRD DT-025 TOP OF MULCH . , '., .�I�-;. .-.�� : ' .: , SINGLE-OUTLET EMITTER: RAIN BIRD XERI-BUG EMITTER ,.,�.�� ..,.,. 1 HYBRID CONTROLLER: RAIN BIRD ESP INDOOR WALL MOUNT 117 VAC, 60 HZ EXTERNAL PLUG-IN TRANSFORMER 1.5-INCH PVC 5CH 40 CONDUIT AND FITTINGS WIRES TO REMOTE CONTROL VALVES � HYBRID CONTROLLER iH GRADE/TOP OF MULCH -UP SPRAY SPRINKLER: AIN BIRD 1804 SCH BO NIPPLE _ENGTH AS REQUIRED) SCH 40 ELL 5CH 40 STREET ELL SCH 80 NIPPLE _ENGTH AS REQUIRED) SCH 40 STREET ELL LATERAL PIPE �PVC SCH 40 TEE OR ELL � POP-UP SPRAY SPRINKLER 30-INCH LINEAR LENGTH OF WIRE, COILED ID TAG: RAIN BIRD VID SERIES WATERPROOF CONNECTION: RAIN BIRD SPLICE-1 (1 OF 2) REMOTE CONTROL VALVE: RAIN BIRD 100-ASVF INSTALL 6-INCH MIN. A80VE HIGHEST POINT OF DISCHARGE UV RADIATION RESISTANT PVC SCH 40 MALE ADAPTER (1 OF 2) UV RADIATION RESISTANT PVC SCH 40 PIPE (1 OF 2) FINISH GRADE/TOP OF MULCH � 1/2-INCH POLYEfHYLENE TUBING: RAIN BIRD XBS BLACK STRIPE TUBING NOTE: FINISH GRADE USE XERIMAN TOOL XM-TOOL TO INSERT EMITTER DIRECTLY INTO 1/2-INCH POLYETHYLENE TUBING. �����,�.��: ,� , � � f1' , i►.� . _ _ - _i- . _�,._.� _- �I��lclf G���'; ;,,,�, �, , � _ - , . .����..�. . �., j�' . , � a�, G 4 , p G � b : . �`!.>..� � :�' ` � t , ` ` � � � � a � � - - .>. � ;�� '�� ��r� �. ,�� , � �� . �.:���e;,��� � _ , i - O .� ; � .. _. -_,,.m-�...,�-� ,._.� �,'►7�r '' f�� j kr,y�, — —...,... . � EI�ITTER FRQ�f 1/2" TUBING I PVC SCH 40 ELL (i oF z) ts" � PVC IATERAL PIPE � � (1 OF 2) ELECTRIC REMOTE CONTROL VALVE Planting Notes: 1 Plaa is diagrammatic only. All local goveming codes shall be met. Lxact location of shrubs/trees shall be determined in the field (lnstall as per details). This plan is not e survey, verify all distances. 2 Owners end Maintenance personnel of said project shall own and understand the following books; a. Westem Gerden Book by: Sunset b. Water-Conserving Plents & Lendscapes for the Bay Area by: EBMUD 3 All ereas shall have 100% coverage with an automatic low flow drip urigation system. 4 Contractor shall advise Landscape Architect or Ownecs representative (in writing) of all substitutions a minimum of two weeks prior to the onset of demolition and/or construction. 5 Upon completion remove all extraneous material and debris; sweep and wash the area clean. 6 Landscape Contractor is responsible for nodfying Landscape Architect, a minimum of 48 hours in advance, for the following site observations and/or meetings: e. Preconstruction meeting with all parties. b. Plant material on site, prior to installation. c. Open trench, main line (with vaJves attached) pressure test. d. Final project walk through. 7 Damages: Contcsctor shall prompUy repair all damages to existing site at no cost to owner. 8 Install all plant material as per details and soil & plant lab report. (See note 12.) Information in soil & plant lab report shall prevail over details. Al] planting areas shall be cultivated to a depth as noted in soil and plant lab report, with removal of all debris, rocks and weeds exceeding 1" diameter. Import topsoil shall be added where required. Such soil shall be friable. 9 A minimum of two working days before performing any digging, call underground service alert at 1-800-227-2600 for information on the location of natural gas lines, electric cables, ete. IYs free and it's the law. 10 Mulch all plandng areas with a two inch depth of pea size nitrogen stabilized fv bark (shredded size on slopes). 11 A smooth transition between finish giade, sidewalk and heedets shnll be requ'ved prior to planting. All plant area grades and plant material shall be approved by the Landscape Arclutect or Owner representative prior to any plant installation. Call 24 hours prior to any work and after all material is on site. Install jute mesh (as per manufacturers recommendations) on all slopes at and exceeding 4:1. 12 Landscape contractor shall deliver 1!2 gallon of typical soil from site to: Soil &Plant Lab,Inc.,352 Mathew, Santa Clata, CA. Test #A05 ($160, verify fee at 408-727-0330, allow 15 bus. days) shall be cun and lab shall send copy of results to Landscape Architect prior to beginning construcHon. Contractor shall pay for A-Ol test and shall follow all rewmmendations. Contractor shall submit a delivery receipt of all amendments installed, within 48 hours to Landscape Architect, 13 Final gcades shall allow for surface flow away from structiurs and off property as � per code. An additional drainage system may be added (verify). 14 Conhactor shall coordinete all work with other t[sdes (ie. paving, plumbing, electrical, etc.). 15 Conhactor shall verify locations of all eusting trees to remain. All precaurions shall be taken to protect exisHng trees from damage during conshvction. 16 All planted areas shall be maintained for a period of sixty days following final written acceptance by landscape architect. Contractor shall guarantee all trees and shrubs for a period of one year following end of maintenance period. 17 Contractor agrees tt�at in accordance with generally accepted conskuction practices, contractor will be required to assume sole and complete responsibility for job site conditions during the course of consnucrion of the project, ineluding safery of all persons and property, that this requirement shall be made to apply continuourlv and shall not be limited to normal workine hours, and conhactor fiuther agrees to defend, indemnify and hold harmless from any and all liability, real or alleged, in connection with the performance of work on this project, excepting liabiliry arising from the sole negligence of the design professional. LANDSCAPE NOTES & DETAILS scale: N.T.S. NO.I DATE/ REVISION � C U � � O a V � � � J��� N �i > � � � �,�,,, � � p�p (� C � f� � j � U �c � U � W O� � C� � � � � � � — m�QH�(0 � W � * �L Q �� = �� 6 8� �� 4 O a� P � O� v � +�+ r ., � C� +' v1 i. a� o� � � � U y p+��°�` C ���c�v M4! H � �„ � O C�d W o � A�l°� � .� .� � '� �C � �O � � f� E V (� = C � T � - � m c � �- � oo U � � � � � ? 3 � p O o �� 08124/10 SCALE N.T.S. PROJECT MANAGER DRAWN DJ JOB N0. AA-03 SHEET L-3 LOT 3 HOUSE , LOT 1 HOUSE - -..- - - J 't,� - - ---_ ; -- - - --�'(�- ----- - - \ � — - -- --- ; �'. , �i� „a - -�.. � _ - �.. ...� , � . ~. :. _. ,�......�.��-�-;._. � e ti �-.. � T�.t.�� . � , ` �i ��,,,. `� `�� - - � r ���`'� ... '�.C_T �. .. .� ..�Y�✓�.l�V� . ;�, . . . __ _ _ — - ?� 4 i_ . _ �.�c—.. _ � ` , � � . �� ,� -- --- ---'--.. ._ �'_*",�-----' : . � . ;✓ , � , , � �.-. I � "�� ° ° ��� / � r �F.a . , ` - , � r . �::: � y .� ]� �. � _:. . ' 't, . �. . � � j 3'-w, �.; . . . - . „ �' I '�a'� � � n., { � '_ �'�.'. , . _ ���C.�.�. , `�... � �� � �.;��.� -,.�_ � , . �" ^ f ��. i!f4 �r- .A '� � �� , i �� 6 ' ��� '� . ' � �.,'.����� ` .�.' Y, ��;� � � ' . . �'_ :.� . '_Y��,�.:_ ��l.� �~��� •.� �i�>M�� f, • '4 � � �` � _ ' �- r ,�,� � '��s. .� �� r��:� �� � �.;,� � �� .��� � � � _�-�� �= � - - , _.,-- __ _ - _ ---,-�=1= .� =- ; -_ . _ -_ - •-`��� _-?---_ �' �: 'L== -� -. -_ �- I � � ! _ {''t! ' lJ _ � L � ` ~' I 1 � ` � • � - ` ` li � � I � t... I _I i �'�'p� If 11: � � I � �^�"�'1' � rsr - � - - ._ . , _ ------- -- — - -- -- — — • � . . _ . __�..__ � .r�•'� � � � �-� u � ���� L �, � I��M����/��Ua� ��1t������� - ' . .. I��N��'i��11A� 1 � •���\/ � . . . I��N�f .tt���f�l IN�����1 �� � { I - ,a .. - .� ;>. .., .. . ..._:. .... . .:..... . . . _�.- .. �...� � LOT 2 - FRONT ELEVATI 1/4" = 1'-0" + +-j � r�;?;+� r11 ; :k �' / _' ��y V � � � �✓�:.�` � '; '` U`� ��� �ppiicd�i����� __�ir�t —a��_o _ -� � �._� J_� �ppro�r�l ��t�a _ _ � t . � � � Signa�ur; - � ���A "�a�; .: ; �'` �� G� Y C G��.o v I es 1s�e5 SEPTE�-?BER 'a 2010 B L A 1`I E Y H O M E S CUPERTINO, CALIFORNIA A0.1 VAN TILBURG, Br1NVARD tk SODGRBCRGEi, AlA ��, �� �. � � �� . � •.. � �.,. • � r� s,. ui ��.. u�u�u�.� t:».c� �n: / 10444 S. BLAN AV�. Uasrnre Resixr�ce ', e�as rne�iteai e�e� DETACHED GARA il � � ,� � ,\ , ,\ � 148'-4� � 67'-11 � ' 65'-1}" � � , _ i \ ......... _-____ _ N _-. 1 __-__-_ �_-__ _-__-__- � T----- - ------------ -------- PBQPCBn-�----- � ' � �� 1� 1� � , , � � , � _ � ' '* �� � � � � �� � -� �+ °� � ° ,.•F� � \ \\ \ � � � _ _ � i i J � � � _ _ _ Q ' N; ` N � y , � �/ � I J , � ` �" � \\ LOT 1 � � � � � � qo '•o" +1 I a� � � ---- - - - \ ,�. � NET AREA: ' \ � o - � ' � - - 0 9�Faw* - - � � ���i � ,736.16 SQ. FT ' l_ _ _ � _ _ ( � L _ n i +-a•Fnu,r I n � c� �� � ew House �, \ .. � 1 - --� I I �`-���� � I \ � \ ti \ PP•101.86 p o ia zz � � � I � i `� \ �\ PAD•100.86 y � s / ��\\�� i 1 I I { � �10'-0" ' .0�' �� ��q i \ \ �p• \ / � // j ' � 18',18°.20'.24'REDWOODS I 70'-0 I �p�i 10'-� � -� _ _ � I '� 1 u I � 10471 OLd�M�YV AV�. ex�snNe ResioeNCe i � I 1 --- iI \ � �t1�\ ` GARAG� /�,�-'� � � I \��\\\`I��II����/ �I � � � -- � � � \ 1� \ FF •�ot�2 /_. / I `'`� ��\� � I LOT 5 � � � I I � � . � � Pa,o.�oo.�z � � � � \ �//� I I �'� � ` �ti°� � \ 12x D/wl e � - �� � � � ` / � ' I I NET AREA: � , ` \ 5t� �'�S \"t�� 11��.0� 6 , s � ' ' � �ll� - �_� / ��i I I ' I ' I I I o \ I � � 6761 CLIFFORD DR. � oPO , � 1 � _� I 7 ,046.49 SQ. FT. � I o EXIST. RESIDENCE m �� \ � /' �/' � � � ' �_p�l 1 a��� � � �. � � � NEW HOUSE� I I i � �' � " � ` ' / / - _,.i_ � ' �' PF•102.68 I I � i u �. `� \�. -' \\ � �� / 1 � / �� 1 I I °' AD•101,BA � I I z � � � w HOU3E LOT � � �� \ I � , ,°� - J I � , � � � ��.t02 EA: �� ' � � � ` I , I , � ` � ��\ ��\ \ 1,1 ,41 .27 Q. FT. �� l; � LO 4 � 1� I � � a � o \ , � I � I� \` \ \ \\ 'a. 1 � E AREA: ' � �� � N-o° J � p ce i a � � �` \ \\ � � i � �/,' � g � 8,71 16 SQ. FT. ` � 1 I _ FF •1o2.s5 � , I I � I- � PAD}10L�5 \ \ \ , � i s�� g*' i' ' . � �2�b/WI � � � � OARAOE / � 's J a' �e�,wN a -� .- L-- � \ � ,a �y�, �.�� FF�101.12 / � r , N�W HOUSt �o � � D•100.1 / �� t' o� FF 102.82 ' ' �a 1 i ��� s-+ 6' � � \ D/WI /, � /' �� o PAD•101.8 1 I i i� cw r»EES � � 1 / I ��L� � `\ \ $'� � � s•. e � �' o� '� � /� � i - __ _ -- �CVPRESS TftEE'�\ry�O'! � a'vi PORU ����,6�i � I o' � L a ° o ° - � � I �� r - ' t, 0 �� � n- J 1� � •� � °� � �� �� \ ��, �0,��� � .O/� � / 1 1 �� G �E i � / a'nc I � � - -5 � - `� � \ '\ �G \ \ � \ \ \ � \\ �\ �\ � \ \� �\ \ , �\ � . � ���_� . . r �, e' r ; � f � � . _ � � _ _._ __�...�_. . .iz . _ , .. . :��:�1 �:������!l��,, j � ___'�-" �._ ` � � r,.�� .�,�.�*� , V �� j � �. _ _ � �G`�n�� ��t� _ � ��t - - "..... , 1! �{g�a�ur �._ _ _� - - i fr:.�`J..�.�:� i�'� � ��..� �.�G� r \ \ \ , ° � � 1 ' - � ��,oz.s� � \ , � i PAD•101.27 �-a' crPRess 0 � � 'v � 1-6" i mEes Tra . ,•�ou LOT 3 � � ', i � 12x �iw►� /, � \ / - --- - - � � � T AREA: � � � � i 6,498. 3 $Q. FT. e � � � � I �.p 10'-On �, i c!. i f � OARAOE ' � -- - � 'ER � NEW HOUSE FF-102.0� � 1 � ,��i � �� - '� \ � / � PF•102.57 PAD•101,08 � / ' �'z o \ PAD•101.5 % D/W ' gL�'�i 4i /_ zoN'�S,�N � A � ' eP' i ��\\ � � � � �� �� �,�c/ � , , / , o \ �\ Q. � ' � � _.....�_\� \, \�.�/��~ st / .�.\ I // � /, % / �� i �� aoNC� . . � // - i i " ° t �� � Il / � / K � _ _ . _ - - �q \\ � �i \ �� � /- O'" �-- ➢fNE � � � � - � _ /� ¢� ,� � - , �f,f. // �/' �.��� /��O � SS \ � � I{ � 22-24-7Y'RED � � G y' ♦ "'�� ' ��\\\ ` I //// � /��I� ��1 \���\\ � y / . � / I \ � , G /. � / / �- ,YH'CHANPHOR / / \� �\, � �� - � - - � / . �`� I \\ / �� �%� / \ � / / . . -..,�\ / . 24-34'RED 0�' = ` �/�� ��' \`� z "Reow000 \�\ �. - � I I 1 � � � y �` /� /, ��/` J `,\ '\ \\\ � / , � i �I+,���� �� / , �• \\ � ' � - � / ' � \/ � /. \ �� ' � ' , �� \ � \ \ � ` � \ \ � \ \\ 1 \ �� b \ SITE DATA: TOTAL PROJECT: 35,402 S.F. (0.81 AC) LOT 1: LOT SIZE: 6,738.16 S.F. LOT COVERAGE: 2,942 S.F. ! 8,736.18 S.F. = 0.437 1ST LEVEL :2,182 S.F. GARAGE:427 S.F. PORCH: 65 S.F. ROOF OVERHANG: 274 S.F. TOTAL BUILDWG AREA: 2,829 S.F. FAR: 2,829 S.F. / 6,738.18 S.F. = 0.390 LOT 2: LOT SIZE: 6,410.27 S.F. LOT COVERACiE: 2,'180 S.F. / 6,410.27 S.F. = 0.340 7ST LEVEL :1,347 S.F. GARAGE: 440 S.F. PORCH: 134 S.F. ROOF OVERHANG 259 S.F. iai rwurthnrr. i,�o� a.r. 2ND FLOOR AREA: 1,088 S.F. TOTAL BUILDING AREA: 2,875 S.F. 2ND FL. TO 1ST FL AREA RATIO: 1,088 S.F. / 1,787 S.F. = 0.609 FAR: 2,875 S.F. / 6,410.27 S.F. = 0.449 LOT 3_ LOT SIZE: 6,498.43 S.F. LOT COVERAGE: 2,348 S.F. / 8,498,43 S.F. = 0.367 7ST LEVEL :1,426 S.F. GARAGE: 42B S.F. PORCH: 280 S.F. ROOF OVERHANG 214 S.F. 1ST FLOORARFA 1,854 S.F. 2ND FLOORAREA: 1,049 S.F. TOTAL BUILDING AREA: 2,903 S.F. 2ND FL. TO 1ST FL. AREA RATIO: 1,049 S.F. / 1,854 S.F. = 0.588 FAR: 2,903 S.F. / 6,498.43 S.F. = 0.447 LOT 4: LOT SIZE; 8,710.16 S.F. LOT COVERAGE: 2,385 S.F. / 8,770.18 S.F. = 0.274 1ST LEVEL :1,513 S.F. GARAGE: 458 S.F. PORCH: 134 S,F. ROOF OVERHANG 282 S.F. 1ST FLOORAREA: 1,969 S.F. 2ND FLOOR AREA: 1,458 S.F. TOTAL BUILDING AREA: 3,425 S.F. 2ND FL. TO 1ST FL. AREA RATIO: 1,458 S.F. / 1,889 S.F. = 0.739 FAR: 3,425 S.F. / 8,710.16 S.F. = 0.383 LOT 5: LOT SIZE: 7,046.49 S.F. LOT COVERAGE: 2,318 S.F./7,046.49 3.F. = 0.329 1ST LEVEL :1,508 S.F. GARAGE: 458 S.F. PORCH: 147 S.F. ROOF OVERHANG: 190 S.F. 1ST FLOORAREA: 1,964 S.F. 2ND FLOOR AREA: 1,198 S.F. TOTAL BUILDING AREA: 3,182 S.F. 2ND FL, TO 1ST FL. AREA RATIO: 1,198 S.F. I 1,984 S.F. = 0.87 FAR: 3,162 S.F. / 7,046.49 S.F. = 0.449 VTBS 29065 AUGUST 27, 2010 BLANEY HONiES CUPERTINO, GALIFORNIA A�.'I VAN TILBURG, BANVARD & SODERBERGH, AIA __ _ _ _ _ _ __ __ _ ---- ARCHITECTU RE • PLAN N1N G• UABAN DES1 Gt3 www.vtbs.com OVERALL SITE PLAN 1/16" = 1'-0' � , � � \ � ` � , � \ � `� � LOT 1 . ` � \ \ �` � � \� �` j 1„ • ,,\ ,, , � ` \ � � \ � ��A ���� � � `r \ y� � ` � � � \� � , \ �� . � � � �G l ��� � �� , , \ �` �� o � � \ 9 � � \\ \ \ \ � \ \ \ � �� � 1 � \ ` ri -, �nl-' Y;- �� � � \ p � � ;�r� �I . . � . � . ._ _ e � � _ �-- --- —' .. . a _._...r.----'s- \ \� ' 1 � �_ �� i �;�;�fi�����:�� I21Y1 ��fl --� � � , � \ ' � -� ' — `- n / i � ��+ ! �� , r � �J' �31� ' ` 1' `-��' \ \ - - � �\ 1N� . • - _- 1 � � �Iy��tU�`�__ _ ;�� �.� .'..ir.. ,. .� �� I �'.�J ..�.n� � i: � �� Q SITE PLAN - LOT 2 1 /8" = 1'-0" i �__________ , ��______ . , 13 � � � �� � ����� � LOT 4 , � ��/ I � � 18" 18",20", ,�% � + ---- � \ ` I 1 �` � j _ \\_ ,�� '� � � �� , i �,�\ � � � -,/\ �� , 1� ; �� �; ����� �I������, �� ��� ��� ,� / � ,, \�, � �� \/ � . �—� �I' a� ' _ _�` /=_---- � -,�--����� `� –� / �� �' Z �/ J''i/ � , a' / // a� \ � SITE DATA: � ' / TOTAL PROJECT: 35,402 S.F. (0.81 AC) r LOT 2: I LOT SIZE: 8,41�.27 S.F. LOT COVERAGE: 2,203 S.F.16,41027 S.F. = 0 344 � � 1ST LEVEL :1,347 S.F. GARAGE: 440 S.F. PORCH: 134 S.F. ROOF OVERHANG 282 S.F. 1ST FLOORAREA: 1,787 S.F. 2NDFLOORAREA:1,081 S.F. TOTAL BUILDING AREA: 2,878 S.F. 2ND FL TO 1ST FL AREA RATIO: 1,091 S.F. I 1,787 S.F. = 0.611 � FAR: 2,B78 S.F. / 6,410.Z7 S.F. = 0.449 VTBS 29065 AUGUST 27, 2010 BLAI�iEY HOM�S CUPERTINO, CALIF'ORNIA A 'I .2 VAN TII.BURG, BANVARD & SODERBERGH, AIA -- - - - _ A R C H 1 T E C T U R E • P L A N N I N G • U R B A N D E 5 1 G N www.vtbs.com �— — ' � �— — ---._ — � � —��' _ — � 1 1 1 1 1 1 I 1 I 1 I 1 1 � � $� � �I r z rn � � ,� t , : : : � � � �J� V � � � �� . ,. ._y: '��'� `�� t '��'�� - �''�� - ! r-� - __= 1 � ��� � �.1 ��iI�L: � r � � �i��%i �'d�4 � a ���� l O i� _ _ _ " ?�.� _ �IC��1c��Ui�:;_ - a. ,, ,,, , � _ � 4��.,..�.,,,� �� ! C'�� �-hc��o e- 1 ' ` L — � 1 I � I _ L _ ____ - � �— LOT 2 - FLOOR PLANS 1/4" = 1'-0" TOTAL LIVING= 2,365 S.F. TOTAL FAR = 2,878 S.F. FIRST FLOOR = 1,347 S.F. GARAGGE = 440 S.F. f _��_ _� — __���-- ��-- AUGUST 27, 2010 VTBS 29085 BLAI�i�Y HOMES CUPERTINO, CALIFORNIA � Az. � VAN TILBURG, BANVA & SODERBERGH, AIA _ --- - __ .__ - A R C H I T E C T U R� • P L A N N I N G � U A B A N D G S 1 G N www.vtbs.com __��_ _�--'�-�_ —� — 1 ' --�___�_ 1 � �� — � " ` � `ROPtRTY LlNE I I � � — � � I � � I � � I � � - r i / � 't'r I l r "�, '1 �y � ,.�11 �. °? ' ` ' � ( `a ,� .,,o� � . �4': r , y � _ 4 " //�� ///\�� w - �� � y +t ��il I � � �/��,/, _ // /J y � l /_ / 7 � �,�y{�P�14�W�`1a' : �•1� ` 31''-�� - V� ) � ����1 �"� i OJ �� � � � ,+f `r' . .. . - _ 1�����.. - . . �{ � �it� J / / 1 .� '�IC�i1`ci��I°f - �.`•�c, . .... , � fv/� ���/ CNG� r SECOND FLOOR = 1,018 S.F. LOT 2- FLOOR PLANS TOTAL LIVING= 2,365 S.F. 1/4" = 1'-0" TOTAL FAR = 2,878 S.F. � � � I � � ! � � / / � 2� � �� ti, v ) I SEPTEMBER 14, 2010 VTBS 29085 BLAI�iEY HONiES ,�2.2 C U P E R T 1 N O, C A L I F O R N 1 A VAN TILBURG, BANVARD & SODERBERGH, AIA - -- - - -- _ _ - -- . AACHITFCTURF, • PLANNIN G• URSAN DF.SiGN W W W. VLbB.COR1 W 2 J � K W a 0 � a � 0 z � 0 0 . j2 2 ., i� ' ,. . � � . .� �..; �. �� . . .. . . ,�, . .. . . . . . . ...__�.�.a._'_' .. � � � ` —_--v� � � � �'. � � �' ,1, ; � ; .' 'i' ' ' � ,,,.�. � ,.,,,,.- ; . _ ..r ����.;�s��� � ��a� � ��t i,' `� � _. . _ - ._ .�s����iie�i . - - .^,� .,.,.. , t ��r �,,-Y eG,.�o il 1 � � �I W a o� di I i I i I I 1 I � �' �I W a �; SIDE YEARD FENCE J REC2SSED J DECORATIVE J PROMINENTJ �— DECORATIVE �RECESSED �— DECORATIVE � SIDE TARD WINDOWS M�TAL RAILING CNTRY OOOR LIGHT FIXTUR� S�CTIONAL CORB�L FCNC� OARAGE DOOR LOT 2 - FRONT ELEVATION 1/4" = 1'-0" vres 2soes SEPTEMBER14,2010 SLAI�IEY HOMES A2.3 C U P E R T I N O, C A L I F O R N I A VAN TILBURG, BANVARD & SODERBERGH, n�n A R C H I T E C T U R R • P�L A�N�N I N G • II R B A N D F. 5 I G N wava.vtbs.com .. �.�. � � ��.. � ��... �.v.. �..�.r � rnv.. – . . . 1 /4" = 1' SEE FRONT ELEVATION FOR TYPICAL NOTES D�CORATIV� BL�ND�D COLOR DCCORATIV� CHIMNEY CAP � SPANISH TILE � � METAL RAILING Z( 1 r'1T '2 LJr11 ICC , , , � � r. . ., . . .. ... ... � Zi J� �� K vl O� a i i i i �� � I I �\ � �� � \ \ \ � � T.O. PLATE � --- _ -- --- - - � � � ?S,��GR�� BGIC \ OlN FN � �`�o \ p � ��NF �\ �\ �\ �� 2ND FLOOR � � __ ._ _... _ _ � - -- --- - -- �� Z J� rl H � W� O� al � � I � i I � i I i � I � i I � . ■■ � � . � � ❑ • . ■ u uu � ■ =� u � , .......... � . ��������������� _ .. _ . - LOT 2— LEFT SIDE ELEVATION 1 /4� - � �-0• SEE FRONT ELEVATION FOR TYPICAL NOTES .; ��, ,,';.. ,; :� ._ . 2_ ��� �' j� __ . . r..,�„�: `, _•. -y ' .z �' a �� �� , � ��� �;.� 1�:��J�1��'�t. : . C='i �!�'�..���0��._ f �� . _..<. i_....<__ �, �� � � I V 1 V :� � � i �Pt .i _ � �„� � "� .. ._ .� .�— �ig���u,��,---_ _ _ ;t:�rr, ':;^ � � �p � �i��l ....i J .. ia i, y � y--_ V� .0 wl � I z z J J �I � � ° a I a o al - - al I .. -. ... .., ' - 1 ----��-- �------ 1 !,' I 1 I � - _. 1 1 � I I -- -- — -- - � - — - T.O. PLATE � -- -- � - � - � I ' � I � � -- - i �' � I � / , � �: � I � ; ' � I � 1 / � i i / � � � --- --- - - — r u � r __ --- _ - _ � � � � J , i - ---- — �� I �� ��� u a i o � � n , -- a= I N O Z : I I ��' I a � o � _ __ _ ; .._...�.. m _..�.m.. � ....r, - -- ' --- --- ------- LOT 2 — REAR ELEVATION 1/4" = 1'-0" SEE FRONT ELEVAT�ON FOR TYPICAL NOTES 2ND FLOOR 15T_FLOOR 0 m tir r � _ N 0 aD 1/THS 2J085 SEPTEMBER 4, SLAI�I�Y HOMES CUPERTINO, CALIRORNIA A2. � VAN TILB BANV & SO AIA _-- ---_ — — --- A RCHITE(:TUIIE • PLANN ING • URBAN U ES [GN cvww.vtbs.com � � 1/4" = 1'-0" . IJ �� Ia �� �a I 1 I I I i I I I I � . _; � '� � ``' ~� F =? ' - O �� � : f.� �. .�.,:._.-::'Y ; � — - -- y.a.._^a_. ._.. __ "-� � � � ��, � '� ���:� �.��fi� �� .� : _� -- �L�_ _� j a► r C����� '�; �,� �'_ _ _ - J ���-��..�.__� �- -- ._ �r� � , , - ��g�a�u���;�_ ir '^r.n . :,' � Y � � � � J.n�N «�i�,.t� I. � . � y — � � T.O. PLAT� I �� 1 a 2ND FLOOR I I 0 a � 1ST FLOOR � --- - -� LV I L- �Cl. I IVIV CS 1/4" = 1'-0" VTBS 29085 AUGU , B L A l�i � Y H O 1Vl E S CUPERTINO, CAL,IFORNIA wIZ J� �' KI a aj A2.5 VAN TILBURG, BANVARD & SODERBERGH, AIA ._ _ _ _ AACHITECTU A�. • PLAN N I NG • U ABAN DE;S 1GN www.vtbs.com NAIL-ON WINDOW FRAME INSTALLED PER MFR. CAULK — i— G.W.B. INTERIOR FlNISH 1 IXTER PAINTE 10 1/4" 7 t/2" I � � � _ �n i� � 6" FOAM CORBEL WRH PAINTED ACCRYLIC � � SMOOTH FlNISH 0 30' O.C. EXTERIOR FACE OF WALL WfTH PAINTED SAND FlNISH PLASTER TERIOR EAVE SOFFIT SCALE � iRBEL & TRIM PROFILE 3"=�' ` '�s1 1 1/2" +7'-0' � �� FOAM TRIIA WffH PAINTED ACCRYLJC SMOOTH FlNISH a� � :- �(� � , � ►� ( •�:; � �i t ..-=s : � � � Pa���...;;�_�.� � . � � �. - - - ���1, J'�,���6 �'`� � �� � � �,� � �- -�-.��� - � � c�'�� � ����rGv�.l ! A��:;.__ l � � ._ �ignatu�� _ __ ' JNV� NI�A 1_� �� � � � /� / ��� V� I � � � �O EXTERIOR PORCH COLUMN WfTH PAINTm SAND FINISH PLASTER FOAM BASE WfTH PAINTED ACCRYLJC SMOOTH FlNISH LOT 2- D ETA1 LS � �. E..� IAEUL TUBE RAILING WRH HAMMERED TD(TURE dc DECORATIVE KNUCKLE PWN METAL TUBE RAIUNG WfTH HAMMERED TIXTURE SCALE PORTUWD CEMENT PLASTER ASSEMBLY SCALE 3"=1'. �B.S 2�.�1 AUGU , B�A��Y Ho��s CUPERTINO, GAL[FORNIA SCALE 3"=1'- 1/4� X t/4� AIEfAL RING +3'-0' ; 2x4 JAMB MEiABERS 2X6 FRAMING AT 16' O.C. EVSTOMERIC SHEET FLASHING CUT k FTTTm TO RECESSED OPENING PER TYP. RECESSED WINDOW AND LOUVER FlASHING DEfAIL EXTERIOR CEMENT PLASIER ASSEMBLY PLYWD. SHTG. Az.6 VAN TILBURG, BANVARD & SODERBERGH, AIA __ _ ---- __ __- _-- AACHIT ECTU RE • PLAN N IN G• U RBAN DL' S I GN www.vtbs.com � cnHnct � 5/8' GYP. BD. TYPE "X' 2z8 WOOD TRIAI CASING AWD SEALANT � - _.._ ACCRYLIC SMOOTH FlNISH 31'-Y s�-r �y-a .� ' � , � ,',\ ,, ' _ __ __-� . _ _ �1 i ei �, ,�,l��,f_ G/ v��/ � � r :t.,cfi �.0 . ., . . + • . _ _ . _._ _ :��.� �:�����=i� `� �► i i� ���.-1 � . � <-_.�: __ . . �,��rG��� '�;�"� G�`_-�c7_ _. ;3� „J - - - - ��i- � � �Ig���U�,`; - ;/ 7r,3 .�,:t� f_ � � �5��� G�n0..b 2ND FLOOR OVERALL = 1,468.73 S.F. A = 10.81 S.F. B = 25.88 S.F. C = 42.78 S.F. D = 22.98 S.F. E = 67.50 S.F. F = 93.83 S.F. G = 113.75 S.F. BUILDING AREA =1,468.73 - 10.81 - 25.88 - 42.78 - 22.88 - 67.50 - 93.83 -113.75 =1,091 S.F. LOT 2 FAR CALCULATION: LOT SIZE: 6,41027 5.��� BUILDING AREA = 1,797 S.f. t 1,091 S,F. � 2,878 S.F. TOTAL FAR = 2,878 S.F, / 6,41027 SF. = 0.449 BUILDING AREA = 2,128.54 - 119.50 - 15.81 - 25.88 - 42.78 - 22.88 - 37.50 - 44.81 - 32.48 = 1,787 S.F. NOTE: 1. STAIRWELL IS COUNTED ONCE FOR THE BOTTOM FLOOR AND SECOND TIME FOR THE TOP FLOOR. vras 2eos5 2. THERE ARE NO INTERIOR SPACE HIGHER THAN 16 FEET EXCEPT FOR THE STAIRWELL. sepreMaeR o2. 20�0 BLAI�I�Y HOM�S CUPERTINO, CALIF'ORNIA A3. 1 VAN TILBURG, BANVARD & SODERBERGH, AIA .1 R C H 1'f F. c. '[ t'� R F. • P I. .1 ti\ l\ C. • I: N B.1 \ n F. C 1 l: N uW{Y.Wh4.[nT