Loading...
RM-2010-26b ,�� OFFICE OF COMMUNITY DEVELOPMENT CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 � �,J P �'�,,'�' � � Q (408) 777-3308 • FAX (408) 777-3333 • planninqCa�cupertino.org December 10, 2010 john Gillette 1758 Junction Avenue, Suite D San Jose, CA 95112 SUBJECT: RESIDENTIAL DESIGN REVIEW ACTION LETTER-Application R-2010-26 and MINOR RESIDENTIAL PERMIT ACTION LETTER-Application RM-2010-26 This letter confirms the decision of the Director of Community Development, given on December 10, 2010 approving the Residential Design Review for 220 sq. ft. first story and 756 sq. ft. second story addition; and a Minor Residential Permit for second story rear and side-facing deck, located at 10131 Phar Lap Drive, with the following conditions: 1. APPROVED PROTECT This approval is based on a plan set entitled, "Second Story and First Story Additions, 10131 Phar Lap Dr., Cupertino, Ca. 95014" consisting of seven sheets, dated May 10, 2010, except as may be amended by conditions in this resolution. 2. GEOTECHNICAL REVIEW The project shall incorporate the following conditions of approval from Cotton, Shires and Associates peer review. a. Structural Engineering Evaluation The applican�s structural engineer shall inspect and verify that the existing foundation beneath the proposed 2nd story addition is in satisfactory condition and suitable for supporting the new building loads. The structural engineer shall verify that thP new foundation elements will be compatible with the existing foundation system, min;m;�ing the potential for differential settlement. Criteria for structurally connecting new foundation elements with the existing foundation shall also be provided. The applicant's structural engineer shall certify the above in a letter to the City prior to issuance of building perxnit. b. Plan Review The applicant's geotechnical consultant shall review and approve all geotechnical aspects of the project plans (i.e. site preparation and grading, site drainage improvements and design parameters for foundations) to ensure that their 1 recommendations have been properly incorporated. The results of the Structural ' Engineering evaluation and Geotechnical Plan Review shall be summarized by the respective consultant in a letter and submitted to the City Staff for approval prior to issuance of building permits. c. Construction Inspection During construction, the applicant's geotechnical consultant shall inspect, test (as needed) and approve all geo-technical aspects of the projects of the project construction. The inspections shall include, but not necessarily limited to: site preparation and grading, site surface and subsurface drainage improvements and excavations for foundations and retaining walls prior to the placement of steel and concrete. The results of these inspections and the as-built conditions of the project shall be described by the applicant's geo-technical consultant in a letter and submitted to the City Engineer for review and approval prior to final occupancy. 3. RELOCATION OF EXISTING SHED STRUCTURE Prior to final occupancy, the existing structures along the north property line shall be removed or relocated to a minimum of 3' from the north side property line. 4. CITY ARBORIST REVIEW Prior to issuance of building permits, a$500 deposit shall be provided for the City arborist ta review potential impacts of the construction to the existing protected trees and recommend tree protection measures during construction. The City arborist shall assess the health of the trees prior to final occupancy. 5. CONSULTATION WITH OTHER DEPARTMENTS 'The applicant is responsible to consult with other depart� and/ or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 6. EXTERIOR BUILDING MATERIALS/TREATMENTS Final building exterior treatrnent plan (including but not limited to details on exterior color, material, architectural treatments and/ or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. The final building exterior plan shall closely resemble the details shown on the original approved plans. Any exterior changes determined to be substantial by the Director of Commv,nity Development shall require a minor modification approval with neighborhood input. . 7. ACCURACY OF THE PROTECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not lixnited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/ or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 2 8. NOTICE OF FEES, DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. Pursuant to Goverrunent Code Section 66020(d) (1), these Conditions constitute written notice of a statement of the amount of such fees, and a description of the dedications, reservations, and other exactions. You are hereby further notified that the 90-day approval period in which you may protest these fees, dedications, reservations, and other exactions, pursuant to Government Code Section 66020(a), has begun. If you fail to file a protest within this 90- day period complying with all of the requirements of Section 66020, you will be legally barred from later challenging such exactions. Please be aware that if this permit is not used within one year, it shall expire on December 10, 2011. Staff has made all of the findings that are required for approval of a Minor Residential Permit as required by the of Cupertino's Municipal Code, Chapter 19.28.090 (B). Also, please note that an appeal of this decision can be made within 14 calendar days from the date of the decision. If this happens, you will be notified of a public hearing, which will be scheduled before the Planning Commission. Sincerely, pa a Ankola Planning Division City of Cupertino Tel: (408) 777-3319 Email: Apamaa@cu�ertino.or� Enclosures: 1. Geotechnical Review by Cotton Shires and Associates Inc. dated 12/08/2010 2. Approved Plan Set CC: Raghuram Thiagarajan & Archana Rao,10131 Phar Lap Drive, Cupertino, CA 95014 3 • • • • � �