Loading...
ERC 01-27-2011 Community Development Department Cupertino, CA 95014 (408) 777 -3308 APPROVED MINUTES OF THE SPECIAL MEETING OF THE ENVIRONMENTAL REVIEW COMMITTEE HELD C/N January 27, 2011 Committee Members: David Knapp Aarti Shrivastava Timm Borden Winnie Lee Committee Members absent: Barry Chang Staff present: Gail Seeds Terry Greene Glenn Goepfer: Staff absent: None APPROVAL OF MINUTES: September 2, 2010 ACTION: Approval of minutes from September 2, 2010 MOTION: David Knapp SECOND: Aarti Shrivastava ABSTAIN: none VOTE: 4 -0 NEW ITEMS: 1. Application No.: Project 9136 (EA- 2011 -01) Applicant: City of Cupertino Location: Scenic Circle Access to Stevens Creek Trail and Blackberry Farm Park (City -owned property) Proposed project would construct an approximately 270 foot long trail to connect Scenic Circle to the existing Stevens Creek Trail in Blackberry Farm Park via an existing pedestrian bridge over Stevens Creek. Also included is construction of approach ramps, stairway, retaining wall, access point at Scenic Circle, and plantings. ❑ Archeological /Cultural o There is a Stop Work Order in the construction documents should any artifacts be discovered on site ❑ Trees o Plant 2 replacement trees, ensure their continued survival for 5 years o Avoid construction in tree drip lines to the extent feasible and trail alignment o No protected trees are expected to be disturbed during construction ❑ Biological/ Wildlife o A pre - construction survey will be conducted to ensure there are no protected wildlife at the site o Install special fencing to help keep creek wildlife out of construction area o Conduct pre - construction training; with contractors o Speed limits will be established at the construction site ❑ Additional Discussion o As a result of public meetings, a change was made to the entry point access location off of Scenic Circle o An Initial Study and Mitigated Negative Declaration has already been prepared by a consulting firm, routed for comments and filed with the State Clearinghouse o A new crosswalk is included in the project with disabled access ACTION: Recommendation for approval of a Mitigated Negative Declaration MOTION: David Knapp SECOND: Timm Borden NOES: none VOTE: 4 -0 OLD BUSINESS None Respectfully submitted, 6,10- gibes Beth Ebben Administrative Clerk G/ planning /erc/actionminu tes012711