105-Fee Schedule B - Engineering.pdf
Changes indicated
CITY OF CUPERTINO
in strikethrough and bold.
Resolution 11-
3% increase unless
Fees Effective July 1, 2011
otherwise noted.
Schedule B - Engineering
Street Cuts Miscellaneous
- Cost of Improvements $10,000 or under$232.00$239.00
- Cost of Improvements between $10,001 and $15,000$347.00$357.00
- Cost of Improvements $15,001 and over5% of cost
- Utility, greater of $1,507 $1,552 minimum or 5% of cost of improve.
$1,507 minimum$1,552.00 minimum
Grading permit; greater of $2,317 $2,387 min. or 6% of cost of improve.
$2,317 minimum$2,387.00 minimum
Parcel Map/Tract Map (Map Checking Fee)
- Parcel Map (1-4 lots)$3,765.00$3,878.00
- Tract Map (> 4 lots)$7,817.00$8,052.00
Plan Check and Inspection
- Review of Building Permit Only$580.00$597.00
Review of Public/Private Improvement Plans:
- Residential; greater of $2,468 $2,542 min. or 5% of cost of improve.
$2,468 minimum$2,542.00 minimum
- Commercial; greater of $3,982 $4,101 min. or 6% of cost of improve.
$3,982 minimum$4,101.00 minimum
Geotechnical Review*Cost of review + 10%
$2,000.00 deposit required
Structural Review*Cost of review + 10%
$2,000.00 deposit required
Green Bldg Code Landscape Plan Review Fee*Cost of review + 10%
2
(applies to 10k ft or greater development area in 2011)
$1,000.00 deposit required
C3 Stormwater Management Plan Review Fee*Cost of review + 10%
2
(applies to 10k ft or greater development area in 2011)
$5,000.00 deposit required
*Per Outside Agency Review/Services on Schedule A - General
Confirmation of Planning Applications$250.00$258.00
Annexation (plus County filing fee)$1,620.00$1,669.00
Certificates of Compliance$1,389.00$1,431.00
Encroachment Permits
- Residential$232.00$239.00
- Non-Residential$232.00$239.00
- Annual Utility Company$405.00$417.00
- Pool Permit$580.00$597.00
Lot Line Adjustment$2,666.00$2,746.00
1
G:\\Finance\\Budget\\FEESCHEDULES\\2011\\Fee Schedule_B_ Engineering 2011
Changes indicated
CITY OF CUPERTINO
in strikethrough and bold.
Resolution 11-
3% increase unless
Fees Effective July 1, 2011
otherwise noted.
Schedule B - Engineering
Engineering Copies
- Microfiche$23.00/sheet**$23.50/sheet **
- Improvement Plans$23.00/sheet**$23.50/sheet **
- Traffic Reports/Plans$23.00/sheet**$23.50/sheet **
- Microfilm$0.57/frame**$0.59/frame **
** Price is for first sheet only. Each additional sheet is $11.22 $11.56.
Transportation Permit (State Regulated Fee)
- Single$16.00
- Annual Utility Company$90.00
- Additional Engineering Investigation or Coordination$59.00/hr.
Telecommunications Facility Fee (5% increase per year)
$2.08 $2.18/lineal ft. of conduit/yr
- Installation Rate
$1.10 $1.16/lineal ft. of leased conduit/yr
- Occupancy Rate
Banners
- Large Banners Across Stevens Creek Boulevard$372.00$383.00
- Small Banners on Light Poles (for 20 poles)$732.00$754.00
Aerial Photo Custom Work
24" x 36"$59.00/sheet$61.00/sheet
8 1/2" x 11"$11.38/sheet$11.72/sheet
Soil/Geo Report Research$1,389.00$1,431.00
Schools - Traffic Request$1,426.00$1,469.00
Special Events$1,263.00$1,301.00
Block PartyNo Charge
Parades$1,069.00$1,101.00
Vacation of Public Street ROW/PUE$534.00$550.00
Small Traffic Calming Request$1,002.00$1,032.00
Rural/Semi-Rural Classification Application$696.00$717.00
Comprehensive Neighborhood Traffic Request$1,993.00$2,053.00
Certificate of Correction$152.00$157.00
Floodplan Evaluation$59.00$61.00
Permit Parking Study$1,017.00$1,048.00
Streamside Review$362.00$373.00
2
G:\\Finance\\Budget\\FEESCHEDULES\\2011\\Fee Schedule_B_ Engineering 2011
Changes indicated
CITY OF CUPERTINO
in strikethrough and bold.
Resolution 11-
3% increase unless
Fees Effective July 1, 2011
otherwise noted.
Schedule B - Engineering
Applications may be subject to an hourly fee of $130.00, for applicable staff time, for cost recovery.
This hourly rate applies to large projects that require a level of staff support greater than the scope of
work included in the regular fee schedule and will be based on the time required to process the entire
project. The applicant will be notified if this fee is applicable to their project.
3
G:\\Finance\\Budget\\FEESCHEDULES\\2011\\Fee Schedule_B_ Engineering 2011