11-035 SSA Landscape Architects, First Amendment, Professional Services Agreement CITY OF r -- \,, „....„ ,S(. 195` CUPERTINO FIRST AMENDMENT to PROFESSIONAL SERVICES AGREEMENT Between THE CITY OF CUPERTINO And SSA LANDSCAPE .ARCHITECTS INC. for the STEVENS CREEK CORRIDOR PHASE 2 PROJECT A CUPERTINO CAPITAL IMPROVEMENT PROGRAM PROJECT Contract No. 00056852 Dated _A to n ! 2 I 20( I SSA First Amendment CITY OF ������ THE CITY OF CUPERTINO % 9 9,N. CUPERTINO FIRST AMENDMENT TO AGREEMENT BETWEEN THE CITY OF CUPERTINO AN D SSA LANDSCAPE ARCHITECTS INC. THIS FIRST AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT ( "Agreement ") is dated this f j day of ,1 P v ( , 2011, in the City of Cupertino, State of California, by and between SSA LANDSCAPE ARCHITECTS, INC., hereinafter referred to as ( "CONSULTANT ") and CITY OF CUPERTINO, hereinafter referred to as ( "CITY "). Recil als WHEREAS, CITY and CONSULTANT desire to amend the AGREEMENT to modify the basic agreement, scope of services and fees; and WHEREAS, the CITY OF CUPERTINO desires to obtain professional consultant services for the Steven Creek Corridor Phase 2 Project, (hereinafter, PROJECT); and WHEREAS, City's rules and regulations authorize City to enter into agreements for professional temporary services; and WHEREAS, SSA LANDSCAPE ARCHITECTS, INC. has the necessary professional expertise and skills to perform the professional services required, Now, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, stipulated and agreed, the parties agree as follows: 1. Scope of Services 1.1 See Basic Agreement, Exhibit A of this First Amendment for changes. 2. Term of Agreement 2.1 Unchanged. See Basic Agreement. 3. Schedule of Performance 3.1 See Basic Agreement, Exhibit A of this F :rst Amendment for changes. 4. Compensation The compensation to be paid to CONSULTANT for professional services and reimbursable expenses shall be base on Time and Materials not exceed Seventy Thousand Dollars ($70,000.00) for Basic Services inclusive of Reimbursable Expenses. The rate of payment is set out in Exhibit B, which is attached to the original Agreement. Agreement between City of Cupertino And SSA - First Amendment 1E 5. Method of Payment 5.1 Unchanged. See Basic Agreement. 6. Independent Contractor 6.1 Unchanged. See Basic Agreement. 7. No Third Party Rights 7.1 Unchanged. See Basic Agreement. 8. Project Coordination 8.1 Unchanged. See Basic Agreement. 9. Assignability / Sub consultants / Employees 9.1 Unchanged. See Basic Agreement. 10. Indemnification a. Claims for Professional Liability. Where the law establishes a standard of care for CONSULTANT's professional services, and to the extent the CONSULTANT breaches or fails to meet such established standard of care, or is alleged to have breached or failed to meet such standard of care, CONSULTANT shall, to the fullest extent allowed by law, with respect to all services performed in connection with the Agreement, indemnify, defend, and hold harmless CITY and its officers, officials, agents, employees and volunteers from and against any and all liability, claims, actions, causes of action or demands whatsoever against any of them, including any injury to or death of any person or damage to property or other liability of any nature, that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT or CONSULTANT'S employees, officers, officials, agents or independent contractors. Such costs and expenses shall include reasonable attorneys' fees of counsel of CITY's choice, expert fees and all other costs and fees of litigation. CONSULTANT shall not be obligated under this Agreement to indemnify CITY to the extent that the damage is caused by the sole or active negligence or willful misconduct of CITY, its agents or employees. b. Claims for Other Liability. CONSULTANT shall, to the fullest extent allowed by law, with respect to all services performed in connection with the Agreement, indemnify, defend, and hold harmless CITY and its officers, officials, agents, employees and volunteers against any and all liability, claims, actions, causes of action or demands whatsoever from and against any of them, including any injury to or death of any person or damage to property or other liability of any nature, that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of CONSULTANT or CONSULTANT's employees, officers, officials, agents or independent contractors. Such costs and expenses shall include reasonable attorneys' fees of counsel of CITY's choice, expert fees and all other costs and fees of litigation. CONSULTANT shall not be obligated under this Agreement to indemnify CITY to the extent that the damage is caused by the sole or active negligence or willful misconduct of CITY, its agents or employees. c. Claims involving intellectual property. In addition to the obligations set forth in (A) and (B) above, CONSULTANT shall indemnify, defend, and hold CITY, its elected and appointed officers, employees, and volunteers, harmless from and against any Claim in which a violation of intellectual property rights, including but not limited to copyright or patent rights, is alleged that arises out of, pertains to, or relates to CONULSTANT's negligence, recklessness or willful misconduct under this Agreement. Such costs and expenses shall include reasonable attorneys' fees of counsel of CITY's choice, expert fees and all other costs and fees of litigation. 11. Insurance 11.1 Unchanged. See Basic Agreement. 12. Nondiscrimination Agreement between City of Cupertino And SSA - First Amendment 2 ❑ 12.1 Unchanged. See Basic Agreement. 13. Termination 13.1 Unchanged. See Basic Agreement. 14. Governing Law 14.1 Unchanged. See Basic Agreement. 15. Compliance With Laws 15.1 Unchanged. See Basic Agreement. 16. Confidential Information 16.1 Unchanged. See Basic Agreement. 17. Ownership of Materials 17.1 Unchanged. See Basic Agreement. 18. Consultant's Books and Records 18.1 Unchanged. See Basic Agreement. 19. Interest of Consultant 19.1 Unchanged. See Basic Agreement. 20. Gifts 20.1 Unchanged. See Basic Agreement. 21. Notices 21.1 Unchanged. See Basic Agreement. 22. Venue 22.1 Unchanged. See Basic Agreement. 23. Agreement Binding / Prior Agreements and Amendments 23.1 Unchanged. See Basic Agreement. 24. Costs and Attorneys Fees 24.1 Unchanged. See Basic Agreement. 25. Electronic Transmission of Information 25.1 Unchanged. See Basic Agreement. 26. Dispute Resolution 26.1 Unchanged. See Basic Agreement. 27. Compliance with Laws 27.1 Unchanged. See Basic Agreement. IN WITNESS WHEREOF, the parties hereto have executed this First Amendment the day first mentioned above. Agreement between City of Cupertino And SSA - First Amendment 3 ❑ "City" CITY OF CUPERTINO, By: t J CI) `4. t t David W. Knapp, Ci M ager Attest: Kimberley Smith, C • Cler "Consultant" SSA LANDSCAPE ARCHITECTS, INC. 303 Potrero Street, Suite 40 -C Santa Cruz, CA 95060 831- 459 -0455 By: 0 Aill Date: lis.itt Name: ` ✓(J ` I".6 .1.$4" Title: lt L. 1 Approved as to form and legality this I day of , 2011. 5 City ' ttorney All of the terms and conditions of the original AGREEMENT not modified by this First Amendment, shall remain in full force and effect. THIS AGREEMENT SHALL NOT BE VALID OR EFFECTIVE FOR ANY PURPOSE UNLESS AND UNTIL SIGNED BY THE CITY MANAGER ON BEHALF OF THE CITY COUNCIL. Amount of Agreement: $70,000 P.O. 00056852 Account No. 427 - 9134 -9300 Agreement between City of Cupertino And SSA - First Amendment 4 E EXHIBIT A SCOPE 01= WORK Amendment No. 1 to the Agreement for Design Services for Stevens Creek Trail Plhase 2, Project 9134 Introduction Working with staff of the City of Cupertino (hereinafter "CITY "), SSA Landscape Architects, Inc. (herein after "SSA ") will work on a basic scope of work for the Phase 2 Stevens Creek Trail, to garner City Council approval and clear direction on a preferred design to move the project into Design Development. SSA will prepare plans and reports as required; SSA will act as the Prime Consultant for this project and will subcontract with the following sub- consultants: Hydrology — Balance Hydrologics, Inc. (herein after "Balance ") Civil and Structural Engineering — Mesiti- Miller Engineers (herein after "MME ") Restoration Ecologists — H.T. Harvey (herein after "HTH ") Geotechnical Engineer — to be determined, work to commence after July 1 Throughout the project SSA and its sub - consultant team will coordinate with the CITY's consultants hired directly by the City as described below. The following consultants will be retained by the CITY as needed: Environmental Planner (Jana Sokale) Topographic Survey (Baseline Surveyors) Golf Course Consultant (Landmark) Archaeologist /Cultural Resources Arborist SSA shall prepare a schematic design that will enable to CITY to establish a construction budget and pursue additional funding. The scope is expeci:ed to be refined as the project continues. Major design elements include but are not limited to: • New trail from Blackberry Farm trail terminus to Stevens Creek Boulevard and Golf /Blue Pheasant parking lot • Trail protective fencing for sections along golf course • New clear -span bridge across creek for pedestrians, bicycles and maintenance vehicles • Reconfiguration of Golf /Blue Pheasant parking lot to provide additional stalls • Revisions to Stevens Creek Boulevard frontage to provide bus dropoff and pickup area • New crosswalk on Stevens Creek Blvd. at Phar Lap with associated safety lighting /signage • Plantings and irrigation to be at trail heads, bridge crossing, trailside, and native plantings along creek banks • Creek widening / restoration modifications • Trailside amenities Exhibit A: Scope of Work Stevens Creek Trail Phase 2 Page 2 of 5 Among the design goals and site constraints are the following: • Accommodate desired future use of Stocklmeir parcel as an educational and historical site with a working "legacy farm" and orchard • Be compatible with the Phase 1 trail, Blackberry Farm park, and McClellan Ranch park • Identify design and construction methods and timing that respect presence of protected wildlife species and natural resources minimize involvement by regulatory agencies • Address flood plain considerations • Conform with golf course modification recommendations (by others) • Minimize impacts on neighbors • Meet requirements of CEQA documents • Meet requirements of regulatory and permitting agencies • Meet requirements of outside funders including Santa Clara Valley Water District • Protect creek channel, wildlife and habitat values • Protect significant trees and orchard trees • Protect water quality Phase One — Site Investigation and Programming Task A — Topographic Survey 1. Attend a design team kick -off meeting with consultant team and CITY. 2. Perform coordination site visit with survey team and hydrologist. 3. Coordinate with all consultants to provide Surveyor with all information required. 4. Coordinate with Surveyor and CITY on benchmark and work already done. 5. Review final product for any additional information required. 6. Attend City coordination meetings / teleconferences. Task B — Initial Analysis Reports 1. Review report and pertinent background information and reference documents available from CITY. 2. Prepare analysis matrix for (3) initial concept alternatives. Phase Two — Conceptual and Schematic Design Task A — Initial Concepts This task is independent and can be deleted without affecting future tasks. 1. Assist City in considering basic design concepts for (3) alternatives: a. Alternate Concept #1: Alternate Bridge Location(s) (upstream of 8 green) b. Alternate Concept #2: West Side Trail (adjacent to homes) c. Alternate Concept #3: East Side Trail (adjacent to golf course) 2. Prepare construction cost estimates if requested. Exhibit A: Scope of Work Stevens Creek Trail Phase 2 Page 3 of 5 3. Provide CEQA preparation support as required. 4. Coordinate and receive direction on from CITY on alternatives to incorporate into preferred design. 5. Allow for coordination meetings with design team and CITY. Task B — Concept Analysis Assist CITY in the planning and decision- making process and in preparing and evaluating concepts and preparing decision - making materials for April 05, 2011 City Council meeting and project update. 1. Provide client support for and attend a Stocklmeir Orchard stakeholder meeting to review the City's design alternatives; receive input, guidance and design ideas from the stakeholder group. Meeting materials and coordination will be handled by the City. 2. As requested, provide client support for and attend a golf course stakeholder meeting and /or a Meadows HOA meeting to review the City's design alternatives; receive input, guidance and design ideas from the stakehclder group. Meeting materials and coordination will be handled by the City. 3. As requested, provide design input and analysis on safety concerns raised regarding the interface of trail, Steven's Creek Blvd. and Stocklmeir Orchard driveway in the City's base design. Review alternatives. 4. As requested, provide design analysis for routing the trail around the west side of the Stocklmeier House. Task C — Preferred Concept Design This task assumes that one preferred concept has been selected and the City is no longer pursuing design alternatives. 1. Coordinate design with Balance Hydrologics, Golf Course Designer and CITY's consultants 2. Prepare Presentation Graphics Package for May 17 City Council meeting or other meeting as directed. Graphics anticipated to be the following or similar: a. Plan View Rendering b. Perspective Views (Sketch Up) c. Power -point presentation 3. Attend City Council meeting or other meeting as requested. Task D — Schematic Design Proceed with Schematic Design tasks as directed by CITY. Provide exhibits and data for CEQA documents as requested. Services may include the following: 1. Prepare Initial Schematic Design Plans Exhibit A: Scope of Work Stevens Creek Trail Phase 2 Page 4 of 5 a. Parking Lot Improvement Plans b. Trail Site Plans c. Bridge Location & Cut Sheet 2. Prepare Schematic Construction Cost Estimate 3. Coordinate design with Balance Hydrologics, Golf Course Designer and CITY's consultants 4. Submit Schematic Design for review and comment 5. Prepare revisions based on feedback 6. Submit Schematic Design to CITY for review and comment. 7. Collect feedback and incorporate comments into final Schematic Design Package. 8. Allow for coordination meetings with the design team and CITY. Phase Three — Design Development Not in Contract Phase Four — Construction Documents Not in Contract Phase Five — Bid Phase Not in Contract Additional Services SSA may provide additional services, as requested in advance by the CITY. Additional services will be negotiated separately based on the billing rates contained in the attached "SSA Rate Schedule ". All Additional Services must be authorized in writing by the CITY prior to the commencement of work. Additional services may i iclude, but are not limited to: 1. Construction phase services. 2. Services related to golf course modifications of tees, greens and ponds beyond those required by trail construction and creek restoration. 3. Evaluation, coordination and engineering related to use or re -use of existing wells on site. 4. Unforeseen significant changes in the scope of work, design program, budget, or schedule. 5. Construction phase management and documentation. 6. Structural Engineering and /or Architecture services for a future restroom building. 7. Restoration of the Stocklmeir home or outbuildings. Services to be Provided by the CITY 1. Procurement of services for consultants listed under project understanding to be contracted directly with the CITY. 2. CITY review, comment and directives as requested by SSA. 3. Coordination and administration of reviews and approvals by internal and external jurisdictional agencies. Exhibit A: Scope of Work Stevens Creek Trail Phase 2 Page 5 of 5 Fee Proposal The fees for the above scope of work tasks are as follows: PHASE ONE — estimated $30,000.00 PHASE TWO — estimated 39,400.00 Reimbursable Expense Allowance $600.00 Total Proposed Fees, Phase One — Two $70,000.00 Fee proposal is inclusive of all fees previously expended under the existing Agreement and includes fees services for the above - described tasks by subconsultants Balance Hydrologics and Mesiti - Miller Engineering. Services are proposed to be provided on a not to exceed hourly basis based on the hours and rates on the attached estimated fee spreadsheet. Fees will be billed monthly based on the actual effort in each task. Should it be determined that some tasks are not required or do not require the estimated effort, fees for that phase or task may be used by mutual consent for other tasks in other phases that require more effort than estimated. Included in the fee proposal is an allowance for reimbursable expenses such as plotting, printing and reproduction, shipping and postage, all of which will be provided per the attached "SSA Rate Schedule ". Billings will be submitted on or around the 25th of each month based on the actual reimbursable expenses incurred for the previous month. Schedule Services shall commence immediately. Major project deadlines: Complete Phase Two, Task C by May 17, 2011. Complete Phase Two, Task D by July 1, 2011. / OFFICE OF THE CITY CLERK /1V CITY HALL 10300 TORRE AVENUE • CUPERTINO, CA 95014 -3255 y -t. !p s TELEPHONE: (408) 777 -3223 • FAX: (408) 777 -3366 WEBSITE: www.cupertino.org CUPERTINO April 21, 2011 SSA Landscape Architects, Inc. 303 Potrero Street, Suite 40 -C Santa Cruz, CA 95060 Re: Agreement Enclosed for your records is a fully executed copy the First Amendment to Professional Services Agreement with the City of Cupertino for the Stevens Creek Corridor Phase Project. If you have any questions, please contact the Public Works Department at (408) 777 -3354. Sincerely, Kirsten Squarcia City Clerk's Office cc: Public Works Enclosure