105-4. Matrix of Env. Notes for CIP.pdf
Attachment 4
Environmental Assessment of File No. CP-2011-02
City of Cupertino First Year Programmed Projects
5-Year Capital Improvement Program
Fiscal Years 2011-12to 2015-16
Project TitleProject Description Environmental Review Notes
Stevens Creek Install bridge and extend multi-Separateenvironmental analysis
Corridor Parkuse trail thru the Stocklemier was completed. Mitigated
(Phase II)Property and connect to Stevens negative declaration adopted by
Creek Blvd.Expand Blue the City Council onJune 20,
Pheasant parking lot and install 2006. Project aspects are likely
a SCB crosswalk.Project to change and a separate
includes restoration of 700 linear environmental analysis will be
feet of Stevens Creek.completed.
Stocklmeir Orchard Installtemporaryirrigation and Categorically Exempt. CEQA
Irrigationrehabilitate an existing well to section 15301, Class 1h:
preserve the heritage orange maintenance of existing
orchard.landscaping;and CEQA section
15304, Class 4f: minor trenching
and backfiling; CEQA section
15302, Class 2c: Replacement or
reconstruction of existing utility
systems, involving no expansion.
Blackberry Farm Golf Replace the existing irrigation, Categorically Exempt. CEQA
Course Irrigation cleanthe existing ponds, and section 15301, Class 1h:
Upgradeand Hole restoreexisting well for water maintenance of existing
th
Modificationsupply. Modify the 8tee box and landscaping;CEQA section 15302,
fairway.Class 2c: Replacement or
reconstruction of existing utility
systems, involving no expansion.
Sports Ctr. Pool Remove existing pool & Categorically Exempt. CEQA
Demo & Sports Courtbathhouse. Replace with an all-section 15303, Class 3e: building
weather multipurpose court.of accessory structures.
Quinlan Interior Correct ADA deficiencies and Categorically Exempt. CEQA
Analysis & Upgradesupdate interior finishes, furniture, section 15301, Class 1a: minor
fixtures and equipmentalteration of existing facilities.
Pavement Ongoing maintenance of street Categorically Exempt. CEQA
Managementpavement, which may include section 15301, Class 1c:repair &
pothole filling, slurry sealing and maintenance of existing facilities,
overlayment.such as streets.
Curb, Gutter, Funds for the repair of curb, gutter Categorically Exempt. CEQA
SidewalkRepairs&and sidewalkswhen they meet section 15301, Class 1c: repair &
ADArampsrepair criteria, including maintenanceof existing facilities,
accessibility upgrades.such as streets.
1
Attachment 4
Project TitleProject Description Environmental Review Notes
Traffic signal battery Final phase to install battery back-Categorically Exempt. CEQA
system backupup system on various traffic section 15301, Class 1c: minor
signals.repair & maintenance of existing
facilities, such as streets.
Minor Storm Drain Funding for emergency repairs as Categorically Exempt. CEQA
Improvementsneeded in various locations.section 15301, Class 1b: minor
alteration of existing facilities
2