106-5. Matrix of GP Notes for CIP.pdf
Attachment 5
General Plan Consistency NotesforFile #CP-2011-02
City of Cupertino First Year Programmed Projects
5-Year Capital Improvement Program
Fiscal Years 2011-12to 2015-16
Project TitleProject Description General Plan ConsistencyNotes
Stevens Creek Install bridge and extend multi-use Maintain usability of city parks.
Corridor Park (Phase trail thru the Stocklemier Property See General Plan policies 2-69 and
II)and connect to Stevens Creek Blvd.2-86, text pages 2-46, 2-51 and 2-
Expand Blue Pheasant parking lot 52.Decrease reliance on private
and install a SCB crosswalk.auto use. See General Plan policies
4-2, 4-3, 4-4, general plan text
pages 2-51.
Stocklmeir Orchard Install irrigation and rehabilitate an Maintain usability of city parks.
Irrigationexisting well to preserve the See General Plan Policies 2-69 and
heritage orange orchard2-86, text pages 2-46, 2-51&2-52.
Blackberry Farm Golf Replace the existing irrigation, Maintain usability of city parks.
Course Irrigation cleanthe existing ponds, andrestoreSee General Plan Policies 2-69 and
Upgrade& Hole existing well for water supply.2-86, text pages 2-46, 2-51&2-52.
th
ModificationModify the 8tee box and fairway
Sports Ctr. Pool Demo Remove existing pool &bathhouse. Maintain usability of city parks.
& Sports CourtReplace with an all-weather See General Plan policies 2-69&2-
Installationmultipurpose court.86, text pages 2-46, 2-51&2-52.
Quinlan Interior Correct ASA deficiencies and Maintain usability of city parks.
Analysis & Upgradesupdate interior finishes, furniture, See General Plan policies 2-69&2-
fixtures and equipment86, text pages 2-46, 2-51&2-52.
Pavement Ongoing maintenance of street Projects that improve the safety &
Managementpavement, which may include functioning of the primary
pothole filling, slurry sealing and circulation system. See policies 4-
overlayment.1, 4-3, 4-6, 4-7&4-8.
Curb, Gutter, Funds for the repair of curb, gutter Projects that reduce flood risks. See
SidewalkRepairs&and sidewalks when they meet Flood Hazards General Plan text,
ADArampsrepair criteria, including starting p. 6-25.Decrease reliance
accessibility upgrades.on private auto use. See general
plan policies 4-2, 4-3, 4-4, general
plan text pages 2-51.
Traffic signal battery Final phase to install battery back Projects that improve the safety &
backup systemup system on various traffic signals.functioning of the primary
circulation system. See policies 4-
1, 4-3, 4-6, 4-7&4-8.
Minor Storm Drain Fundingfor emergency repairs as Projects that reduce flood risks. See
Improvementsneeded in various locations.Flood Hazards General Plan text,
starting page 6-25.
1