Loading...
106-5. Matrix of GP Notes for CIP.pdf Attachment 5 General Plan Consistency NotesforFile #CP-2011-02 City of Cupertino First Year Programmed Projects 5-Year Capital Improvement Program Fiscal Years 2011-12to 2015-16 Project TitleProject Description General Plan ConsistencyNotes Stevens Creek Install bridge and extend multi-use Maintain usability of city parks. Corridor Park (Phase trail thru the Stocklemier Property See General Plan policies 2-69 and II)and connect to Stevens Creek Blvd.2-86, text pages 2-46, 2-51 and 2- Expand Blue Pheasant parking lot 52.Decrease reliance on private and install a SCB crosswalk.auto use. See General Plan policies 4-2, 4-3, 4-4, general plan text pages 2-51. Stocklmeir Orchard Install irrigation and rehabilitate an Maintain usability of city parks. Irrigationexisting well to preserve the See General Plan Policies 2-69 and heritage orange orchard2-86, text pages 2-46, 2-51&2-52. Blackberry Farm Golf Replace the existing irrigation, Maintain usability of city parks. Course Irrigation cleanthe existing ponds, andrestoreSee General Plan Policies 2-69 and Upgrade& Hole existing well for water supply.2-86, text pages 2-46, 2-51&2-52. th ModificationModify the 8tee box and fairway Sports Ctr. Pool Demo Remove existing pool &bathhouse. Maintain usability of city parks. & Sports CourtReplace with an all-weather See General Plan policies 2-69&2- Installationmultipurpose court.86, text pages 2-46, 2-51&2-52. Quinlan Interior Correct ASA deficiencies and Maintain usability of city parks. Analysis & Upgradesupdate interior finishes, furniture, See General Plan policies 2-69&2- fixtures and equipment86, text pages 2-46, 2-51&2-52. Pavement Ongoing maintenance of street Projects that improve the safety & Managementpavement, which may include functioning of the primary pothole filling, slurry sealing and circulation system. See policies 4- overlayment.1, 4-3, 4-6, 4-7&4-8. Curb, Gutter, Funds for the repair of curb, gutter Projects that reduce flood risks. See SidewalkRepairs&and sidewalks when they meet Flood Hazards General Plan text, ADArampsrepair criteria, including starting p. 6-25.Decrease reliance accessibility upgrades.on private auto use. See general plan policies 4-2, 4-3, 4-4, general plan text pages 2-51. Traffic signal battery Final phase to install battery back Projects that improve the safety & backup systemup system on various traffic signals.functioning of the primary circulation system. See policies 4- 1, 4-3, 4-6, 4-7&4-8. Minor Storm Drain Fundingfor emergency repairs as Projects that reduce flood risks. See Improvementsneeded in various locations.Flood Hazards General Plan text, starting page 6-25. 1