Exhibit CC 05-23-2011 No. 1 Budget Study Session (2) (0 (I
#Iv
i OFFICE OF THE CITY MANAGER
CITY HALL
S S. 19 10300 TORRE AVENUE -CUPERTINO, CA 95014 -3255
A
TELEPHONE: (408) 777 -3212 www.cupertino.org
CUPERTINO
CITY COUNCIL STAFF REPORT
Meeting: June 21, 2011
Subject
Per council direction provide printing options for community newsletter Cupertino Scene
Description:
Currently 23,300 issues of 16 pages Cupertino Scene are printed 10 times in a year and get
distributed to all residential and business addresses in the city. The cost of printing per edition is
$3,760 and the cost of postage per issue is $3,500 with the total cost of $7,260 per edition.
Discussion:
Per Council direction, staff has explored several alternatives. The current Scene is printed on 50#
Paper with 30% recycled content (PCW). This paper comes in 8 -page increments.
Staff first explored the option of changing the number of pages printed per edition. The second
consideration was changing the number of times the newsletter is printed each year. The third
consideration was to print the newsletter as an insert of Cupertino Courier. The options are
described as follows:
OPTION 1: Change the number pages in the newsletter. The current
• The city can increase the number of pages of the publication from 16 to 24 pages. This
will result in estimated printing costs of $4.278 per edition.
• The city can decrease the number of pages from 16 to 8. This will result in estimated
printing costs of $3,304 per edition.
OPTION 2: Change the number of times the newsletter is published
• For each month the Scene is not printed as currently configured, the City can save
$7,260.
• For each additional month the Scene is printed as currently configured, the City can save
$7,260.
#-io
PUBLIC WORKS DEPARTMENT
Timm Borden, Director
�cSi. N CITY HALL
10300 TORRE AVENUE ^ CUPERTINO, CA 95014 -3266
CUPERTINO (408) 777 - 3354 ^ FAX (408) 777 -3333
C IP
2011_ 2012
Status report of the Capital Improvement Program
Current as of June 15, 2011
Table of Contents
Introduction 4
Proposed CIP Projects 8
Civic Center Master Plan 9
Various Minor Intersection Traffic Signal Battery Backup System 10
Pavement Management 11
Curbs, Gutters and Sidewalk Repair & ADA Ramps 12
Electric Vehicle Charging Station 13
Active CIP Projects 14
Priority 1 Projects 15
Safe Routes to School- Garden Gate 16
Monta Vista Storm Drain System 17
McClellan Ranch Repairs & Painting 18
Emergency Van Upgrade 19
Various Park Path and Parking Lot Repairs & Resurfacing 20
Stocklmeir Orchard Irrigation 21
Stevens Creek Corridor Park Phase 2 22
Blackberry Farm Infrastructure Upgrades 23
Priority 2 Projects 24
Various Traffic Signal /Intersection Modifications 25
Quinlan Center Interior Upgrade 26
McClellan Ranch 4H Sanitary Connection 27
EOC Generator w /Trailer 28
Blackberry Farm Golf Course Irrigation Upgrades 29
Priority 3 Projects 30
Various Trail Resurfacing at School Sports Fields 31
Priority 4 Projects 32
Stocklmeir Legacy Farm 33
Development in -Lieu Contributions 34
Page 2 of 58
Monument Gate Way Signs (4) 35
DeAnza Blvd. /McClellan /Pacifica Signal Modification 36
North Stelling Rd/I-280 Bridge Pedestrian Lighting & Upgrades 37
Unfunded CIP Projects 38
Temporary Dog Park 39
Blackberry Golf Course Master Plan 40
Blackberry Golf Pro -Shop Upgrades 41
McClellan Ranch / Simms Master Plan 42
City Hall Remodel (Seismic Upgrade) 43
Stocklmeir Preservation and Restoration 44
Lawrence -Mitty Park - Additional Funding 45
Stevens Creek Trail to Bay — Study Only 46
Tank House Completion (Nathan Hall) 47
Stevens Creek Trail Bridge Over UPPR 48
Linda Vista Pond Improvements 49
Tri- School Area Sidewalk Project 50
Sports Center Tennis Court Retaining Wall 51
Various City Wide Bicycle Plan Implementation 52
McClellan Ranch Blacksmith Shop 53
Wilson Park Irrigation System Renovation 54
Service Center Tool Crib 55
Sports Center — Court, Pool, or Covered Gym Study 56
Pavement Management Gap Funding 57
Traffic Management Studies — 3 Intersections 58
Page 3of58
Introduction
June 19, 2011
To the Citizens of Cupertino, Honorable Mayor, and members of the City Council
Subject: Fiscal Year 10/11 CIP Status Report and Fiscal Year 11/12 CIP Proposal
In an effort to provide the best information and greatest transparency to the Capital
Improvement Program (CIP), I am pleased to provide you the following comprehensive
document that includes all of the newly proposed projects, currently budgeted projects, and
unfunded projects.
While the main objective of this current document is to provide the Council sufficient
Information to make decisions on moving forward with priority projects, it is also anticipated
that much of the document will be updated quarterly with current project information for the
Council and the public. This report will have a prominent link on our website for the public's
information. Since this is our initial roll -out of this document, we are very interested in getting
your feedback on how we can optimize the format for your use.
Besides unveiling this new project information format, also included is a proposed prioritization
system. The Council has been requesting to see project priorities, so each project is categorized
and prioritized using the following criteria:
Categories
• A — Public Safety/ Regulatory Mandate/ Grant Commitment
• B — Preventative Maintenance/ Resource and Cost Efficiencies
• C — Enhancement
Priorities
1. Ongoing or imminent upon 2011 -12 Budget Adoption
2. Near -term in 2011 -12 but contingent on resources available from Priority 1 projects
3. Planned, but contingent on resources available from Priority 1 and 2 projects
Page 4 of 58
4. Proposed to be deferred past 2011 -12, moved to unfunded list, or dropped due to
being no longer necessary
Proposed in this document are several changes to projects that have been in the budget
previously, as well as new projects proposed by staff to be elevated in importance and funded,
or to begin tracking them in the Unfunded List. These changes are recommended typically
based on recently acquired information, project priorities, or project infeasibility.
Based on the City Council discussion at the CIP Study Session on June 15, 2011, we have made
the following changes to this version of this document:
Report Format
• All Completed Projects have been removed. •
• A new section has been included to track projects proposed to be funded exclusively
with development in -lieu contributions.
• Budget Clarification — The report now differentiates between the Current Budget,
what has been Spent to Date, and the Current Balance.
• Some additional scope or history has been included for various projects to address
some of the questions from the Study Session.
Removed from CIP Report based on Study Session discussion and straw vote (note: the Council
may still want to revisit these but they are excluded from report at this time.
• AM Radio Station Antenna and Transmitter Location
• CH Generator Connection
• Sports Center Sports Court
• Skate Park
• McClellan Ranch Environmental Education Facility — Delete project but included
analysis in proposed Unfunded McClellan Ranch /Simms Master Plan.
• Library Parking — Delete project, but direct $50,000 towards Stevens Creek Corridor
Park Phase 2 and fund Civic Center Master Plan with remaining $50,000, with parking
bei ig an element of the proposed plan.
• Photovoltaic System & Car Port at Corp Yard
• Rancho Rinconada Street Study
• Simms Property — Remove from Unfunded List and include analysis in the newly
named, but Unfunded, McClellan Ranch /Simms Master Plan
• Additional Tennis Court Lighting
Page 5 of 58
Project Proposed for Deferral, Scope and Funding Adjustments or Moving to Unfunded List
• Temporary Dog Park- Mary Avenue — Since the project is now approximately
$125,000 short due to soil remediation needs, it is recommended to be moved to the
Unfunded List. The Mary Avenue designation is also removed with the potential to
identify an alternate location in the future.
• Service Center Tool Crib — Move to Unfunded List.
• Blackberry Golf Pro -Shop Upgrades — Recommend moving to Unfunded List until end
of Blue Pheasant lease.
• Sports Center Sports Court — This project is proposed to be renamed Sports Center —
Court, Pool or Covered Gym Study
• Wilson Park Irrigation System Renovation
New Projects Proposed for Funding
• Various Minor Intersection Traffic Signal Battery Backup System (proposed remaining
intersections are now included in report)
• Pavement Management — Recurs Annually
• Curbs, Gutter, and Sidewalk Repair & ADA Ramps — Recurs Annually
• Civic Center Master Plan
• Electric Vehicle Charging Stations
New Projects Proposed for inclusion on Unfunded List
• Blackberry Golf Course Master Plan
• McClellan Ranch /Simms Master Plan
• Linda Vista Pond Improvements (alternative scopes and budgets now included in
report)
• Tri- School Area Sidewalk Project
• Sports Center Tennis Court Retaining Wall
• Various City -wide Bicycle Plan Implementation
• Pavement Management Gap=Funding — This is the amount Unfunded from the
necessary investment to maintain current average Pavement Condition Index (PCI)
• Traffic Management Studies at 3 Intersections — Stevens Creek /Tantau, Stevens
Creek /Vista, and Kim Street.
Page 6 of 58
Projects with More Information Included
• Stevens Creek Trail to Bay — Multi -City Collaboration is described.
• Various Minor Intersection Traffic Signal Battery Backup — Intersections are included.
• Various Park Path and Parking Lot Repairs and Resurfacing — Order of Magnitude
Estimate included for some replacement of asphalt paths with softer running
surfaces. This is not recommended since these paths also need to carry maintenance
vehicles.
• Various Traffic Signal /Intersection Modifications- examples of the types of projects
are now included.
Project Delivery Schedules
While you might notice that the schedule section of many projects is currently blank, once we
know what is ultimately adopted by Council, our intent is to determine the most efficient
delivery method and advise Council of the proposed schedule.
Respectfully submitted,
Timm Borden
Director of Public Works
Page 7 of 58
Civic Center Master Plan
•
Current Scope: Study alternatives and develop a plan of improvements to be made to
the civic center, address current and future parking needs, future
expansion capacity, City hall disabled access upgrades, seismic upgrades,
and improved customer service alternatives.
Category: C — Enhancement
Priority: 2
Status: Proposed
Proposed Budget: $50K (General Fund)
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: n/a
2011 -12 Recommended Budget Action:
Funding is proposed to be re- directed from the Library Parking project
and the scope is proposed to include the elements listed in the City Hall
Remodel project as well as parking throughout the civic center area.
Project cost currently shown in the proposed budget.
Page !) of 58
Various Minor Intersection Traffic Signal Battery Backup
System
I
44 C iro '
Current Scope: Install battery backup systems at minor traffic signal locations
throughout the City. The batteries should be replaced every 5 -6 years,
and replacement cost per intersection is about $1300. Assuming five -
year replacement cycle and 55 intersections, that puts annual
maintenance cost for the battery backups at approximately $15K.
1) Tantau /Vallco Parkway, 2) Tantau /Tandem dwy, 3) Tantau /Pruneridge, 4)
Pruneridge /HP dwy, 5) Foothill /Voss, 6) Vallco Parkway /Perimeter
Category: A - Public Safety
Priority: 1
Status: Proposed
Proposed Budget: $45,000 (General Fund)
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Recommend funding from the General Fund and directing staff to move
forward as Priority 1 project. This funding is currently shown in the
proposed budget.
Page 10 of 58
Pavement Management
Current Scope: Recurring annual pavement repair, patching, slurry seal, cape seal, and
overlay throughout the City.
Category: B — Preventative Maintenance
Priority: 1
Status: Proposed
Proposed Budget: $1,250,000 (Gas Tax)
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Recommend funding with annual gas tax revenue and directing staff to
move forward as a priority 1 project. The funding is currently shown in
the proposed budget.
Page 11 of 58
Curbs, Gutters and Sidewalk Repair & ADA Ramps
Current Scope: Recurring annual repairs of curbs, gutters, sidewalks and ADA ramps at
various locations throughout the City.
Category: B — Preventative Maintenance
Priority: 1
Status: Proposed
Proposed Budget: $215,000 (Gas Tax)
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Recommend funding with annual gas tax revenue and directing staff to
move forward as a priority 1 project. The funding is currently shown in
the proposed budget.
Page 12 of 58
Electric Vehicle Charging Statiori
IP
t.
Current Scope: Install the necessary electrical infrastructure to create two electric
vehicle charging stations near City Hall.
Category: B — Resource and Cost Efficiencies
Priority: 2
Status: Proposed
Proposed Budget: $30,000 (General Fund)
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
The funding is currently shown in the proposed budget.
Page : 13 of 58
Safe Routes to School - Garden Gate
Current Scope: Install sidewalks where gaps exist on Stelling Rd., Greenleaf Dr. and on
Ann Arbor Ave. to provide a safe route to Garden Gate School. Includes
some work on the Stelling /Greenleaf signal.
Category: A - Public Safety / Grant Commitment
Priority: 1
Status: Active - Construction contract awarded May 17, 2011
Current Budget: $442,000 (General Fund — 48,000 & Grant — 394,000)
Spent to Date: $277,756
Current Balance: $164,244
Schedule: Construction start June 2011
Maintenance: Increase
2011 -12 Recommended Budget Action:
Continue current budget.
Page 16 of 58
Monta Vista Storm Drain System
11111 _
:.l ity -•
Current Scope: Installation of storm drainage system in Monta Vista on Orange Ave. and
Byrne Ave.
Category: B - Preventative Maintenance
Priority: 1
Status: Active - Design 70% complete
Current Budget: $893,000 (Storm Drain Fund)
Spent to Date: $49,954
Current Balance: $843,046
Schedule: Neighborhood meetings Summer 2011
Construction 2011- 2012
Maintenance: Increase
2011 -12 Recommended Budget Action:
Continue current budget.
Page 1 . 7 of 58
McClellan Ranch Repairs & Painting
1r VT,
n
,. " fir '
Current Scope: Project preserves historic quality of the Milk Barn and Water Tower
siding with historically correct materials, siding profile, and architectural
details, following emergency repair of termite damage to tower
structure.
Category: B - Preventative Maintenance
Priority: 1
Status: Active - Historically correct design underway
Current Budget: $100,000 (General Fund)
Spent to Date: 0
Current Balance: $100,000
Schedule: anticipate completion late Fall 2011
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Continue with current budget.
Page 18 of 58
Emergency Van Upgrade
Current Scope: Project converts a donated van into an Emergency response vehicle,
with installation of radios, transmitters /antenna, and various emergency
equipment for CARES. Shortwave radios, currently in City Hall, will also
be installed.
Category: A - Public Safety
Priority: 1
Status: Active - Van engine repairs and upgrades underway
Current Budget: $75,000 (General Fund)
Spent to Date: 0
Current Balance: $75,000
Schedule: anticipate fully operational by Spring 2012
Maintenance: Increase
2011 -12 Recommended Budget Action:
Continue with current budget.
Page 19 of 58
Various Park Path and Parking Lot Repairs & Resurfacing
Jot
mo' *- ... ...
Current Scope: Resurface portions of pathways in Linda Vista, Memorial, Portal, Regnart
and Somerset Parks (including basketball courts). Resurface portions of
parking Tots at Senior Center, Somerset and Varian.
Category: A - Public Safety
Priority: 1
Status: Active - Design begins July 2011
Current Budget: $250,000 (General Fund)
Spent to Date: $13,135
Current Balance: $236,865
Schedule: Construction — Late 2011,
Maintenance: Decrease
2011 -12 Recommended Budget Action:
Continue with current budget. In response to a June 15 question:
Jogging surface must be applied over a fully restored asphalt sub
surface. Cost will double. Pathway cannot be used for maintenance
vehicles. Access to pathway must be controlled. Staff recommends not
installing a jogging surface.
Page 20 of 58
Stocklmeir Orchard Irrigation
4 t
Current Scope: Installation of a temporary irrigation system to prevent further
deterioration of the heritage orange orchard.
Category: B - Preventative Maintenance
Priority: 1
Status: Active - Not yet initiated
Current Budget: $50,000 (General Fund)
Spent to Date: 0
Current Balance: $50,000
Schedule: Anticipate temporary, above ground irrigation in place for Spring of 2012
Maintenance: Increase
2011 -12 Recommended Budget Action:
Change funding source to Recreation Fund
Carry over to FY 11 / 12. Redirect General Fund $50,000 to Stevens
Creek Corridor Park Phase 2.
Page 21 of 58
Stevens Creek Corridor Park Phase 2
3
Current Scope: Design and construction of the second phase of the multi -use trail
through Blackberry Farm, adjacent to the golf course, crossing the creek
on a new bridge into and through the Stocklmeir orange orchard,
terminating at the creek crossing on Stevens Creek Blvd with minor
sidewalk improvements along the Blvd towards the Blue Pheasant,
improvements and increased parking in the parking lot, bus drop -off
spots along the street, and crosswalk improvements at the intersection
of Phar Lap Drive and Stevens Creek Blvd.
Category: A - Grant Commitment
Priority: 1
Status: Active - Preliminary design initiated, advanced design authorized by
Council May 17 CEQA process underway. Design and Permit phases
insufficiently funded.
Current Budget: $200,000 (Park Dedication)
Spent to Date: $196,703
Current Balance: $3,297
Schedule: Design 2011, Permit 2012, Construct 2013
Maintenance: Increase
2011 -12 Recommended Budget Action:
Authorize a total budget of $3.5M, accept awarded grants, and fund the
shortfall. These actions were approved by Council on May 17, 2011 and
now should be implemented within the 2011 -12 budget.
Page 22 of 58
Blackberry Farm Infrastructure Upgrades
444 EEE
Current Scope: Disabled access upgrades to pool houses, restrooms, and retreat center,
the need for which was triggered by improvements made during SCCP
Phase 1 but which could not be accomplished in time for season
opening. Project also includes a concrete retaining wall at the park
maintenance service yard. Project formerly included new restrooms and
relocation of park maintenance buildings to area near volleyball courts.
Scope reduced by Parks and Rec.
Category: A - Public Safety
Priority: 1
Status: Active - January bids coni:ained an administrative error and were
rejected. Re -bid is scheduled for June 24th
Current Budget: $800,000 (General Fund •- originally part of SCCP Phase 1 budget)
Spent to Date: $285,612
Current Balance: $514,388 (if 115,000 re- directed then balance becomes 399,388)
Schedule: Award Bid: Summer 2011
Construction: Fall / Winter 2011
Maintenance: Increase
2011 -12 Recommended Budget Action:
Budget reduction by $115,000 considered acceptable. This $115,000 is
recommended to be re- directed to Stevens Creek Corridor Phase 2.
Remaining budget considered sufficient to deliver project.
Page Z:3 of 58
Various Traffic Signal /Intersection Modifications
R
It.
t, __
, W17
Current Scope: These annual funds are for minor upgrades to various traffic signals, City
wide, beyond routine maintenance. For example: Upgrading De
Anza /Rodriguez to 8 -phase signal (if determined to be beneficial);
Converting Foothill /SCB to 8 -phase signal; Installing far -side left -turn
heads at intersections that do not have them; Replacing substandard
masts and mast arms.
Category: A - Public Safety
Priority: 2
Status: Active - There are no plans currently to upgrade any signals but this fund
has been used for minor modifications when needed at signals.
Current Budget: $75,000 (General Fund)
Spent to Date: $48,540
Current Balance: $26,460
Schedule: As needed
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Carry over the current balance of $26,000 and add the annual $75,000
allocation.
Page 2:5 of 58
Quinlan Center Interior Upgrade
t
ff ~ £
1I Y
Current Scope: Develop upgrade alternatives and estimates to address circulation and
disabled access issues, furniture replacement, interior color schemes,
and tripping hazards. Objective is to maximize customer experience and
maintain or increase revenue in this 20 plus year old building. (Note:
hard construction costs, exclusive of furniture, fixtures, and equipment,
which exceed $129,000, triggers necessity to fully upgrade the entire
facility to meet California Building Code access requirements)
Category: C - Enhancement
Priority: 2
Status: Active - Design alternatives are being developed for anticipated
$200,000 final design and construction funding in FY 11/12 and
$200,000 construction funding in FY 12/13.
Current Budget: $30,000 FY 10/11 (Recreation Fund)
$200,000 FY 11/12 (Recreation Fund)
$200,000 FY 12/13 (Recreation Fund)
Spent to Date: $30,000
Current Balance: 0
Schedule: Architectural Design report due to City mid - summer 2011
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Recommend reducing the FY11/12 budget from $200K to $50K —
authorize staff to use the $50K to initiate final design to be complete by
June 2012 — authorize balance of $350K to be used in FY 12/13 for
construction.
Page 26 of 58
McClellan Ranch 4H Sanitary Connection
w
Current Scope: Project removes the existing septic tank at the 4 -H building and connects
the building's existing sanitary lines to a main sanitary line a short
distance away.
Category: B - Preventative Maintenance
Priority: 2
Status: Active - Design underway
Current Budget: $45,000 (General Fund)
Spent to Date: 0
Current Balance: $45,000
Schedule: Anticipated completion late Fall 2011
Maintenance: Decrease
2011 -12 Recommended Budget Action:
Continue with current budget.
Page 27 of 58
EOC Generator w /Trailer
Current Scope: Purchase of a second trailer mounted generator, using federal grant
money. Requires 25% share by City.
Category: A - Grant Commitment / Public Safety
Priority: 2
Status: Active - Generator specification development in progress
Current Budget: $276,500 (General Fund — 69,125 & Grant - 207,375)
Spent to Date: $5,000
Current Balance: $271,500
Schedule: Purchase complete by November 2011
Maintenance: Increase
2011 -12 Recommended Budget Action:
Continue with current budget.
Page 28 of 58
Blackberry Farm Golf Course Irriigation Upgrades
Current Scope: Replace existing outdated irrigation main line, laterals, sprinkler heads,
and controllers, clean and reconfigure the two existing ponds, and
potentially fill the ponds with water from the existing well at the
Blackberry Farm concession stand.
Category: B - Preventive Maintenance
Priority: 2
Status: Active - Preliminary design initiated — project on hold for Council
consideration of expanding scope to address golf course / trail impacts,
alternative reservoir irrigation source, and well water access rights.
Current Budget: $550,000 (Blackberry Fund — 150,000 & Recreation Fund — 400,000)
Spent to Date: $29,069
Current Balance: $520,931
Schedule: TBD
Maintenance: Decrease
2011 -12 Recommended Budget Action:
Draft FY 11/12 CIP originally indicated a need for additional $200,000,
however no additional scope or funding is proposed until creek and
groundwater rights are confirmed.
Page 2:9 of 58
Various Trail Resurfacing at School Sports Fields
Nri
Current Scope: Replace existing decomposed granite (DG) trails with asphalt trails at
Faria and Lincoln school sports fields.
Category: B - Preventative Maintenance
Priority: 3
Status: Active - Design begins July 2011
Current Budget: $125,000 (General Fund)
Spent to Date: 0
Current Balance: $125,000
Schedule: Design / Construction — Summer 2011
Maintenance: Decrease
2011 -12 Recommended Budget Action:
Continue with current budget.
Page 211 of 58
Stocklmeir Legacy Farm
Current Scope: Coordinate with the Stocklmeir Task Force to develop an interactive
educational farming program on the Stocklmeir orange orchard and
farm, integrate the Stevens Creek Trail, and include the preservation
objectives for the Stocklmeir structures.
Category: C - Enhancement
Priority: 4
Status: Preliminary feasibility study completed — overall concept will be
integrated with SCCP Phase 2 Trail and Creek Restoration, if Phase 2 is
approved and fully funded for FY 11/12.
Current Budget: $50,000 (Recreation Fund)
Spent to Date: 0
Current Balance: $50,000
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Carry over to FY 11/12
Page 33 of 58
Development in -Lieu Contributions
Page 34 of 58
Monument Gate Way Signs (4)
Current Scope: Upgrade or replace three existing center island gateway signs, that
announce one's entry into Cupertino, at 1) Stevens Creek Blvd near
Tantau, 2)De Anza Blvd near 1 -280 overcrossing, 3) De Anza Blvd near
Bollinger Road, and install a new center island gateway sign at Stevens
Creek Blvd near the Oaks shopping center.
Category: C - Enhancement
Status: On Hold for sufficient Developer contributions or supplementary City
funding
Current Budget: Budgetary Estimate - $400,000
Spent to Date: 0
Current Balance: $35,000 ($25,000 Pinn Brothers contribution received August 2006 -
expires August 2011, plus $10,000 GF recovered from damage claim)
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Hold funds until sufficient funding for scope is available.
Page 35 of 58
DeAnza Blvd./McClellan/Pacifica Signal Modification
,-,
Current Scope: Reconfiguration of the intersection to address efficiency and traffic flow
which might include relocating two signal mast arms and poles, related
electrical, concrete and striping work, and the closing of the Pacifica
street driveway to the gas station.
Category: C - Enhancement .
Status: On Hold for sufficient Developer contributions or supplementary City
funding
Current Budget: Budgetary Estimate - $350,000
Spent to Date: 0
Current Balance: $200,000 ($200,000 Hunter -Storm developer contribution received June
2007 - expires June 2012)
•
Schedule: TBD
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Hold funds until sufficient funding for scope is available.
Page 36 of 58
North Stelling Rd/ I -280 Bridge Pedestrian Lighting & Upgrades
100 "4-2.1}. 41 . fit *M
Current Scope: "The applicant shall contribute $25,000 to the City for enhancements to
the pedestrian walkway along the east or west side of the N. Stelling
Road Bridge that crosses over Interstate 280 located south of the project
site. The City shall use the money to add pedestrian scaled lighting,
paving materials, railings and /or repainting of the pedestrian facilities of
the east or west side of the bridge."
Category: C - Enhancement
Status: On Hold for sufficient Developer contributions or supplementary City
funding
Current Budget: Budgetary Estimate - TBD
Spent to Date: 0
Current Balance: $25,000 Villa Serra developer contribution — east side of bridge (received
July 2007 - expires July 2012)
$25,000 Las Palmas developer contribution — west side of bridge
(received August 2008 - expires August 2013)
Schedule: TBD
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Hold funds until sufficient funding for scope is available.
Page 37 of 58
Temporary Dog Park
4 at
Current Scope: Design and construct an enclosed, off -leash dog park for large and small
dogs.
Category: C - Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate - $225,000 (Recreation Fund)
Spent to Date: $17,800
Current Balance: $207,200
Schedule: ' TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Page 39 of 58
Blackberry Golf Course Master Plan
2; p
r '14
Current Scope: Develop a master plan with a priority list of repairs, improvements, and
resource conservation alternatives that will ensure that the golf course
and the associated facilities are capable of generating cost recovery
revenue for another 30 years of use.
Category: C - Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate - $50K
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Recommend funding from the deferred Golf Pro Shop Upgrades.
Page 40 of 58
Blackberry Golf Pro -Shop Upgrades
Current Scope: Upgrade the interior layout, circulation, finishes, and equipment of the
pro -shop.
Category: C — Enhancement
Status: Unfunded
Current Budget: Originally proposed for FY 11/12 - $150,000 (Blackberry Farm Golf
Reserve)
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Recommend moving this proposed project to the Unfunded List and
using $50,000 of the Golf Reserve to fund a Blackberry Golf Course
Master Plan.
Page 41 of 58
McClellan Ranch / Simms Master Plan
Current Scope: The scope of the Master Plan will be to study:
• Preventative Maintenance - Develop a priority list of historical
repairs, improvements, and resource conservation alternatives
that will ensure that each structure is safe and capable of
withstanding another 30 years of use.
• Environmental Education Facility, including covered outdoor
teaching space
• Simms Property
Category: B/C - Preventative Maintenance /Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate - $75K
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Recommend funding this project from Recreation Fund as a Priority 2.
Page 42 of 58
City Hall Remodel (Seismic Upgrade)
Current Scope: Original 2005 scope included moving public service counter to the main
floor, converting former council chambers into a conference center, and
upgrading disabled access to meet current code. Initial study uncovered
error used in Essential Facility structural assumptions in 1987 remodel to
create an EOC on the lower level. Main floor structure and roof are
presumed to be in compliance with the 1964 building code.
Category: A - Public Safety
Status: Unfunded - Main floor concrete slab and beam cracks, reinforcing bar
quantity and placement currently under investigation.
Current Budget: Budgetary Estimate - $3.OM
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Page 43 of 58
Stocklmeir Preservation and Restoration
Current Scope: Preserve and restore the exterior walls, fireplace and chimney, doors,
windows, and architectural details of the Stocklmeir House to prevent
further deterioration until a complete restoration scope can be
developed.
Category: B - Preventative Maintenance
Status: Unfunded - New roof shingles applied several years ago holding up well
— occasional break -ins through windows covered by plywood — minor
fire and graffiti damage due to vandalism — termite damage suspected
to be extensive
Current Budget: Budgetary Estimate - TBD
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Page 44 of 58
Lawrence -Mitty Park - Additional Funding
Current Scope: Obtain by purchase or trade of land, approximately 4 acres of land
adjacent to Creek and currently owned by the County - used as a storage
yard for asphalt grindings & equipment — at the southwest corner of
Lawrence Expressway and Mitty
Category: C - Enhancement
Status: Unfunded - Initial appraisals and land swap alternatives have become
outdated — no subsequent action taken
Current Budget: Budgetary Estimate - $5.8M, of which $1.3M is budgeted in FY 12 -13 and
the balance is unfunded. The 1.3M is for and acquisition and is
considered insufficient at this time. The accuracy of the balance for
design and construction must be verified
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Page 4.5 of 58
Stevens Creek Trail to Bay - Study Only
Current Scope: The Stevens Creek Trail is a bike and pedestrian corridor along Stevens
Creek from the San Francisco Bay Trail south. The purpose of the study
is to propose options for extending a trail through Cupertino to connect
with Los Altos. Develop preferred alignments of the trail while
identifying environmental, engineering and safety issues. The City of
Sunnyvale is taking the lead and contributing $75,000.
Category: C - Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate - $100K
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Recommend allowing $10K from the VTA Project Readiness Initiative
funds be made available to Sunnyvale for planning purposes.
Page 46 of 58
Tank House Completion (Nathan Hall)
Current Scope: Convert the recently acquired Tank House into usable space, consider an
addition, and improve landscaping — within the parameters of the
current use agreement
Category: C - Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate - $500K
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Page 47 of 58
Stevens Creek Trail Bridge Over UPPR
rim h
Current Scope: Provide a vehicle /pedestrian /bicycle bridge span over the UPPR right of
way, adjacent to Stevens Creek Blvd, near the Lehigh Cement Plant to
connect with the Stevens Creek Trail and provide vehicle access to the
Hammond - Snyder House. This project is included within the City's
adopted Bicycle Transportation Plan.
Category: C - Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate - $2.0M
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Staff recommends the development of an accurate budgetary estimate
using technical consultants. Likely outcome of will be that the $2M
estimate is insufficient for the project.
Page 48 of 58
Linda Vista Pond Improvements
lir -wpm
Current Scope: Reinstate existing ponds and recirculation pumps and update to current
codes. Concepts developed and estimated in May of 2010.
Category: C - Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate — Concept 1 Full Restoration - $615,000
Budgetary Estimate — Concept 2 Upper Area Restoration - $525,000
Budgetary Estimate — Concept 3 Dry Creek - $460,000
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Page 49 of 58
Tri- School Area Sidewalk Project
.Y M*
Current Scope: Study and implement sidewalk improvements along the streets that
feed directly from Monta Vista to the Tri - School area along McClellan
Road.
Category: A - Public Safety
Status: Unfunded
Current Budget: Budgetary Estimate - TBD
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Page 50 of 58
Sports Center Tennis Court Retaining Wall
Current Scope: Remove and replace the concrete retaining wall at the northwest corner
of the tennis facility adjacent to the Commons residential property.
Category: B - Preventative Maintenance
Status: Unfunded
Current Budget: Budgetary Estimate - TBD
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Decrease
2011 -12 Recommended Budget Action:
Page 51 of 58
Various City Wide Bicycle Plan Implementation
Current Scope: Bicycle improvements at various locations throughout the City
Category: C - Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate - TBD
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Page 52 of 58
McClellan Ranch Blacksmith Shop
Y1
Current Scope: Project relocates the existing % scale replica Baer blacksmith shop from
under the heritage Oak tree to a site near the Barn and trail, preserves
and restores the historic facade and architectural details, and provides
for more security and protection of the blacksmith tools and forge.
Category: B - Preventative Maintenance
Status: Unfunded - Design consultant stopped June 15, 2011.
Current Budget: $250,000 (General Fund)
Spent to Date: $20,000
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Moved to the Unfunded list as of June 15, 2011
Page 53 of 58
Wilson Park Irrigation System Renovation
Current Scope: Reroute a section of main irrigation line that now passes under the
community center building to a new location for easy access and
renovation of existing irrigation system to keep turf in good condition
and reduce water consumption.
Category: B - Preventative Maintenance
Status: Unfunded
Current Budget: Budgetary Estimate - $150,000
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Decrease
2011 -12 Recommended Budget Action:
Moved to the Unfunded list as of June 15, 2011
Page 54 of 58
Service Center Tool Crib
Current Scope: Install concrete building pad for a tool protection and storage structure.
(Was originally thought an existing metal building from Franco Court
could be relocated and used here —that has since become impractical)
Category: B - Preventative Maintenance
Status: Unfunded
Current Budget: Budgetary Estimate - $40,000 (General Fund)
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Decrease
2011 -12 Recommended Budget Action:
Moved to the Unfunded list as of June 15, 2011
Page 55 of 58
Sports Center - Court, Pool, or Covered Gym
Study
Current Scope: Develop preliminary Scope, Schedule and Budget for sport court, a new
swimming pool, or an enclosed gym, to occupy the site of the former
DACA swimming pool and restrooms at the Sports Center.
Category: C - Enhancement
Status: Unfunded
Current Budget: Budgetary Estimate — Study ($25,000)
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Increase
2011 -12 Recommended Budget Action:
Project was added to the Unfunded List as a result of Council discussion
regarding the re -use of the former DACA swimming pool site on June 15,
2011. Project scope may be determined following a local resident
survey scheduled for January 2012.
Page 56 of 58
Pavement Management Gap Funding
r .,
jI li_t
i
Current Scope: This represents the gap between the proposed annual pavement
investment (Annual Pavernent Management - $1,250,000 )and the
investment necessary to rnaintain the City's average Pavement
Management Index of 70 ($3,500,000). The scope includes additional
pavement repair, patching, slurry seal, cape seal, and overlay
throughout the City
Category: B — Preventive Maintenance
Status: Unfunded
Current Budget: Budgetary Estimate - $2,250,000
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: Neutral
2011 -12 Recommended Budget Action:
Project was added to the Unfunded List as a result of Council discussion
on June 15, 2011
Page 5'7 of 58
Traffic Management Studies - 3 Intersections
•
Current Scope: Study the impacts of altering or removing traffic dividing features at the
intersections of Stevens Creek /Tantau, Stevens Creek /Vista, and Kim
Street between Bollinger and Kirwin.
Category: A — Public Safety
Status: Unfunded
Current Budget: Budgetary Estimate - $50K
Spent to Date: 0
Current Balance: 0
Schedule: TBD
Maintenance: n/a
2011 -12 Recommended Budget Action:
Project was added to the Unfunded List as a result of Council discussion
on June 15, 2011.
Page 58 of 58
l
Cupertino Chamber of Commerce
Your Partner in Silicon 'Valley
Cupertino Chamber of Commerce
20455 Silverado Ave.
Cupertino, CA 95014
Phone: 408.252.7054 Fax: 408.252.0638
FAX -FAX- FAX -FA.X- FAX -FAX- FAX - FAX -FA.X -FAX- FAX - FAX -FAX -FAX- FAX -FAX -FAX
To: " t � V 9
Fax Number: ( itoco 117 - 3 3 (0 G,
From: 1 Faksuviir +) , C v r A o Cir1avr kr 0C Coo pie ice
Date: Ql Z! / So
# Of Pages: 3 (Including cover)
v Io jc c) M, ' C � j Coo vsc.;1 . -i -t 3u 1_
teckse pro.,; de pi eo.Gl CoL. Member
Tor hvt 5 f Zt. /It) C; C n�nci -)-inU. The
0110 iNq dO(dG YITA rovi c.. a -Hie 5er Vice
e-r ,or me-8 b a-I�e Cln��i r Commierc-C
Ci- C„ per -kno ALS o � clucte cA l o-F
r o q rot vlr, 5 -14e C, 4-� C u f � r ip.o c� � +he
C weber c)--P Comm ice ?o-r 4-ne
36 --her v
80 /T0 39tid J38WVH3 ONIld3dflD 8890ZSZ80tT 8Z:ST TTOZ /TZ /90
C Cupertino Chamber of Commerce
w � T
Your Partner in Silicon Valley
Services Performed and Collateral Distributed for
the City of Cupertino
dl c I P !J fib'', �I :i} i, _.. "
i
,v. � `�i d' � i i qq r` v � II �..` r t Li �,1i19i111 i � r
W71 V ;.. � +dJ V �� t�',� ti' L �lR �' V J t'� �� � LL �iJ tl �
.� .1.,,...
Package Individual Package • $2.90 1000
g $2,900
Cost of Materials $3.10 1000 $3,100
Postage $2.41 1000 $2,410
Labor (70 hours @ $1,750
$25 /hour for putting
together package)
'Community Guide and Staff Cost (80 hours @ $2,000
Ro siness Directory 25 /hour for compilation
of information)
Staff Cost (20 hours @ $500
$25 /hour for design and
layout)
Support for Inquiries Staff Cost (Based Qn $6,250
approximately 3000
inquires from walk - in,
phone, email and mail at
5 minutes per contact @
25/hour)
Cupertino Map Individual Map $1.00 12,500 $12,500
Dining Guide Individual Dining Guide $1.00 2,000 $2,000
Approximate Cost of Collateral & Services $33,410
Staff time given for committee meetings, city held meetings, community driven
events and programs have not been included in the above breakdown.
CO/Z0 3Ddd ammm0 ONIIi3df0 8E90Z9Z8OtI 8Z:ST TTOZ /tZ /90
_. Cupertino Chamber of Commerce
"' ' .-6 Your Partner in Silicon Valley
City of Cupertino and Chamber of Commerce
Partnership Programs .
Cupertino Restaurant and Hotel Association
Cupertino An association of Restaurants and Hotels that collaborates on
DinIrg
Guide ways to work with the City to encourage tourism and recreation
in Cupertino.
7i0Pr4 ( _.
Annual State of the City Luncheon
4'' (' ' Ca- hosted with the Cupertino Rotary Club, City of Cupertino
`y' • and Chamber of Commerce to provide a forum for the newly
'' I elected mayor to outline his goals and objectives for the
CUP upcoming year
y Mandarin Business Seminar
' _ Free seminar offered in Mandarin, the official language of
..2...,--- yr-- - China and Taiwan, that teaches new inunigrants how to start
, .,';? `_ and run a business
Shop Cupertino
Shop Cupertino is program being developed that is designed to encourage new retail
businesses into Cupertino as well as encourage the community to shop at Cupertino
businesses. The goals of this program are to increase sales tax revenue and the success of
Cupertino businesses.
EO/EO 39 d 03gNdH0 ONIeedf10 8E9035Z8a1T 8Z :5T TTOZ /TZ /90
c.c 021 h e,-) do -1-4-'e,t,
Rio
Karen B. Guerin
From: betsy dougherty [betzd @pacbell.nat]
Sent: Tuesday, June 21, 2011 3:16 PM
To: City Council
Subject: Cupertino Dog Park
There was a brief article in the news recently that too much toxic waste rendered the site
along Mary Avenue unsuitable for a dog park. Is there a new site in the works? After all
those years of meetings and research it would be sad to not only see that come to nothing but
still be one of the few cities in the bay area without somewhere to exercise our family pets.
The recommendation still seems to be for Cupertino dog owners to visit neighboring cities dog
parks. My neighbors and I hope that the money that was voted on by the city council to be
allocated for a dog park will someday (soon ?) be spent for that purpose.
Thank you,
Elizabeth Dougherty
Cupertino Resident
1
(p (- 4 /
U fa
PUBLIC WORKS DEPARTMENT
CITY HALL
<4, j �9s4, 10300 TORRE AVENUE CUPERTINO, CA 95014 -3255
TELEPHONE: (408) 777 -3354 www.cupertino.org
CUPERTINO
CITY COUNCIL STAFF REPORT
Meeting: June 21, 2011
Subject
Proposed FY 11/12 Capital Improvement Program.
Recommended Action
Approve the proposed FY 11/12 Capital Improvement Program.
Discussion
Attached are the CIP status report, the FY 1 l/12 CIP recommendations, including staff
recommendations on priorities, funding alternatives, and potential new projects. The report is
inclusive of all currently budgeted CIP projects as well as Unfunded Projects and some potential
new projects. A great deal of information is included in this report so that Council will be able to
understand the feasible alternatives to staff's recommendations.
Based on the City Council discussion at the CIP Study Session on June 15, 2011, we have
made the following changes to this version of this document:
Report Format
• All Completed Projects have been removed.
• A new section has been included to track projects proposed to be funded exclusively
with development in -lieu contributions.
• Budget Clarification — The report now differentiates between the Current Budget, what
has been Spent to Date, and the Current Balance.
• Some additional scope or history has been included for various projects to address
some of the questions from the Study Session.
A Proposed Five -Year Capital Improvement Program (Three Year) budget sheet, prepared by
Finance, showing proposed funded projects, fund balances, and reserves, is attached to this Staff
Report.
New Projects Proposed for Funding
• Various Minor Intersection Traffic Signal Battery Backup System (proposed
remaining intersections are now included in report)
• Pavement Management — Recurs Annually
• Curbs, Gutter, and Sidewalk Repair & ADA Ramps — Recurs Annually
• Civic Center Master Plan
• Electric Vehicle Charging Stations
Removed from the CIP Report based on Study Session discussion and straw vote (note: the
Council may still want to revisit these but they are excluded from report at this time.
• AM Radio Station Antenna and Transmitter Location
• CH Generator Connection
• Skate Park
• McClellan Ranch Environmental Education Facility — Delete project but included
scope in proposed Unfunded McClellan Ranch /Simms Master Plan.
• Library Parking — Delete project, but direct $50,000 towards Stevens Creek Corridor
Park Phase 2 and fund Civic Center Master Plan with remaining $50,000, with parking
being an element of the proposed plan.
• Photovoltaic System & Car Port at Corp Yard
• Rancho Rinconada Street Study
• Simms Property — Remove from Unfunded List and include in the newly named, but
Unfunded, McClellan Ranch /Simms Master Plan
• Additional Tennis Court Lighting
Project Proposed for Deferral, Scope and Funding Adjustments or Moving to Unfunded List
• Temporary Dog Park- Mary Avenue — Since the project is now approximately
$125,000 short due to soil remediation needs, it is recommended to be moved to the
Unfunded List. The Mary Avenue designation is also removed with the potential to
identify an alternate location in the future.
• Service Center Tool Crib — Move to Unfunded List.
• • Blackberry Golf Pro -Shop Upgrades — Recommend moving to Unfunded List until end
of Blue Pheasant lease.
• Sports Center Sports Court — This project is proposed to be renamed Sports Center —
Court, Pool or Gym Study and carried on the Unfunded List until a survey on whether
residents would like the ultimate replacernent of the existing pool to be another pool, a
sports court, or a covered gymnasium for activities like badminton.
• Wilson Park Irrigation System Renovation
• Blacksmith Shop Relocation — Moved to Unfunded List. Staff recommends
incorporating scope into McClellan Ranch/Simms Master Plan
New Projects Proposed for inclusion on Unfunded List
• Blackberry Golf Course Master Plan
• McClellan Ranch /Simms Master Plan
• Linda Vista Pond Improvements (alternative scopes and budgets now included in
report)
• Tri- School Area Sidewalk Project
• Sports Center Tennis Court Retaining Wall
• Various City -wide Bicycle Plan Implementation
• Pavement Management Gap Funding — This is the amount Unfunded from the
necessary investment to maintain current average Pavement Condition Index (PCI)
• Traffic Management Studies at 3 Intersections — Stevens Creek/Tantau, Stevens
Creek/Vista, and Kim Street between Bollinger and Kirwin.
Projects with More Information Included
• Stevens Creek Trail to Bay — Multi -City Collaboration is described.
• Stevens Creek Trail Bridge over UPPR — vehicle bridge reuirement
• Various Minor Intersection Traffic Signal Battery Backup — Intersections are included.
• Various Park Path and Parking Lot Repairs and Resurfacing — Order of Magnitude
Estimate included for some replacement of asphalt paths with softer running surfaces.
This is not recommended since these paths also need to carry maintenance vehicles.
• Various Traffic Signal /Intersection Modifications- examples of the types of projects
are now included.
Prepared by: Timm Borden, Director of Public Works
Approved for Submission by: David W. Knapp, City Manager
Attachments: FY 11 -12 CIP Status Report (6.15.1 1) — Issued Separately
CIP Summary of Staff Recommendations
CIP Reserve Balances
o
`o 2 to m v
-- a E s « -c
--- E c c c
V V C
' c j > i O O c • L ° '
`' V = . N C CO y -C: O ' N o ' w
O 0p N S 0 y
C C N i e . O 06 O
u Y 0 CO3 00 .c ' p u E 9 0
f0 V i0 (Y) L 'N
p d N N C M 0 O °• 0 1 . -
L .� a 8 0
• al ( .,) C 0 0 a, C 2 m
d .0 w f1 00 N in. 03 c 0 n
` u ,,...7,
3 000 c) ^ ' m c 1,1
o
c
a co
V II d A L -p L al
C U N u a) a/ . . 1
J N N X C C C C C f' GO U 0 0 c c 0
' Q 0) 0 0 0 0 u j0 10 N 0 O y ,, = O N
E O O 0 0 0 0 0 �7 O N . � ` - p (0 C
U Y • > 0 N N N N N } t Y u c a) VT N m � u, N
N +' O C C C C C f' 1d O C C
CC O '~ . p' c 0 0 0 0 0 0 0 a - (O w 7 0 0 . 0 N 0
VI. ."I 0 m U U U U U U L 0 N U y L 0 0
c o a 8 CA. ai S QS 02S aiS o $ of c ° c N °� CO N v
C A O 0 H • 0 DO C M 0 C M t 0 LL o O .\-I .00 U 0) O O N 0
CO 0 U - p N Ui LL c N N • N N = U .--I L L
E n l.7 O N a) 0) a) 0) dl K
v u v v' v v o 0 0 0 o c) LL m u ai N o o • 3 0 0 °
a) E E a) a) a) a) a) a) a) 0) ) O0 O a) a) Y t, CU 0)
• c c c c c c c � � ui c > 8 c c CO .1.7, c 0 E
u n 'O "O a - 0 -0 00 - ':
O N C y C C C C C C C C 0 ,. C ` .0 U _c 0 p .0 C C c o
Q
Y 0 N a 0 0 U) O 0 0 0 0 0 0 0 N 0 in U 0 O O 0 O ro
LL _ LL LL LL n U U U U U U , U 00 U U Z V U U 00 0_
4"
.L
O N N N N N N .-1 N N N .--1 N N N N N N N M V
C
0 U
RI U ao Q m m CO Q 00 CO Q Q CO < < < u 00 < CO CO u u
Q
C pp
0 O O 0 0
E 0 O 0 0 0
d E 4 .: 0 v V) V 0
c H VT VT N N VT
U W e-Z VT
N w VT
'i ce e-1
rl (0 VI
CL/ p o m p 8 0 N 4- C 0 0 0 0 0 N 00 �D 0 N 0 a1 0 O O 0 ri
o RI c OO
N 0 O M 0 .-.4
N (.0 O VT M m N 0 N 00 0
CO m \ C . 0 in. VT V 1//T .4./1. V). N VT
0 N v im ). N l � L +^ > E
E LL v. iv i� 0 u_
cG
(...7 u_ io MccW Woo ).
E
7 pp m 0 .- N M La n o0 a, 0 .-1 N M In i.0 r 00 m .-1 m ut
H d e -I .--1 .--1 .--1 r-1 L-1 e-1 e-I N N N N N N N N N m en M
e•1
.•-I
0
N
N
0. n 00
E c
u cc 0 ro
00
ca Q 0
. 0 N N N N
0)
< CO 0 v v
@ a)
(0 of (0 0q LL
0O - u, U
N '� N C n N
E
4.1 .-I v n v U O 0 O
on C O V) 1-1 Y a) 00 cc N V)
Z U (0 N (6 C «. N n c c p
4.. . 3 c E '� 1 (0 D 0 ar 0 O - 0 0
E CO 0) > a 0 ° LA to 2' Y
• O c CO v n n on i u a) n CO C
C 0 00 C pO (0 C i N (0 (0 0. ` D - 0 0O DO
CI- c ', (a (0 C C7 a_ no H c . 0 a` U • C E in
a N (a '^ oO p (S 0 E c _ Q V, 6 w ° ( o > E
III v 2 V, i E a - 0 a ° `L 3 E
L c co > > E
• c E u n c A 0 0 °) c o E` v v fO 8
`o
.--1 a ) N > A a) C 0
o° _ c u m. • v u 2 u c v Z
N a N - U V 0 > v N E N 01 N c aJ N E E q>
u ° E(0 (0 (O v m° c a ° m v -0 °
_ ° ,,
N u O 01 C V N c U N O U > U C C j U Y j Y j C
.n w 0 u 0 0) CO 0 (o 0 0
CU > ( 0 > C C N a ) f( 2 2 E (O ( 0 0 O f0 m w
c v > 1n < < . w 1n w > (n ( m > C7 2 w m > in 2 1 "
c
ci .--I N M V V) l0 1� 00 al O ." 1 N M [r V) l0 1.. 0O al O .--I , c E
CU Z . - I .--1 .--I .--1 .--I .--I .-I e-1 e•-1 '-1 N N - y
d u f
L. co
N
. 3am,;
L c c o
v
`o m a
n E « -c
00 E
c ` o . 8 -2
c '>
,o o
I
.._1 a N 0 E m
_ _ O
a) = .�. _ c v 3 a) of .r E 9 c
U ,o 0 c a 0 01 10
7 A ra O Y •.,
C c c 0) O O m` _
d c v, 0 0 O
C ▪ C c N N .n ra a)
.- v, .n . ' y, .n Z m
o o 0 0 C J C n' 2 V' O = 0 0 0 0 0 0 n
O E E O O O N '.� f° H Li H H `/ u, u,
,a CO •N • N a a) a v 0.1 p p p p p
.47. C C 0) aJ 0 0) f0 •C 00 U = — = — =
°� ' u ° aJ > > u o c _0 0
c c c V C C
C 0_ g "0 C U 07 0 C > 0 0 0 0
Q! • al ,0 0 au 0 0_ '5 E N 0 0 O 0 0
E -, . ' „ > c in a n v 1 v ° fl U
E c c E o ' " s Y o 0 '" i �� 'i ti
✓ 0 0 N '� lD � 0J l0 E _ u (5 V1 V1 Vl V1 0 V1 Vl
N U U a N C 00 C O > 00 -o 00 . -1 r-1 .-I C N .--1
Ce C C U 0 0 C U 0 N C • '" 'a l0 l0 l0 a1 „ l0 • l0
4- w aa)i y , . 0 v c 0 (0 • - • 0 v 2) 5) 0 c 03 v w
V Y O Q ra w - N C N ai ai u0 Y al > a/ a/ ai ai 'O - O - o 51' E o -o
L L v Z' v ,o 1 ,,, o 110 E '47 To �• .E E Y
1 w w V-. ° w .:
7 7 w 2 H C 0 �Oi, > H ,n C N N H H 0 u, 0 . d D D
l] .D u N a a) ••O a 0.1 Q . 4-, To._ 4. E R Y N Y Y 0 0 0 C 0 O
co coo v> o E n o f i0 m i0 io 03 1.0 m v v v v c - o a
00 00 U 0 - o w n o c c c U c c u L c C C c > > >> 0 > >
o
E N N o N a) O 0 0 0 aJ 0 o cu N 0 0 0 0 0 0 0 u O o 0
a a cc ac z 0 z z z z v, = a
r
C
O
0 'C
c a
o '
CO u U U U U U m Q CO U U U U U< m U 00 0a m U CO Q
C
E 0 0 0 0 0 0 0 0 0 00 0 0 oo O 0 0 0 0 ' oo 0
Q E �, o 0 0 11 1 o p o 0 o p p p o 0 o (2 ,
0 0
o ,n ,n n 0 0 0 0 m ,n v u-) ,n
V U W 411. L-I tn. ni i/T 0 H N V1 O VI H Ca °3 a3 H H N .-� N H N v)
V1 in in L in
N W in in in in
P'I
� N
i1 (0
N Vf
i h
n
f0 in an 0
f0 CO > > in
0 0 Li-
cc
E .
H d l0 I 01 0 .--1 N CO a V1 l0 n N M V V
00 01 0 . 1 l0 N. CO
M M M a' V 47 tt Cr V Cr V Cr 1.I1 1/1 V1 Vl 1n 1/1 1.0 111 1/1
vn
0)
L
CO
00
0_
C 025
O >,
00 U
c0 C 0
U
V L C O N
00 E N
J C C
O
_ > O
GJ i O .c c f c o w u
E 7' O T - 3 N
c C c = • 0C E CO N 13 `,
(0 00 y C .n CO a) T. 0 0 10 a _C >> N C al
Z 01 "0 ,o a) 0. "0 0 LL >, _ C O ' a C > c —
y , ,0 d a 0 i N , C N '� E o al U C
L' 0 CO u L OC 0
LI Gl u °) + � 0. ^ OC ° v1 " > v o ac a ut E p m
0p O us
O a °— CO u C 0 � , Z O , E a t a t N o C7 v
a
a o v r E o Q m o -o o m, >. a `n n. c ;
na N Y E N Y m 0. 3 N u 0 c 1.1 . a) to E
N 0 ' A N E a) .0 tb R O 0 E c
u- 0_ o Z CO m a 'f c a/ m C p o b aJ E
2 cC 00 w w u a Y H E H c ,e I v v u • oo ' . c E 8
0 v 3 W p l7 l7 z y a v v v °' Q a) >� C Y C .. .. C N a.
.• 1 CO y Z Z c 174 • cJ U U 2 o v v c v ar y c ,°�
O N R V 1 0 N G/ 'f0 — C u of o .n H O U • y� a U U cu o >
N C .0 0. Y Y N = Y v a) N , ' 0 ' of V 0 a) C N E V c m
N Q u u U u > Y > N 0 U v, L'' v fk
01 0) o N CO CO U N _ O N 0.) c •- G . , a " N d f co W
C O Z H m m 2 U N J V1 H V1 -J I VI > .C> V) N a H • U
o
Q N M V V1 l0 IN 00 01 O . N m 010101010101.7 Li1 l0 I. 00 01 O . N M w e
2 Z N N N N N N N N M M M m a Cr Q
w ,_, ▪ f
D. m E c
`) m a a w
CL
3a,nu
CC- (0 40 1 /II
to
Proposed Five -Year CIP Budget Savings and Increases By Funding Sources (i.e. Funds); With CIP Reserve Balance
6/21/11 Public Hearing
(Project budgets listed horizontally; funds listed vertically; beginning reserves at top; ending reserves at bottom)
(Three years of proposed projects and activity FY 2011 -12 through FY 2013 -14)
General
Fund CIP Park Transporta-
Reserves Recreation BBF Golf Dedication tion
Beginning CIP Reserves 2010 -11 per Fund Balance Trends '106,000 450,000 241,000 591,000 4,00(
Net Revenues - 1,100,000 13,000 1,720,000 4,497,00(
Utility User Tax Reserve 534,000
Stevens Creek Corridor Park Phase 2 Grant
Pavement Management STP -CMAQ Grant
Rancho Rinconada Street Study
Reserves + Revenues (A) 640,000 1,550,000 254,000 2,311,000 4,501,00(
Proposed Capital Project Savings
Completed Projects:
Park Tennis Court Resurfacing 112,700
Sterling Barnhart Park 76,500 (1)
Stevens Creek Corridor Park Phase 1 57,000 (1)
Library Fountain 115,200 (1)
McClellan Ranch (Park) Building Improvements 24,120
McClellan Ranch Facilities Improvements 154,220 (1)
Quinlan Center Trellis 3,700 (1)
Service Center Security Gate 25,180 (1)
Traffic Signal Battery Backup System 825 (1)
Monta Vista Recreation Center Floor Cabinet 4,650
Street Lights & Irrigation Conservation 143,780
Current Project Reductions /Change:
BBF Infrastructure Upgrade 115,000 (1)
Stocklmeir Orchard Irrigation (change to Recreation) 50,000 (1) (50,000)
Library Parking 100,000 (2)
City Hall Emergency Generator 47,375 (1)
AM Radio Station Antenna Relocation 80,000 (1)
Service Center Tool Crib 40,000
Temporary Dog Park 207,000 (1)
McClellan Ranch Environmental Education Facility 200,000
Wilson Park Irrigation System Renovation 150,000
McClellan Ranch Blacksmith Shop 230,000
Rancho Rinconada Street Study
CIP Savings Total (B) 1,388,780 474,350 - 24,120 -
Proposed CIP Increases FY 2011 -12 thru 2013 -14
Stevens Creek Corridor Park Phase 2 (FY12 & 13) (855,000) (207,000) (650,000)
Stocklmeir Legacy Farm (FY13 & 14) (450,000) (3)
Lawrence & Mitty Park Land Purchase (FY 13) (1,300,000)
Quinlan Interior Upgrades (FY 12 & 13) (400,000)
Pavement Management (3,750,00(
Curb, Gutter Sidewalk Repairs & ADA Ramps (665,00(
Pavement Management STP -CMAQ (74,00(
Var. Minor Intersection Traffic Signal Battery Backup (45,000)
Civic Center Master Plan (50,000)
Electric Vehicle Charging Station (30,000)
CIP Increases Total (C) (980,000) (1,057,000) - (1,950,000) (4,489,00(
�
"" it... 00000000000000 0
(; J M 03 0 0 0 L() (O 0 0 0 0 0 0 0 CO
0)0O0000v ' N-
N Mtn O tn (o(Otri ,- MO1.61. O co
, M N- O N- M N st f- N O N M 03 M
`J _ 00 - N N (0 N • 0
N M
U
I-
C.-.1 N 000 to O OO to
L o to O r- O O 0 N
O 0 0 0 M 0 0 0 , :t
uJ C 0) r- N N 03 40 00
c •D
N C r
i U L
0 0
0
O o 0 0
N
L_ co co
03
03
o O
0 O o
0
co La o
N r-
0
(I)
CC
0 0 0000(0 O to
M O O to (O O N 0 (O
a. uJ O) O O 03 0 •,- 0 CO
CD 00 O to (O (O to ( f .N
@ U a) M O f- N N � (0 r-
C -
C a) c C V)
0 LL CC
u)
a)
0) 23_ 0
.0 U )
Q
' N
f9 a *5
a) C c 0 0)
Q' O c O Il C
a) U N 0 N Q)
N C 3
f%) ,_ ._ O vw 0 J
c „
CO C Q O U O O,, as
t a) 2 'c
r.. LL u)
.— _' C C N N O 0)
d C7 •E« C O O P2 c C a)
•0 `•• O N O d J a) C O_ V) �n a)
7 N 'D .. CI-
@ � a) o2 Cd (0 (
m ` > u) a) 0 .. C o U o) C 0)
0 ' C7 . 0 O ." U (0 c co N- F C Cr) "0
z 0 0 O ( . - 0- a) m as w e
U) C O 0 c a) n 05 C= .` d 't m O
' C L 0 E . D L _ 0) - C 7> 0O
3 C 003 (/) (n 0 N C C is (n C 3 h f0 a) N N
.N+ a S o p c as d c o is a) iY
v c (/) m >- ' m (a OU - 0
c L � aa )) as E CK > `m c CK `m U 0 ( ,.' 0) a ).% M m o> o m a u) ti m a) o m u, ai c
c
.6 CO d m CE al O rn 0 7 N (� (D N a t- • N
C Z C c o a)• ° ° ° c m
tN 0
0 (n 2W >>2wmO >z
O cfl 0
CC
lfi j 0
Grace Schmidt
From: Shabbir Nomanbhoy [nomanbhoys@hotmail.com]
Sent: Tuesday, June 21, 2011 2:58 PM
To: City Council; City Clerk; David Knapo
Cc: Mark Santoro
Subject: linda vista ponds
Gentlemen
We understand that this issue will come up before the city council today. We request that the Linda Vista ponds be fixed
and maintained. The ponds are a significant feature of Inda vista park, and we four cupertino residents and voters
request that budget be allocated for their restoration. It is surprising that new projects costing millions of dollars are
undertaken in our fair city, while maintenance and repair of the city's exisiting assets are not approved.
Sincerely,
Shabbir, Munira, Insiyah and Sarrah Nomanbhoy
Phone: 1- 408 - 996 -8786
Email: Nomanbhoys@ Hotmail.com
Address: 11254 Mt. Crest Place,
Cupertino, CA 95014, USA
1
CC (-Z t I1
4 ±, fo
Karen B. Guerin
From: jer2574 @fhda.edu
Sent: Tuesday, June 21, 2011 1:32 PM
To: Barry Chang
Subject: Euphrat, Cupertino, budget, auction -
Hi Barry,
Hope all is going well for you.
I will try to be by at some point tonight for the final budget hearing, however it may be for
a short time. Or maybe it will be Diana Argabrite.
We are all working around the clock on our Benefit Auction for the Euphrat to raise more
money. Since artwork and other items are still coming in, we will probably still be
installing tomorrow. Thursday afternoon there will be a press- conference with Chinese -
language newspapers and others.
Connie Young Yu and Jianhua Shu have been assembling some wonderful artworks. Other members
of our Council have been very involved also.
I hope you can attend the auction and /or the preview days beforehand.
Lots of excitement.
Let me know if you have any last minute questions, regarding the Euphrat.
We have appreciated the good sentiments that you have expressed towards the Euphrat. We
value our relationship with the City.
Thank you for all.
Best,
Jan
Jan Rindfleisch
Executive Director
Euphrat Museum of Art
De Anza College
Cupertino, CA 95014
http:// www.deanza /edu /inthemuseum.html
1
CG 6 6. i /ii
SID
Grace Schmidt
From: Grace Schmidt
Sent: Tuesday, June 21, 2011 1:29 PM
To: Grace Schmidt
Subject: Support for Linda Rios
Original Message
From: Textor Debbie <Textor Debbie @cusdk8.org>
To: Carol Atwood
Sent: Tue Jun 21 11:27 :20 2011
Subject: Support for Linda Rios
Hi Carol,
This letter is sent in support of Linda Rios and her position in the Cupertino Union School District.
Linda has worked with CUSD and our families for many years in a couple of different capacities. She
knows our families and their histories and this information along with her background in probation allows
her to provide unique support to our students. When we are working with a student in the area of
discipline or truancy, Linda's input is invaluable to each child's success. She is a liaison between CUSD
and many outside agencies, including our local police. In this capacity she is able to provide amazing
support and resources to our families. Additionally, she attends our regular Student Attendance Review
Board (SARB) meetings to offer strategies to our fan lies who are having difficulty getting their
children to school.
CUSD values our partnership with the City of Cupertino which allows the district to be proactive in our
solutions for children and families who need assistance for success. If you need more information from
me about Linda's position and the positive value that she adds, please don't hesitate to contact me at
(408) 252 -3000, ext 116.
Debbie Textor
Director, Pupil Services
Cupertino Union School District
1
c ((21 /if 4ti
MMOMOMMEMI o�MOUNJ,�j�,
�,� CITY OF MOUNTAIN VIEW
Office of the Mayor and City Council • 500 Castro Street • Post Office Box 7540 • Mountain View, California 94039 -7540
650- 903 -6305 • FAX 650 - 903 -6039
May 31, 2011
The Honorable Gilbert Wong, Mayor
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
Dear Mayor Wong:
The City of Mountain View is grateful for tl financial contribution to Deer Hollow
Farm provided by the City of Cupertino in Fiscal Year 2010 -11. I am writing in support
of the upcoming budget recommendation pat forth by City Manager David Knapp to
contribute $5,000 toward the operational expenses of Deer Hollow Farm for Fiscal
Year 2011 -12.
It is rewarding to know that the City of Cupertino views Deer Hollow Farm as an
important and unique outdoor educational facility which serves residents throughout
Santa Clara County.
Thank you for your consideration of support to Deer Hollow Farm.
Sincerely,
c Siege
ayor
JS /RM /6 /CSD
234- 05- 31- 11L -E^
cc: Mr. David Knapp
Recycled Paper