Loading...
11-097 Letter Agreement, Alex Tsai, Concrete Retaining Wall at Blackberry Farm 1 PUBLIC WORKS DEF'ARTMENT Timm Borden, Director '9` CITY HALL 10300 TORRE AVENUE — CUPERTINO, CA 95014 -3266 CUPERTINO (408) 777 -3354 — FAX (408) 777 -3333 September 15, 2011 LETTER AGREEMENT between Alex Tsai and the City of Cupertino Concrete Retaining Wa11 at Blackberry Farm This Letter Agreement formally establishes points of agreement between Alex Tsai, hereinafter referred to as Resident, and the City of Cupertino, hereinafter referred to as City, regarding the construction of a concrete retaining wall at the Black Berry Farm maintenance yard. This connection concept was discussed and informally agreed to by both City and Resident several years earlier when City contributed funding to Resident's retaining wall. 1. Resident agrees that City may construct the new concrete retaining wall in accordance with the design documents, attached for reference, which were prepared by City's structural engineer, AKH (Tim Hyde) and made a part of the Bid Documents for the Blackberry Farm Infrastructure Upgrade project. 2. Resident further agrees to allow the retaining wall to encroach onto Resident's property approximately ten (10) inches to enable the wall to be physically connected to Resident's existing concrete retaining wall. 3. Resident further agrees that the City's new concrete retaining wall will be allowed to be physically connected to Resident's existing concrete retaining wall by use of steel dowels, as shown on City's structural documents. Resident and City both agree that this connection is mutually beneficial because it allows the City's new retaining wall to be constructed without disrupting Resident's retaining wall "end wall pier ". This "end wall pier" is structurally essential to the end wall of both the Resident's and City's retaining walls. 4. Both City and Resident agree that a physical :onnection of the two retaining walls will also prevent erosion of both Resident's and City's property, both of which are immediately behind the retaining connection point. ACKNOWLEDGEMENT and ACCEPTANCE ate: ` 3 :7 Z / Timm Borden, irector of Public Works ■••11 City Hall Ie: /. r'71 10300 Torre Avenue Alex Tsai, ' esident Cupertino, Ca. 95014 21975 San Fernando Ave. Cupertino, Ca. 95014 408 - 525 -2481 r Date: $ B Kimberly Smith, City Clerk City Hall 10300 Torre Avenue Cupertino, Ca. 95014 END