Loading...
11090020 - SI, evCTVT CC ENGINEER YU JAR CHEN, S.E. JNB ,Associates 4066o Robin Street Fremont, CA 94538 STRUCTURAL OBSERVATION REPORT Date Job Number Page Number Date: February 10, 2012 Project: Residence Addition 18791 Arata Way Cupertino, CA 95014 To whom it may concern, IFIL At the request of Mr. C.H. Shek, I performed a structural observation on this single -story wood framed house at 18791 Arata Way, Cupertino. Based on my observation, I certify that the as -built structural framing and shear walls are in general conformance with the approved plans. The existing exterior walls were covered first by one layer of exterior graded plywood panel approximately 1 /z" thick; and then in year 2005, another layer of (3) coats, 7/8" thick Portland Cement Plaster (Stucco) was applied over the plywood panel. Existing plywood siding was fastened to the studs with 10d nails spaced at 6" on center at edges and at 12" on center at field, in according to industry standard practice. This would satisfy the requirement specified on the approved plan sheet #2. In addition, the stucco finish also adds shear strength to exterior walls. The facts that by cement plaster wall covering (Stucco) alone would have satisfied "Brace Wall" requirement because there are more than 12 feet of net wall length on all sides, subtracting the openings. (Reference: CBC sections 2308.12.4 and Table 2308.12.4.) If you have questions regarding this report, please contact me at (510) 687 -0939. Sincerely, Yu-Jar Chen, SE 2762 oQROVESS /0�9 l a No. 2762 Exp.09/30/13 S� sTRUCT�IRP� �� ,or CA1-1F��� Tel /Fax 51o.687.0939 yujarchen@hotmail.com