08090120 CITY OF CUPERTINO gea..n,ra,�w: a:: P""-•.a - ,;r .--" ---
BUILDING DIVISION PERMIT -CONTRACTOR.INFORMATTON.`,
PERMIT BUILDII/G,( TEShRIANA AVE INTEGRITY ROOFING 08090120
•NEWS NAME: FERhIIT CSUEDATE
JUDITH & JOHN WEST 6820 MOSELLE DR 09/18/2008
PHONE (408) 225-9263 SANITARY Nth, CONTROL NO
ARCHPIEC fENGtNEER: BUILDING PERMIT INFO
BLDG ELECT PLUMB MECH
U05 LICENSEDCONTRALIURs UbLIdRAUDN O O O
u 1 hereby affirm Nat 1 em thermal under pmdGOrm of Chs w 9(commcaing lob Description
nz1 1^sSecuaa o fDhision3aftheBusiaaandProfessiowCode.andmylicense is RE-RF RMV SHK INSTL 7/16 OSB SHTHNG INSTL
>'y.i LieenaClm Lk.x �Y-iJ CERTAINTEED PRES TL SHNGLS CLS A SOSQ
n F p Dak ConlrsClw f
7W ARCHRECI'S DEC
lundeesund my pilots NWl the used apublic records r
y�tn IrcenuJ Prnlcsuewl
03 OWNER-BUILDER DECLARATION
a��f I Wrathy aRrm that 1 am exempt fmm the Contractors License Law for the
O O following touod.(second 71313,Busiruu and Prn(essiow Cede:Any city or manly I
Io� which mquirns a Permit to comas ,eller,mprow,coolish.or¢pair any someone
-Z< poor w is issuance.alto mauves Nee applicant for such permit to file a signed Mtemenl
�O
chat the U licensed parraant to the pmviaiow of the Connector's finnan Law(Chapter 9 . Sq.Ft. Floor Area Valuation
P2 (commcamg ants Swoon]DOB)ofDimian 3 of dui Business and Professions Code)or i $31390
lt, $ Wl he is exempt Urrefmm and the Weis for the alleged commuter.Any violaua of
section 7031.5 by any appllwnt for a permit sublimes the applicant to a civil Penalty O
ot mom had firm handled dollars($5M 1 32620051 Number Occupancy Type
I,as owner of the pmputy,or my employees wits cages as u1sm ale ammptuili
will do the work.and the smamum is not incurred or cliental for sale(sec.7016.Bunn
and Pmfrsslow Code:That coneramYs I aeonsc law dos rot apply in an Owner of Required Inspections
progeny who builds orimprows thamon,and who dassuch wwkhimulf wthrough his
awn cmploym,proNdod Nat such impedwmenu art nutinundN aoRcmd forak.B,
however,the holding or impmvemest is sold anNin One Year of ampkoon.the morn
builder will lure the burden of proving that k did rot build in improae for purpone of
ak.).
❑I.all Owner M Um pmpeny,am eaclusivety contracting with licensed interactions in
cummct the pm)eet(See.Iliad,Business and Pmkadow COdat:)The Contractors U.
awe Law does not pply to an owner of Property who Wilds or improve thereon,and
who come cu for such prejecu wish a com actorls)licensed pursuant us the Contiacmes
Liceme Law.
❑I am esempa under See .B A P C for this mason
Oner Dam
WORKER'S COMPENSATION DECLAR-11ON
1 hereby affirm under penalty of perjury one of the following dalentirw:
Qlluw andwill mardWna Cartif teofConummCode,four fa Wwtemmed of the
winos,ur provided for by Section
isca 1100 Of the labor Code.fns the perfomena of ear
wank fns which cos permit u tsstud.
❑1 have and will maintain Wwkcrs Compenraton Insurance,in required by semen
37W of the tabor Code.fur the performance Of ft wank for which this permit u imm l
My Workers Compensation Ina`�f m tidier and Policy number art
:
Caller.$Tqr{ I n 7f Policy No.: Ci '�O t
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
Cnt9acUm need not he completed if the permit is forme hundieddoBars($100)
or Ism.)
1 comfy Net in the perromenm of the work for which this pemit u wood.l shell not
employ any Pared.m any manner a as m become abjeet m the workvY Compwaim
Laws of California Du-
Appfio i
NOTICE M APPLICANT:If.afar making his Cemficate of Exemption,you should
biome subject M the Workers Compensation i m,i darl of the labor Code.you mew
.,z fonhwrW comply with such provinow in the permit"I bee doomed mdk
r` CONSTRUCTION LENDING AGENCY
f-' Ihereby iii that di=m is a comtmnfm lending agent'for the perfomaec of
Ri„�„ Ne work fns which Thu Permit is wad(See 3097,Civ.C.) -
es Name
.7 z �Lermcrs Ail—•
U O 1 cndfy that I have read Ws application W sack that the above inf.,old is I
ty L., comm I agree to comply wits all city and county Ordinances and sou laws miming to
C >, building cmuaucuon,and hemby mthonre repreunuum of this city to tour upon use
ahwerequan eO the ProlanY.fm inspection purposes
tf'r d (We).,ere b ate,indemnify and keep hamkss Uu City Of Cupertino against
to IabillumJudgmmu,coll and capcww which may in-1—1 a auc against sad City
U z in APPLICANT of the RraAN of Nu D WTI. IJ��
t^ APPLICANT UNDER ANDS AND/WILL Y WITH ALL NON-POINT I Issued by: Date Y
Re-roofs Q
Mm of AppiflEarak'6mractor Data
HAZARDOUSMATERIALSDISCLDSURE Type of Roof
"— Will the applicants m future building ORtrpanL Mm a handle hamdow maunel G
as 40ned by the Cupertino Municipal Code.Chapter 9.13.and die HcelN and Safety
r. 0 YU ON.ea 25s3K,)I All roofs shall be inspected prior to any roofing material being installed.
Will the. ticmt Or future buddies aced If a roof is installed without first obtaining n inspection,I agree to remove
pp L gam arc equipment Qtr w devices when g P
'
Classic'? air conwninanu u UcOned by Nc Bay Area Air Quality Management all new materials for' spection.
❑Yes ❑No
I hmread hmaI dmu nhatit 4 MyresmedummerCNpyraoofthet or0 the
ni,Hcal"SafetyCede,Seemrm 25NI5.25533 andif 3d.I mderused dim dear budding (f
low at currently raw a temunL that it u mY respambility b notify Nc occupant of U¢
McNi mh trustee 'or to ta/eaac of a Ignatuie OfApplicant ' Date
O'wn i m-aulhmcrcd m f- 6 �u a All roof coverings to be Class a s. _
j% g /� or better
Community Development
0 10300 Torre Avenue
°✓ Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
4tUPEI�TINO
Building Department
JOB ADDRESS: PERMIT#
10ZZ1 Av F- O&O-FOl2 0
OWNER'S NAME: S / Torn �/�s k PHONE #
GENERAL CONTRACTOR: znko�� FAX #
I am not using any subcontractors:
r% /�gnature Date
Please check applicable subcontract and complete the following information:
® SUBCONTRACTOR i BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
. I I Linoleum / Wood
Glass / Glazing
Heating
( Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal I I
Painting/ Wallpaper I I Il
Paving I I
Plastering
Plumbing
I I Roofing
Septic Tank
Sheet Metal I I I
Sheet Rock
I I Tile I I
Owner/Contractor Signature Date
CITY OF CUPERTINO
• 2 ITEMS OF 2 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN 32620051. 00
DATE ISSUED. . . . . . . : 09/18/2008
RECEIPT # . . . . . . . . . : BS000006124
REFERENCE ID # . . . : 08090120
SITE ADDRESS . . . . . : 10221 ADRIANA AVE
SUBDIVISION
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : JUDITH & JOHN WEST
ADDRESS . . . . . . . . . . : 10221 ADRIANA AVE
CITY/STATE/ZIP CUPERTINO CA, 95014-1125
RECEIVED FROM . . . . : INTEGRITY ROOFING
CONTRACTOR . . . . . . . : GREGORY E. WILCOX LIC # 28418
COMPANY . . . . . . . . . . : INTEGRITY ROOFING
ADDRESS . . . . . . . . . . : 6820 MOSELLE DR
CITY/STATE/ZIP . . . : SAN JOSE, CA 95119
• TELEPHONE . . . . . . . . : (408) 225-9263 ,
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR VALUATION 31, 390 .00 3 .20 0 .00 3 .20 0 .00
1REROOFRES SQ FEET 50. 00 650 . 00 0 . 00 650 . 00 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 653 . 20 0 . 00 653 . 20 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CHECK 653 . 20 #9797
---------------
TOTAL RECEIPT 653 .20
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF
•
CITY OF CUPERTINO
JF a--
REROOF
CITY OF
*CUPERTINO PERMIT APPLICATION
APN # I Date:
Building Address:
Owner's Name: Phone #:
sua ,�h 561,E � yaS-863- 13 3
Contractor: q Phone #: t-(pb- 2 2 S- CjZ(o'.S
Fax #: _
Cupertino Business License #: Z� Contractor License #:
y I � �ossr_7
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles -;d Asphalt Shingles
• -.4 Wood Shakes ❑ Wood Shakes
• Wood Shingles ❑ Wood Shingles
• Other(Specify) ❑ Other (Specify)
Number of existing coverings ❑ Provide I.C.B.O. Report #
To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: I
RCrrpvt S �Ce 1rSto '1410 oSD
T S�linq �� S � �� a ZooF
Residential Commercial'7
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation:
•I Have Read, Understand)and Will Comply with Cupe - o's Tear-Off Policy:
Si ature
Revised 6/16/08
-1 CITY OF CUPERTINO
��'-�I' REROOF
C1 OF
CUPEkTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1RER00FC0M Re-roof Commercial B 1COMMLROOF
1 IBSEISMICO Seismic Commercial B
1REROOFRES Re-roof Residential B 1SFDWLROOF
1BSEISMICRE Seismic Residential B l
1
1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF .
I
IBSEISMICRE Seismic Residential B
1
1BUSLIC Business License B I
Revised 6/16/08
•
Community Development Department
Building Division
` City of Cupertino
• 10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards
and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City,the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
• a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without fast obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4 "per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O.report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: TkA, �k SUhr-, (oec '
Job Site Address: 1 ��2. 1 ! c� ilk Y,O. A0 t-
Roofing Company Name: _r 1JT l; a
• A PP licant's Signature: ate:
ate:
Greg Casteel /
Building Official
Revised 07/30/08
Green Building Plan Check
Index of Green Building Points/Categories
• A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans (See below)
B. Site 9. Install H.E. Irrigation, (details/spec)` L-1 2 points
11. Permeable Paving, (Note) L-1 2 points
C. Foundation 1. Use 15% Flyash Concrete, (note) S-1 5 points
D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points
5. Use Truss with heels, (detail) S-2 2 points
6. B. OSB Sheathing, (detail) S-2 2 points
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec.) A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec) L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec.) A-3 1 point
P. Other 1. List Green Features on Plans A-1 ` 1 point
,e TOTAL POINTS v 40 points
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a"total points'value to a project to be considered environmentally friendly is
• not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for'greening"your project.
A.Site
It.Recycle Sob Site Construction&Demolition Waste
65%=1 point;75%= 2 points;60%=4 points up to 4 Resource pts 0
12.Salvage Reusable Building Materials _ _ _ _ 4 Resource pts y--yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y=yes 0
4.Protect Native Soil 2 Resource pts y--yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yas 0
6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
(B.Design Resource-Efficient Landscapes and Gardens _ 4 Resource pts y=yes 0
9.Reuse MateriaWUse Recycled Content Materials
for Landscape Areas 2 Resource pis y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0
1 1 1
B.Foundation
1.Incorporate Recycled Ryash in Concrete
• 25%Racycfad Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource pis 0
2.Use Recycled Content Aggregate 2 Resource pis y=yes 0
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0
I 1 !
C.Structural Frame
r1_.Subs6tute Solid Sawn Lumber wdh Engineered Lumber_ 3 Resource pis y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3.Use Wood k Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5,Design Energy Heels on Trusses 6"or more 2 Energy pis y=yas 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pis y=yes 0
S.Use Recycled Content Steel Studs for Interior Framing 2 Resource pis y=yes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pis y=yes 0
b.Wall 3 Energy pis y=yes 0
c.Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pis y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pis y-yes 0
12.Use O8B
• a.Subfioors _ 1 Resource pt Y=Yas 0
b.Sheathing 1 Resource pt Y--Yes 0
1 1 1
INPUT RESOUTCeS Energy IA011-leadh
D.Exterior Finis
1.Use Sustainable Decking Materials '•
a.Recycled content 3 Resource pts y--yes 0
b.FSC Certified Wood 3 Resource pts y---es 0
I2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAO/Health pt y--yes 0
3.Install House Wrap under Siding 1 IAQ/Health pt y--yes 0
4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0
1 1
E.Plumbing
---
I1-LInstall Water Heater Jacket 1 Energy pt y=yes 0
2.Insulate Hol and Cold Water Pipes 2 Energy pts y=yes 0
f3.Retrofit all Faucets and Showerheads with Flow Reducers .
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads It point each,up to 2 points) Up to 2 Resource pts. 0
I4.Replace Toilest with Ultra-Low Flush Toilets
I(1 point each,up to 3 points) _ Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y--yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pis y=yes G�
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0
S.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
1 1 1
r-.nrecmcar
l1.Install Compact Fluorescent Light Bulbs(CFLs)
6 bulbs-_2 points,10 bulbs=3 points,12 bulbs=4 points) _ Up to 4 Energy pts. 0 •
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls It point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
1 1 1
G.Appliances
11.Install Energy Star Dishwasher 1 Energy pt y=yes 0
12.Install Washing Machine with Water and Energy
iConservation Features 1 Energy pt y=yes 0
,3.lnstall Energy Star Refrigerator 1 Energy pt y=yes 0
;4.Install Built-In Recycling Center 3 Resource pts y=yes 0
H.Insulation
1,Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pis Y_-Yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
'3.Install Recycled-Conterd,Fiberglass Insulation with
lNo Added Formaldehyde 31AOMealth pts y=yes 0
4,Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0 •
b.Ceilings 4 Resource pts y=yes 0
6.Alternative Insulation Products(Cotlon,spray-foam)
a.Walls 4 Resource pts y=yes 0
D.cetlmgs 4 Resource pts y=yes 0
1 1
1.Wmaows
1.Install Energy-Efficient Windows
•• i a,Double-Paned 1 Energy pt Y--yes 0
b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0
c.Low.Conductivity Frames 2 Energy pts y=yes 0
2.Install Low Heat Trwnsmission Glazing 1 Energy pt y=yes 0
1 1 1
J.Heating Ventilation and Air Conditioning
1.Use Dud Mastic on All Duct Joints __ _ 2 Energy pts y=yes o
2.Install Ductwork within Conditioned Space 3 Energy pis y=yes 0
3.Vent Range Hood to the Outside 1 IAO/Health pt y=yes - 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pis y=yes 0
5.Install Solar Attic Fan 2 Energy pis yryes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts Y--yes 0
8.Install Sealed Combustion Units
a.Furnaces 3 IAQ/Health pis y=yes 0
b.Water Heaters 3 IAQ/Health pts y=yes 0
9-Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER111 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y--yes 0
12.Install 90°!Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pis y=yes 0
13.Retrofit Wood Burning Fireplaces
a.Install EPA certified wood stovestinserts 1 IAQ/Health pt y=yes 0
b. Install/Replace Dampers 1 Eneray pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 41AQ1Hsa1th pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pis y=yes 0
17.Install Separate Garage Exhaust Fan 31AQ/Healih pts y=yes 0
1 1 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0
4.lnsIM Pholovoltaic(PV)System
(12 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 16 Energy pts 0
16.Select Safe and Drirable Roofing Malenals __ _ 1 Resource pt y=yes 0
T.Install Radiant Barney 3 Energy pts y=yes 0
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating :Energy y=yes 0
2.Install Overhangs or Awnings over South Facing Windows , y=yes 0
3.Plant Deciduous Trees on the West and South Sides y=yes 0
• 1 1 1
�IAGIMmIlp
M.Indoor Air Quality and Finishes
Low/No--VOC Paint _ _ _ 1 IAO/Health pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 21AQ/Health pts y=yes 0 •
13.Use Low%Nic VOC Adhesives 3 IAO/Health pts y=yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5,Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQ/Health pts y=yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0
17.Seal all Exposed Particleboard or MDF 4 IAOMealth pts y=yes 0
B.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0
1 ! !
N.Flooring
1.Select FSC Certified Wood Flooring 6 Resource pis Y--yes 0
2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tdes 4 Resource pts y=yes 0
4.Install Natural Unoieum in Place of Vinyl 5 IAQ/Health pts y--yes; 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
1 f !
Total Points Available: 1401 1301 571 •
Total Points Project Received: ,1 01 01 01
G:daWprog-sigreenbd1 ngguidelineslr elers�greenpoints(inne1212 04pmtectetlxls v l I�� `