Loading...
02090100r �O a u rn¢ FFy OZ� aHr LLyK I LLO to ai❑ �m L-z qPqF i3 OQ Z.. a> W: gy Li U' O =;r =W U Z' All r CITY I CONTRACTOR INFORMATION: I DPI G DIVISION C BUILDING ADDRESS' P PERMIT NO 22609 ALPINE DR J J. TOLENTINO 0 02090100 96WAT KANG 2 284 BURNING TREE DR APPLICATION 2002 1 PHONE: S (4 Z SANITARY NO. CONTROL NO. OFFICE- Building Division 10300 Torre Avenue Cupertino, CA 95014 -3255 Telephone: (408) 777 -3228 Far: (408) 777 -3333 Building Depa ritment Subject: Reroofing policy for the City of Cupertino. 1. Prior to permit issuance, you must agree to comply with 1997 UBC Standards and manufactures specifications on reroofing. 2. ..New roof coverings shall not be applied without first obtaining all inspection "and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the reroofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City the following steps are required. 1) Preinspection and /or tear off approval. 2) In progress inspection approval 3) Final inspection approval a) Spark arrester installation 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing so that the proper City inspection can be performed. IMPORTANT: 1. Flat roofs must have a minimum of Y4" per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time of inspection We understand the above policy on reroofing and will comply with this policy. Homeowners Name: Address: L0 .. Applicants NE j,,,a dk�-� Joe Antonucci (Chief Building Official) 6/25101