Loading...
08050207 CITY OF CUPERTINO x n" " " - BUILDING DIVISION-- PERMIT :-',:',CO.. 418RTORINFORIATAVam k , -PERMIT BUILj)IgCsagpI t AMISTAD CT KELLAR CONST. 08050207 OWNER'S 1.NNA/MEE: PERMIT ISSUE DATE RAVIN CHECKER 15240 MADRONE HILL RD 05/27/2008 •NE: ' SANITARY NO. CONTROL NO. (408) 867-9743 ARCHITECT/ENGINEER: BUILDING PERMIT INFO 'BLDG ELECT PLUMB MECH ' C 0 C C u00 LICENSED CONTRACTOR'S DECLARATION Job Description rg I hereby affirm that 1 am licensed under provisions of Chapter 9(commencingP U <F insullfoorceandeffecoimaionpyfNCBtsneuanePratcssiun,GF51-I myBcen,eu RMDL MSTRBTHRM, NON-STRUCTURLr INCLD M/E/P (160SQ) 2 ja z License masa. t. L� Lic.N nt-A Date 1-..- Contractor —i I ARCHITECTS DECLARA 1N I understand my plans shall be used as public records JyV a g la� Licensed Professional • A 5 OWNER-BUILDER DECLARATION 2<F I hereby affirm Nat I am exempt from the Contractors License Law for the ,,eO following reason.(Section 7031.5.Business and Professions Code:Any city or county mrequires which a permit to construct,alter.improve.demolish,or repair any structure _z prior to its issuance.also requires the applicant for such permit o file a signed statement E'`e that he is licensed pursuant to lie provisions of the Conlraceor'u License Law(Chapter9 Sq.Ft. Floor Area $15000 Valuation y (commencing with Section 7000)of Division 3 of the Business and Professions Code)or e — that he is exempt therefrom and the basis for the alleged exemption.Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of Number Occupancy Type not more than five hundred dollars(S3 34245014 P Y yP I.as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044,Business '.. ns Required Inspections and Professions Code:The Contractor's License Law does not apply to an owner of 9 P property who builds or improves thereon,and who does such work himself or through his own employees,provided that such improvements are not intended or offered for sale.If, • however,the building or improvement is sold within one year of completion,the owner- builder will have the burden of proving that he did not build or improve for purpose of sale.). . El I.as owner of the property am exclusively contacting with licensed contractors to construct the project(Sec.7044.Business and Professions Cade:)The Contractors Li- . cense Law does not apply to an owner of property who builds or improves Merton.and. who contracts for such projects with a eontraclor(a)licensed pursuant to the Contractor's License Law. ❑Iamexempt under See ,B&P C for this mason Owner Date WORKER'S COMPENSATION DECLARATION �I I hereby affirm under penalty of perjury one of the following declarations: LI 1 hare and will maintain a Certificate of Consent to self-insure for Worker's Conpen- ' onion,as provided for by Section 3700 of the Labor Code,far the performance of the work for which Nis permit is issued. ❑I have and will maintain Worker's Compensation Insurance,as required by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. My Worker's Compensation Insurance carer and Policy number are: Carrier. Policy No.: CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE ' • (Thu section need notbe completed if the permit is for one hundred dollars($100) or lens.) I certify that in the performance of the work for which this permit in issued.I shall not • employ any person in any m/yaJn�(rso as omc subject tgfl�e Wgtkry'Ca jsatimn Laws of California.Date Wv /1__ it /��,/l�(� Applicant J NOTICE TO APPLICANT:If,after making this Cen;ncate of Exemption,you should • become subject to the Workers Compensation provisions of the Labor Code,you must . 3 Z forthwith shall he darned revoked. comply with such provisions or this permit ' .—I CONSTRUCTION LENDING AGENCY (--a I hereby affirm that there is a construction lending agency for the performance of Ira the work fur which this permit is issued(Sec.3097,Civ.C.) fA 0 Lender's Name 7 Landers Address • C.)0 I certify Nal I have read this application and state Na the above infomauon is Ly F correct.I agree to comply with all city and county ordinances and state laws relating to O 1.7 building construction,and hereby authoris representatives of Nis city to enter upon the 17 above-mentioned property for inspection purposes It e) ree to save. and Fzj liabilities,judgments,cots and expenses which map y in anssy wayCity accnu against said Ciity 7111/1111�1 V Z in consequence of the granting of this permit. /v /��'7 �i APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: �. ea l��// Date S— Ci [-6`r, SOURCE RE�Ik.AT1078/„cto 27-0'6 Re-roofs drSignature oftApplican oonteac' Date • i • HAZARDOUS MATERIALS DISCLOSURE Type of Roof • Will the applicant or future building occupant store or handle hazardous material • as defined by the Cupenino Municipal Code.Chapter 9.13.and the Health and Safety Code,Section 25532(a)? CI yes El No All roofs shall be inspected prior to any roofing material being installed. Will the applicant or future building occupant use equipment or devices which If a roof is installed without first obtaining an inspection,I agree to remove emit hazardous air comm;nano as defined by the Bay Area Air Quality Management all new materials for inspection. District? ❑Yes 0Nu I have read the hazardous materials requirements under Chapter 6.95 of the Califor • - nia Health&SafetyCede,Sections 25505,25533 and 75534.I understand dun if to building docs not currently have a tenant Nat it is my responsibility to notify the occupant of the require tawnic�t5bmet puerto;,,un�amc rtea2, Occupancy.cmp Signature of Applicant Date most be All roof coverings to be Class'R” Owner authorized agent Dau' g or better CITY OF CUPERTINO • 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg COPY # : 1 Sec : Twp: Rng: Sub: Blk: Lot: APN • 34245014 . 00 DATE ISSUED • 05/27/2008 RECEIPT # • BS000004901 REFERENCE ID # . . . : 08050207 SITE ADDRESS • 10376 AMISTAD CT SUBDIVISION CITY • CUPERTINO IMPACT AREA OWNER • RAVIN CHECKER ADDRESS - 10376 AMISTAD CT CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-2606 • RECEIVED FROM • DON KELLAR CONTRACTOR • DONALD R. KELLAR LIC # 24365 COMPANY • KELLAR CONST. ADDRESS • 15240 MADRONE HILL RD CITY/STATE/ZIP . . . : SARATOGA, CA 95070 TELEPHONE • (408) 867-9743 • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL 1BSEISMICR VALUATION ,15, 000 . 00 1 . 50 0 . 00 1 . 50 0 . 00 1REMRESBAT SQ FEET 160 . 00 429 . 00 0 . 00 429 . 00 0 . 00 1STPLNCK HOURS 1 . 00 122 . 00 0 . 00 122 . 00 0 . 00 TOTAL PERMIT : 552 . 50 0 . 00 552 . 50 0. 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER CASH 552 . 50 TOTAL RECEIPT : 552 . 50 • ogoso ? 07 • CITY OF CUPERTINO ADDITION/REMODEL CITY OF CUPERJINO PERMIT APPLICATION FORM APN # i hL1L 5191/`4 06 Date: _C--2 "7--or 2 "7Nr Building Address: /O 3-- Ain s 2tJ L� . Mailing Address (if different from building address): Owner's Name: e4 v I N C f-(LCIcE le Phone# : too y,s g 2S(5 Contractor:Ke � CcotC Phone#: 90bf_�Sro7_9 T./ Fax #: Contractor License #: 70/6 5/./ Cupertino Business License#:•G7 3 t 21-1 3 G c Contact: IOC �/ 1 ctr ' Phone#: LiU�' 39(}-6,9 • Imo• Fax #: Building Permit Info: aBldg. ❑ Elect. ❑ Plumb. ❑ Mech. ❑ Hillside ❑ Job Description: Addition (adding sq footage): • What is being remodeled? Ip CA r (SOT OT k COO rn m Iv, 1 J (•e 0c1 mil — on S-tTo c,�c.rra el0 d-c (ct-i) Lt) C® Remodel Includes Re-Roof: Yes ❑ No 171 If yes list number of squares Remodel Includes Structural: Yes ❑ No E] Square Footage: Addition: Porch: Deck: Garage: Detached Attached Remodel: Kitchen Batt-K./6o_, Other Type of Construction (Usage Class): Occupancy Type: 1A, 11B ❑ 11, 111, V-A ❑ 11, I11, 1VV-B Q tz Valuation: odo Please check this box if the project is a second-story addition ❑ Please complete relevant portion of the Green Building Checklist& attach it to the application or if applicable, Green Building Points Achieve • include in plan set & the sheet index. ***For Office Use Only*** Over-the-Counter ❑ CITY OF CUPERTINO • '' i ADDITION/REMODEL CUPERJINo FEE SCHEDULE S Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft ADDITIONS 1R3SFDADD PLLONGRNGR Long Range PL Planning/Residential 1R3INSP Dwellings Inspections • B 1R3PLNCK Dwellings plan check B 1R3REPINSP Dwellings Repeat B Inspection 1R3REPPLNC Dwellings Repeat Plan B Check • 1R3HINSP Dwellings Hillside B inspection 1R3HPLNCK Dwellings Hillside plan B check IR3HREINSP Dwellings Hillside B Repeat Inspection • 1R3HREPLNC Dwellings Hillside B - Repeat Plan Check IR3ALTINSP Dwellings Alternate B Materials Inspection 1R3ALTPLNC Dwellings Alternate B Materials Plan Check 1PCESS Cesspool P 1PPRSEWG Ea. Private Sewage P • Disposal System 1PRSEWER Sewers P 1BPSPRINK Lawn Sprinkler/Backflow P 1BPWSVCS Main Water Service P 1BSEISMICRE SeismicResidential •B DECKS 1R3SFDADD OR 1R3SFDREM 1DECKWOOD Deck (Wood)-Each B (Each) • IDECKRAIL Deck Railing-Each B (Each) . CITY OF CUPERTINO • ADDITON/REMODEL • FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft GARAGES 1R3SFDADD OR' 1R3SFDREM 1GARDTW<=1K Wood Frame up to B 1,000 SF 1GARDTM<=1K Masonry up to 1,000 SF B BCONSTAXR Construction Tax Res • (new detached garage) PATIO'S OPEN 1R3SFDADD OR 1R3SFDREM 1PATIOWOOD Wood Frame up to 300 B SF 1PATIOMETAL Metal Frame up to 300 B SF 1PATIOOTHER Other Frame up to 300 SF B PATIO'S CLOSED 1R3SFDADD OR • 1R3SFDREM 1PATIOENCLW Enclosed Wood up to 300 B SF 1PATIOENCLM Enclosed Metal up to 300 B SF 1PATIOENCLO Other Enclosed Patio up B to 300 SF 1COVPORCH Porch Covered-Each B (Each) 1 REROOFRES Residential Re-roof Each B 100 SF REMODELS 1R3SFDREM 1REMRESKITKitchen Remodel up to 13 (Deduct "$"for ea plan 300 SF check) 1REMRESBAT Bath Remodel up to 300 B " Jb D SF 1REMREOTH Other Remodel up to 300 B u SF REMODEL PLNCK • 1STPLNCK (1-3 for Standard Plan Check B NOT FOR OVER THE remodel) COUNTER PLAN CKS. 3 of 3 • l CITY OF CUPERTINO ADDITON/REMODEL • FEE SCHEDULE • Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft " WINDOW/SLIDING 1R3SFDREM GLASS DOOR 1 WINREP Replacement windows B (ea 8 windows) I WINNEWNSTR New Window (non- B structural) 1WINMEWSTR New Window (Structural B Shear Wall/Masonry) • 1 WINBAYSTR Bay Window (Structural)• B SKYLIGHTS 1R3SFDREM 1 SKYL<10 SF Skylight less than 10 sf B 1 SKYL>10SF Skylight greater than 10 B sf or structural 1STAIRS Stairs-first flight/ea addt'l B • 1EPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1 PPERMITFEE Plumbing Permit Fee P 1ELCPLNCK Stand Alone Electric Pln E Ck (hourly) 1 MECPLNCK Stand Alone Mechanical M Pln Ck(hourly 1PLMPLNCK Stand Alone Plumbing P Pln Ck (hourly) 1BSEISMICRE Seismic Residential B 1TRAVDOC Travel & Documentation B . 1BUSLIC Business License B 4of3 • Green Building Plan Check Index of Green Building Points/Categories • A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Q (; Plans See below '.Im.9P:.+p�p�+ C "4.s.:.h::. "�„"J',�y .i ?a'n'a3 3,�":.:.n �W :PYr"."•4 ,r -}„�"�!e=„ � vry^'sw'l>,� .jYY' ,i' s n�tZy l"'T" V ..^f,:l nSA. uSw:pa'ue1�74",��Y� B. Site 9. Install H.E. Irrigation, (details/spec)* L-1 • 2 points 11. Permeable Paving, (Note) L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) 5-2 2 points 6. B. OSB Sheathing, (detail) S-2 2 points E. Ext. Finish 1. Composite Decking; (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec.) A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) 12-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec) L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec.) A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point st'rFj >'>`f, ' TOTAL POINTS ( � 40 points 70 3 ? .0447;1-ii-i-c-mac C..1— '`r— 1111 . c=rn MAY 27208 • � Plan Review Process Work Book Page-12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a°total points'value to a project to be considered environmentally friendly is I • not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project. INPUT Resources Energy IAQ/Health • A.Site [1.Recycle Job Site Construction&Demolition Waste l 1 (65%=1 point;75%= 2 points;80%=4 points I up to 4 Resource pts ' 0 2.Salvage Reusable Building Materials I 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 • 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes _ 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 18.Design Resource-Efficient Landscapes and Gardens _j 4 Resource pts y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas • 2 Resource pts y=yes 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 U • ' U U B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes- 0 . 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes_ 0 U 0 0 C.Structural Frame LSubstitute Solid Sawn Lumber with Engineered Lumber 1 3 Resource pts y=yes 0 2,Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 . . 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6°or more 2 Energy pts y=yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 8.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPs) a.Floors 3 Energy pts y=yes - 0 b.Wall 3 Energy pts y=yes 0 c.Roof 3 Energy pts y=yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 12 Use OSB -- _ ! a.Subfloors _ I 1 Resource pt y=yes 0 • b.Sheathing _ i Pt 1 Resource Y=Yes 0 0 0 0 INPUT Resources Energy IAO/Health D. xtenor Finish 5.Use Sustainable Decking Materials Ia.Recycled content 3 Resource pts y=yes— 0 . 1 b.FSC Certified Wood 3 Resource pts y=yes— 0 2.Use Treated Wood That Does Not Contain Chromium/Arsenic , 1 IAQ/Health pt y=yes 0 3.Install House Wrap under Siding • ' 1 IAQ'Health pt y=yes_ 0 4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0 0 0 0 E.Plumbing F.Install Water Heater Jacket 1 1 Energy pt y=yes I 0 —J 2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 2— 0 13.Retrofit all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) ' Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0 4.Replace Toilest with Ultra-Low Flush Toilets (1 point each,up to 3 points) ! Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 4 IAQ/Health pts. 0 8.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0 U U 0 r.electrical • 1.Install Compact Fluorescent Light Bulbs(CFL5) (6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) I Up to 4 Energy pts. 0 • 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to 5 points) Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4,Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 0 0 0 G.Appliances 11.Install Energy Star Dishwasher 1 1 Energy pt y=yes_ 0 12.Install Washing Machine with Water and Energy [Conservation Features 1 Energy pt y=yes- 0 13.Install Energy Star Refrigerator 1 Energy pt y=yes— 0 4.Install Built-In Recycling Center 3 Resource pts y=yes— 0 H.Insulation • 1.Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y=yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 LInstall Recycled-Content,Fiberglass Insulation with Added Formaldehyde _ i 3 IAQ/Health pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls , 4 Resource pts y=yes 0 • b.Ceilings 4 Resource pts y=yes0 • 6.Alternative Insulation Products(Cotton,spray-foam) a.Walls 4 Resource pts y=yes 0 o.ceilings . 4 Resource pts y=yes 0 0 0 0 • INPUT Resources Energy IAO/Health I. indows • r1.Install Energy-Effint W cieindows a.Double-Paned 1 Energy pt y=yes /I 0 1 b.Low-Emissivity(Low-E) 2 Energy pts y=yes 1 0 ' c.Low.Conductivity Frames j 2 Energy pts y=yes 0 2.Install Low Heat Transmission Glazing . 1 Energy pt y=yes 0 • 0 0 0 J.Heating Ventilation and Air Conditioning 11.Use Duct Mastic on All Duct Joints _ - 1 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQMealth pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts . y=yes 0 8.Install Sealed Combustion Units a.Furnaces 3 IAQ/Health pts y=yes 0 b.Water Heaters 3 IAQ/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 . 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 • 13.Retrofit Wood Burning Fireplaces . a.Install EPA certified wood stovesrinserts 1 IAO/Health pt y=yes 0 b. Install/Replace Dampers 1 Energy pt y=yes - 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQMealth pts y=yes 0 . 0 0 0 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2,Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0 16 Select Safe and Durable Roofing Materials — —1_ 1 Resource pt y=yes 0 7.Install Radiant Barrier 3 Energy pts y=yes 0 0 0 0 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0 • 0 0 0 INPUT Resources Energy 140/Health • M. n u oor Air s uality and Finishes 1.Use Low/No-VOC Paint t 1 IAO/Healthes is 0 she P y=y 2.Use Low VOC,Water-Based Wood Finishes 2 IAOMealth pts y=yes 0 • R.Use Low/No VOC Adhesives 3lA0/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 6lAOMealth pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 7.Seal all Exposed Particleboard or MDF 4 1A0/Health pts y=yes 0 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 9.Use Finger-Jointed or Recycled-Content Tdm 1 Resource pts y=yes ' 0 10.Install Whole House Vacuum System 3 IAS/Health pts y=yes 0 0 0 0 N.Flooring - 1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0 I` Use Rapidly Renewable Flooring Materials __—I 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAO/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 o o 0 Total Points Available: 1401 1301 57 Total Points Project Received: y 01 01 0 • • G:datarprogsigreenbuildingguidelinesremodeleNgreenpentsfinal2.12.04protected.xls " • • • • • • 1- -24'-6"_ v' o 4'�----6'---- ---5'-10"---�9' -101-9-2�_ ) 3 --I 12' 7" i � 7e 1I 1�, 6'-4 8'-921"-- r-- / 6-02 n 4'-02" ^, WALK IN CLOSET �, 1 8 0 — - * i13J3" a` ,, 1 I II ro11ro 16,-7" 15'110" 4' > SHOWERas, 1 r P )fl MASTER BED$OOM - Ls G n �e 6I1" 1 o O� ) — 1 r‘ TOILET GL S c 6i-1I 01" o� (1- a� 2 A---5'-3"---� — T I* 400 n rb n `'' y ----7' 1"---- ---5' 6"--- )4' ---5'-3"---- ' ,10' EXISTING (MASTER BED ROOM) TOILET DETAIL • • • TeImfkoceA ALT-1 LOOKING MIRROR ABOVE COUNTER TOP STANDARD WINDOW TILL-7'-0"LEVEL(FROM FLOOR FINISH.) SILL-3'-0" LENTEL-7'-0" 24'-6" p" 2' 2' n r f * Jo 9 At. 5-10" II I 1 I I #1 - 4'--'---*v-re k_ r __# II —p'$ - I I Y 12'-?' 1 1 1 0 O (7..1 SLIDING DOOR �, f I 10' 10" •-- +- ' -' b TOILET \ i JACUZZI I Ln 417 2,-(9,1,01-1 -(1,0� '-10"X 121-61 -e 9+ / �� i'. �0' 111/2'TH.GLASS MASTER BEDROOM -dl �• ' to iI F. 12'-7"X 151-10" b s �N 7' NI I I 4 t, C `r I OOp ''r,/Kr _ . g2'TH.GLASS Skold ec - \-- -?r 2 3' Hoer Moe (Xtrl I /--g— Y -/ tc( 12'-err + t' WALK IN I r SHOWER ct 1., U'' 2 I CLOSET .41- 1 .2 M 044 i'e 4«dl b1 1 5r-2rr rn S) \, a'1 51-3.5"X ' -1---r '*SS Goof '94//•e(9' 5.5" * -.--$.� - , Jtie, AAAA 70`' 5= 1-2 y (�FJJV� �Crt� i -St-'c-r 4 7'-1" 5'-6" Sir S'-31/2" 14. It k 13'-3 1/2" I 11'-2 1/2" PROPOSED (MASTER BED ROOM) TOILET DETAIL IS XIS AAcieSs • I ALT-1 _ , , • . SLIDING DOOR .. l ® - - \atLZ (,��` TOILET JACUZZI (5'-0"X 6'-0") / (10i-10"X 1241 tc Qedcca?xi‘ G-Cr- c iocvr MASTER BEDROOM ® 1 1/2"TM.GLASS _ 12'-7"X 15' 10" s�� OV p9 }t2"TH.GLASS WALK IN 1 CLOSET 414 ____, 5'-3.5"X SHOWER 9'-5.5" i 1 ' >< L ELECTRICAL LAYOUT PLAN (MASTER BED ROOM)TOILET LEGEND IC WALL BRACKET LIGHT AT T-0"AFFL G CEILING LIGHT '—r—r-' 1 x 36 W FLOURESCENT TUBE LIGHT ON WALL AT 7'-0" P- 6A 5 PIN SWITCHED SOCKET OUTLET r 6A ONE WAY SWITCH AT 4'-0"AFFL C kecK-ec `� , 5copc. 01=z woct� Evia - l_ks t oti5 -- pL u K-1. riveck, 10Y76 Rlt/6574dt c.T. 206) -. - c ec too `;S - `MC. S3- 256�f. 9.0d - net. M --- N-IN _ = �,� i H co I° • / 1\— }L asa t/ ( 1ty Oily cc O \ w J\---Le•—r— I 0 I — V/ I t O— J �� I _ Q w 7 -leg 1-' cilia; I o OD o ll'n' ' I W I z • J •-_ m ?? O • I Q O ^� o r I I O zo 1 / \ 1 I o WSIN CO Ncr ; o I. --M-- � — ICe Ia 4Fco _I F t Q 2 v \5 °`t II z I i` W aoa S%\s col o� .\sso`o �� _ °P�Wcy toy Q\tire;°a'1�� e'c e,e0\ \he '* W I gI '0) \10o°e.,„cet\NI\.,c) ,a0..„.. ���aco' <The _4 'eft ogic,.so • -`I-- I -k • • • e e wM QBc , ALT-1 LOOKING MIRROR ABOVE COUNTER TOP STANDARD WINDOW • TILL- 7'-0"LEVEL(FROM FLOOR FINISH.) SILL-3'-0" LENTEL- 7'-0" 24'-5" • gip" 2' 6,-7„ 2' 5' 5-10" > II 4"" nt k I I "1 4'5' 4' r 4'5 12'-7" i O Co) ti 4 i Z1till SLIDING DOOR , 10'-10" + b 1< 1 TOILET \I\URI j 17,(10-10 X12-6)II I MASTER BEDROOM 0, 12'-7"X 151-10" b I 154\1.0 N io � \ r I j,G `.\� � � M m 0009 > 14211TH.GLASS I _ k ,• Skw I g'-2' I 3' 12'-7" �� WALK 4N ~ SHOWER .3 ih f IO I /110° F0/1 + s a CLOSET Tic-1-71,b5, 2„ MaK 91-5.5" co y v _r 4 W'II(1 1:€M rererl 1 I S4SS door < v v �+ ti above AC� 7-1„ 5'-6" 51-3 1/2" X141' 4'�� k 13'-3 1/2" je- 11'-2 1/2" PROPOSED (MASTER BED ROOM) TOILET DETAIL • • 15` X I S MU ccs- a cc-esS 0 ALT-1 I _, I -----1 G--10 0 SLIDING DOOR ® u,ec TOILET A%k` (5'-0"X 6'-0") JACUZZI $ Giccu R MASTER BEDROOM / ® II 1/2"TH.GLASS r 12'-7"X 15'-10" s�yC 1 �Sp9 S2"TH.GLASS WALK IN CLOSET or cio (en .,.__ 5'45"X _ SHOWER 9' 5.5" c \ �, ELECTRICAL LAYOUT PLAN (MASTER BED ROOM)TOILET LEGEND -O WALL BRACKET LIGHT AT 71-0"AFFL G CEILING LIGHT ' 1 1 ' 1 x 36 W FLOURESCENT TUBE LIGHT ON WALL AT T-0" D- 6A 5 PIN SWITCHED SOCKET OUTLET f 6A ONE WAY SWITCH AT 4'-0"AFFL • ,,,,,, ;i .� Community Development , it, 10300 Torre Avenue it Cupertinn C Cupertino CA 95014 Telephone(408) 777-3228 CITY OF Fax(408)777-3333 KUPERTINO Building Department JOB ADDRESS: , PERMIT # 10 411/1 Cr et O&O 5 0207 OWNER'S NAME: Rav'ii\ ckcx c-cr PHONE # 1108^'39(7-6401 GENERAL CONTRACTOR: Rd kr Co ri FAX # I am not using any subcontractors: S -2 -O O Signature Date Please check applicable subcontractors and complete the following information: 121 SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date