1783 (2"zeu2
'IfyOF
SUPPLFJ5NJAL
CITY OF CUPS TINO JAN 1 j0 f
APPLICATION FOR RESIDENTIAL BUILDING FERMI PERMIT PERMIT NUMBER 8
AND F • ,
CERTIFICATE OF OCCUPANCY
APPLICANT TO FILL IN
BUILDING INSPECTION DIVISION STRETO9pSEEthF P (VEC
:AnR .
a e Legal Description:
Tract......6551....... Block........ Lot 13............
Plans Received By..................................................Date ..................... solar
Description of Work: .......... . . ... ..permit
..
.. .................................
REO.: Plans.... Survey.... Calcs: Struc..... Energy.... Elect..... Mach.... 1st Struct. Improvement on Parcel: Yes.... No... Area of Bldg...............
Plans Checked By....................................................Date ......................... Separate Structure............ or Addition/Alteration to Exist. Bldg
Application Approved B P g...........
A
PP PP Y................_......_......_.......Date ......................... No. of Stories_...... ....... Use of Building .................. ...............................
ValidatedBY..............................................................Date ....................... Valuation of Project: $................................................................................
Compensation Certificate Verified By ................. Date ........................ Owner: Phone:....................
• • Contractor: ..... ....-BAS-HOPIES-,. INC., -City Bus. Lic. # ..............
$
. . Contractor's Address: .........._.................... ............ Phone:....................
Permit Fee (Plus penalty if applicable) ........................$ 2440....... Contractor - Electrical: _ ...... ................._.............................
Plan Check Fee (less deposit of$.......... Rct, #.......... $.................. City Business License #.................... Phone:....................
Energy Plan Check Fee (Dep. of $........ Rot. #........)$...................... Plumbing: .......................................City Business License #.............. ..... Phone:..................................................................
. .
Strong Motion Fee ..........................................................$.........'.....0.... Heating and Cooling
Plumbing' Permit Fee ................................................$.... ..D...Q.�....
Electrical Permit Fee ......................................................$.......... City Business License #......._............ Phone:....................
Htg
Rech.Residential
Construction
Permit x............................. $.......................
Architect/Designer: ............. .................................... Phone:....................
Engineer: Phone: .
Residential Construction Tax ....................._................$.......... Lender: . .. .........._....._......_......................._.... own
.. a .in th.. performance
......................................... c ❑ Unknown
Misc. Fee ..............._............._......................................_$..._.................. '•I cerlily that in the pedormanco of the work for which this permit is
Misc. Fee ..............................._....................................._$.......... �� issued I Shan not employ any Parson in any manner so as to became subject
• $ 24-Sn to the workman's compensation laws of California."
SIGNATURE OF
• • APPLICANT/OWNER ........___..._..._.............__.............._............ DATE........................
Environmental Status: Exempt ............ Other........................................ ,... 'I certify that as the applicant I am licensed unde• the provisions of the
Design Review Approval: Bldg. __....._ Site ............ Sign ............ Contractors License Lew and further that my Lidera, No. ............................
Use Zone P.D. Conditions in Classification ...........__..................... Is in full force and effect: or
Cond. Use Permit #............ Variance #............ Parking Spaces............ I certify that I am exempt from the "Licensed Required" provisions of the
Approved By............................... ........................... Date """""""""""' Contractors License Law. (State basis of exemption.)
I hereby acknowledge that I have read this application and state that the above Is
• , • earrect and agree to comply with all City Ordinances and State Laws regulating
building.
1
nCfOBChment Permit........................ Grant of Easement......... I (We) agree to save, indemnify and keep harmtoes the City of Cupertino
............... against liabilities, judgments, costs and expenses which may In any way
Gutter, Sidewalk, Driveway: Replace.......... Repair.......... occurs against said City in consequence of the granting of this permit."
L....._.... Conn. Fee $................ Water............... Meter $................ SIGNATURE OF
greement for Completion of Public Works Improvements ....._____ APPLICANT/CONTRACTOR ......._. ...............................:............ DATE ........................ t
Plans Checked By........ Date........ Approved By........ Date................... NOTE: when properly validated this form constitutes a Building Permit. This
permit expires and becomes null and void should work not be commenced within
APPLICATION • 120 days from validation date, or should authorized construction be suspended or
abandoned for a period of 120 days altar work Is commenced.
PERMIT INSTALLATION NO. EACH FEE
APPLICATION • . PLUMBING
Light Outlets............ Switches.......... .
Fixtures............ Receptacles............ PERMIT INSTALLATION NO. EACH FEE
TOTAL NUMBER (less than 1000 watts) ............ $ .50 Gas System with up to 5 outlets ...............................$4.00 .............
Range........ Cooking Unit........ Oven............ ............... 2.00 .. ............ Each additional outlet ............................................. 1.00...............
Dryer........ Garb. Disp......... Dishwasher ............. ....... 2.00 .............. Water System (Installation, Alt. or Repair) ................. 4.00,..............
MOTORS: 1 HP or less ............................................... . 2.00 Water Closet.... Water Heater.... Ld. Tray..................... 4.00 .............
Greater than 1 HP not more than 5 HP .............. . 3.50 .............. Lavatory.... Shower Pan.... Bathtub.... Sink................... 3.00...............
Temporary Power Pole or Service — 100 amp . ....... ..5.00 .............. Wash. Mach.... Dishwasher.... Garb. Disp..... ............... 3.00...............
—200 amp......... 7.00 .............. Sewer ............................................................................. .. 8.00...............
Time Clock .................................... .................................. 1.50............... Lawn Sprinkler Sys. $5.00 Ea. add Sys. $2.00..................... .............
Misc,_ so Ord. current)...................................................... Vacuum Breakers ................................ ..............3.50..............
New Residential Occupancies Flat R ...........ate Interceptor........ Water Softener........ ...4.00.
Plumbing Piping without fixtures ................ ...............a.0q ..............
0-500 sq. ft. $22.00 1501-1750 $34.50.............................. Misc. (See Ord. Current) ... .8.@xnli•
.24.50 1751-.20000 37.50.............................. ...............6.00 ....
501-750 Permit Fee ...............
751-1000 26.00 2001-2260 39.50.............................. .......................( ........alty......................$ 10.
1001-1250 28.60 2261-2500 42.00.............................. TOTAL PLUMBING PERMIT FEE (plus penalty II app. ❑) $ 10.00
1251-1500 32.00 2501-2750 49.50.............................. APPLICATION FOR HEATING/COOLING PERMIT
Permit Fee...............................................$5.00
TOTAL ELECTRICAL PERMIT FEE (Plus penalty if app.p) $ PERMIT INSTALLATION NO. EACH FEE
Forced Air Unit..................to 100M ..............................$ 6.00...............
• ' ' ' over 100M........................ . 10.00..............
Comfort Cooling Unit......to 3 ton/HP ........................... 5.00...............
Forms / Foundation ............. ............. . By:. ..... . ..... . Date:................ to 15 ton/HP......................... 9.50..............
Plumbing Ground Work . . . ................ ....__................... to 30 ton/HP..................
....... ..12.00. ............
Rough Electrical ..__...._.................._... _. ..._......
rame - Plumbing and Heating to at ton/HP. .........................17.00.. ...........
......... ...........................
ANI[
9 9 ................................... ........................... Space Heater........ Well Heater .................................. 6.00..
l ellen & Energy.............................. ............ ....................................... Flues - other than above ............................................�.. 3.00..............
Test
........ ................. ...... . .._................. . ..............
............. Vent Fan: Kitchen........ Bath .... .................................... 3.00...............
porary Power Gas / Elect. _............._................ ...I....................... Commercial Range Hood
• ..............._......_.......... ....... ..
Final - Electrical ......5. '.k..cS...._.............._............... ........................... Misc. (See Ord. Current.............. .......
....._..............................................
Final - Building/ Mechanical ..._................................. ......................... Permit Fee ................. .. $ 5.00
. .... .................pp.... )
Final - Design Review / Landscaping . ... ........................................... TOTAL Htg./ Coolg. Permit Fee (plus penalty it app. ❑) $
Final— Pub�lice Works .......................................... ...............
�'�`�.
1 'S p.O'J TE
tr
L
Date
Sub ect
1
Notes -- // '" — ----
Approve
Date , :_ I