08090134CI'1;'YOF CUPERTINO
BUILDING DIVISION PERMIT
6 0NT"QT,0Rj1NF0RMA.TI0I!T
BUIL41NG ADDRESS:
PERMIT N0.
L2447 BALUSTROL CT
ADVANCED ROOFING TECHNIQUES
08090134
NER'S NAME:
PERMIT ISSUE DATE
LOWENBERG PETER H AND RACHEL H
15272 STRATFORD DR
09/19/2008
PHONE:
SANITARY NO. CONTROL NO.
ARCHIIEC (ENGINEER:
BUILDING PERMITINFO
TEAR OFF SHAKE ROOF INSTALL
BLDG ELECT PLUMB MECH
LICENSED CONTRACTORSamandi DECLARATION
EI)SB 30 FRf-92 48
Job Description
1 hmcbr $)Tian that 1 liamea under pmvtstoos of Chapel Y (commcncin6
• -- ^ ^- --- •-_ - .... -
with Swtion ]1100)af Division 3afthe Bmineu sed Profcsaluv code..nam Itcou is
3
in roll To>na S fD
ilrenS Class Ct
Dho:.Conuw,uSrf3kLGlnfX
ARCHITECTS DECWlATION
1 uodconand my Plans shall he used as Public records
Licensed Pmfeautime
OWNER -BUILDER DECLARATION
I hereby olirm that I am exempt from Ne Contractors License Law for the
following m".^n. (Section 703 1.5, Bus'.... and Professions Corm: Any city of county
which re uhns a permit to CnIWYeI. alto. hnphom. demolish, ar raper my SWLWm
prior to its issuance, end requires the applicant foruch Permit o file a signed sutment'
the he is licensed pursuant to the povistom or de Contmcmr's Manse Law (Chapter 9
Sq. Ft. Floor Area
Valuation
(commencing with Semon 7000) of Division J of the Business and Prufecomas Code) w
that W to eamPt tMrefmm and the We. for the alleged gumption. Any violatia. of
Section 7031.5 by any applicant for a permit aubjecu the applicant in a civil penalty of
APN Number
Occupancy Type
P
ret mom than fiw hundred dalan (5500).
Y YP
❑ I. as ownec of the property. er my emplayens with wages as their Sut oompenution.
and Prthetut. ane the swcturehnolNLt woRucd rr awe(Sec. 70 e4, Busitvss'
are Pro(ntions Cove: The Canterers Lion¢ Uw dots cal apply to an ow.
Required IDSPCCiIODS
ugh is
Property who buildsi thereon.ve who Emsot h htmulfm his
duoomh tmPmvemw art not tended moBerta forsee
awn employees. P edinuShe Such ode
t the own r,
Wildingor i ovrmutt u old within em Wile of m theowner,
however, ille buildinghu i
e. i rove for Of
builder will have th burden of pmHng that M did not dem a improve for purpose of
act.).
,
❑ 1. u owner of the propen, the eaeivalvclr coraramtng with Basad mrbaetaal in
comrmct the Project (Sec. 7044. Businm and Professions Code:) The Conuacmrs Li.
emu Law does not apply man owner of property who hums or impmwes thereon, and
who con Vans for Such pm)LN with a eMlraeter(S) IIeeM1Rd pmaeam in the CorVCtOrS
Lic.. law.
❑ I un ...in under See ,B& P C for Nis reason
.
Dan
WORKER'S COMPENSATION DECLARATION
I bereby affirm under penalty of pe0ury orc of the following declarations:
1 ham and will mahera Certificate of Conenl to YlehmR rMwmh sCompere
uvon, as provided for by Sucuun 3700 of tit Tabor Cade, for the perfmcn. of the
wort for which this permit is issued.
I have and will mains, Worldrs Compensation Tnsuunce, as required by Section
J of the labor Code. for the perfornance ofthe wart for which thh pcmtt is tallied.
My Worke pens�antimaree�adf reser and Policynumber a�t5:
Cartier: t_Stitt �() Policy No.: 1-1 lti�
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
Craig stun need Out d: completed lithe permit is fwonehuttmed defua ($100)
or leu.)
1 arufy Out fo the performuee of the work for which this remix h iatim, l shall and
employ anypcalon in any maumr Su u m became Subject to She Weiland coutpetwum
Laws of California. Dat
Applicant
NOTICE TO APPLICANT: If, after mating this Certificate d Eaemplten, yeti should
become subject In the Workers Cmrpame tion previsions or the tabor Code, you muse
forthwith comply with Such provisions Or the permit Shall be dumed novated.
CONSTRUCTION LENDING AGENCY
1 hereby affirm dor there is a connotation lending agency Car the perfurmua of
the wart for which tMa permit is issued (Sec. 3077, Civ, C)
Lenders Name
Lenders Add.
I cvury, that I have read this applicant and We dor the Shows ittformaum u
correct. I agtec to comply with all city and county orcinanes and stat Ian mining m
Wilding eonsuumim, and hereby autharine represenuuves of this city m now upon the
above-tmnuanW property for inspection
(We) agree to save, indemnify and kxp humless the City of Cupertino against
which may
capctsapawhich may In any way aarue galnslsald City
inCo..,..gme the .sed
in consequeof the 6ranunj of tis permit
APPLICANT UNDERSTANDS AND WILL COMPLY WITH
SOU REGUQONSS.
Issued by:
Date 7`—�1
t.�QA�qlI%—Re-roofs
'NON-MINT
Signed. Aplicent/Ci nu ctm—
HAZARDOUS MATERIALS DISCLOSURE
Type of Roof
Will Ne applicants funic building ecculamad a or hanale Income. muerid
So, defied by at Cuperhan Municipal Code. Chapter 9.11, and the Health and Safety
de. Seedon 15332(07All
❑Yns XNa
roofs shall be inspected prior to any roofing material being installed.
Will at epplictt or twat building accuWnt use cyuipmeno w deHaa which
If a roof is installed without first obtainingan inspection, I agree to remove
P
cce I, hvoudow air conumtuanis as defined by the Bay Ara Air Quality Management
all new materials for inspection.
0 Yes \ETNo
I Namadthehva mamd.15 uimmenuundercMPtrb.97ofdcCalifor-
ntaHmlth& Safely Cade, Secduu25M5, 755]3 atW 25534.1 ummond thmif the Wilding
deer ret currently Mm a ruin dial it h my oapemibility m mdry the aaupms of the
rnquitemrds hich mtu be ormismmsa ofd Cerufiatof Occupuuy.
Z4w � n �h h q I Iq I
C,`� /
Signature of Applicant Date
All roof coverings to be Class an" or better
,cd. -- , O.w
Ownv or mthwrsd agent at '
F�I
CITY OF
SCUPERTINO
E
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
Fax(408)777-33333
Building De artment
JOB ADDRESS: PERMIT #
2a q-1
OWNER'S NAME: PHONE # -
GENERAL CONTRACTOR: FAX #
I am not using any subcontractors: Q a � q
Signature bate
Please check applicable subcontractors and complete the followin information•
Owner/Contractor
%)qlng
ate
SUBCONTRACTOR BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass/ Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
N
Tile
Owner/Contractor
%)qlng
ate
• 2 ITEMS OF 2
•
•
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk: Lot:
APN ........: 35603014.00
DATE ISSUED.......: 09/19/2008
RECEIPT #.........: BS000006139
REFERENCE ID # ...: 08090134
SITE ADDRESS .....: 22447 BALUSTROL CT
SUBDIVISION ......:
CITY CUPERTINO
IMPACT AREA .......
OPERATOR: SylviaM
COPY # : 1
METHOD OF PAYMENT
-----------------
CREDIT CARD
TOTAL RECEIPT
AMOUNT
---------------
377.80
-----------
377.80
VOICE ID DESCRIPTION
-------- ----------------------------
601 ROOF TEAR OFF
604 ROOF IN -PROGRESS
REFERENCE NUMBER
--------------------
master card
VOICE ID DESCRIPTION
-------- ----------------------------
602 ROOF PLYWOOD NAIL
605 FINAL REROOF
OWNER ............:
LOWENBERG PETER H AND RACHEL H
ADDRESS ..........:
22447 BALUSTROL CT
CITY/STATE/ZIP ...:
CUPERTINO CA, 95014-3948
RECEIVED FROM ....:
ADVANCED ROOFING
CONTRACTOR .......:
ORSBURN, DUANE LIC # 21245
COMPANY ..........:
ADVANCED ROOFING TECHNIQUES
ADDRESS ..........:
15272 STRATFORD DR
CITY/STATE/ZIP ...:
SAN JOSE, CA 95124
TELEPHONE ........:
(408)249-4937
FEE ID
----------
UNIT QUANTITY
------------- ----------
AMOUNT PD -TO -DT THIS REC
NEW BAL
1BSEISMICR
VALUATION 8,000.00
------------------------------
0.80 0.00 0.80
----------
0.00
1REROOFRES
SQ FEET 29.00
377.00 0.00 377.00
0.00
TOTAL PERMIT
---------- ---------- ----------
377.80 0.00 377.80
----------
0.00
METHOD OF PAYMENT
-----------------
CREDIT CARD
TOTAL RECEIPT
AMOUNT
---------------
377.80
-----------
377.80
VOICE ID DESCRIPTION
-------- ----------------------------
601 ROOF TEAR OFF
604 ROOF IN -PROGRESS
REFERENCE NUMBER
--------------------
master card
VOICE ID DESCRIPTION
-------- ----------------------------
602 ROOF PLYWOOD NAIL
605 FINAL REROOF
CITY OF CUPERTINO
REROOF
CUPEIZT`1NO PERMIT APPLICATION
APN #
Date: n l og
"I
Building Address:
-
G
Owner's Name:
Phone #:
Contractor:
Phone #: @-J-AC - (4 CL _�;_l
`)0_o(e(1 Yl
Fax #: q - co
Cupertino Business License #:
Contractor License #:
I 5�a
Type of Roof
Covering:
Existing:
Proposed:
❑ Built -Up Roof
❑ Built -Up roof
❑ Asphalt Shingles
ywC Asphalt Shingles
)kD Wood Shakes
❑ Wood Shakes
❑ Wood Shingles
❑ Wood Shingles.
❑ Other (Specify)
❑ Other (Specify)
Number of existing coverings ,
a Provide I.C.B.O. Report #
To be Removed
❑ Provide Mfgr. Installation Specs.
Job Description: 7_-kD-r�Q
Residential
Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation: & $CX)O�
•I Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy:
Signature
Revised 6/16/08
CITY OF
CUPERTINO
CITY OF CUPERTINO
REROOF
FEESCHEDULE
Number of
Squares
Fee ID
Fee Description
Fee
Group
Permit Type
1REROOFC0M
Re -roof Commercial
B
1COMMLROOF
1BSEISMICO
Seismic Commercial
B
a�
1REROOFRES
Re -roof Residential
B
1SFDWLROOF
1BSEISMICRE
Seismic Residential
B
1RER00FMRES
Re -roof Multi -Family
B
1MFDWLROOF
1BSEISMICRE
Seismic Residential
B
1BUSLIC
Business License
B
Revised 6/16/08
0
Community Development Department
Building Division
City of Cupertino
O 10300 Torre Avenue
Telephone: (408) 777-3228
Fax: (408) 777-3333
Building Department
Subject: Re -roofing policy for the City of Cupertino
1.
Prior to permit issuance, you must agree to comply with 2007 IBC Standards
and manufacturers specifications on re -roofing. All roofs are Class "A" per Cupertino
municipal code 16.04.080.
2.
New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re -roofing
is completed.
3.
All roofs shall be inspected prior to any roofing installation.
4.
To receive a final sign off from the City, the following steps are
required:
1) Pre -inspection and/or tear off approval.
2) In -progress inspection approval.
•
3) Final inspection approval.
a) Spark arrester installation.
5.
If plywood is installed, a plywood nail inspection is required.
6.
Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7.
NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re -inspection fee of $176.18. The re -inspection fee must
be Raid before another inspection can be scheduled
IMPORTANT:
1.
Flat roofs must have a minimum of'/ " per foot slope and demonstrate
that there is no ponding.
2.
An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re -roofing.
Homeowner's Name: P_a-C.k_u1
Job Site Address: � 4t �� %GAA 1 ,�cn
Roofing Company Name: 1 C�-
• Applicant's Signature:DDate: I 1 en, I (�
Greg Casteel T I
Building Official
Revised 07/30/08
•
•
Plan Review Process Work Book Page -12-Revised 3/25/08
Green Building Plan Check
Index of Green Building
Points/Categories
A.
Category
Example of an Index or Table of Green
Plan Sheet or Page
Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
N k,
B.
Site
9.
Install H.E. Irrigation, (details/spec)'
L-1
11. Permeable Paving,Note
L-1
C.
Foundation
1.
Use 15 % Flyash Concrete, (note)
S-1
7points
D.
Structural
3.
Uses Wood I -Joist; (See Spec.)
S-2
5.
Use Truss with heels, (detail)
S-2
6.
B. OSB Sheathin detail
S-2
E.
Ext. Finish
1.
Composite Decking, (Note/Spec.)
A-3
2 points
4.
B. Fiber Cement Siding, (Note/Spec.
A-4
2 points
F.
Plumbing
1.
Insulate all.H.W. pipes, (Note/Spec.)
P-1
2 points
5.
Tankless W.H., (Note/Spec.)
A-2
2 points
11. A 2500 Gal. Tank, (Note/Spec
L-1
10 points
G.
Electrical
4.
E. Ceiling Faris, (Note/Spec.)
A-3
4 points
H.
Appliances
1.
Energy Star Dishwasher, (Note/Spec.)
A-3
1 point
3.
Energy Star Refrigerator, (Note/Spec.
A-3
1 point
P.
Other
1 1.
List Green Features on Plans
A-1
1 point
TOTAL POINTS1
40 points
•
•
Plan Review Process Work Book Page -12-Revised 3/25/08
Green Points Rating
System for Remodeling Projects
•
Due to the diversity of remodeling project types, assigning
a "total points' value to a project to be considered environmentally friendly is
not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for "greening" your project.
A. Site
1. Recycle Job Site Construction & Demolition Waste
i
165%=1 point; 75%= 2 points; 80%= 4 points
up to 4 Resource pts 0
j2. Salvage Reusable Building Materials
{ 4 Resource pts y=yes 0
3. Remodel for Mixed Use, Adaptive Reuse, and
Historic Preservation
4 Resource pis y=yes 0
4. Protect Native Soil
2 Resource pts y=yes 0
5. Minimize Disruption of Existing Plants & Trees
1 Resource pt y=yes 0
6. Implement Construction Site Stormwaler Practices
2 Resource pts y=yes 0
7. Protect Water Quality with Landscape Design
2 Resource pts y --yes 0
B. Design Resource -Efficient Landscapes and Gardens
4 Resource pts y=yes p
9. Reuse Materials/Use Recycled Content Materials
for Landscape Areas
2 Resource pts y=yes , 0
10. Install High -Efficiency Irrigation Systems
2 Resource pts y --yes 0
11. Provide for On -Site Water Catchment / Retention
2 Resource pts y--yes"p
B. Foundation
1 1 1
•
1. Incorporate Recycled Flyash in Concrete
25% Recycled Flyash = 2 points; Add 1 point for every 10%
increase of flyash, up to 5 points
up to 5 Resource pts0
2. Use Recycled Content Aggregate
2 Resource pts y=yes 0
3. Insulate Foundation/Slabbefgre backfill
3 Energy pts . y=yes 0
C. Structural Frame
1 1
1
1. Substitute Solid Sawn Lu nber with Engineered Lumber
3 Resource pts y=yes 0
2. Use FSC Certified Wood for framing
(For every 10% of FSC lumber used = 2 points, up to 10)
up to 10 Resource pts. 0
3. Use Wood I -Joists for Floors and Ceilings
2 Resource pts y --yes 0
4. Use Web Floor Trusses
2 Resource pts y=yes 0
5. Design Energy Heels on Trusses 6° or more
2 Energy pts y=yes 0
6. Use Finger -Jointed Studs for Vertical Applications
2 Resource pts y=yes 0
7. Use Engineered Studs for Vertical Applications
2 Resource pts y=yes p
8. Use Recycled Content Steel Studs for Interior Framing
2 Resource pts y=yes p
9. Use Structural Insulated Panels (SIPS)
a. Floors
3 Energy pts y=yes 0
b. Wall
3 Energy Pts Y=Yes 0
c. Roof
10. Apply Advanced Framing Techniques
3 Energy pts y=yes 0
11. Use Reclaimed Lumber for Non Structural Applications
4 Resource pts y --yes p
3 Resource pts
72. Use OSB- --
y=yes p
•
a. Subfloors
b. Sheathing
1 Resource of y=yes 0
1Resource pt y=yes p
1. Use Sustainable Decking Materials
a. Recycled content
3 Resource pts
y--yi
b. FSC Certifed Wood
3 Resource pts
y=y
2. Use Treated Wood That Does Not Contain ChromiunmrArsenic '
1 IAQ/Health pt
y=y
3. Install House Wrap under Siding
1 IAQ/Health pt
y=y
�4. Use Fiber -Cement Siding Materials
1 Resource of
Y --yes
E. Plumbing
`1. Install Water Heater Jacket _ _
1 Energy pt y=yes
2. Insulate Hot and Cold Water Pipes
2 Energy pts y=yes
i3. Retrofit all Faucets and Showerheads with Row Reducers
Up to 4 Energy pts.
a. Faucets (1 point each, up to 2 points)
Up to 2 Resource pts.
!b. Showerheads (1 point each, up to 2 points)
Up to 2 Resource pts.
4. Replace Toilest with Ultra -Low Flush Toilets
Up to 4 Energy pts.
I(1 point each, up to 3 points)
Up to 3 Resource pts.
5. Install Chlorine Filter on Showe head
1 IAQ/Health pt y --yes
6. Convert Gas to Tankless Water Heater
4 Energy pts Y --yes
7. Install Water Filtration Units at Faucets
3 IAQ/Health pts
(2 points each, up to 4 points)
Up to 4 IAQ/Health pts.
8. Install On -Demand Hot Water Circulation Pump
4 Resource pts y --yes;
r-. crecmcai
11. Install Compact Fluorescent Light Bulbs (CFLs) 1
1. Upgrade Insulation to Exceed Title 24 Requirements
t(6 bulbs=2 points, 10 bulbs=3 points, 12 bulbs = 4 points)
Up to 4 Energy pts.
2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to
2 Energy pts
5 points)
Up to 5 Energy pts.
3. Install Lighting Controls (1 point per fixture, up to 4 points)
Up to 4 Energy pts.
4. Install High Efficiency Ceiling Fans with CFLs
4 Energy pts
(1 point each, up to 4 points)
Up to 4 Energy pts.
G. Appliances
1. Install Energy Star Dish -washer 1 Energy pt
2. Install Washing Machine with Water and Energy
(Conservation Features 1 Energy pt
!3.Install Energy Star Refrigerator 1 Energy pt
I
4. Install Built_In Recycling Center _ 3 Resource
H. Insulation
1. Upgrade Insulation to Exceed Title 24 Requirements
a. Walls
2 Energy pts
y=yes
b. Ceilings
2 Energy pts
y=yes
2. Install Floor Insulation over Crawl Space
4 Energy pts
y=yes
IS. Install Recycled -Content, Fiberglass Insulation with
[No Added Formaldehyde
3 IAQ/Health pts
y=yes
4. Use Advanced Infiltration Reduction Practices
2 Energy pts
y=yes
S. Use Cellulose Insulation
a. Walls
4 Resource pts
y --yes
b. Ceilings
4 Resource pts
y=yes
6. Alternative Insulation Products (Cotton, spray -foam)
a. Walls
4 Resource pts
y=yeE
D. cemngs
4 Resource pts
y=ye:
40
•
• 1. Install Energy -Efficient Windows
J. Heating Ventilation and Air Conditioning
a. Double -Paned 1 Energy pt
b. Low -Emissivity (Low -E) 2 Energy pts
c. Low. Conductivity
1. Use Duct Mastic on All Duct Joints
l 2 Energy pts
Y --yes
2. Install Ductwork within Conditioned Space
Frames
2 Energy pts
2.-Insfall Low Heat Transmission Glazing
1 Energy pt
1. Use Duct Mastic on All Duct Joints
l 2 Energy pts
Y --yes
2. Install Ductwork within Conditioned Space
3 Energy pts
y=yes
3. Vent Range Hood to the Outside
1 IAQ/Health pt
y=yes
4. Clean all Ducts Before Occupancy
2 IAOMealth, pts
y=yes
5. Install Solar Attic Fan
2 Energy pts
y=yes
6. Install Attic Ventilation Systems
1 Energy pt
y=yes
7. Install Whole House Fan
4 Energy pts
Y --yes
B. Install Sealed Combustion Units
a. Furnaces
3 IAQ/Health pts
y=yes
b. Water Heaters
3 IAQ/Health pts
y --yes
9. Replace Wall -Mounted Electric and Gas Heaters with
Through -the -Wall Heat Pumps
3 Energy pts
y=yes
10. Install 13 SEER/11 EER or higher AC with a TXV
3 Energy pts
Y --yes
11. Install AC with Non -HCFC Refrigerants
2 Resource pts
y=yes
12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace
2 Energy pts
e13. Retrofit Wood Burning Fireplaces
a. Install EPA certified wood stoves/inserts
1 IAQ/Health pt
b. Install/Replace Dampers
1 Energy pt
c. Install Airtight Doors ,
1 Energy pt
14. Install Zoned, Hydronic Radiant Heating
3 Energy pts
15. Install High Efficiency Filter
4 IAQ/Health pts
16. Install Heat Recovery Ventilation Unit (HRV)
5 IAQ/Health pts
17. Install Separate Garage Exhaust Fan
3 IAQ/Health pts
K. Renewable Energy and Roofing
1. Pre -Plumb for Solar Water Heating 4 Energy pts y=yes
2. Install Solar Water Heating System 10 Energy pts y=yes
3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y=yes
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw = 12 points, 3.6 kw =16 points)_ _ Up to 16 Energy pts
6. Select Safe and Durable Roofing Materials _ _ 1 Resource pt y=yes
7. Install Raaiant Barner 3 Energy pts Y --yes
L. Natural Heating and Cooling
1. Incorporate Passive Solar Heating 5 Energy pts y=yes
2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts . y=yes
3. Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes
0
M. Indoor Air Quality and Finishes
1. Use Low/No-VOC Paint 1 IAQ/Health pts y=yesD
2. Use Low VOC, Water -Based Wood Finishes 2 IAQ/Health pts y=yes
i Use LowNo VOC Adhesives 3 IAQ/Health pts y=yes
4. Use Salvaged Materials for Interior Finishes 3 Resource pts y--yesD
5. Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AO/Health pts y=yes
6. Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes
.7. Seal all Exposed Particleboard or MDF 4 IAQ/Health pts y=yes
6. Use FSC Certified Materials for Interior Finish 4 Resource pts y --yes
9. Use Finger -Jointed or Recycled -Content Trim 1 Resource pts y=yes
10. Install Whole House Vacuum System 3 IAO/Health pts y=yes
y=yes
_ D •
0
0
0
D
0
D
I 0
y --yes
4 Resource pts
y=yes
5 IAO/Health pts
y --yes
4 Resource pts
y=yes
4 Resource pts
Mes
N. Flooring
1. Select FSC Certified Wood Flooring
i2. Use Rapidly Renewable Floodng Materials
3. Use Recycled Content Ceramic Tiles
4. Install Natural Linoleum in Place of Vinyl
5. Use Exposed Concrete as Finished Floor
6. Install Recycled Content Carpet with Low VOCs
Total Points Available:
Total Points Project Received:
6 Resource pts
y=yes
4 Resource pts
y --yes
4 Resource pts
y=yes
5 IAO/Health pts
y --yes
4 Resource pts
y=yes
4 Resource pts
Mes
CA/,tn, I og
G:dataiprogsigreenbuildogguideline remodelersigreenpointsfirel21204pmle7ed.ds
I
�J