Loading...
12125 POST THISNEAR FRONT OF BUILDING' CIT F CUPERTINO PFRMITNDMRER _ INSPECTION DIVISION12125 JOB INSPECTION RECORD �• I /� �j,, _ - PERMIT EXPIRATION JOB ADDR LOT# pERM1T EXPIRES IF WORK OWNER /21 lbldt� ' CONTRACTOR IS NOT STARTED WITHIN INSPECITION DATE INSPECTOR INVECTION RECORD 180 DAYS OF PERMIT ISSU- FOUNDATION' ANCE OR 180 DAYS FROM " LIFER - � I L.�S@MD INSPECTION. PR EGUNITE. PERMIT VALIDATION , - � � � r/7 Qp POUR,NQ,CONCRETE UNTIL ABOVE°.HAS BEEN SIGNED,,; �..y UNDERGROUND /SLAB IS�MI�D PLUMBING - - ELECTRICAL y -ISSUANCE DATE MECHANICAL a ELECT, PLG. NECK ❑ ❑ ❑' DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED' BUILDING PERMIT INFORMATION WOOD.FLOOR'. VALUATION $/FT. ' ,.PLUMBING � - � � , • MECHANICAL ELECTRICAL - - PERMIT To_ FRAMING ' TO S rYPE CONSTR. INSULATION OCC.GROUP RES,UNITS PLACE NO'SUBFLOOR UNTIL ABOVE HAS BEEN SIGNED ROOF " - 50.F',FLOOR AREA TOTALACREAGE DIAPHRAGM BUILDING USE. RES IND 0 PB ,ONn APPLY NO ROOFING UNTIL ABOVE HAS BEEN SIGNED " ' I ❑• El , 1:1 ASSESSO SPARCEL NO. ROUGH PLUMBING TRACT NO, PARCEL NO. GAS TEST MECHANICAL • °:< • DATE WCC.FILE N0. ELECTRICAL FINALS DATE ,NSP. ACC. � FRAMING' . SAN # - ZONING ENG.SITE NO. INSULATION � PLUMBING � . GAS FIRE SPRINK ENERGY T 24 • MECHANICAL v -N❑ -v ❑ N[] COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED HEATING .LATH—INTERIOR ELECTRICAL - FLOOD ZONE AL.UC" ' LATH=EXTERIOR FIRE DEPT. - y NE Y'0 NEl SHEETROCK GRADE FEE SUMMARY SHEAR INTERIOR' - BUILDIN •.y — SHEAR EXTERIOR - - TEMPORARY APPROVAL BUILDING ± , FIREWALLS. - ELECTRIC . .PLAN CHECK GAS FEE NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED OCCUPANCY SEISMIC FEE OCCUPANCY OF BUILDING IS NOT PERMITTED.UNTIL BUILDING FINAL ISSIGNED BY BUILDING INSPECTOR. MICR ARRANGE FOR INSPECTION BY PHONING 252.4505, ELECTRIC. o� . ONE WORKING DAY BEFORE REQUIRED INSPECTION. PLUMBING Z PLEASE GIVE JOB ADDRESS WHEN PHONING. - SEE PERMIT FOR EXPIRATION DATE MECHANICAL 'IMPORTANT, ' CONST.TAX PLEASE READ REVERSE SIDE BEFORE TOTAL CALLING FOR,FINAL INSPECTION. OFFICE COPY' - . , ASBESTEST, INC. 3747259 P. 01 �o8 -2R4. 3zz� 'Zb ASBESTEST, INC. :�)3 OL 1350 Dell Avenue,Suite G Campbell,CA 95008(408)374-3362 Fax(408)374-7269 CKS GROUP, INC. 7 November, 1997 10441 BANDLEY DRIVE Job No. A-18540-97 CUPERTINO, CA 95014 PROJECT: 10381 BANDLEY DRIVE ASBESTOS IDENTIFICATION BY Rqj.ARIZED LIGHT MICROSCOPY Non-Fibrous Fibrous Asbestos Other Fibrous Materials or Sample Identification Miner las % Materials, % Minerals % 1 JOINT COMPOUND NONE NONE SAND, BINDER, DETECTED 2 FLOORING, BREAK NONE ORGANIC BINDER, 85% ROOM DETECTED FIBERS, 15% 3 2' X 2' CEILING TILE NONE FIBERGLAS, MISCELLANEOUS DETECTED ORGANIC PARTICLES, FIBERS, 65% BINDER, 35% This test report relates only to the items tested. The materials were examined by polarized light microscopy according to Environmental Protection Agency methods. Reported asbestos percentages w be stored foe estimater six months and then properly dispobased on comparison to test sed es provided by the EPA, Samples p unless prior arrangements have been made. Respectfully submitted, ASBESTEST, INCORPORATED O JUN Robert M. Kumagai BO 11 jgg9 Microscopist �' GC SPEClojv FAUC AR F E ,RT/Np NT