Loading...
08070004CITY OF CUPERTINO Buit.mNcDkyrstoN PERMIT CONTRAC£ORjNFORMATIOI BUIL LNG DRESS: p21.3�5 PERMITNO. BENETTI CT A-1 ELECTRIC 08070004 OWNER'S NAME: PERMIT ISSUE DATE FiOSLUND JIM 421 E HEDDING ST 07/01/2008 ONE: SANITARY NO. CONTROL NO. (408)975-9171 ARCHITEC (ENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH 0 0 0 0 LICENSED CONTRACTOR'S DECLARATION 1 hereby afford that 1 aw licensed under provis ic, of Chapter 9 (commencing Job Description p aim Section 7") of Dlvonso 3 of Ne Bull.. and Professions Cade. and my lkcn. is UPGRD SVC & REPLC 100AMP FOR 125 AMP in full force and effect, -1 Lln clu ^act Lk.g 4iol come 3—acv canmacmr l;-� a t+;� ARCHITECTS DECLARATION I urdcrstan ! my plans shall be used u public records Licensed Professional OWNER -BUILDER DECLARATION 1 bcmby 41firm that I am memo[ from the Contractor's License Law for de following moan. (Section ?031.3, Business and Profeumm Code: Any city or county which mquirm a permit as momme, alcor, improve. domolich, or .pair any Mo.. prior m its issuance. also requires We applicanl for such permit to file a signed statement thw he Is famed to tie of tho contractor, Llama law(C'hapw 9 Sq. Ft. Floor Area Valuation pwment provisions (com.eming with Sector, 7") of Division 3 of do Business wit Professions Code) at $18 00 • that he is esempt therefrom and the hub for the alleged esemption. Any violation of Section 7031.3 by any applicant for a pem it subjects the applicant an a civil penalty ofNumber OGDU Occupancy Type nolo. than five hundred dollars ($5=. 3 2 6 4 9 0 3 0. L, m owner of use property. or my c sployas with wad m in dcir sole compensation, will dodo work, amd the structure is not intended or offered forsale (Sec. TON, Busmen areal Prof ..I.. code: The Cantacmrs License Law dam trot apply m ,n owner of Required Inspections propertywho builds o improves theroon, and whodoassuch werkhimxlfothmugh his ' own cmployam. provided Nu such improvements am not intended arofferW for sales If. ' however, the building or improvement Is sold within ane yew of completion. the owner. buildw will have the burden of proving that he did net build or improve for purpose of sale.). ❑ 1, u ower of the popery, am eulusvcly cnnuusing with licensed mnmamom as corumum the project (Sec. 7W. Business add profeuimns Code:) The Contractors U. . Cense law does nal apply . N mare( of p(Opemr who builds or brown S dleRan, and who contracts far such p.jeeta with a eanuatto,4) licensed pursuant in We Comminutes I.Iceme Law. ❑ l am mcmpt under See . B B P C for this reason Owe Data WORKERS COMPENSATION DECLARATION I hereby aliir. under penally of perjary, arc of the fallowing decbrWom: ❑ 1 ham and will maintain a Cemifimm of Conwm to self -Inst. for Wotreh Campen- aul.n, u provided far by Section 3700 of the labor Code, for the perforrdma of the work for which this permit is Want have and will maintain Workees CO.pematlon insurance, as required by $a40n 700 of the labor Code, far the performance of the work far which Nb permit is Issued. ' My Worker C.unparompon Lnvuams carrier std Policy number art: Cartier.Policy No:4ptie%1o41 (4'1 i FOPPON FROM WORKERS' COMPENSATION INSURANCE (This orlon need not bu completed lines permit is forone hundred dollars ($100) or lora) I certify unit th the perfomaxe of the work fw which this Permit 4 issued, l NJI trot employ amy' perm. in say master. u m biome mbj.t to the Woken Compensation lass of California. Data Applicant NOTICE TO APPLICANT: If, after making this Certificate of Exemplium, you should become subject m the WoduYs Compensation previsions of the labor Cads, you most forthwith comply with such Parwhoom o this permit shall k deemed rooked. CONSTRUCTION LENDING AGENCY I hereby afro died there b a construction lording agancy for the perrarmm ec of dne work far which this permit is issued (Sec. 3097, Civ, C.) Lenders Name Latrines Address I Cavity that T have mad this application and soon that the above information is cpmXL L agmL . comply with all city Nd county oNinwKea nib alae laws elating to Wilding construction, and hereby wthodue reponsenuuvm or this city. coerupnn the above -me property for purpowhich ma (We) agree to save, Indemnify and keep hwmlass the City of Cupertino agaiML expenses In judgmontundents. whhch may in eny wy accrue against mid Cily andexpensesthis Cmitieajodg of the permit. in coLICANT of the gradmRSTAN of thisDWI` APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT Issued by: 1V O Y CE REGUIgAS. Date Re-roofs �• _2'I Si6nmuof ApplmmnUC m onmacoor Dadw a HAZARDOUS MATERIALS DISCLOSURE Type of Roof Will the applicant or Indiana building accupsmstere or handle hmardom mabdal u dcfned by the Cupertino Municipal Cade. Chapter 9.13, and the Health and Safely cepa. Second m533(.)? ❑ Ym All roofs shall be inspected prior to any roofing material being installed. rego Will the applicant or future Wilding oCaupanl um equipment or devices which If a roof is installed without first obtaining an inspection, I agree to remove emit havafdnis air contsmimnts u defined by Ne Bay Amo Air Quality Managemem all new materials for inspection. District? C] Yet Nu Ihave mad thehuardous materials macdabrequimmenbuCltapmr6.95 oftic Cables. riaHnSaetyCoda 3n.Inirc Wild .&dot'monCtuncnu lowlmasmt cansitigna,espomandily mmmtil'ytheetplmsae ^O mcnuwhichm tpdarmimmnaaraCertificate ofOceupocy. Signature of Applicant Date `I^l otc All roof coverings to be Class's" or better Ownerorauthoriacd age. D,m' L� • • C CUPEkTINO CITY OF CUPERTINO GENERAL BUILDING PERMIT APPLICATION FORM APN #� Drlate:\�o Building Address: A 21 35 Mailing Address (if different from building address): Owner's Name: Phone #: —s"\ . 16-1 Contractor: Phone: c� rlS9 VV—k�L\ `Q �C Fax: Contractor License #: LI-bL> I L+ Cupertino Business License #: Contact: Phone: tieg ,i�3o�V) Fax: Residential Commercial Job Description: gLR-V 1 tt` �ae9_e.c�_ (pc7 ,rte e P09--kLS, Building Permit Info: Bldg ❑ Elect Plumb ❑ Mech ❑ Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ❑ IUIII/V-A ❑ IUIII B, TV -HT, V -B [q-- 12--�] Valuation: Square Footage: vo Project Size: Express EC Standard ❑ Large ❑ • Major ❑ Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Points Achieved: For help, contact Build it Green at www.builditQreen m• Revised 6/16/08 W CITY OF CUPERTINO CUPERTINO GENERAL BUILDING PERMIT APPLICATION FORM Quantity/Sf Fee ID Fee Description Fee Permit Type Group 1GENRES or 1 GENCOM 1BTEMPPER Temporary Building Permit (good for B 30 days 1BBOILERI For the installation or relocation of ea M boiler/compressor to & including 3 horsepower, or ea absorption sys to & incl 100,000 Btu/h (29.3kw 11313OILER2 Installation /relocation of ea M boiler/compressor over 3 horsepower to & incl 15 horsepower, or ea absorption sys over 100,000 Btu/h 1BBOILER3 Installation/relocation of ea M boiler/compressor over 15 horsepower to & incl 30 horsepower, or ea absorption sys over 500,000 Btu/h to & incl 1,000,000 Btu/h 11313OILER4 Installation/relocation of ea M boiler/compressor over 30 hosepower to & incl 50 horsepower, or for ea absorption sys over 1,000,000 Btu/h to & incl 1,750,000 Btu/h 11313OILER5 Installation/relocation of ea boiler or M refrigeration compressor over 50 horsepower, or ea absorption sys over 1,750,000 Btu/h 1BAPPLOTH For ea appliance or piece of equip M regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this code. IELECINSP Other Electrical Inspections (per hour) E 1MECHINSP Other Mechanical Inspections (per M hour) IPLMBINSP Other Plumbing & Gas Inspections P (per hour 1MEETINGIHR Application Meeting B • affix CITY of CUPEkTINO CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEE SCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM ACOUSTICAL REVIEW IACOUSFDW SFDWL/Duplex New B IACOUSRESAD SFDWL/Duplex-Addition/Alteration B 1ACOUSCOM Multi-Family/Commercial B CHIMNEY'S 1 CHIMNEY Chimney B 1CHIMNEYR Chimney Repair B FENCES 1 FENCE>6FT Non -masonry, over 6 ft in height B 1FENCEMAS>6 Masonry, over 6 ft in height B FIREPLACES 1FIREPLMAS Fireplace Masonry B 1FIREPLFAB Fireplace Pre-Fabricated/Metal B 1FLAGPOL>20 Flag pole (over 20 ft in height) B IMODUSTRU Modular Structures B FOUNDATIONS 1FOUNDREP Foundation Repair B -7- 1PILECAST Pile Foundation Cast in place concrete B 1PILE5RIV 1 Pile Foundation Driven (steel, pre- stressed concrete) B 3 of 5 �� OF CUPERTINO CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEE SCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM RETAINING WALL(CONCRETE OR MASONRY) 1RETSTN Standard (up to 50 ft) B 1RETSP310 Special Design, 3-10' high (up to 50 `) B 1RETSP10 Special Design, over 10' high (up to 50' B 1RETCRB< Gravity/Crib Wall, 0-10'high (up to 50 ft B 1RETCRB> Gravity/Crib Wall over 10' high (up to 50 ft B SIDING 1SIDESTBK Siding, Stone & Brick Veneer (interior/exterior) B 1SIDEOTHER Siding all other B SKYLIGHTS 1SKYL<10 SF Skylight less than 10 sf B 1 SKYL>I OSF Skylight greater than 10 sf or structural B 1STAIRS Stairs -first flight/ea addt'1 B STORAGE RACKS 1 SRACKS<=8 Storage Racks 0-8' high (up to 100 sf) B 1SRACKS>8 Storage Racks over 8' high (up to 100 St B 1STUCOAP Stucco Applications (up to 400 sf) additional stucco application B 4of5 LJ • • 6 SO CITY OF CUPERTINO CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEESCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM I WINREP Replacement windows/sliding glass door ea 8 windows) B IWINMEWSTR New Window -structural shear wall/masonry (includes plan ck fee B IEPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1PPERMITFEE Plumbing Permit Fee P Ilk IELCPLNCK Stand Alone Electric Pln Ck (hourly) E IMECPLNCK Stand Alone Mechanical Pln Ck (hrly) M IPLMBLNCK Stand Alone Plumbing Pln Ck (hrly) P 1 STPLNCK-(3 Hr in when not over counter) Standard Plan Check (when no E/M/P) hourly -stand alone B 1BSEISMICR Seismic Residential B 1BSEISMICO Seismic Commercial B / I 1TRAVDOC Travel & Documentation B IBUSLIC Business License B • 5 of 5 • • Plan Review Process Work Book Page -12-Revised 325/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)• L-1 OREM 2 points 11. Permeable Paving,Note L-1 2 pints C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood IJoist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathin detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A3 2 points 4. B. Fiber Cement Siding,(Note/Spec.) A-4 F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 __Z_points 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec) L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A3 1 point 3. Enerov Star Refrigerator, Note/S ec. A3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points • • Plan Review Process Work Book Page -12-Revised 325/08 Green Points Rating System for Remodeling Projects • Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening" your project. 1. Recycle Job Site Construction &Demolition Waste 3 Energy pts y=yes 65%=1 point; 75%= 2 points; 80%= 4 points , up to 4 Resource pts 2. Salvage Reusable Building Materials _ J' 4 Resource pts y --yes 3. Remodel for Mixed Use, Adaptive Reuse, and (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource Historic Preservation 4 Resourceis p y�e 4. Protect Native Soil 2 Resource pts y=yes 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt Y --yes 6. Implement Construction Site Stonnwater Practices 2 Resource pts y=yes 7. Protect Water Quality with Landscape Design 2 Resource pts y=yes B. Design Resource -Efficient Landscapes and Gardens 4 Resource 2 Resource pts _ pts y=yes 9. Reuse Matedals/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 10. Install High -Efficiency hdgation Systems 2 Resource pts y=yes 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y --yes B. Foundation 1. Incorporate Recycled Flyash in Concrete • 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points up to 5 Resource 2. Use Recycled Content Aggregate 2 Resource pts y= 3. Insulate Foundation/Slab before backfill , ❑,,,,,,,,, C. Structural Frame 3 Energy pts y=yes `. Substit teu(So'i al d S wn Lumber with Engineered Lumber J 3 Resource pts y=yes 2. Use FSC Certified Wood for framing 3 Energy pts y=yes (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pts. 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=yes 4. Use Web Floor Trusses 2 Resource pts y=yes 5. Design Energy Heels on Trusses 6' or more 2 Energy pts y=yes 6. Use Finger -Jointed Studs for Vertical Applications 2 Resource pts y=yes 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes, B. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y=yes b. Wall 3 Energy pts y=yes c. Roof 3 Energy pts y=yes 10. Apply Advanced Framing Techniques 4 Resource pts y=yes 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes • a. Subfloors b. Sheathing 1 Resource pt j y=yes — — -- 1 Resource or y=yes It Use sustainable Decking Materials I .a. Recycled content I b. FSC Certified Wood 12. Use Treated Wood That Does Not Contain Chromium/Arsenic 3. Install House Wrap under Siding 4. Use Fiber -Cement siding Materials E. Plumbing 1. Install ater H Weater ket Jac -_ 2. Insulate Hot and CDld Water Pipes 3. Retrofit all Faucets ang Shovi rheads with Flow Reducers i a. Faucets (1 point each, up to 2 points) ) b. Showerheads (1 point each, up to 2 points) 4. Replace Toilest with Ultra -Low Flush Toilets (1 point each, up to 3 points) 5. Install Chlorine Filter on Showerhead 6, Convert Gas to Tankless Water Heater 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) 8. Install On -Demand Hot Water Circulation Pump r. tiecrncai I1, Install Compact Fluorescent Light Bulbs (CFLs) t (6 bulbs=2 points, 10 bulbs � points, 12 bulbs = 4 points) _i L --I — -----' 2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to 5 points) 3. Install Lighting Controls (1 point per fixture, up to 4 points) 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) G. Appliances 1. install Energy Sta -Dishwasher ? 2. install Washing Machine with Water and Energy i Conservation Features 3.lnstall Energy Star Refrigerator 4. Install Built -In Recycling Center H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls b. Ceilings 2. Install Floor Insulation over Crawl Space N3.Iristall Recycled-Coo'terit, Fiberglass Insulation with o Added Formaldehyde 4. Use—A& a;cedInfiltration Reduction Practices 5. Use Cellulose Insulation a. Walls b. Ceilings 6, Alternative Insulation Products (Cotton, spray -foam) a. Walls D.Cemngs 1 Energy pt 2 Energy pts Up to 2 Resource Up to 2 Resource Up to 3 Resource 1 IAQ/Health pt y: 4 Energy pts y= Up to 4 IAQ/Health pts. 4 Resource pts Y_ -Yes Up to 4 Energy Up to 5 Energy Up to 4 Energy to 4 Energy pts. 1 Energy of 1 Energy pt 1 Energy pt 3 Resource pts 2 Energy pts 2 Energy pts 4 Energy pts 31AQ/Health pts y=yes 2 Energy pts Y --yes 4 Resource pts 4 Resource pts 4 Resource pts y=yes 4 Resource pts y=yes • • • 3 Resource pts y=yes 0 3 Resource pts y=yes 0 1 IAQ/Health pt y --yes 0 1 IAQ/Health of y=yes 0 1 Resource pt y=yes 0 1 Energy pt 2 Energy pts Up to 2 Resource Up to 2 Resource Up to 3 Resource 1 IAQ/Health pt y: 4 Energy pts y= Up to 4 IAQ/Health pts. 4 Resource pts Y_ -Yes Up to 4 Energy Up to 5 Energy Up to 4 Energy to 4 Energy pts. 1 Energy of 1 Energy pt 1 Energy pt 3 Resource pts 2 Energy pts 2 Energy pts 4 Energy pts 31AQ/Health pts y=yes 2 Energy pts Y --yes 4 Resource pts 4 Resource pts 4 Resource pts y=yes 4 Resource pts y=yes • • • Fl. Install Energy-Efficiern Windows a. Double -Paned 1 Ener t Energy P b. Low -Emissivity, (Low -E) t 2 Energy pts c. Low. Conductive Frames � _ ----_ry ___--- ___ ___ _-' 1 Energy pts 2. Install Low Heat Transmission Glazing � 1 Enerw of J. Heating Ventilation and Air Conditioning 11. Use Dud Mastic on All Duct Joints __ 2. Install Ductwork within Conditioned Space 3. Vent Range Hood to the Outside 4. Clean all Ducts Before Occupancy 5. Install Solar Attic Fan 6. Install Attic Ventilation Systems 7. Install Whole House Fan S. Install Sealed Combustion Units - a. Furnaces b. Water Heaters 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 10. Install 13 SEER/11 EER or higher AC with a TXV 11. Install AC with Non -HCFC Refrigerants 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace • 13. Retrofit Wood Burning Fireplaces a. Install EPA certified wood stoveslnserts b. Install/Replace Dampers c. Install Airtight Doors 14. Install Zoned, Hydronic Radiant Heating 15. Install High Efficiency Filter 16. Install Heat Recovery Ventilation Unit (HRV) 17. Install Separate Garage Exhaust Fan IC Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 2, Install Solar Water Heating System 3. Pre -Wire for Future Photovoltaic (PV) Installation 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw = 1 B points) (6. Select Safe and burable Roo—ting Materials - - l 7. Install Rediani Barrer - - "- - - ` " L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 2. Install Overhangs or Awnings over South Facing Windows 3. Plant Deciduous Trees on the West and South Sides is 2 Energy pts 3 Energy pts 1 IAQ/Health pt 21AQ/Health pts 2 Energy pts 1 Energy pt 4 Energy pts 31AQ/Heaith pts 31AQ/Haalth pts 3 Energy pts 3 Energy pts 2 Resource pts 2 Energy pts y=yes 1 IAQ/Health pt y=yes 1 Energy pt Y --yes 1 Energy pt Y=Yes 3 Energy pts y=Yes 41AQ/Health pts y=yes 5 IAQ/Health pts y=yes 31AQ/Health ots v=vas 4 Energy pts 10 Energy pts 4 Energy pts Up to 18 Energy pts 1 Resource pt y=yes 3 Enerov ots v=ves 5 Energy pts 3 Energy pts 3 Energy pts Y=yes F1. Use LowMo-VOC Paint 2. Use Low VCC, Water -Based Wood Finishes , 3. Use Low/No VOC Adhesives 4. Use Salvaged Materials for Interior Finishes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 6. Use Exterior Grade Plywood for Interior Uses 17. Seal all Exposed.Particcleboard or MDF B. Use FSC Certified Materials for Interior Finish 9. Use Finger -Jointed or Recycled -Content Trim 10. Install Whole House Vacuum Systen N. Flooring 1. Select FSC Certified Wood Flooring 2. Use Rapidly Renewable Flosring Matenals _r 3. Use Recycled Content Ceramic Tiles 4. Install Natural Linoleum in Place of Vinyl 5. Use Exposed Concrete as Finished Floor 6. Install Recycled Content Carpel with Low VOCs Total Points Available: Total Points Project Received: ed. IAQ/Health pts y=yes D • 21AQ/Health pts y=yes D 31AQ/Health pts y=yes D 3 Resource pts y --yes 0 1 1 61AQ/Health pts 1 IAQ/Health pts 41AQ/Health pts 4 Resource pts 1 Resource pts 3 IAO/Health pts B Resource pts y=yes 4 Resource pts y=yes 4 Resource pts y=yes 5 IAQ/Health pts y=yes 4 Resource pts y=yes 4 Resource pts y=yes 1401 1301 57 • 01 01 0 C::atarpmgs/greenboilrLngguidelineshemodelersrpaenpoin:sfnal212.e4prme:ted.ds • • 3 ITEMS OF 3 • • CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN 32649030.00 DATE ISSUED.......: 07/01/2008 RECEIPT #.........: BS000005309 REFERENCE ID # ...: 08070004 SITE ADDRESS .....: 21835 BENETTI CT SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OWNER .............. ROSLUND JIM ADDRESS ..........: 21835 BENETTI CITY/STATE/ZIP ...: CUPERTINO CA, OPERATOR:pdtg COPY # : 1 95014-1221 RECEIVED FROM ....: A-1 ELECTRIC CONTRACTOR .......: ROBERT LAMANTA LIC # 27061 COMPANY ..........: A-1 ELECTRIC ADDRESS ..........: 421 E HEDDING ST CITY/STATE/ZIP ...: SAN JOSE, CA 95112 TELEPHONE ........: (408)975-9171 FEE ID UNIT QUANTITY ----------------------- AMOUNT PD -TO -DT THIS REC NEW BAL ---------- 1BSEISMICR VALUATION 1,800.00 -------------------- '0:50 0.00 ---------- 0.50 ---------- 0.00 1EPERMITFE FLAT RATE 1.00 40.79 0.00 40.79 0.00 1TRAVDOC FLAT RATE 1.00 40.79 0.00 ---------- 40.79 0.00 TOTAL PERMIT ---------- 82.08 0.00 ------ 82.08 ------ 0.00 METHOD OF PAYMENT AMOUNT ----------------- --------------- REFERENCE NUMBER CHECK 82.08 -------------------- #10564 --------------- TOTAL RECEIPT 82,08 CITY OF SCUPERTINO Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax(408)777-3333 Building Department JOB ADDRESS: PERMIT # 2l 3� 0 V 070 OWNER'S NAME: PHONE # GENERAL CONTRACTOR: FAX # I am not using any subcontractors: --1—o X Signature Date Please check applicable subcontractors and complete the follnwinv;nfnrmaf9nn• Owner/ Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical 1�_t Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock nI, Tile Owner/ Contractor Signature Date