Loading...
08090058,m .o �u n�1 ngLq 2 �6 Ln �O a-= _Z 0 z F W d 7 U 0 0 F U r CIT S OF CUPERTINOF" i7 P2. lin y - 13UILDIN(pD1VIS5GN PERMIT ;RCONTR'A@TQR„I,1}�f}RMAT QN BmL1T1�G69T"SkANCHI WAY UNIT 209 CONSOLIDATED PLUMBING INC PERMIT NO. 08090058 OWNER'S NAME: PERMIT ISSUE DATE CUPERTINO COMMUNITY HSNG 3732 CHARTER PARK DR STE D 09/11/2008 NE: SANITARY NO. CONTROL NO. (408)978-3093 ARCHIfECTFENGINEER: BUILDING PERMITINFO BLDG ELECT PLUMB MECH 0 0 0 0 p LICENSED CONTRACTORS DECLARATION Chapter 9 - Job Description ' 1 hereby affirm Net 1 am licensed under provisions of (commencing u, with Session70M)ofDivision 3ofNeBadnessandPm(cuiovCode. andmyleenu GAS REPAIR ON EXISTNG GAS LINE; GAS TEST(AIR) 0.n full form and ellen. U Z License Cl s Lle. Y q Date Comate 7W ARCHIIE 1 understand my plarus shall he o� blit recorda U Licensed Professional 3 OWNER-BUILDERDECLARATIONthe RAT70N . 1 hereby a(Ertn shat 1 License law for the umpt from the Contracrkmons O following moon.erten(Section 103 1.5, Business and Ptofcssinns c 0 1. , o Any city or county t. or which require a Permit m ennwuq alter, impaw. consultant. Or rtooir any stmnure j, prior w its issuance, also counts the applicant for such permit to file a signed statement that M u licensed moment dtn provisions of the COnuactor's Licnuc Law (ChameT9 Sq. Ft. Floor Area Valuation 9 (commencing with fined.7000)ofDivision3ofthe Bminessand ProfessimsCount Or $1000 .• that h u eumpt thetefmm and site buns for The alleged cumpUon. Any violation of 3 5 9 0 7 0 2 0 $1PiF§er Occupancy Type Section 7031.5 by any applicant for a permit subjccs the applieanuo a civil penalty of not mare man RK hmdmd dollaa (3300) . O I. u Ownu of tis, popery, o mY emploru with vngu u thebsele=N=dm. will do the work, and the muctum u not intended Or offered for ale (Sec. 70a, Business and Prefesdors Cade: The Conaute's Litua law dao rot appy b an Owner of Required Inspections progeny who buildsorimprom thacon, and whodoessuch work himvlfor through his awncmployne, Pmrided that such improvements are not intended oroRaed fmsale if. however. sew building m impmvcment Issold within one year of completion. me awner- Wilder. will have the burden of proving dust le did not build a intpom Inc peryme of sale.). 0 1, u Owner of the property. am exclusively contracting wish licensed contractors m mnatrsct the project (Sec. 70th. Besides and Professions Code:) The Caotra:mra U. . ecus Taw does not apply ce an owner of property who Wilds or impovu Norton, and whocontactsforsuch pajece, with a coeua=K,) licensed pogo of m the Commuter, Licata law. 0 lanexemptonder See .B&PCforthi]reaOO 0. Data WORKER'S COMPENSATON OECLARATiON 1 hereby aB'um under penalty of perjury, one or tis, following de danoam: I ham and will maintain • Certifram of Concert self -Ilium for Workers Campn- fro m, u provided for by Section 3700 Of the Labor Code, for the perfor . of Ne ' wart for which this permit is issued. 0 1 have and will msinain Worlds CompensNon Inssu . u required by Second 3700.1the labor Code. for me perfmmanm of Ne work for which this permit is issued. ' My Workers Compensation Ince. artier and Policy number are: Carver..� Poliry No.: C4'.JLtiDe-72 CLt7 CERTI LATE-I�OFE Z.PPI70N FROM WORKERS' COMPENSATION INSURANCE (Thu seNra need not he completed If the permit u foronc hundred dollar (SIM) m las) I certify Nat in the Performance of to work for which this permit u issued. I shall net employ any parson in my summer an u m become subject to Ne Workers' Compeadmine Laws of Califorria. Date ' Applicant NOTICE TO APPLICANT. If, after making this Certificate of Exemption, you should become subject m ds, Wmkcr'a Compen utdon provisions of On labor Code. you most Oforthwith comply with such povisiens or Nu Permit shall W bummed remkcd. _ lin CONSTRUCTION LENDING AGENCY 1 hemby.M. that Nero Is. cuwctinn lending agency for the performance of > the work for which Nu Permit is Wood (Sm. 309'7, Civ. C) Lcrd sName z Lenders Address Q 1 certify that I ham mad this applicuum and sore Net the ashes information is conecL 1 al m comply with all city and county ardinanaa and mute laws mlaont or Wilding construction, and hereby authorise mpracnuotes of Nu city m roto noun Ne ashes:-mcnooned property for es (We) agree m ave, indemnify and kmp humless the City of Cuikmno against ..poresen which ens,msB engo sPewhich may in any waramrve againslmsid Cly incomummen th APPLICANT Olthegran TANDf AND WILL APPLICANT UN ERSTANDS AND WILL C LY WITH ALL NON -POINT SOURCERE N5. Issued b y; Date)—'� ve Re -roofs o Type of Roof fin"of AWlicmWCommumr te HAZARDOUS MATERDMS'DISCLOSURE Will the appliam or future building Omupantmore m handle hazaEons memrial u defined by the Cupertino Municipal Code. Chapter 9.12 and the Health and Safety Code. Schon 25512(a)?All 0Ta roofs shall be'inspec[ed prior to any roofing material being installed. 0win Nn applicant or future Wilding Occupant use equipment m devices which If a roof is installed without first obtaining an inspection, I agree to remove 'Z'1Y�ha'W:f'.t air contaminants a deflood by the Bay Area Air Quality Management all new materials for inspection. 0ya Er".— .Ihave Ills.read she heardmu materials nomf cmenn under Chapter 6.95afNe Calif.. nu"tud kSafety COdc Sc d.25505,25533 ash 25534.1uMersantl Na Ras, WildNg docs not curre.0y cane a tenant met it as my mapo dity m d.ofy me conupent of Ne rcquirnmcnts which prior m iss a Ccr i1 ca c Of (kcu Signature of Applicant Date ,i � All roof coverings to be Class'n3' or better nester Pr rira nnd egem ,te CITY OF CUPERTINO 4 ITEMS OF 4 PERMIT RECEIPT OPERATOR: pdtg • COPY # : 1 Sec: Twp: Rng: Sub: Blk: Lot: APN 35907020.UNIT209 DATE ISSUED.......: 09/11/2008 RECEIPT #....:....: BS000006049 REFERENCE ID # ...: 08090058 SITE ADDRESS .....: 10092 BIANCHI WAY UNIT 209 SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT AMOUNT --------------- 143.27 --------------- 143.27 REFERENCE NUMBER -------------------- #4023 VOICE ID -------- -----------------------------,.. OWNER ............: CUPERTINO COMMUNITY HSNG - DESCRIPTION 301 ROUGH PLUMBING ADDRESS ..........: 10092 BIANCHI WAY UNIT 209 CITY/STATE/ZIP ...: CUPERTINO, CA 95014 RECEIVED FROM ....: CONSOLIDATED PLMB CONTRACTOR .......: D DOUGLASS LIC # 22941 COMPANY ..........: CONSOLIDATED PLUMBING INC ADDRESS ..........: 3732 CHARTER PARK DR STE D CITY/STATE/ZIP ...: SAN JOSE, CA 95136 TELEPHONE ........: (408)978-3093 • FEE ID ---------- UNIT QUANTITY ------------- AMOUNT PD -TO -DT THIS REC NEW BAL 1BSEISMICR ---------- VALUATION 1,000.00 -------------------- 0.50 ---------- 0.00 0.50 ---------- 0.00 1PGASRES OUTLETS 1.00 61.19 0.00 61.19 0.00 1PPERMITFE FLAT RATE 1.00 40.79 0.00 40.79 0.00 ITRAVDOC FLAT RATE 1.00 40.79 ---------- 0.00 40.79 0.00 TOTAL PERMIT ---------- 143.27 ---------- 0.00 143.27 ---------- 0.00 METHOD OF PAYMENT ----------------- CHECK TOTAL RECEIPT AMOUNT --------------- 143.27 --------------- 143.27 REFERENCE NUMBER -------------------- #4023 VOICE ID -------- -----------------------------,.. DESCRIPTION VOICE ID -------- - DESCRIPTION 301 ROUGH PLUMBING ---------------------------- 1 507 FINAL PLUMBING 0 tlwo., cm of • CUPEkTINO CITY OF CUPERTINO REPIPE/SEWER/MAIN SERVICE PERMIT APPLICATION FORM DSU9DU5 APN # 2� nO J 7 Date: Fee Description it S a� Building Address: 7QuantityFee DOgZ Uv fl 2e�9 Commercial building sewer/sanitary sewer Owner's ame: Phone #: -f- QfM� 6� 3)J/ -e 2e Contractor: F Phone #: q wo 9-21; 3o''-? S21��4+�t & u 21 Fax#: cG897S 3o46 Contact: Phone #: tl vo 97e �vy� r� cam( Fax #: % `ll 362 6 Contractor License #: SOS ! 6 Z e3& IBSEISMICOM Cupertino Business License #: P Job Description: 6--1 S PeI04ji eK t Xis��µ 9 ys It ve, 5 lx�s �e54-,�,qiQ) Seismic Residential p esidential [� Commercial Q Valuation: 1RPSS UdC Project Size: E press Standard ❑ Large Major Green Building: Please complete relevant portion of the Green Building Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Green Building Points: ID Fee Description Fee Group Permit Type 7QuantityFee 1PCSEWER Commercial building sewer/sanitary sewer P 1CPSS II PREPIPE Commercial re -pipe per fixture P 1CPRP 1PGASCOM Commercial Gas Piping System 1-4 Outlets p IBSEISMICOM Seismic Commercial P { 1BSEISMICR Seismic Residential p 1PRSEWER Residential building sewer/sanitary sewer P 1RPSS CITY OF CUPEkTINO CITY OF CUPERTINO REPIPE/SEWERIMAIN SERVICE FEESCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type 1PRREPIPE Residential re -pipe per fixture P 1RPRP 1BPWSVCS Water Service P ICPWS or IRPWS 1PPRSEWG Private Sewage Disposal System P 1PCESS Cesspool P 1BPWATER Install/alter Water Pipe P IBPFIXTURE Plumbing Fixture P 1PGASRES Residential Gas Piping System 1-4 Outlets P 1BPGAS Gas Piping System 5+ Outlets P / 1PPERMITFEE Plumbing Permit Fee Issuance P 1PLMBLNCK Plumbing Plan Check P IPLMBINSP Other Plumbing/gas Insp. P / / 1TRAVDOC Travel -& Documentation Fee B 1BUSLIC Business License B Revised 6-16-08 • 0 11 • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 paints 11. Permeable Paving, Note L-1 2 oints C. Foundation I. Use 15 % Flyash Concrete, (note) S-1 5 paints D. Structural 3. Uses Wood ]Joist, (See Spec.) S-2 5: Use Truss with heels, (detail) S-2 2 points 2 points 6. B. OSB Sheathing, detail S-2 2 tints E. Ext. Finish 1. Composite Decking, (Nate/Spec.) A3 2 points 4. B. Fiber Cement Siding,(Note/Spec.)A-4 F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 __joints 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Ga]. Tank, (Note/Spec L-110 o]nts G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A3 4 points . 3. Enerqy Star Refrigerator, (Note/Spec. A3 1 point 1 oint P. Other 1. List Green Features on Plans A-1 TOTAL POINTS 1 paint 40 paints 11 • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a "total points" value to a project to be considered environmentally friendly is • not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. 1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 80%= 4 points up to 4 Resource pt: 12. Salvage Reusable Building Materials 4 Resource pts y--ye! 3. Remodel for Mixed Use, Adaptive Reuse, and 2. Use FSC Certified Wood for framing Historic Preservation 4 Resource pts yrye; 4. Protect Native Soil 2 Resource pts y=ye: 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt yrye: 6. Implement Construction Site Stormwater Practices 2 Resource pts yrye: 7. Protect Water Quality with Landscape Design 2 Resource pts yrye! fe. Design Resource-Eifcient Landscapes and Gardens _ _' 4 Resource pts yrya< 9. Reuse Matenals/Use Recycled Content Materials 2 Resource pts y=ya for Landscape Areas 2 Resource pts yryec 10. Install High -Efficiency Irrigation Systems 2 Resource pts y=,a, 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes B. Foundation 1. Incorporate Recycled Flyash in Concrete • 25% Recycled Ryash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points up to 5 Resource pts 2. Use Recycled Content Aggregate 2 Resource pts yryes 3. Insulate Foundation/Slab before backfill 3 Energy pts y=yes C. Structural Frame r r 0 r r r r r r r �1. Substitute Solid Sawn Lumber with Engineered Lumber - J 3 Resource pts 2. Use FSC Certified Wood for framing y --ye (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pt: 3. Use Wood I -Joists for Floors and Ceilings 2 Resource pts y=ye 4. Use Web Floor Trusses 2 Resource pts y --ye 5. Design Energy Heels on Trusses 6" or more 2 Energy pts yrye 6. Use Finger -Jointed Studs for Vedical Applications 2 Resource pts y=ye 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=ye. 6. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=ya 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y=ye: b. Wall 3 Energy pts y=ye: c. Roof 3 Energy pts y=ye: 10. Apply Advanced Framing Techniques 4 Resource pts yrye; 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts 12.Use 0513 y=yas a. Subfloors 1 Resource pt y=ye=- b. Sheathing • 1 Resource pt y=yes r r 0 r r r r r r r -_ iis• s is• q o of r r r r r r r r r r iis• is• 0. 0, Q 1. Use Sustainable Decking Materials 1 Energy pt y=yes 2 Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 13. Retrofit all Faucets and Showerheads with FlowAeducers 0 a. Faucets (1 point each, up to 2 points) a. Recycled content 3. Resource pts y=yes D 0 ;(1 point each, up to 3 points) Up to 3 Resource pts. b. FSC Certified Wood 3 Resource pts y=yes 0 7. Install Water Filtration Units at Faucets • I2. Use Treated Wood That Does Not Contain ChromiumlArsenic 1 IAQ/Heafth pt y=yes D 3. Install House Wrap under Siding 1 IAQ/Health pt y=yes 0 14. Use Fiber -Cement Siding Materials 1 Resource pt y=yes 0 E. Plumbing 1. Install Water Heater Jacket 1 Energy pt y=yes 2 Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 13. Retrofit all Faucets and Showerheads with FlowAeducers 0 a. Faucets (1 point each, up to 2 points) Up to 2 Resource pts. b. Showerheads (1 point each, up to 2 points) Up to 2 Resource pts. I4. Replace Toilest with Ultra -Low Flush Toilets 0 ;(1 point each, up to 3 points) Up to 3 Resource pts. 5. Install Chlorine Filter on Showerhead 1 IAQ/Health pt y --yes 6. Convert Gas to Tankless Water Heater 4 Energy pts Y --yes 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) Up to 41AQ/Health pts. B. Install On -Demand Hot Water Circulation Pump 4 Resource pts y=yes r. mecmcar It. Install Compact Fluorescent Light Bulbs (CFLs) i1. Install Energy Star Dishwasher 1(6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points) Up to 4 Energy pts. 0 _ 2. Install IC -AT Recessed Rxtures with CFLs (1 point each, up to • 5 points) Up to 5 Energy pts. 0 3. Install Lighting Controls (1 point per fixture, up to 4 points) Up to 4 Energy pts. 0 4. Install High Efficiency Ceiling Fans with CFLs 1 Energy pt (1 point each, up to 4 points) Up to 4 Energy pts. 0 G. Appliances i1. Install Energy Star Dishwasher 1 Energy pt y=yes 2. Install Washing Machine with Water and Energy 0 0 0 0 D Conservation Features 1 Energy pt y=yes !3.lnstall Energy Star Refrigerator 1 Energy pt y=yes i4. Install Built -In Recycling Center 3 Resource pts y=yes H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls 2 Energy pts y=yes b. Ceilings 2 Energy pts y=yes 2, Iristall Floor Insulation over Crawl Space 4 Energy pts y=yes 3. Install Recycled -Content, Fiberglass Insulation with jNo Added Formaldehyde 3 IAQ/Health pts y=yes 4. Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 5. Use Cellulose Insulation a. Walls 4 Resource pts y=yes b. Ceilings 4 Resource pts y=yes 6. Alternative Insulation Products (Cotton, spray -loam) a. Walls 4 Resource pts y=yes o. uewngs 4 Resource pts y=yes • D D 0 0 0 0 0 0 D 1. Install Energy -Efficient Windows 2 Energy pts y=yes a. Double -Paned • b. Low -Emissivity (Low -E) 1 Energy pt 2 Energy pts y=yes y=yes c. Low. Conductivity Frames -Low 2 Energy its y=yes _ 2. Install Heat Transmission Glazing - . 1 Energy pt Y --yes J. Heating Ventilation and Air Conditioning 1 Energy pt y=yes 11. Use Duct Ivtastic on All Nu_ct Joints _ 2 Energy pts y --yes _ 2. Install Ductwork within Conditioned Space 3 Energy pts y=yes 3. Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 4. Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 5. Install Solar Attic Fan 2 Energy pts y=yes 6. Install Attic Ventilation Systems 1 Energy pt y=yes 7. Install Whole House Fan 4 Energy pts y=yes 8. Install Sealed Combustion Units a. Furnaces 3 IAQ/Health pts y=yes b. Water Heaters 31A]/Health pts y=yes 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 3 Energy its y=yes 10. Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 11. Install AC with Non -HCFC Refrigerants 2 Resource pts y=yes 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts y=yes 13. Retrofit Wood Burning Fireplaces 10 Energy pts y=yes • a. Install EPA certified wood stovesrinserts b. Install/Replace Dampers 1 IAQ/Hsalth pt y=ye=- 4. Install Photovoltaic (PV) System 1 Energy pt y=yes c. Install Airtight Doors 1 Energy pt y=yes 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts y=yes 15. Install High Efficiency Filter 4 IAQ/Health pts y=yes 16. Install Heat Recovery Ventilation Unit (HRV) 5 IAQ/Health pts y=yes 17. Install Separate Garage Exhaust Fan 3 IAQ/Health cis v=ves K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 4 Energy pts y=yes 2. Install Solar Water Heating System 10 Energy pts y=yes 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y=yes 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2A kw =12 points, 3.6 kw = 18 points) Up to 18 Energy pts 6. Select Safe and durable Roofing Materials_ 1 Resource pt y=yes 7 Install Radiant Barrier 3 Energy pts y=yes L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 Energy pts y=yes 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts , y=yes 3. Plant Deciduous Trees on the West and South Sides 3 Energy pis y=yes 1. Use LOW ND-VOC Paint 2. Use Low VOC, Water -Based Wood Finishes 13. Use Low/No VOC Adhesives 4. Use Salvaged Materials for Interior Finishes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 6. Use Exterior Grade Plywood for Interior Uses 7. Seal all Exposed Particleboard or MDF 6. Use FSC Certified Materials for Interior Finish 9. Use Finger -Jointed or Recycled -Content Trim 10. Install Whole House Vacuum System N. Flooring 1. Select FSC Certified Wood Flooring i2. Use Rapidly Renewable Flooring Mater als 3. Use Recycled Content Ceramic Tiles 4. Install Natural Linoleum in Place of Vinyl 5. Use Exposed Concrete as Finished Floor 6. Install Recycled Content Carpet with Low VOCs 1 IAQ/Health pts y=yes 0 21AQ/Health pts y=yes 0 31AQ/Health pts y=yes 0 • 3 Resource pts y=yesH 0 61AQ/Health pts y=yas 1 IAQ/Health pts y --yes 41AQ/Health pts y=yes 4 Resource pts y=yes 1 Resource pts y=yes 3 IAO/Health pts y=yes 8 Resource pts 4 Resource pis 4 Resource pts 5 IAQ/Health pts 4 Resource pts 4 Resource pts Total Points A 1 1401 1301 57 Total Points Project R 1 01 01 0 • /! 5 G:data/pmgslgreenbulldinaguidelineslremodelerslgreenpoints5na12.12.04pmleled.zls 0 CITY OF 16UPEkTINO 0 • Community Development 10300 Tone Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax(408)777-3333 Building Department JOB ADDRESS:{{�� (z, ,+ PERMIT # //,,[� 0?(D 10022-/& a vL r. 1 vq BUSINESS LICENSE # OWNER'S NAME: c' PHONE # GENERAL CONTRACTOR: FAX # o Cement Finishing I am not using any subcontractors: ���5—/�� o a Sieg atrg ate Please check applicable subcontractors and comvlete the following information: Owner/ Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/ Contractor Signature Date