20061 20062 20082 20 (2) or
D&M CONSULTING ENGINEERS, INC.
?'! Geotechnical/Environmental/Materials Testing
F
A URS CORI'ORAfION CCIMPANV
January 29, 2002 Permits: 20061, 20062, 20082, 20106,
Project No.: 0001437 20125, 20129, 20130, 20133,
20135, 20136
Prometheus Real Estate Group, Inc.
350 Bridge Parkway
Redwood City, California 94065
ATTENTION: Ms. Christine A. Weaver
SUBJFCT: Progress Report No. 22 for Construction Observations and Materials Testing
(Special Inspection) Services; Lake Biltmore Apartments, 10159 South
Blaney Avenue, Cupertino, California
Ladies and Gentlemen:
As requested, D&M Consulting Engineers, Inc. (dba D&M/Terratech) is providing construction
observation and materials testing (Special Inspection) services for the subject project. Specific
items observed and/or tested for the subject project are presented on our technicians' daily field
reports (attached). These observations and/or tests have been performed as requested,.in general
accordance with the requirements of the project plans, the project struciural test and'inspections
schedule, and the requirements set forth in the Uniform Building Code. Our services'performed
during the period of January 11 through January 24, 2002 are listed.below. No services were
requested or performed during the period of November 9, 2001 through January 10, 2002.
Laboratory test results are reported under separate cover as the tests are completed. Our services
during the identified time period included:
• Observation of previously completed shear wall diaphragm nailing.
The work observed during the reporting period was, to the best of our knowledge, in
conformance with approved project plans and applicable standards of workmanship at the time
of completion, except as noted below.
f
OPEN EXCEPTIONS
January 11, 2002 — Nails at building 11 need to be set. Blocking needed at windows.at buildings
II, JJ, HH, LL and MM.
March 22, 2001- Due to clearance issues, holes for two epoxy-set,holdown,bolts,.were drilled
slightly off vertical. The holes broke through the side-6f the stem wall above.the slab.. This
requires the review of the project engineer.
0001437(502R0026)gr Page I of 2 Copyright 2002 D&M Consulting Engineers,Inc.
January 29,2002
3194 De La Cruz Blvd.,Suite 19 Santa Clara,California 95054 408 297 6969 Tel 408 297 7716 Fax
December 18, 2000 — Shear wall, floor and roof diaphragm nailing incomplete. Work was
reported to have been reinspected by the city building inspector on or about January 26, 2001.
November 26, 2000 — One epoxy-set anchor bolt had embedment limited to 9 inches due to
conflict with reinforcing steel. Project plans indicate 16 inch embedment requirement. This
requires engineer's review.
LIMITATIONS
As our client, please recognize that construction monitoring is a technique employed to reduce
the risk of deviations from the approved plans from becoming incorporated into the completed
project without appropriate engineering review and approval. Provision of construction
monitoring by D&M/Terratech's field personnel is not insurance, nor does it guarantee
construction of any type. Even with diligent monitoring, some construction defects may be
missed. In all cases, the contractor shall retain sole responsibility for the quality of work, for
adhering to plans and specifications and for repairing defects, deficiencies or omissions,
regardless of when they are found. We have performed our services in a manner consistent with
the standard of care and skill ordinarily exercised by firms of our type practicing under similar
conditions at this same time and locality. However, we do not undertake the guarantee of
construction nor production of a completed project conforming to the project plans and
specifications. No warranty is expressed or implied. Our services were limited to those
documented in our attached reports.
We appreciate the opportunity to work with you on this project. If you have any questions
concerning our observations or test results, or require additional information, please do not
hesitate to contact us at your earliest convenience.
Sincerely,
D&M CONSULTING ENGINEERS, INC.
A URS CORPORATION COMPANY
President/Principal Engineer
Attachments: daily field reports (3 pages)
cc: Trident Construction
City of Cupertino
0001437(502R0026)gr Page 2 of 2 Copyright 2002 D&M Consulting Engineers,Inc.
January 29,2002
IP D&M CONSULTIN NGINEERS, INC. 10
A URS CORPORATION COMPANY
PLYWOOD NAILING(INNSjP'E7CTION REPORT
DATE: 01 / (-,U� t - PROJECT NO. \—�( Time Arrived:
,y,� Time Left:
PROJECT : ��/'—l'_ ''r S Job Time:
Travel Time:
CONTRACTOR: Tf�—IUE� Total Time:
Mileage:
PERMIT NO.: -S Q�'�-aW Expenses:
DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other
TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) Boundary Nailing (4) Other
TYPE OF DTL. NO.
BUILDING
PbU4'l tT 69C'AYfO1V'^ C) DESCRIP. NAILING DRWG. NO. COMMENTS
A t t 3
1
L—� Ca
of 0-7-'-0 ru, (0 i
NOTES:-yU)4 L L SCTl AIAILC ) .- 6LDq 149 4YC4-Cr- / S Af�T AA/ 6,ic&.- �
1 P t d w'HL- (AJ rA,) w/ Tl r n�tr 1+otef
A'-L- I& n6 C — l}0 D A}-T U!1 Ajy3C'W / & W Z ,✓r}7 L
Cr
-0 the best of my knowledge, the abovS SN Aperformed in accordance with the approved plans, specifications, and regulatory requirements.
Superintendent/Representative: e/ Al Inspector:
� 3-
1365 lkmdee WaY•Son Jose, CA 95112 12 Thonuo (A,en., Wut •Munteret; CA 9+940
(408)297 6969 7e1•(408)297 7716 Fax (831)372 3716 Tel•(X311372 7481 Fn,r
DAILY PROGRESS REPORT 7
Project No.
1., D&M CONSULTING ENGINEERS, INC. Page % of /
r
A uas C(IrrN)RA,W,u cr,n,rnw Report Sequence No.
Date/Day /-All-oz, �L-P .
Project Name Weather
Project Address
Purpose of site visit
Project activity since last visit —
Project activity today
Comments
continued ❑
Equipment in use
Client Superintendent Phone
Contractor Foreman Phone
Copy to
Print Full Name
1365 Pander Wai •San Jas,. CA 95112 12 TAumns 0"ens Wac•Manterer. CA 91940
WON)297 6969 7i•l•(403)297 7716 6ttr (8.31).372 3hri lel• (83/) 372 7481 Fa'
FORM 360-(Rev.7/99)
f D&M CONSULTINCONGINEERS, INC. •
A URS CORPORATION COMPANY
II g PLYWOOD NAILING INSPECTION REPORT
DATE: e (_ O U PROJECT NO. .7� Time Arrived:
(( Time Left:
PROJECT :�_•�� - 5 �(.� J Job Time:
.t^ ,1� �� Travel Time:
CONTRACTOR: _ �( Total Time:
Mileage:
PERMIT NO.: Expenses:
DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other
TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) Boundary Nailing (4) Other
BUILDING f 6j l LeCATf6R h'C1 , DESCRIP. TYPE
NAILINGG DRWG. NO. COMMENTS
0L'L • L G c.l Qi Y u rm eY4Y rc�7
NOTES:
-o the best of my knowledge, the above
bov WAS WAS NOT performed in accordance with the approved plans,specifications, and regulatory requirements.
Superintendent/Representative: Inspector: �f 1,