20062 20082 20125 20 0
r ' D&M CONSULTING ENGINEERS, INC.
Geotechnical/Environmental/Materials Testing
A URS CORPORATION COMPANY
March 7, 2002 Permits: 20062, 20082, 20125, 20129,
Project No.: 0001437 20130, 20133, 20135, 20136
Prometheus Real Estate Group, Inc.
350 Bridge Parkway
Redwood City, California 94065
ATTENTION: Ms. Christine A. Weaver
SUBJECT: Progress Report No. 23 for Construction Observations and Materials Testing
(Special Inspection) Services; Lake Biltmore Apartments, 10159 South
Blaney Avenue, Cupertino, California
Ladies and Gentlemen:
As requested, D&M Consulting Engineers, Inc. (dba D&M/Terratech) is providing construction
observation and materials testing (Special Inspection) service%s for the subject project. Specific
items observed and/or tested for the subject project are presented on.our technician's daily field
reports (attached). These observations and/or tests have been performed as requested, in general
accordance with the requirements of the project plans, the project structural test and inspections
schedule, and the requirements set forth in the Uniform Building Code. Our services performed
during the period of January 25 through February 26, 2002 are listed below. Laboratory test
results are reported under separate cover as the tests are completed. Our services during the
identified time period included:
• Observation of previously completed shear wall diaphragm nailing.
The work observed during the reporting period was, to the best of our knowledge, in
conformance with approved project plans and applicable standards of workmanship at the time
of completion, except as noted below.
CLEARED EXCEPTIONS
February 4, 2002 — Cleared exception of January 11, 2002. Nails at building II were set.
Blocking needed at.windows at buildings II, JJ, HH; LL and MM was added.
March 22, 2001- Due io',clearance issues, holes'for. two,epoxy-set holdown bolts�were.drilled
slightly off vertical. The holes broke through the side of the stem wall above,the slab' This'
requires the review of the project engineer.
0001437(502R0055)gr Page 1 of 2 Copyright 2002 D&M Consulting Engineers,Inc.
March 7,2002
3194 De La Cruz Blvd.,Suite 19 Santa Clara,California 95054 408 297 6969 Tel 408 297 7716 Fax
December 18, 2000 — Shear wall, floor and roof diaphragm nailing incomplete. Work was
reported to have been reinspected by the city building inspector on or about January 26, 2001.
November 26, 2000 — One epoxy-set anchor bolt had embedment limited to 9 inches due to
conflict with reinforcing steel. Project plans indicate 16 inch embedment requirement. This
requires engineer's review.
LIMITATIONS
As our client, please recognize that construction monitoring is a technique employed to reduce
the risk of deviations from the approved plans from becoming incorporated into the completed
project without appropriate engineering review and approval. Provision of construction
monitoring by D&M/Terratech's field personnel is not insurance, nor does it guarantee
construction of any type. Even with diligent monitoring, some construction defects may be
missed. In all cases, the contractor shall retain sole responsibility for the quality of work, for
adhering to plans and specifications and for repairing defects, deficiencies or omissions,
regardless of when they are found. We have performed our services in a manner consistent with
the standard of care and skill ordinarily exercised by firms of our type practicing under similar
conditions at this same time and locality. However, we do not undertake the guarantee of
construction nor production of a completed project conforming to the project plans and
specifications. No warranty is expressed or implied. Our services were limited to those
documented in our attached reports.
We appreciate the opportunity to work with you on this project. If you have any questions
concerning our observations or test results, or require additional information, please do not
hesitate to contact us at your earliest convenience.
Sincerely,
D&M CONSULTING ENGINEERS, INC.
A URS CORPORATION COMPAANNy
Gregory
President/Principal Engineer
Attachments: daily field reports (5 pages)
cc: Trident Construction
City of Cupertino
0001437(502R0055)gr Page 2 or 2 Copyright 2002 D&M Consulting Engineers.Inc.
March 7,2002
D&M CONSULTINCWGINEERS, INC. •
A URS CORPORATION COMPANY
PLYWOOD NAILING INSPECTION REPORT
^ / dY 4
DATE: �' (�/ G' '� 1_ PROJECT NO.� \� , Time Arrived:
Time Left:
PROJECT : � D (_ L.7�],�1 frt.�" TS Job Time:
r ,�� �' Travel Time:
CONTRACTOR: Tlr�' 1( I Total Time:
_, , Mileage:
PERMIT NO.: S� ({ -� �J Expenses:
DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other
TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) Boundary Nailing (4) Other
BUILDING f1EVA L�ee�rTieta DESCRNAILING DRWG. NO.IP. TYPE OF DTL. NO. COMMENTS
coo t p 3 31 4 2 3 o(--
Ajtfz CrJi'h.f'CI�E'
JJ w a G ti 3 DK
1. L Oyu 2D (tiS- G ( 1 3 0
NOTES: Ft Q 1
U-)G 9L-
-o the best of my knowledge,the abov WAS WAS NOT performed in accordance with the approved plans,specifications, and regulatory requirements.
Superintendent/Representative: Inspector:
6-d P n 3/31 A, S
1365 Vander Way•San Jose, CA 95112 12 Thomas Owens Way•Maniere):CA 93940
(408)297 6969 Tel•(408)297 7776 Farr,.,-
D&M CONSULTINVNGINEERS, INC.
A URS CORPORATION COMPANY
PLYWOOD NAILING INSPECTION REPORT
DATE: ( O � t
_ PROJECT NO. f 3 ) Time Arrived:
/u
PROJECT : � ' I r� Time Left:
�-- l l.. V/"[ ZS Job Time:
r A O Travel Time:
CONTRACTOR: Ql/�s .�.,, •1 Total Time:
PERMIT NO.: Mileage:
Expenses:
DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other
TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) Boundary Nailing (4) Other
. TYPE DBUILDING P6-., MWe*ffGN ND DESCRIR NAILING DRWG. NO. COMMENTS
oaa2G 3S
NOTES:
'o the best of my knowledge, the above
bov WAS WAS NOT performed in accordance with the approved plans,specifications,and regulatory requirements.
Superintendent/Representative: Inspector:
SIL IlISl11dM C2? 2I+d-
1365 Vander Way•San Jose, CA 95112 12 Thomas Owens Way•Monterey, CA 93940
(419R)29 7 6969 Tel•(4081 297 7716 Fnr ru7 t 1777 271K T,/.197 1 1 771 len, c,,..
0 D&M CONSULTING ENOEERS, INC. •
Geotechnical/Environmental7Materials Testing
A URS CORPORATION COMPANY
DATE: —1/— 07121 DSA FILE/APPL.NO.
PROJECT NO.: /937 OSHPD NO.
PROJECT Z?
NAME:Iakr- e 7- PERMIT N0.
i�
LOCATION: WEATHER:I f �Z
•Pjy�/� TEMP: ,
❑ PROOF LOAD ❑ TORQUE WITNESSING
❑ Testing was performed on the following items. All tests were performed with the following calibrated equipment:
RAM: GAGE: TORQUE WRENCH:
RAM: GAGE: TORQUE WRENCH:
LOCATION OF TEST TYPE/SIZE ° %of LOAD Ib p p p
TESTED TOTAL or Ft Lbs GAGE(PSI) ACC. FE., RETEST
[7T
Type of epoxy/grout used: J / Method of application/cleaningi k 5X
❑ Visual inspection was performed on / o
f - - O 3-
Zed azlty,,�, C4
❑ Show up/Stand by time. Job Canceled/Delayed due to:
❑ All non-compliance items were brought to the attention of: at the job site.
❑ NON-COMPLIANCE REPORT ATTACHED ❑ ADDITIONAL TESTS ATTACHED
NOTES:
To the best of my knowledge, the above WAS/WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements.
Superintendent/Representative: Inspector:
3194 De Ln Cru;,Bli l_ Suite 19•Santa Clore, CA 45054 12 Tdnama01. ... ttirc..5tM 30
(408)297 6969 Tel•(408)297 7716 Fax (831)372 3716 Tel•(831)372 7481 Fas
D&M CONSULTINCSNGINEERS, INC. •
A URS CORPORATION COMPANY
PLYWOOD NAILING INSPECTION REPORT
DATE: _� 2"�'�' Z I (1 PROJECT NO. _�_ / Time Arrived:
r ^ ,' , Time Left:
PROJECT : t/H'K-G Gl(,ZMt.�'tL,.J
Job Time:
pp �
�r- Travel Time:
CONTRACTOR: T94 00 Total Time:
Mileage:
PERMIT NO.: S ��1 Expenses:
DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other
TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) Boundary Nailing (4) Other
BUILDING ��Q,/y1L71- T A1,05). DESCRIP. TYPE OF DTL. NO.
NAILING DRWG. NO. COMMENTS
8 2 po S'Z A 2 3 PPo2z�l
v �
0 00Lill 3 Pzy -
D0-D2u06Z- L3 L 3
NOTES:
the best of my knowledge,the abov 90
WAS NOT performed in accordance with the approved plans,specifications,and regulatory requirements.
Superintendent/Representative: Inspector:
C�PoT/.sJly S
1365 Vander Way•San Jose, CA 95112 12 Thomas Owens Way•Monterey, CA 93940
(408)297 6969 Tel•(408)297 7716 Fax (83 11 377 7716 T,/.1R a 11 771 74R 1 F.,r
D&M CONSULTIN(ONGINEERS, INC. •
A URS CORPORATION COMPANY
PLYWOOD NAILING INSPECTION REPORT
DATE: n�- `L'I. _ `L I PROJECT NO. -L / Time Arrived:
A„
PROJECT plr ��3 Time Left:
: /Yw Job Time:
�'ti , O � Time:Time:
CONTRACTOR: _F-'l Total me:
('�I
PERMIT NO.: J� 6� Mileage:
Expenses:
DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other
TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) BoundaryNailing (4) Other
BUILDING LOCATION DESCRIP. TYPE OF DTL. NO.
NAILING DRWG. NO. COMMENTS
( � D10T, ,vrq' �
Do,
G t •� 3
8 lOK I Z
NOTES C1t� LnlJryy�I— ��LQJJI&!) �f / WAT
-o the best of my knowledge, the abov WAS WAS NOT performed in accordance with the approved plans,specifications,and regulatory requirements.
Superintendent/Representative: Inspector:
Com,,-O a?/rih z
0IM4= IVU P1111-14 G277o-
1365 Vander Way•San Jose, CA 95112 12 Thomas Owens Way•Monterey, CA 93940
(408)297 6969 Tel•(408)297 7716 Fax (831)372 3716 Tel•(R31)372 7487 Far