20062 20082 20125 20 (2) ®� D&M CONSULTING ENGINEERS, INC.
OFGeotechnical/Environmental/Materials Testing
A URS CORPORATION COMPANY
April 22, 2002 Permits: 20062, 20082, 20125, 20129,
Project No.: 0001437 20130, 20133, 20135, 20136
Prometheus Real Estate Group, Inc.
350 Bridge Parkway
Redwood City, California 94065
ATTENTION: Ms. Christine A. Weaver
SUBJECT: Progress Report No. 27 for Construction Observations and Materials Testing
(Special Inspection) Services; Lake Biltmore Apartments, 10159 South
Blaney Avenue, Cupertino, California
Ladies and Gentlemen:
As requested, D&M Consulting Engineers, Inc. (dba D&M/Terratech) is providing construction
observation and materials testing (Special Inspection) services for the subject project. Specific
items observed and/or tested for the subject project are presented on our technician's daily field
report (attached). These observations and/or tests have been performed as requested, in general
accordance with the requirements of the project plans, the project structural test and inspections
Schedule, and the requirements scf forth in the-Uniform Building Code. .Our services.performed
during the period of April 5 through April 18, 2002 are listed below. ' Our services during the
identified time period included:
• Observation of previously completed shear wall diaphragm nailing.
FINDINGS
The work observed at Building 19 during the identified time period was, to the best of our
knowledge, in conformance with approved project plans and applicable standards of
workmanship at the time of completion.
OPEN EXCEPTIONS
March requires 9, 21-002- action
gP n act on he framing
ramin gr cto d the absence of nailing was. noted at Building 18 and
- -_ _ .or clarific�ation� from the Engineer..,- . .'
37(502R0143) .- , Page I oC2 Copyright 2002'D&M Consulting Engineers,Inc.
April2
April 22,,2002
12 Thomas Owens Way Monterey,California 93940 831 372 3716 Tel 831 372 7481 Fax
3194 De La Cruz Blvd.,Suite 19 Santa Clara,California 95054 408 297 6969 Tel 408 297 7716 Fax
1500 Graham Hill Road,Unit B Santa Cruz,California 95060 831 458 4383 Tel 831 458 4388 Fax
LIMITATIONS
As our client, please recognize that construction monitoring is a technique employed to reduce
the risk of deviations from the approved plans from becoming incorporated into the completed
project without appropriate engineering review and approval. Provision of construction
monitoring by D&M/Terratech's field personnel is not insurance, nor does it guarantee
construction of any type. Even with diligent monitoring, some construction defects may be
missed. In all cases, the contractor shall retain sole responsibility for the quality of work, for
adhering to plans and specifications and for repairing defects, deficiencies or omissions,
regardless of when they are found. We have performed our services in a manner consistent with
the standard of care and skill ordinarily exercised by firms of our type practicing under similar
conditions at this same time and locality. However, we do not undertake the guarantee of
construction or production of a completed project conforming to the project plans and
specifications. No warranty is expressed or implied. Our services during the identified time
period were limited to those documented in our attached report.
We appreciate the opportunity to work with you on this project. If you have any questions
concerning our observations or test results, or require additional information, please do not
hesitate to contact us at your earliest convenience.
Sincerely,
D&M CONSULTING ENGINEERS, INC.
A URS CORPORATION COMPANY
Gregory J. Ruf, P.E.
President/Principal Engineer
Attachments: daily field report (1 page)
cc: Addressee
Trident Construction
City of Cupertino
0001437(502R0143) Page 2 of 2 Copyright 2002 D&M Consulting Engineers,Inc.
April 22,2002
D&M CONSULTINCWGINEERS, INC. •
A URS CORPORATION COMPANY
PLYWOOD NAILING INSPECTION REPORT
DATE: �� �� 0 Z () PROJECT N0. (4-37 Time Arrived:
�.( Time Left:
PROJECT : �1 E—C fJ U Ll C� "Zi Job Time:
p J— Travel Time:
CONTRACTOR: �1�—t,O � Total Time:
PERMIT NO.: Scd—, Mileage:
Expenses:
DESCRIPTION: (A) Shear Wall (B) Floor Diaphram (C) Roof Diaphram (D) Other
TYPE OF NAILING: (1) Edge Nailing (2) Field Nailing (3) Boundary Nailing (4) Other
O.
BUILDING L9CATfON DESCRIP. TYPE OF DTL. . N
�= NAILING DRWGtd0. COMMENTS
(� d oG 2100CL A- I, z ,3 C-x7lEf-ra-
NOTES:
"o the best of my knowledge, the above&
WAS NOT performed in accordance with the approved plans,specifications, and regulatory requirements.
Superintendent/Representative: Inspector:
03/31/D5�
ftA1 —,4(SudrJ -- Cjjto k
1365 Vander Way•San Jose, CA 95112 12 Thomas Owens Way•Monrerey. CA 93940
(408)297 6969 Tel•(408)297 7716 Fax (831)372 3716 Tel•(831)372 7481 Far
D&M CONSULTING 3194 f LA CRUZ BLVD, SUITE 18
ENGINEERS, INC. SANTA CLARA CA 95054
CONC ETE COMPRESSION TEST REPORT (408) 297-6969
PROJECT NO. : 0001437
RPT TO: PROMETHEUS REAL ESTATE GROUP * PROJECT DETAIL INFORMATION
CHRISTINE WEAVER LAKE BILTMORE APTS-24 NEW UNIT
350 BRIDGE PARKWAY 10159 SOUTH BLANEY AVE.
REDWOOD CITY CA 94065 CUPERTINO CA
PERMIT # : 00020141 /
APPL #
---------------------------------= MIX DATA
----------------------------------
Lab Number 03148 Mix number : 5423
Sample date 06/22/01 Size agg : 3/8"
Material type CIP CONCRETE COMPRESSION TEST Spec Strength: 3000psi @ 28 Days
Supplier RMC Cement factor: 6. 00 sack
Admixture
_______________________ SAMPLE DATA
Set number : 0001 Slump, ASTM C143 6. 00in
Cast time : 1 : 50pm Air temp 85deg F
Fld Inspector : FRANK NISHIURA Mix temp 68deg F
Ticket/Truck 13097055/ 721 Air content, ASTM C173
Test tech Fresh unit wt, ASTM C138 : pcf
Dry unit wt, ASTM C567 pcf
PLACEMENT LOCATION : CONC. SHEAR WALLS-BUILD. #23 PERMIT #00020066
BUILDING #24 PERMIT #00020073
TESTDATA =_______________________________
SAMPLE TEST AREA LOAD CORR CURE FRAC COMPRES
NO DATE AGE DIMENSIONS (in . ) (sq in) (lbs) FACT TYPE TYPE STR (psi)
--------------------------------------------------------------------------------
00074 H 6 . 00 x 12 . 00 28 . 27 L
00075 06/29/01 7 6 . 00 x 12 . 00 28 . 27 67080 L A 2370
00076 07/20/01 28 6 . 00 x 12 . 00 28 . 27 103290 L A 3650
00077 07/20/01 28 6 . 00 x 12 . 00 28 . 27 106420 L A 3760
Samples MEET specified 28 - day strength requirement at 28 days . Avg = 3710
Comments :
Samples tested in accordance with ASTM C39
------- LEGEND
Curing type : L = tab, F = field
Fracture types : A=cone, B=cone and split, C=cone and shear, D=shear, E=columnar
cc : PROMETHEUS REAL ESTATE GROUP Respectfully submitted,
RMC LONESTAR D&MCE SANTA CLARA DIVISION
CITY OF CUPERTINO BLDG. DEPT .
*FILE COPY*
Gregory R
Preside