08060104 CITY OF CUPERTINO
BUILDING DIVISION PERMIT MCTGt1R&INkURNIATIfIN
BUILDING ADDRESS: PERMIT No.
1.0729 S BLANEY AVE WESTERN ROOFING SYSTEMS 08060104
OWNER'S NAME: PERMIT fSUE DATE
JF'RRY HUANG 1328 WHITE OAKS RD 06/13/2008
NE: SANITARY NO. CONTROL NO.
ARCHT ECT/ENGINEER: BUILDING PERMIT INFO
TEAR OFF SHAKE ROOFING— FILLBLDc ELECr PLUMB MECH
O O O O
u O p LICENSED CONTRACTOR'S DECLARATION
uC 1 hereby aDirn Was I am lieemed ander pmviaans of Chapter 9 tanmmcm na __ ... _-_,..-._ _ _ .Job.Deseription
�W with Suction] OiHsion 3ofthe Basineu arM Professions Code,aMmYliee"u
mora loIShnr.roeand IT
ert Lle.g T2.i
z Lice"Clan
p,p Da¢_�p�K Conlracmr
££700CHIiECI'S DEC11��
k 1 undersand my phos Nall he used as pdhlic ds
�yV
g o 1 Licensed Professional
5 OWNER-BUILDER DECLARATION
P I hereby affirm that 1 am exempt from the Committees Litems
i c O following mason.(Section 7031.5.Business and Professions Cods:Any city or county
m which requires a pomft to construct.alter,improve,deme oda.or repair any suunum -
m prior W its issuance.also requires the applicant for such permit in rile a signed announced
that W is licensed pursuant in the provisions of the Contractor's License Law(Chapter 9 Sq.Ft. Floor Area Valuation
x�0 (commencing with section 7000)of Division 3 of the Business and Professions Cow)or
y
that W is exempt therefrom and the basis for We alleged exemption.Any violation of
Section 7031.5 by my applicant for a permit subjects We applicant to a civil penalty of APN Number Occupancy Type
not mot roan five handled delays(5500). P Y YP
0 I,as matter of Was property,in my employes with wages as their sok wmpcnu bus.
will do to wank.and Cheam ium Is not minded or offered for ask(Sec.70th,Business
and Profcssi.v Code The Con rmwea Lia"Law does not apply in an comer of Required Inspections
progeny who builds o improvea thereon,and who deer such wort himself.,through his
mm employees,provided that such improvemmv are notimmnded oroffened foreale IL
however.the building or improvement is sold within ohm year recompletion,the owner-
builder will have We Wmen of proving that he did tet Wild in improve for purpose of
tile.).
0 1,as owner of the property,am exclusively conmasing with Ba"d tmmmactms to
construct the project(Sec.7014.Business and Professions Code:)The Committees U. .
cove Law docs not apply to an owner of property who Wilds or improves Norton,and
wo conuacu for such projau with a conmsstena)licensed poeaam on the Contractors
Lice"law.
0 lamesemplunder See ,B&PC(m WWwxum
Owner Dau
WORKER'S COMPENSATION DECLARATION
I beleby air=under peviry of psajury arc of the fallowing declwions:
ma1haw and willf.byn•C..37 teofC LbWsclf-inwle(v Worker Compere
anion, r provided ripe by Sector 3]00 a(the labor Code.fo Ne peAonnarc of the
wok for which Nu permit is issued.
1 have and will maintain Worker's Compensation Insurance,as required by Section
37M of the labor Code,for We performance ofthe wort for which was permit is issued. '
My Work�esr'.Compensate.l"ounce,carrier Md Policy number art:
Cameria�,Nv<^�IaW A//&res. Polley No.: S)/SIC7'
CERTIFlCATE OF M ON FROM WORKERS'
COMPENSATION INSURANCE
(Thu rection and net W conplecd Russ psmsit Isforov hundeaddullan($100)
or leas.)
1 caniry that in We performance of we work for which this permit u issoed.I shall net
employ an,,...user,m ernoto as in We.subject in We Workers'C.mpevadon
Laws of Californa.Dau
Applicant
NOTICE TO APPLICANT:If.after making Wu Cenirrcac of Exemption.you should
Women$Uhl=m We Wader's Compensation provisions of We Labor Code,you mum
0,z forthwith comply with such provisions or this permit shall W deemed lewktd.
Z O CONSTRUCTION LENDING AGENCY
[—m IWrehy affirm thou ftisaconatrominn leading sleety for the performs a
(Yi We work fur which this permit it issued(Se,.3077,Civ.C.)
0 lender's Name
= z leader's Md.
V O I citify that 1 have rad this application and sum Wm We move wromaton u
U.r' tortes 1 agree W comply with all city and county woulmanas and sum laws relating W
-0 U tinkling construction.and hereby ambrome mprnsoauuves of this city a enter upon tic
� {T.l sow-mentioned property fes,inspection pury"L
"f1 (We)agree in ears,indemnify and keep harmless We City of Captain.agaiast
f/1 liabilitins,judgrecnu,cvts and vpcvu which may in any way sane apivt mid City D
U Z in co"quence of to Spending of this permit. )
^ APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL.NON-POINT Issued by: Date
s0 LA
REGU
ginjumre ofA icanmC Re-roofs
x&zARDOU 7IDt1AlS DlsaosuRE Data
Type of Roof
Will the applieantmrut Wil Ing asuPan'scam an
handle havardov material
as defined by sic Cupertino Muni, Cede.Chapter 9.12,and sic Health and Safety
Code,section 25532(p?
40 Oyes No All roofs shall be inspected prior to any roofing material being installed.
Will We applicant or future Wilding occupant"equipment in W,as which If a roof is installed without first obtaining an inspection,I agree to remove
emit haramnus air contaminants as defined by the Bay Area Air Quality Management all new materials for inspection.
Dam et, /
0 yea
I have mad We haankmarateriaurequiremcnuunder Chapicr6.95ofthe CslifoP -
meRCAIW&Safely Code,Secuoo25505,25533 md25534.1 understand dwifthe Wilding
does ngl',&�nane W 't u my lesponthility m noul'y Ws occupant of treeuipoor issuanofaCcnificamofSI afar ofApplica Date
All of c rims to be Class'A!perm' - g 'or better
CITY OF CUPERTINO
• 2 ITEMS OF 2' PERMIT RECEIPT OPERATOR: SylviaM
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot :
APN . . . . . . . . : 36934046 . 00
DATE ISSUED. . . . . . . : 06/13/2008
RECEIPT # . . . . . . . . . : BS000005112
REFERENCE ID # . . . : 08060104
SITE ADDRESS . . . . . : 10729 S BLANEY AVE
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : JERRY HUANG
ADDRESS . . . . . . . . . . : 10729 S BLANEY
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014-4543
RECEIVED FROM . . . . : WESTERN ROOFING
CONTRACTOR . . . . . . . : MICHAEL LUNNEBORG LIC # 25896
COMPANY WESTERN ROOFING SYSTEMS
ADDRESS . . . . . . . . . . : 1328 WHITE OAKS RD
CITY/STATE/ZIP . . . : CAMPBELL, CA 95008
TELEPHONE . . . . . . . . : (831) 278-1837
•
FEE ID UNIT QUANTITY _AMOUNT; PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR VALUATION 16, 500 . 00 1 . 70 0 . 00 1 . 70 0 . 00
1REROOFRES SQ FEET 25 . 00 325 . 00 0 . 00 325 . 00 0 . 00
---------- ---------- ---------- ----------
TOTAL PERMIT 326 . 70 0 . 00 326 . 70 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 326 . 70 VISA
---------------
TOTAL RECEIPT 326 . 70
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS 605 FINAL REROOF
•
-� CITY OF CUPERTINO
REROOF
Circ or
CUPEkTINO PERMIT APPLICATION
6 Mpo/U
APN # Date:
ONLO.
Building Address:
Owner's Name: Phone #:
Contractor: Phone #:,,,, eta 9 q i 7s
�Je34efa��r� S��r4er»s
Fax #: 'f rc ST4 i733
Cupertino Business License #: Contractor License #:
<Y�(p (. 7 57
Type of Roof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles ❑ Asphalt Shingles
Wool Shakes ❑ Wood Shakes
❑ Wo Shingles ❑ Wood Shingles
❑ Other (Specify) 'r Other (Specify) _M-e-4P.(— j=e
Number of existing coverings ❑ Provide I.C.B.O. Report # V27Ze
❑ To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: -Aeac- of-r- SR°,T�'NS — -FIlskee ;-s &*+ t+0 (%s
Residential Commercial El
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the there are any restrictions: ❑
application or if applicable, include in plan
set & the sheet index.
Valuation:
I v 1'0 0
•1 Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy:
Signatu e
au-
CITY
CITY OF CUPERTINO
REROOFqkUkTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Commercial B 1COMMLROOF
1BSEISMICO Seismic Commercial B
1REROOFRES Re-roof Residential B 1SFDWLROOF
2C
1BSEISMICRE Seismic Residential B
1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF
IBSEISMICRE Seismic Residential B
1BUSLIC Business License B
Green Building Plan Check
Index of Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
72points
B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 11. Permeable Pavin Note L-1C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 5. Use Truss with heels, (detail) S-2 6. B. OSB Sheathin detail S-2
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Nate/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11.A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A-3 1 point
P. Other= 1. List Green Features on Plans A-1 1 point
TOTAL POINTS1 40 points
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
• Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is
not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project.
INPUT Reqources Ener
A. rte
1.Recycle Job Site Construction 8 Demolition Waste I
65°!°=1 point 75%= 2 points;So 4 points up to 4 Resource pts D
2.Saivage Reusable Building Matenals 1 4 Resource pts y=yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y--yes 0
4.Protect Native Soil 2 Resource pts y=yes 0
5.Minimize Disruption of Existing Plants 8 Trees 1 Resource pt y--yes 0
6.Implement Construction Site Stormwater Practices 2 Resource pis y--yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes D
8.Design Resource-Efficient Landscapes and Gardens 4 Resource is
_ _ p y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes D
11.Provide for DnSite Water Catchment/Retention 2 Resource pts y=yes D
B.Foundation
• 1.Incorporate Recycled Flyash in Concrete
25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of flyash,up to 5 points up to 5 Resource ptsno
2.Use Recycled Content Aggregate 2 Resource pts y=yes
3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0
1
C.Structural Frame 1 1
1.Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 0
2.Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0
3,Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0
4.Use Web Floor Trusses 2 Resource pts y=yes 0
5.Design Energy Heels on Trusses 6'or more 2 Energy pts Y--yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0
7.Use Engineered Studs for Vertical Applications 2 Resource pts Y--yes 0
B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts yryes 0
9.Use Structural Insulated Panels(SIPS)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Ener y=
yes Pts )-Yes D
c.Root
3 Energy pts yryes 0
10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0
. a.Subfloors + 1 Resource pt y=yes 0
b.Sheathing
1 Resource pt y=yes 0
1 1 t
INPUT ResDurces Energy IAD[Heafth Extenorr.rnrs
1.Use Sustainable Decking Materials •
a.Recycled content 3.Resource pts y=yes 0
l b.FSC Certified Wood I 3 Resource pts Y_-Yes 0
2.Use Treated Wood That Does Not Contain ChromiurrdArsenic 1 1 IAQ/Health pt y--yes 0
3.Install House Wrap under Siding 1 IAQ/Health pt y=yes D
p
4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0
1 i 1
E.Plumbing
1.Install Water Heater Jacket _ 1 Energy pt y=yes D
2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes D
3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 pants) Up to 2 Resource pts. 0
4.Replace Toilest with Ultra-Low Flush Toilets
(1 point each,up to 3 points) _ Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead _ 1 IAQ/Health pt y--yes D
6.Convert Gas to Tankless Water Heater 4 Energy pts y=yas D
7.Install Water Filtration Units at Faucets
(2 points each,up to 4 points) Up to 41A(UHealth pts. 0
B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0
1 1 !
r.trecmcar
1.Install Compact Fluorescent Light Bulbs(CFLs) •
(6 bulbs=2 points,10 bulbs_-3 points,12 bulbs=4 points Up to 4 Energy pts. 0
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up 10
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0
4.Install High Efficiancy Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. 0
1 1 1
G.Appliances
1.Install Energy Star Dishwasher 1 Energy pt y=yes 0
2.Install Washing Machine with Water and Energy
Conservation Features 1 Energy pt y=yes 0
I3.Install Energy Star Refrigerator —' 1 Energy pt y=yes 0
4.Install Built-In Recycling Center 3 Resource pts y--yes 0
1 1 !
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pts y=yes 0
b.Ceilings 2 Energy pts y--yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0
LInstall Recycled-Content,Fiberglass Insulation with
Added Formaldehyde _ _ 31AQIHealth pts y=yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y=yes 0 •
b.Ceilings 4 Resource pts y=yes 0
6.Alternative Insulation Products(Cotton,spray-loam)
a.Walls 4 Resource pts y--yes
n.Uemngs 4 Resource pts y=yes 0
I.Win ows
• 1.Install Energy-Effic ent Windows
a.Double-Paned 1 Energy pt y--yes D
b.Low-Emissivity(Low-E) 2 Energy pis y=yas 0
c.Low.Conductvty Frames { 2 Energy pts y=yes D
2.Install Low Heat Transmission Glazing 1 Energy pt y=yes D
1 1 1
J.Heating Ventilation and Air Conditioning
f 1l Use Duct Mastic on All Duct Joints J 2 Energy pts Y--yes0
2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0
3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes D
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 7
0
5.Install Solar Attic Fan 2 Energy pts y=yes 0
6,Install Attic Ventilation Systems 1 Energy pt y-y'es 0
7.Install Whole House Fan 4 Energy pts yryes 0
8.Install Sealed Combustion Units
a.Furnaces 31AQ/Health pts yryes D
b.Water Heaters 31AQ/Health pts y=yes 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y=yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts yryes D
11.Install AD with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install M Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0
• 13.Retrofit Wood Burning Fireplaces
a.Install EPA certified wood stoves/insarts 1 IAD/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt y=yes 0
c.Install Airtight Doors 1 Energy pt y=yes D
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15.Install High Efficiency Filter 4 AQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IA(llHealth pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y--yes p
1 1 1
K.Renewable Energy and Roofing ,
1.Pre-Plumb for Solar Water Heating 4 Energy pts Y--yes 0
2.Install Solar Water Heating System 10 Energy pts y=yes D
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y--yes 0
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0
6.Select Safe and Durable Roofing Materials------
-- 1 ResourceP t
— — Y=Yes 0
7. f
7.Install Radiant Barrier 3 Energy pts y=yes p
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes D
2.Install Overhangs or Awnings over South Facing Wlindows 3 Energy pts , y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes D
• 1 1 1
M.Indoor Air Quality and Finishes
'17Use LOWNDN C Paint 1 IAQ/Health pts y=yes 0 •
2.Use Low VOC,Water-Based Wood Finishes 2IAQ/Health pts y=yes 0
r.-Use Low/No VOC Adhesioes - 1 3 IAQ/Hsalth pts y=yes 0
P.
4.Use Savaged Materials for Ince or Finishes 3 Resource pts y--yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AQMealth pts y--yes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes D
7 Beal all Exposed Particleboard or MDF _ �{ 4 IAQ/Health pts y--yes 0
8.Use FSC Certified Materials for Interior Finish 4 Resource pts y--yes 0
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0
10.Install Whole House Vacuum System 3 IAQ/Health pts y--yes D
1 1 1
N.Flooring
1.Select FSC Certified Wood Flooring 8 Resource pts y=yes D
ruse Rapidly Renewable Flooring Materials _ _� 4 Resource pts y=yes 0
3.Use Recycled Content Ceramic Tiles 4 Resource pts yges 0
4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Heeth pts y=yes 0
5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0
6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0
Total Points Availabi 1 1401 130 57 •
Total Points Project Received: 1 01 01 0
G:datalprogslgreenbuildnoguidelineslremodelersrgreenpointsfinel212.D4profeded.xls
•
Community Development Department
Building Division
City of Cupertino
• 10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re-roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
• 5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled
IMPORTANT:
1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: t•f r� a- J-ect"i g,,,,,,,,,
Job Site Address: ) O"12 C1
Roofing Company Name: ' TQC Tei. 1"ynr� S� j /h
Applicant's Signature: Date:
Greg Casteel
Building Official
Revised 11/2/04