Loading...
08060104 CITY OF CUPERTINO BUILDING DIVISION PERMIT MCTGt1R&INkURNIATIfIN BUILDING ADDRESS: PERMIT No. 1.0729 S BLANEY AVE WESTERN ROOFING SYSTEMS 08060104 OWNER'S NAME: PERMIT fSUE DATE JF'RRY HUANG 1328 WHITE OAKS RD 06/13/2008 NE: SANITARY NO. CONTROL NO. ARCHT ECT/ENGINEER: BUILDING PERMIT INFO TEAR OFF SHAKE ROOFING— FILLBLDc ELECr PLUMB MECH O O O O u O p LICENSED CONTRACTOR'S DECLARATION uC 1 hereby aDirn Was I am lieemed ander pmviaans of Chapter 9 tanmmcm na __ ... _-_,..-._ _ _ .Job.Deseription �W with Suction] OiHsion 3ofthe Basineu arM Professions Code,aMmYliee"u mora loIShnr.roeand IT ert Lle.g T2.i z Lice"Clan p,p Da¢_�p�K Conlracmr ££700CHIiECI'S DEC11�� k 1 undersand my phos Nall he used as pdhlic ds �yV g o 1 Licensed Professional 5 OWNER-BUILDER DECLARATION P I hereby affirm that 1 am exempt from the Committees Litems i c O following mason.(Section 7031.5.Business and Professions Cods:Any city or county m which requires a pomft to construct.alter,improve,deme oda.or repair any suunum - m prior W its issuance.also requires the applicant for such permit in rile a signed announced that W is licensed pursuant in the provisions of the Contractor's License Law(Chapter 9 Sq.Ft. Floor Area Valuation x�0 (commencing with section 7000)of Division 3 of the Business and Professions Cow)or y that W is exempt therefrom and the basis for We alleged exemption.Any violation of Section 7031.5 by my applicant for a permit subjects We applicant to a civil penalty of APN Number Occupancy Type not mot roan five handled delays(5500). P Y YP 0 I,as matter of Was property,in my employes with wages as their sok wmpcnu bus. will do to wank.and Cheam ium Is not minded or offered for ask(Sec.70th,Business and Profcssi.v Code The Con rmwea Lia"Law does not apply in an comer of Required Inspections progeny who builds o improvea thereon,and who deer such wort himself.,through his mm employees,provided that such improvemmv are notimmnded oroffened foreale IL however.the building or improvement is sold within ohm year recompletion,the owner- builder will have We Wmen of proving that he did tet Wild in improve for purpose of tile.). 0 1,as owner of the property,am exclusively conmasing with Ba"d tmmmactms to construct the project(Sec.7014.Business and Professions Code:)The Committees U. . cove Law docs not apply to an owner of property who Wilds or improves Norton,and wo conuacu for such projau with a conmsstena)licensed poeaam on the Contractors Lice"law. 0 lamesemplunder See ,B&PC(m WWwxum Owner Dau WORKER'S COMPENSATION DECLARATION I beleby air=under peviry of psajury arc of the fallowing declwions: ma1haw and willf.byn•C..37 teofC LbWsclf-inwle(v Worker Compere anion, r provided ripe by Sector 3]00 a(the labor Code.fo Ne peAonnarc of the wok for which Nu permit is issued. 1 have and will maintain Worker's Compensation Insurance,as required by Section 37M of the labor Code,for We performance ofthe wort for which was permit is issued. ' My Work�esr'.Compensate.l"ounce,carrier Md Policy number art: Cameria�,Nv<^�IaW A//&res. Polley No.: S)/SIC7' CERTIFlCATE OF M ON FROM WORKERS' COMPENSATION INSURANCE (Thu rection and net W conplecd Russ psmsit Isforov hundeaddullan($100) or leas.) 1 caniry that in We performance of we work for which this permit u issoed.I shall net employ an,,...user,m ernoto as in We.subject in We Workers'C.mpevadon Laws of Californa.Dau Applicant NOTICE TO APPLICANT:If.after making Wu Cenirrcac of Exemption.you should Women$Uhl=m We Wader's Compensation provisions of We Labor Code,you mum 0,z forthwith comply with such provisions or this permit shall W deemed lewktd. Z O CONSTRUCTION LENDING AGENCY [—m IWrehy affirm thou ftisaconatrominn leading sleety for the performs a (Yi We work fur which this permit it issued(Se,.3077,Civ.C.) 0 lender's Name = z leader's Md. V O I citify that 1 have rad this application and sum Wm We move wromaton u U.r' tortes 1 agree W comply with all city and county woulmanas and sum laws relating W -0 U tinkling construction.and hereby ambrome mprnsoauuves of this city a enter upon tic � {T.l sow-mentioned property fes,inspection pury"L "f1 (We)agree in ears,indemnify and keep harmless We City of Captain.agaiast f/1 liabilitins,judgrecnu,cvts and vpcvu which may in any way sane apivt mid City D U Z in co"quence of to Spending of this permit. ) ^ APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL.NON-POINT Issued by: Date s0 LA REGU ginjumre ofA icanmC Re-roofs x&zARDOU 7IDt1AlS DlsaosuRE Data Type of Roof Will the applieantmrut Wil Ing asuPan'scam an handle havardov material as defined by sic Cupertino Muni, Cede.Chapter 9.12,and sic Health and Safety Code,section 25532(p? 40 Oyes No All roofs shall be inspected prior to any roofing material being installed. Will We applicant or future Wilding occupant"equipment in W,as which If a roof is installed without first obtaining an inspection,I agree to remove emit haramnus air contaminants as defined by the Bay Area Air Quality Management all new materials for inspection. Dam et, / 0 yea I have mad We haankmarateriaurequiremcnuunder Chapicr6.95ofthe CslifoP - meRCAIW&Safely Code,Secuoo25505,25533 md25534.1 understand dwifthe Wilding does ngl',&�nane W 't u my lesponthility m noul'y Ws occupant of treeuipoor issuanofaCcnificamofSI afar ofApplica Date All of c rims to be Class'A!perm' - g 'or better CITY OF CUPERTINO • 2 ITEMS OF 2' PERMIT RECEIPT OPERATOR: SylviaM COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot : APN . . . . . . . . : 36934046 . 00 DATE ISSUED. . . . . . . : 06/13/2008 RECEIPT # . . . . . . . . . : BS000005112 REFERENCE ID # . . . : 08060104 SITE ADDRESS . . . . . : 10729 S BLANEY AVE SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : JERRY HUANG ADDRESS . . . . . . . . . . : 10729 S BLANEY CITY/STATE/ZIP . . . : CUPERTINO, CA 95014-4543 RECEIVED FROM . . . . : WESTERN ROOFING CONTRACTOR . . . . . . . : MICHAEL LUNNEBORG LIC # 25896 COMPANY WESTERN ROOFING SYSTEMS ADDRESS . . . . . . . . . . : 1328 WHITE OAKS RD CITY/STATE/ZIP . . . : CAMPBELL, CA 95008 TELEPHONE . . . . . . . . : (831) 278-1837 • FEE ID UNIT QUANTITY _AMOUNT; PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BSEISMICR VALUATION 16, 500 . 00 1 . 70 0 . 00 1 . 70 0 . 00 1REROOFRES SQ FEET 25 . 00 325 . 00 0 . 00 325 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 326 . 70 0 . 00 326 . 70 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CREDIT CARD 326 . 70 VISA --------------- TOTAL RECEIPT 326 . 70 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF • -� CITY OF CUPERTINO REROOF Circ or CUPEkTINO PERMIT APPLICATION 6 Mpo/U APN # Date: ONLO. Building Address: Owner's Name: Phone #: Contractor: Phone #:,,,, eta 9 q i 7s �Je34efa��r� S��r4er»s Fax #: 'f rc ST4 i733 Cupertino Business License #: Contractor License #: <Y�(p (. 7 57 Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof ❑ Asphalt Shingles ❑ Asphalt Shingles Wool Shakes ❑ Wood Shakes ❑ Wo Shingles ❑ Wood Shingles ❑ Other (Specify) 'r Other (Specify) _M-e-4P.(— j=e Number of existing coverings ❑ Provide I.C.B.O. Report # V27Ze ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: -Aeac- of-r- SR°,T�'NS — -FIlskee ;-s &*+ t+0 (%s Residential Commercial El Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the there are any restrictions: ❑ application or if applicable, include in plan set & the sheet index. Valuation: I v 1'0 0 •1 Have Read, Understand and Will Comply with Cupertino's Tear-Off Policy: Signatu e au- CITY CITY OF CUPERTINO REROOFqkUkTINO FEE SCHEDULE Number of Fee ID Fee Description Fee Permit Type Squares Group 1REROOFCOM Re-roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 1REROOFRES Re-roof Residential B 1SFDWLROOF 2C 1BSEISMICRE Seismic Residential B 1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF IBSEISMICRE Seismic Residential B 1BUSLIC Business License B Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below 72points B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 11. Permeable Pavin Note L-1C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 5. Use Truss with heels, (detail) S-2 6. B. OSB Sheathin detail S-2 E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Nate/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11.A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other= 1. List Green Features on Plans A-1 1 point TOTAL POINTS1 40 points Plan Review Process Work Book Page-12-Revised 3/25/08 Green Points Rating System for Remodeling Projects • Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is not feasible.However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project. INPUT Reqources Ener A. rte 1.Recycle Job Site Construction 8 Demolition Waste I 65°!°=1 point 75%= 2 points;So 4 points up to 4 Resource pts D 2.Saivage Reusable Building Matenals 1 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y--yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants 8 Trees 1 Resource pt y--yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pis y--yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes D 8.Design Resource-Efficient Landscapes and Gardens 4 Resource is _ _ p y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes D 11.Provide for DnSite Water Catchment/Retention 2 Resource pts y=yes D B.Foundation • 1.Incorporate Recycled Flyash in Concrete 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource ptsno 2.Use Recycled Content Aggregate 2 Resource pts y=yes 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes 0 1 C.Structural Frame 1 1 1.Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3,Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6'or more 2 Energy pts Y--yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts Y--yes 0 B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts yryes 0 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Energy pts y=yes 0 b.Wall 3 Ener y= yes Pts )-Yes D c.Root 3 Energy pts yryes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 . a.Subfloors + 1 Resource pt y=yes 0 b.Sheathing 1 Resource pt y=yes 0 1 1 t INPUT ResDurces Energy IAD[Heafth Extenorr.rnrs 1.Use Sustainable Decking Materials • a.Recycled content 3.Resource pts y=yes 0 l b.FSC Certified Wood I 3 Resource pts Y_-Yes 0 2.Use Treated Wood That Does Not Contain ChromiurrdArsenic 1 1 IAQ/Health pt y--yes 0 3.Install House Wrap under Siding 1 IAQ/Health pt y=yes D p 4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0 1 i 1 E.Plumbing 1.Install Water Heater Jacket _ 1 Energy pt y=yes D 2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes D 3.Retrofit all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 pants) Up to 2 Resource pts. 0 4.Replace Toilest with Ultra-Low Flush Toilets (1 point each,up to 3 points) _ Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead _ 1 IAQ/Health pt y--yes D 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yas D 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 41A(UHealth pts. 0 B.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0 1 1 ! r.trecmcar 1.Install Compact Fluorescent Light Bulbs(CFLs) • (6 bulbs=2 points,10 bulbs_-3 points,12 bulbs=4 points Up to 4 Energy pts. 0 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up 10 5 points) Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiancy Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 1 1 1 G.Appliances 1.Install Energy Star Dishwasher 1 Energy pt y=yes 0 2.Install Washing Machine with Water and Energy Conservation Features 1 Energy pt y=yes 0 I3.Install Energy Star Refrigerator —' 1 Energy pt y=yes 0 4.Install Built-In Recycling Center 3 Resource pts y--yes 0 1 1 ! H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y--yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 LInstall Recycled-Content,Fiberglass Insulation with Added Formaldehyde _ _ 31AQIHealth pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 • b.Ceilings 4 Resource pts y=yes 0 6.Alternative Insulation Products(Cotton,spray-loam) a.Walls 4 Resource pts y--yes n.Uemngs 4 Resource pts y=yes 0 I.Win ows • 1.Install Energy-Effic ent Windows a.Double-Paned 1 Energy pt y--yes D b.Low-Emissivity(Low-E) 2 Energy pis y=yas 0 c.Low.Conductvty Frames { 2 Energy pts y=yes D 2.Install Low Heat Transmission Glazing 1 Energy pt y=yes D 1 1 1 J.Heating Ventilation and Air Conditioning f 1l Use Duct Mastic on All Duct Joints J 2 Energy pts Y--yes0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes D 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 7 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6,Install Attic Ventilation Systems 1 Energy pt y-y'es 0 7.Install Whole House Fan 4 Energy pts yryes 0 8.Install Sealed Combustion Units a.Furnaces 31AQ/Health pts yryes D b.Water Heaters 31AQ/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts yryes D 11.Install AD with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install M Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 • 13.Retrofit Wood Burning Fireplaces a.Install EPA certified wood stoves/insarts 1 IAD/Health pt y=yes 0 b. Install/Replace Dampers 1 Energy pt y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes D 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 4 AQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IA(llHealth pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y--yes p 1 1 1 K.Renewable Energy and Roofing , 1.Pre-Plumb for Solar Water Heating 4 Energy pts Y--yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes D 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y--yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0 6.Select Safe and Durable Roofing Materials------ -- 1 ResourceP t — — Y=Yes 0 7. f 7.Install Radiant Barrier 3 Energy pts y=yes p 1 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes D 2.Install Overhangs or Awnings over South Facing Wlindows 3 Energy pts , y=yes 0 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes D • 1 1 1 M.Indoor Air Quality and Finishes '17Use LOWNDN C Paint 1 IAQ/Health pts y=yes 0 • 2.Use Low VOC,Water-Based Wood Finishes 2IAQ/Health pts y=yes 0 r.-Use Low/No VOC Adhesioes - 1 3 IAQ/Hsalth pts y=yes 0 P. 4.Use Savaged Materials for Ince or Finishes 3 Resource pts y--yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQMealth pts y--yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes D 7 Beal all Exposed Particleboard or MDF _ �{ 4 IAQ/Health pts y--yes 0 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y--yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAQ/Health pts y--yes D 1 1 1 N.Flooring 1.Select FSC Certified Wood Flooring 8 Resource pts y=yes D ruse Rapidly Renewable Flooring Materials _ _� 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts yges 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Heeth pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 Total Points Availabi 1 1401 130 57 • Total Points Project Received: 1 01 01 0 G:datalprogslgreenbuildnoguidelineslremodelersrgreenpointsfinel212.D4profeded.xls • Community Development Department Building Division City of Cupertino • 10300 Torre Avenue Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards and manufacturers specifications on re-roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. • 5. If plywood is installed, a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Homeowner's Name: t•f r� a- J-ect"i g,,,,,,,,, Job Site Address: ) O"12 C1 Roofing Company Name: ' TQC Tei. 1"ynr� S� j /h Applicant's Signature: Date: Greg Casteel Building Official Revised 11/2/04