Loading...
02100103 CITY OF CUPERTINO DUILDINIG DIVISION PERMIT .CON,TRkCTORiiNtORMAT-tijN:,,— BUII9DN67AD8bAZINGWOOD AV PRESTIGE ROOFING PERMIT NO 2100103 owORDROKAK TERRY R AND CAROLYN 725 MIRAMAR APPLICATT"05yE1D02002 or1ONF.: (408) 268-8003 SANITARY NO. CONTROL NO. ARCHITECTENCINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MP.CH �00 LICENSED CONTRACTOR'S DECLARATION �ry�tt�, F I hereby affirm Nal I am licensed under previsions of Chapter 9(commencing REROOF FINALP1C with Section"'Y'ofoivisi..n 3 of the Business and Professions Cute,and my license is in fullfm ride cl- ='aa `I"" I`'" OCT 2 8 2002 Ddle C INCI 1 ARCf11TE S ATION I understa my Planatud� s u toad. LLo Lice dpmfurimnal ^� BUILDING )OWNER-BUILDER DECLARATION Y <I 1 hereby allund that I am exempt from the Contractor's License Law for[be 5 O O(] 00 following mason.(Section](131.5.Business and Professions Code:Any city Or county $C! which requires a permit Of construct,after,improve,demolish,or repair any structure Fiy prior to its uniform.alto(esliires the applicant for such permiuo rile a signed statement x< that he is licensedpursuanttotheprovisionsOftheContmctor''sLicenseLaw(Chapter9 3*92MdogAlafl Valuation FO (commencing with Section 7000)of Division 3 of the B usiness and Professions Cole)or y $ that he is exempt lhemfrom and the basis for Ne alleged exemption.Any violation of Sacuon 7031.5 by arty applicant for a Permit subjects the applicant to a civil penalty ofp�N Occupancy Type ml mote than five hundred dollars(s3110). 307 - INSULATION ❑ Less.,of Ne Property.0,.YemPloycca with wagesas dpirsolecompermatu , will do the work,and the slrunute is notimended oroffered forsale(Sm.7040,Business and Profession' m Code:The Communes License Law dma not apply to an owner of 602 - ROOF P nRjkefitns property who buildsor improves thereon,and who door such work himself or through his Own employees,prodded Net such improvements are not intended oroBered for sale.If. 603 — ROOF BATTENS however,the building or Improvement is said within one year of completion,Ne owner- 604 — ROOF IN-PROGRESS builder will have Ne humen of proving Nat he did not build or improve for purpose of sale.). ❑1.as Owner of IM property,am exclusively contracting with licensed co ers mors to construct the project(Sec.7044,eusimss and Professions CWc:)The Contractor's Li- cense Taw dims not apply to an Owner of property who Wilds or impntru themon,and who contracts for such projecb with a contractor(,)licensed pursuant to the Contractor's License Law. I am exemp nder Sec. .B&P C for Nis reason Ow rip/ pate x .F=7 ER'S COM ENSA ON T�t.AYkl'ION thereby aRrm under penury of perjury ons of following declarations: I have and will maintain a Ceri ficete of Consent o self-insure for Worker's Camper. station,es provided for by Section 3701 of the Labor Code,for the Performance of the work far which Nis pc(mit is issued. 01 have and will maintain Worker's Compensation Insurance,as required by Section 31M of the labor Cole,for the performance of the work for which this Permit is issued. My Worker's panallinn Into ceca "rand Policy numbers Policy NO.: _ CERT I'1CATE OF EXEM ON FROM WORKERS' l/ COMPENSATION INSURANCE ohisseedon need not becompleted fine Parmit a formic hundred dollars($10) or less.) 1 cenify Nat is the41�11]qnante of this work for which this permit is issued,l shall not employ any parson itaa7fsrmannerso as to Masmegghjeat mlhc Workers'Compensation Laws of California.Data VV s Applicant N�IC/�/dr'�0 APPLICANT:If,of r aking this cnilicate of Caemphun,you s null hecp�efObject m the Worker's C pensation provisions of the Labra CnJe,you muss OO fort wificomply with such provisions or NisPermit shall he deemed revoked. z h CONSTRUCTION LENDING AGENCY [-+ Ihereby allion Nn there is a construction lending agency for the performance Of �. > the work fur which this Permit is issued(Sec.3897,CO,C.) 6Wi 0 Lenders N. z Lender's Address U O I cenify that I have read this application and state that the above information is V. P correct,l agree to comply with all city and county Ordinances and state laws relating to DU building construction,and hurehy amhonal represenunives of Nis If iy hs enter upon the move-mentioned property for inspection purposes. kk. (We)agree to neve,indemnify and keep harmless the City of Cupertino against f0 liabilities,judgments,costs and expenses which may in my way accrue against said City U in consequence of the granting of this Permit. APPLICANT UNDERSTANDS AN ILL COMPLY WITH ALL NON-POINT Issued by: Date SOURCE REATP ATIONS. r Re-roofs ignamrc of Applica130 nocouARDOUS MATERIALS DISCLOSURE Dctc Type Of ROOF Will the applicant of future building Occupant store or handle hanNuus mateual as defined by the Cupanino Municipal Code.Chapter,9.12,and the Health and Safely Code,ovf5 2553260? Nn All roofs shall be inspected prior to any roofing material being installed. Will the appticantor�building Occupant use equipment or devices which If a roof is installed without first obtaining an inspection, I agree to remove emit If air commandants as defined by the Bay Area Air Quality Management all new materials for inspection. District'/ ❑Yes Ihave&Safet Node,S"ll nt 25%5,n533mmenu under understand of the C.IWit ary �� r �� O^ doesOuth&Safay haves,amonnsortiti,25573 and 35534.1unMrsundeoccup buof l does not currently have a amount Naz it is myy responsibility dfy IM mcupmt of N /f reyuimm ,which muss hum prim to issV, Ofd Cenifreateo ' ancy' Signature of Appl' nt \// Date wnmmaamn agent D{ All roof coverings to be Class/"B" or better Binding Division ' 10300 Tose Avenue Cupertino,CA 95014-3255 ` Telephone: (408)777-3228 p Fax: (408)777-3333 CUPERTINO Building Depaeut Subject: Reroofing policy for the City of Cupertino. 1. Prior to permit issuance,you must agree to comply with 1997 UBC Standards and manufactures specifications on reroofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector.A final inspection and approval shall be obtained from the building inspector when the reroofing is completed. S. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City the following steps are required. 1) Preinspection and/or tear off approval 2) In progress inspection approval 3) Final inspection approval • a) Spark arrester installation 5. If plywood is installed,a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection,will require the removal of all new material down to the sheathing so that the proper City inspection can be performed. IMPORTANT: 1. Flat roofs must have a minimum of Vi"per foot slope and demonstrate that there is no ponding. 2. AnI.C.B.O.report is required to be on the job site at the time of inspection. We understand the above policy on reroofing and will comply with this policy. Homeowners Name: v, Address: OLZtL40 (.4 Reroofing Company Name: . • - Cc: Applicants Signature: {e; Joe Antonucci (Chief Building Official) 6MI01