Loading...
08050201 CITY OF CUPERTINO BUILDING C:'!ISZON PERMIT C01�[TRACTOR INFORMATION ; BUl1.IpNp11DOREs$:ZINGWOOD AVE WYANDT DAVID A P08050201 E`1AS NAME: LA PERMIT ISSUE DATE N WYANDT DAVID A 19827 COLBY CT 05/27/2008 ONE: SANITARY NO. CONTROL NO. V ARCHITECT/ENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH app LICENSED CONTRACTOR'S DECLARATION IOD Description m 1 hereby affirm that li 1 ao:nsed under provisions of Chapter 9(commencing E with Section 7")of Division3Orate:Business audProressionsdeu Cods. WATER LINE REPAIR& TERMITE/WTR DAMAG REPAIR& SOME I.fall rortt and effear- j g i License Class Lie.g FRMNG Dam Contractor ARCHITECT'S DECLARATION ¢ I am ersuns N nd my Plans be used as public record, Jas gQ y Ucc acd Professional 5OWNER-BUILDER DECLARATION F I hr Sce(See that 1 am exempt from the Con=10rS Licanu Law far the following reason. uan 1W 1.5.Busivas and Professions Cade:Any city or county Tai which requires a Famous so e..L alo-+.imPro e,demolish,or mpsir any mumuro =< prior Wits issuance.also requiresm applicant for such Permit m file a signed ytaumem z turn W u licensed pursuant mtam provisions of roc Contractor's Lives,Law(Chapter 9 Sq.FL Floor Area $ Valuation F^$ (commencing withSecuonT000)or Division3oftadBusinessandProfessionsCode)or 3000 Nat he is rump,tWmfrom aha the burn for the alleged eumpow Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil Penalty ofNumber Door mom Joan five hundred dollars(115W), 3 6 9 2 0 019'O� Occupancy P Y Type 1,u Owner of tad property or my employceswith wagesat their sole eompensadon, will d0 the work,and the ants,u not intruded art rRctcd for eas e(Ser.1044•Burd. and Prorudaos Code:The Can"cufa License Law dxw far apply to an awmr or - - _ Required Inspections pmpery who Wildsorimproves thaeon,and who doessuchw°rkhimselforthrough his "a employees.provided thassuch Improvements are not intended Ororfcrnt Intimae.B. ' however.Joe building or improvement is mid within can year of Completion.the numm- builder will have dm burden of Proving Nos he did not build or improve for purpam Of um.). 1.as Owner of the Property w mtclmively contracting with lie uud Con answ s W wmtmci are pmjem(See.TWa,Business and Pmressiou Cade:)The Cunasctor's U. ceoae Taw does not apply to an owner of property who Wilds Or improve ahemon.and , wad cormacu far suets projects with a eonuactor(s)licensed pursuant to tic Conuacrrel License law. ' ❑ I.me mPr un B At P C fm this ream. nrr /sq��/. �{, Dam WORKEWSLOMPENSA ON DECLARATION ^� 1 kmby aRm uuder penalty°(perjury m art tic falbwin6 decleroorts: I ham and will far b in a tion 37 0 of Conacnt Claim. (s,Watlre ance of m worn,r Providedh ui far mi Sudan 3TW.(rite Tatar code,for tha performance of the work for which this permit is LV.ed. ❑1 have and will malmum Wale(s Comperu,ti°n htsu ..as required by Section 31W Of dm taWr Code,for the performance of tad wart for which this permit if issurd. My Worker's Computation Luursnee carrier and Policy number ace: Cartier. Polity No.: CERTIFICATE OF EXEMPTION FROM WORKERS COMPENSATION INSURANCE (This aceum went nos k cumPkmtl if rad permit Is faam hurtthed mBus(SI00) Or Ices) 1 cutify that in the performance of the work for which ad permit u issued,l shall not employ any Person in anYmanwermu become rob' Wo Com n tion laws of ealifomit Dau Applicant NOTICE TO APPLICANT.1, makm Nu Ceni or Eacmption,you should become subject to the WorkaS Compensation provisions of the labor Code you muss .JO fntthwith comply with such Provisions or this Permit Nall W decmnt revealed.'�y CONSTRUCTION LENDING AGENCY [-, 1 Mmby alliin and them is a Construction lending agency for the Performance of C> iW wast fm which this Permit is Cauca(Sec.3097•Civ.C.) A lsndcYs Nun" . 7 z Undeh Address U O 1 certify this I have mad this application read suis into tic show,infmsumma Is Iy F COMM I agree to Comply with all city and county ordinances and sum laws misting to .O v Wilding com action,rand hereby authorix mpreumKiM of this city to enter upon the ahave-menues dgm Property ts,wa for inspenses Puryaua a (We)agree to ave.indemnify and keep hsrmleis the City of Caperuoa against h inconeraimde Ofthecosuua ing Of thus expenses which may in any wyurneagainst sald City V z APPLICANT°UN EyMANDS AND WILL COMPLY WI LL ON-POINT Issued by: Date SOURCE REGUL S. �TWe-roofs �l Signature or Applicaiiantractor VDau HAZARDOUS MATERIALS DISCLOSURE Type of Roof Will the appllamnt form Wilding Occupant nom uhambe hmardou material u defined by the Cupertino Municipal Cade.Chapter 9.12,and the Health and Safety Sectionyc" ON.2ss3z(,)1 ❑Ya All roofs shall be inspected prior to any roofing.material being installed. Will the appfieant Or future building Occupant ace equipment or devices which If a roof is installed without first obtaining an inspection,I agree to remove emir moaNnus air conuminants u darned by one Bay Asea Air Quality Management all new materials for inspection. District? DYC3 No 1 have mal the hayardeas materials mquimntenu umber Chapter 6.95 of au Cslifm- meHralthh SafctyCOdc.Sccons 25505,25533 wel Zi534.1 understood that If Jie Wilding draw our currently have a unsnl that is is mss responsibility as wary the neco,o t of the mq°imwwft,;mplrrOytWRe`/ Pb°;mia",n °I C.*morgy Y' n) Signature of Applicant Date Ou.er or autintriced agLe(l/VIl&1 Th ])am All roof coverings to be Class'{"or better pyo 5 0o2 o CITY OF CUPERTINO [1t' ADDITION/REMODEL CUP'fk" iN0 PERMIT APPLICATION FORM APN # ,0 0/ C) l] Date: Building Address: C _27 1 Mailing Address (if differ t Wing dre s : C_ Owner's NamPhone# : Contractor: Phone#: S p � SA w� Fax #: Contractor License #: Cupertino Business License#: Contact: Phone#: Fax #: Building Permit Info: fihBldg. ❑ Elect. ❑ Plumb. ❑ Mech. ❑ Hillside ❑ Job Description: Addition (adding sq footage): What is being remodeled? Pz+e- `� e r.e P� ,•. 2 r l i 1� e ! �/2�ph C�?i� age Y't ,- lrfsv � Y ��r�n:tig Remodel Includes Re-Roof: Yes ❑ No R- If yes list number of squares Remodel Includes Structural: Yes ❑ No ®' Square Footage: ' Addition: d Porch: Deck: Garage: Detached Attached Remodel: Kitchen Bath Other Type of Construction (Usage Class): Occupancy Type: Q 1 A, pJ 11, 111 V-A ❑ 11, 111 Valuation: O Please check this box if the project is a 64 second-story addition ❑ Please complete relevant portion of the Green Building Checklist& attach it to the application or if applicable, Green Building Points Achieved: include in plan set & the sheet index. ***For Office Use Only*** Over-the-Counter ❑ R_ CITY OF CUPERTINO u " ADDITION/REMODEL CUPEkTiNO FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft ADDITIONS 1R3SFDADD PLLONGRNGR Long Range PL Planning/Residential 1R31NSP Dwellings Inspections B 1 R3PLNCK Dwellings plan check B 1R3REPINSP Dwellings Repeat B Inspection 1 R3REPPLNC Dwellings Repeat Plan B Check 1R3HINSP Dwellings Hillside B inspection 1 R3HPLNCK Dwellings Hillside plan B check IR3HREINSP Dwellings Hillside B Repeat Inspection IR3HREPLNC Dwellings Hillside B Re eat Plan Check 1R3ALTINSP Dwellings Alternate B Materials Inspection 1R3ALTPLNC- Dwellings Alternate B Materials Plan Check 1PCESS Cesspool P 1PPRSEWG Ea. Private Sewage P Disposal System 1PRSEWER Sewers P 1BPSPRINK Lawn Sprinkler/Backflow P IBPWSVCS Main Water Service P 1BSEISMICRE SeismicResidential B DECKS IR3SFDADD OR 1R3SFDREM 1DECKWOOD Deck(Wood)-Each B • Each IDECKRAIL Deck Railing-Each B (Each) CITY OF CUPERTINO ADDITON/REMODEL FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft GARAGES MSFDADD OR 1R3SFDREM 1GARDTW<=1K Wood Frame up to B 1,000 SF 1GARDTM<=1K Masonry up to 1,000 SF B BCONSTAXR Construction Tax Res (new detached garage) PATIO'S OPEN 1R3SFDADD OR 1R3SFDREM 1PATIOWOOD Wood Frame up to 300 B SF 1 PATIOMETAL Metal Frame up to 300 B SF 1PATIOOTHER Other Frame up to 300 SF B PATIO'S CLOSED 1R3SFDADD OR 1R3SFDREM 1PATIOENCLW Enclosed Wood up to 300 B SF 1PATIOENCLM Enclosed Metal up to 300 B SF 1 PATIOENCLO Other Enclosed Patio up B to 300 SF 1COVPORCH Porch Covered-Each B Each 1REROOFRES Residential Re-roof Each B 100 SF REMODELS 1R3SFDREM IREMRESKIT Kitchen Remodel up to B (Deduct "$"for ea plan 300 SF check 1 REMRESBAT Bath Remodel up to 300 B 64 SF I REMREOTH Other Remodel up to 300 B SF REMODEL PLNCK 1 STPLNCK(1-3 for Standard Plan Check B NOT FOR OVER THE remodel) COUNTER PLAN CKS. 3of3 CITY OF CUPERTINO ADDITON/REMODEL FEESCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type Sq Ft WINDOW/SLIDING 1R3SFDREM GLASS DOOR 1 WINREP Replacement windows B ea 8 windows) 1 WINNEWNSTR New Window (non- B structural) 1 WINMEWSTR New Window (Structural B Shear Wall/Masonry) 1 WINBAYSTR Bay Window (Structural) B SKYLIGHTS 1R3SFDREM 1 SKYL<10 SF Skylight less than 10 sf B 1 SKYL>10SF Skylight greater than 10 B sf or structural 1STAIRS Stairs-first flight/ea addt'l B • IEPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1 PPERMITFEE Plumbing Permit Fee P IELCPLNCK Stand Alone Electric Pln E Ck our] 1 MECPLNCK Stand Alone Mechanical M Pln Ck (hour] 1 PLMPLNCK Stand Alone Plumbing P Pln Ck (hourl ) 1BSEISMICRE Seismic Residential B 1TRAVDOC Travel &Documentation B • 1BUSLIC Business License B 4of3 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 7points 11. Permeable Paving, Note L-1 C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 5. Use Truss with heels, (detail) S-2 6. B. OSB Sheathing, detail S-2 E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec, A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS1 40 points • Plan Review Process Work Book Page-12-Revised 3/25/08 1 . Green Points Rating System for Remodeling Projects • Due to the diversity of remodeling project types,assigning a'total points'value to a project to be considered environmentally friendly is not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for'greening'your project. INPUT ReSOUTces Energy ACHeal-th A.Site 1.Recycle Job Site Construction&Demolition Waste 65% 1 point;75%= 2 points;60%=4 points I up to 4 Resource pts 0 2.Salvage Reusable Building Materials 4 Resource pts y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y=yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants&Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 [a.Design Resource-Efficient Landscapes and Gardens J 4 Resource pts y=yes 0 9.Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10,Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes 0 1 1 1 B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10%, increase of flyash,up to 5 points up to 5 Resource pts 0 2.Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yesl;; 0 1 I 1 C.Structural Frame 1.Substitute to Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 0 2.Use FSC Certified Wood for framing (For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Energy pts y=yes 0 b.Wall 3 Ener is 9Y P Y=Yes 0 c.Roof 3 Energy pts y=yes 0 10.Apply Advanced Framing Techniques 4 Resource pts y=yes 0 11.Use Reclaimed Lumber for Non Structural Applications _ 3 Resource pts y=yes 0 12.Use OSB a.Subfloors 1 Resource pt y=yes 0 b.Sheathing 1 Resource pt y=yes p --- — D.Extenor Frnis Energy A01Health r Use Sustainable Decking Materials • a.Recycled content 3.Resource pts y=yes 0 to.FSC Certified Wood 3 Resource pts y=yes 0 2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAO/Health pt y=yes 0 3.Install House Wrap under Siding 1 IAQ Health pt y=yes 0 4.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0 E.Plumbing 1.Install Water Heater Jacket_ 1 Energy pt y=yes 0 2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0 3.Retrofit all Faucets and Showerheads with Flow Reducers I a.Faucets(1 point each,up l0 2 points) Up to 2 Resource pts. 0 b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0 4.Replace Toilest with Ultra-Low Flush Toilets (1 point each,up to 3 points) Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead 1 IAO/Health pt y=yes 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes 0 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 4 IAO/Health pts. 0 8.Install On-Demand Hot Water Circulation Pump 4 Resource pts y=yes 0 1 1 1 r.oecmcar 1.Install Compact Fluorescent Light Bulbs(CFLs) (6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points)--J Up to 4 Energy pts. 0 • 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to 5 points) Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. 0 1 1 1 G.Appliances 1.Install Energy Star Dishwasher } 1 Energy of y=yes 0 2.Install Washing Machine with Water and Energy Conservation Features 1 Energy pt y=yes 0 3.Install Energy Star Refrigerator 1 Energy of y=yes 0 4.Install Built-In Recycling Center 3 Resource pts y=yes 0 1 1 1 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts y=yes 0 b.Ceilings 2 Energy pts y=yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y=yes 0 f3.Install Recycled-Content,Fiberglass Insulation with No Added Formaldehyde _ 31AO/Health pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes 0 5.Use Cellulose Insulation a.Walls 4 Resource pts y=yes 0 b.Ceilings 4 Resource pts y=yes 0 • 6.Alternative Insulation Products(Cotton,spray-foam) a.Walls 4 Resource pts y=yes 0 o.cemngs 4 Resource pts y=yes 0 INPUT Resources Energy 1ADIKealth I.Win ows • 1.Install Energy-EMcierll Windows a.Double-Paned 1 Energy pt y=yes 0 b.Low-Emissivity(Low-E) 2 Energy pts y=yes 0 Vic.Low.Conductivity Frames _ _ i 2 Energy pts y=yes 0 2.Install Low Heal Transmission Glazing- 1 Energy pt y=yes 0 1 11 J.Heating Ventilation and Air Conditioning . 1.Use Duct Mastic on All Duct Joints_ 2 Ener y=y — ---_—�— —_ 1 9Y Pts es 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y--yes 7 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 6.Install Sealed Combustion Units a.Furnaces - 31AQ/Health pts y=yes 0 b.Water Heaters 31A0/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 • 13.Retrofit Wood Burning Fireplaces a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y--yes 0 J. Install/Replace Dampers 1 Energy pt y=yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 41AQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 1 1 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2,Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=16 points) Up to 16 Energy pts 0 16.Select Safe and Durable Roofing Materials —? 1 Resource of y=yes 0 7.Install Radiant Barrier J 3 Energy pts y=yes p I 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes p 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p • 1 1 1 M. n oor Arr Qua rty and meshes !1.Use Low/No-VOC Paint - -- - - i 1 IAOMealth pts y=yes 0 2. . Use Low VOC,Water-Based Wood Flnishes 2 IAOMeaith pts y=yes _ 0 [Y-Use-low e VOC Adhesives _ _ 3 IAQMealth pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 0 6,Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 t7.Seal all Exposed Particleboard or MDF 4 IAO/Health pts y=yes 0 B.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0 1 1 1 N.Flooring i. ii 1.Select FSC Certified Wood Flooring __ 8 Resource pts y=yes 0 2.Use Rapidly Renewable Flooring Materials _ -_ 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 1 1 Total Points A 1 1401 1301 57 • Total Points Project Received: 1 01 01 0 G:datarprogsrgreenbuildingguidelines4emodelersrgmenpointsfmal2.12.04proteded.xls • CITY OF CUPERTINO • 4 ITEMS OF 4 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec : Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 36920019 . 00 DATE ISSUED. . . . . . . : 05/27/2008 RECEIPT # . . . . . . . . . : BS000004895 REFERENCE ID # . . . : 08050201 SITE ADDRESS . . . . . : 943 BLAZINGWOOD 'AVE SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : WYANDT DAVID A ADDRESS . . . . . . . . . . : 19827 COLBY CT CITY/STATE/ZIP . . . : SARATOGA CA, 95070-3202 RECEIVED FROM . . . . : DAVID A WYANDT CONTRACTOR . . . . . . . . `LIC .V *OWNER* COMPANY . . . . . . . . . . : WYANDT DAVID A ADDRESS . . . . . . . . . . : 19827 COLBY CT CITY/STATE/ZIP . . . : SARATOGA CA, 95070-3202 • TELEPHONE . . . . . . . . : FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ------- ------ ----- - --- - --- IBSEISMICR VALUATION 3 , 000 . 00 0 . 50 0 . 00 0 . 50 0 . 00 1REMRESBAT SQ FEET 2 . 00 551 . 00 0 . 00 551 . 00 0 . 00 IREMRESKIT SQ FEET 1 . 00 551 . 00 0 . 00 551 . 00 0. 00 1TRAVDOC FLAT RATE 1 . 00 40 . 79 0 . 00 40 . 79 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 1143 .29 0 . 00 1143 . 29 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CREDIT CARD 1, 143 . 29 MC --------------- TOTAL RECEIPT 1, 143 . 29