08050111CITYIhLCjJPERT1N0'b
- IONN
BU11MMVISION PERMIT;ICON'TRA
ftj�J-NFORMMg
Buaq�r �oTMUBB RD
PLATINUM ROOFING INC
PERMITNO.
08050111
'FIT'S NAME : :PERhffI
�TIEDATE
RADFORD FINANCIAL
1900 DOBBIN DR
05/13/2008
PHONE:
SANITARY NO. CONTROL NO.
(408)280-5028
ARCHTTECTIENGINEER:
BUILDING PERMIT INFO
-
BLDGELER PLUMB MECH
= l� 0
LICENSED CONfRW(7MES DECLARATION
JOU Description
busby WTIM that 1 w lived under proviLons of ChaPmr 9 (commencing
with Sax:dm7O0) of Divishm3of WC Business and Professions Code, and my license u
RE–RF T/0 EXTNG RFS& INSTL 4–PLY BLTUP
in full rata and effort
uaveclm [— Lk.L
CAPSHT,"COOL CAPSHT"CLS A 200SQ
Da¢ Comsactar
ARS DELLA A N
"I W uT
I uhMeruanJ my plans aIW M1e used u public rerord
Monaco PmfnYanal
OWNER -BUILDER DECLARATION
1 hcrtby .ift. m.,1 am Wempt from the Contractors u... Lsw for the
follnwing mason. (Sado. RD 1.5, Business and Promaafons Cock: Any city or county
which mmu oar, a pmmit to construct, Wer. improve. dem ish, or mpnir my svuatum
! Frim W its hone. shad squirts the applicant forsuch pmmit to Ek a signed ststomWt
that nc u uanaed pursuant 10 the provisions df the Contractors license Law (ChaPtm9
Sq. Ft. Floor Area
Valuation
I (eommenciin[with Scedon7000) of Division 3ofNeBusihwssand ProfasionsCoot) or
$157562
. that he is e.mpt tkmfrom and the buts for the alleged gas mp0on Any violation of
3 5 7 2 0 0 3 8 EbT Number
Occupancy Type
Sossion 703IJve mIt dbxmnapplicant m a civil wwlr
ormassfmboaddo�(
❑ I. u owner of tK property, m mY emPlaYm wIN wag. ss tlm'v sole compewton,
Required Inspections
will do the wank and the structum u natinuMW mo@red tarok (Su:. TOa4, Busimss
=
and ProfntiOns cook, The Contractors n Law fuant apply to an awner or
p.pywho Wilamimproveathumn,andwMo swhw khimsrlforW aghhis
rst
awn cmplaym, provided Nu such imVronmmts sm notinu:ndeo oro@sd formic. B.
however. the building m improwmhant I. sold within ane year of cornylotion, the owner -
Wilder will haw the When of proving out In did not build or imprvn fm purpos of
.k.).
❑ 1, as owner of the property am uelusinhy contracting with Ilcenmd contractors to
construct the project (Sec. 1044. Busitm and Profmadons Code:) The Coouxtm's li
sue law dm not apply to m sura of property wish Wilds car improvo Nemo.. and
who contracts for such projects with a contracmr(s) lived pursmnt to the Contractors
License law.
❑I..mhptundo Bee .BkPCfm NisrWsaa
m Das
WORKER -S COMPENSATION DECLARATION
I nereby alarm under po salty of perjury one of the following dclarWahsc
❑ 1 M1aw aM will maintsin a Cenifiwmaf Covent to sl(insam (or markers Compw-
.tion, as provided for by Section 3100 of the IaWr Cade. fm the peRorohana of the
work for which Nis pont is issued.
❑ 1 ban arho will mumu. Workers Compensation inouana, as hop had by Section
3700.(Jan labor Cook. for Ne performaneeofdm work fnwhich this permit is issued.
'
My Worim ompeuaJon Wuramec�amrieay1Iatd Policynntunberare: /r��� (�
Carrion . (�d>r) a i�, fNsllPOhiry No.: X13 -' M / >R10 )
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
(Tbif sctitm ted rotbecornpkmd if the permit is forone handmt da0an ($100)
orlon)
1 artily that in me porformanee of the work for which this permit is issues. I shall not
employ any Peron in my manner. as N become subject to the Wmkma' Compensation
taws of California. Dam
Applicant
NOTICE TO APPLICAND If, after making this Cenificam of Exemption, you should
become subject to Ne Workers Com,mosm. provisions of the labor Cod, you moa
• foMwith comply with such provisions or Nu permit shin be d crrcd rooked.
j CONSTRUCTION LENDING AGENCY
.
IMroby iaand(S 3M,Chgg agumy for tan perfmmamm of
Nalot
which mu
the work ran which Nis pemhil k iumL (sue, 709'1, Civ. C)
I
..
Lends Name
Lcndeh Addrm
j 1 artily that 1 have mad this application W sum thu the Shan information is
' camel I aye to comply with all city and county on inures and auto dews misting to
Wilding construction, and beteby a oOmm, repmxnutins of this city to w.,n the
shave -menton. property for inspection purFass.
(Wk,) agora to on, indemnify and kap harmless the City of Cupertino agunst
j Iisbilitin.jWgmenu.cmts andexpevn which may in anyway acmay
e ina wdCity
of Nu permit.
of the UNDERSTANDS
A APPLICANT
APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT
Issued b Date
REGULATIONS(;--/
y
Type of Roof
3 -0�
0"oZ'rRe-roofs
Signaturso(ApplicanuoZontracaor Dam
HAZARDOUS MATERIALSDISCLOSURE
Will theapplicant orfolum Wildingmcupantr9Aorand ha'ssNoumamriu
pa
def the vo Municipal Code. chapter 9.13. and Um HnIN and Safety
-
Sec Section 32(.)7
. xenon ass3x(.)1 ❑ Yn )7No
All roofs shall be inspected prior to any roofing material being installed.
ii ,
Will
If a roof is installed without first obtainingan inspection, I agree to remove
Pe g
the aPp onto i amort Wilding by ft Bt ase a Air Qu car Mxm whim
emit W'raNnu air contaminants u de0ncd by Um Bay Ama Air Quality Management
all new materials for inspection.
Disuictl
❑Yrs rXWd
-
lhavo mad tm lumarchou``materials mquimmem under Chapmr 6.95 of the Califon.
ni-N.i"Safety Code.Sd..2505,25333.d25534. ImWcremnd thmifum building
man not Connally ban a man� u
ndwt it my mapomibility N nosily the fy aCcupml of On
\a�� a
e./
requirement which most WCmtfua
r rvuarce ofa maf Occvpumy.
Signature of Applicant Date
s S_ 0 g
All roof coverings to be Class 'W' or better
owne wn a>masem _ Dam
0 2 ITEMS OF 2
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk: Lot:- .'
APN ........: 35720038.00
DATE ISSUED.......: 05/13/2008
RECEIPT #.........: BS000004762
REFERENCE ID # ...: 08050111
SITE ADDRESS .....: 10420 BUBB RD
SUBDIVISION .......
CITY .............: CUPERTINO
IMPACT AREA .......
OPERATOR: patg
COPY # : 1
OWNER ............:
BRADFORD FINANCIAL
ADDRESS ..........:
P 0 BOX 117010
CITY/STATE/ZIP ...:
BURLINGAME CA, 94010
RECEIVED FROM ....:
PLATINUM ROOFING IN
CONTRACTOR .......:
MICHAEL T. STEPHENSON LIC # 22805
COMPANY ..........:
PLATINUM ROOFING INC
ADDRESS ..........:
1900 DOBBIN DR
CITY/STATE/ZIP ...:
SAN JOSE, CA 95133
•
TELEPHONE ........:
(408.)280-5028
FEE
ID UNIT QUANTITY
-- -------------
AMOUNT PD -TO -DT THIS REC
NEW BAL
1BSEISMICO
----------
VALUATION 157,562.00
----------------------------------------
33.18 0.00 33.18
0.00
1REROOFCOM
SQUARES 200.00
1255.00 0.00 1255.00
0.00
TOTAL
PERMIT
------- ---- --------- ----------
1288.18 0.00 1288.18
0.00
METHOD
OF PAYMENT AMOUNT
----------
REFERENCE NUMBER
CHECK
---------------
1,288.18
--------------------
#20838
TOTAL
---------------
RECEIPT 1,288.18
VOICE
--------
ID DESCRIPTION
----------------------------
VOICE ID DESCRIPTION
601
ROOF TEAR OFF
-------- ----------------------------
602 ROOF PLYWOOD NAIL
604
ROOF IN -PROGRESS
605 FINAL REROOF
•
i Q 1-11— OCA � /L.
Plan Review Process Work Book Page -12-Revised 3/25/08
Green Building Plan Check
Index of Green Building
Points/Categories
A.
Category
Example of an Index or Table of Green
Plan Sheet or Page
Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B.
Site
9.
Install H.E. Irrigation, (details/spec)'
L-1
11. Permeable Paving,Note
L-1
C.
Foundation
1.
Use 15 % Flyash Concrete, (note)
S-1
72points
D.
Structural
3.
Uses Wood I-Joist, (See Spec.)
S-2
5.
Use Truss with heels, (detail)
S-2
6.
B. OSB Sheathing,detail
S-2
E.
Ext. Finish
1.
Composite Decking, (Note/Spec.)
A-3
2 points
4.
B. Fiber Cement Siding, (Note/Spec.
A-4
2 points
F.
Plumbing
1.
Insulate all H.W. pipes, (Note/Spec.)
P-1
2 points
5.
Tankless W.H., (Note/Spec.)
A-2
2 points
11. A 2500 Gal. Tank, (Note/Spec
L-1
10 points
G.
Electrical
4.
E. Ceiling Fans, (Note/Spec.)
A-3
4 points
H.
Appliances
1.
Energy Star Dishwasher, (Note/Spec.)
A-3
1 point
3.
Energy Star Refrigerator, (Note/Spec.
A-3
1 point
P.
Other
1.
List Green Features on Plans
A•1
1 point
MrAMMOM
TOTAL POINTS1
40 points
•
i Q 1-11— OCA � /L.
Plan Review Process Work Book Page -12-Revised 3/25/08
• Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is
not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project.
I1. Recycle Job Site Construction & Demolition Waste
4
65%=1 point; 75%= 2 points; BO%, = 4 points
up to 4 Resource pts .
2. Salvage Reusable Building Materials
} 4 Resource is
P
y --yes
_
3. Remodel for Mixed Use, Adaptive Reuse, and
2 Use FSC Certified Wood for framing
Historic Preservation
4 Resource pts
y --yes
4. Protect Native Soil
2 Resource pts
y --yes
5. Minimize Disruption of Existing Plants & Trees
1 Resource pt
y=yes
6. Implement Construction Site Stormwaler Practices
2 Resource pts
y=yes
7. Protect Water Quality with Landscape Design
2 Resource pts
y=yes
r8. Design Resource Efficient Landscapes and Gardens
4 Resource pts
y --yes
9. Reuse Matedals/Use Recycled Content Materials
2 Resource pts
y --yes
for Landscape Areas
2 Resource pts
y==yes ,
10. Install High -Efficiency Irrigation Systems
2 Resource pts
y=yes
11. Provide for On -Site Water Catchment / Retention
2 Resource ots
v=ves
B.Foundation
• 1. Incorporate Recycled Flyash in Concrete
25% Recycled Flyash = 2 points; Add 1 point for every 10%,
increase of flyash, up to 5 points up to 5 Resource pts
2. Use Recycled Content Aggregate 2 Resource pts y --yes
3. Insulate Foundation/Slab before backfill 3 Energy pts y=yes
C. Structural Frame
1. Substitute S01id Sawn Lumber with Engineered LumberJ
3 Resource pts
y=ya`
2 Use FSC Certified Wood for framing
(For every 10%, of FSC lumber used = 2 points, up to 10)
up to 10 Resource pts.
3. Use Wood I -Joists for Floors and Ceilings
2 Resource pts
y_ -yes
4. Use Web Floor Trusses
2 Resource pts
y=yes
5. Design Energy Heels on Trusses 6' or more
2 Energy pts
y=yes
6. Use Finger -Jointed Studs for Vertical Applications
2 Resource pts
y=yes
7. Use Engineered Studs for Vertical Applications
2 Resource pts
y=yes
B. Use Recycled Content Steel Studs for Interior Framing
2 Resource pts
y --yes
9. Use Structural Insulated Panels (SIPS)
a. Floors
3 Energy pts
y=yes
b. Wall
3 Energy pts
y=yes
c. Roof
3 Energy pts
y=yes
10. Apply Advanced Framing Techniques
4 Resource pts
y=yes,
11. Use Reclaimed Lumber for Non Structural Applications
3 Resource pts
y=yes
12. Use 0SB
• a. Subfloors
1 Resource pt
y=yes
b. Sheathing
-.. ,_— -------__-- _ --.---
1Resource pt
y=Yes
11. Use Sustainable Decking Materials
I a. Recycled content
�b. FSC Certified Wood
2. Use Treated Wood That Does Not Contain Chromiurn/Arsenic
13. Install House Wrap under Siding 1
14. Use Fiber -Cement Siding Materials
E. Plumbing
1. Install Water Heater Jacket —!
2. Insulate Hot and Cold Water Pipes
(3. Retrofit all Faucets and Sliowerhea'ds with Flow Reducers
a. Faucets (1 point each, up to 2 points)
b. Showerheads (1 point each, up to 2 points)
4. Replace Toilest with Ultra -Low Flush Toilets
(1 point each, up to 3 points) — �J
s: instar cmonne rarer on �,nowemeao
6. Coned Gas to Tankless Water Heater
7. Install Water Filtration Units at Faucets
(2 points each, up to 4 points)
8. Install On -Demand Hot Water Circulation Pump
r. trecrncar
1. Install Compact Fluorescent Light Bulbs (CFLs)
(6 bulbs=2 points, 10 bulbs 4 points, 12 bulbs = 4 points)
2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to
5 points)
3. Install Lighting Controls (1 point per fixture, up to 4 points)
4. Install High Efficiency Ceiling Fans with CFLs
(1 point each, up to 4 points)
G. Appliances
1. Install Energy Star Dishwasher
2. Install Washing Machine with Water and Energy
Conservation Features
3.lnstall Energy Star Refrigerator
4. Install Built -In Recycling Center
H. Insulation
1. Upgrade Insulation to Exceed Title 24 Requirements
a. Walls
b. Ceilings
2. Install Floor Insulation over Crawl Space
3. Install Recycled -Content, Fiberglass Insulation wi6
No Added Formaldehyde _
4. Use Advanced Infiltration Reduction Practices
5. Use Cellulose Insulation
a. Walls
b. Ceilings
6. Alternative Insulation Products (Cotton, spray -foam)
a. Walls
D. Cemngs
3 Resource pts
3 Resource pts
1 IAQ/Health pt
1 IAO/Health pt
1 Resource of
1 Energy pt Y --Yee
2 Energy pts y=yes
Up to 2 Resource pts
Up to 2 Resource pts
Up to 3 Resource pts
1 IAQ/Health pt y=ye;
4 Energy pts y=ye:
Up to 4 IAQ/Health pts
4 Resource pts y=ye<
Up to 4 Energy pts.
Up to 5 Energy pis.
Up to 4 Energy pts.
Up to 4 Energy pts,
1 Energy pt
1 Energy pt y=yes
1 Energy pt y=yes
3 Resource pts y=yes
2 Energy pts
2 Energy pts
4 Energy pts
31AQ/Health pts
2 Energy pts
r
r
r
�
r
r
r
�
r
0
M1111
1 Energy pt y=yes
1 Energy pt y=yes
3 Resource pts y=yes
2 Energy pts
2 Energy pts
4 Energy pts
31AQ/Health pts
2 Energy pts
4Resource pts y=yes
4 Resource pts y=yes
4 Resource pts
4 Resource pts
110
•
E
r
r
M1111
4Resource pts y=yes
4 Resource pts y=yes
4 Resource pts
4 Resource pts
110
•
E
t. Install Energy -Efficient Windows i
y=yes
10 Energy pts
a. Double -Paned
1 Energy pt y=yes
b. Low -Emissivity (Low -E)
2 Energy pts y=yes
c. Low. Conductivity Frames
2 Energy pts y=yes
_
2. Install Low Heat Transmission Glazing
1 Energy pt y=yes
J. Heating Ventilation and Air Conditioning
�1. Use l)uctMasfic on All Duct Joints
2. Install Ductwork within Conditioned Space
3. Vent Range Hood to the Outside
4. Clean all Ducts Before Occupancy
5. Install Solar Attic Fan
6. Install Attic Ventilation Systems
7. Install Whole House Fan
B. Install Sealed Combustion Units
a. Furnaces
b. Water Heaters
9. Replace Wall -Mounted Electric and Gas Heaters with
Through -the -Wall Heal Pumps
10, Install 13 SEER/11 EER or higher AC with a TXV
11, Install AC with Non -HCFC Refrigerants
12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace
• 13. Retrofit Wood Burning Fireplaces
a. Install EPA certified wood stoveslnserts
b. Instal /Replace Dampers
c. Install Airtight Doors
14. Install Zoned, Hydronic Radiant Heating
15. Install High Efficiency Filter
16. Install.Heat Recovery Ventilation Unit (HRV)
17. Install Separate Garage Exhaust Fan -
&14newable Energy and Roofing
1. Pre -Plumb for Solar Water Heating
2. Install Solar Water Heating System
3. Pre -Wire for Future Photovoltaic (PV) Installation
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw = 12 points, 3.6 kw =18 points)
.6. Select Safe and�Duratile Roofng Walerials
7. Install RadlaM-Barrer -
L. Natural Heating and Cooling
1. Incorporate Passive Solar Heating
2. Install Overhangs or Awnings over South Facing Windows
3. Plant Deciduous Trees on the West and South Sides
0
2 Energy pts
3 Energy pts
1 IAO/Hsalth pt
21AQ/Health pts
2 Energy pts
1 Energy pt
4 Energy pts
31AQ/Health pts
3lAQlHealth pts
3 Energy pts
3 Energy pts
2 Resource pts
2 Energy pts
1 IAQ/Health pt
1 Energy of
1 Energy pt
3 Energy pts
41AQ/Health pts
5 IAQ/Health pts
31AQ/Hseth cis
4 Energy pts
y=yes
10 Energy pts
y=yes
4 Energy pts
y=yes
Up to 16 Energy
1 Resource pt y=
3 Energy pts y=
5 Energy pts
3 Energy pts
3 Energy pts
y=yes
j1. Use Low/No-VOC Paint - __ I IAQ/Health pts y --yes
2. Use Low VOC, Water -Based Woad Finishes 2 IAWealth pts y --yes
r'—
�3. Use LowMc VOC Adhesives 3 IAQ/Health pts y=yes
4. Use Sa vaged Materials for Interior Finishes 3 Resource pts y=yes
5. Use Engineered Sheet Goods with no added Urea
Formaldehyde 6IA0/Health pts y=yes
6. Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes
7 Seal all Exposed Particleboard or MDF 4 IAQ/Health.
L - is
— -- — — P Y=Yes
6. Use FSC Cefir"led Mate als for Inte or Finish 4 Resource pts y=yes
9. Use Finger -Jointed or Recycled -Content Trim 1 Resource pts y=yes
10. Install Whole House Vacuum System 3 IAQ/Health ots v=ves
8 Resource pts
y=yes
2. Use Rapidly Aenewable Flooring Materials !
4 Resource pts
+
`
3. Use Recycled Content Ceramic Tiles
0
D
0
y=yes
p
0
0
0
D
D-------
5 IAQ/Health pts
y=yes
5. Use Exposed Concrete as Finished Floor
4 Resource pts
y=yes
5. Install Recycled Content Carpet with Low VOCs
4 Resource pts
y=yes
n
N. Flooring
1. Select FSC Certified Wood Flooring
8 Resource pts
y=yes
2. Use Rapidly Aenewable Flooring Materials !
4 Resource pts
y=yes
3. Use Recycled Content Ceramic Tiles
4 Resource pts
y=yes
4. Install Natural Linoleum in Place o1 Vinyl
5 IAQ/Health pts
y=yes
5. Use Exposed Concrete as Finished Floor
4 Resource pts
y=yes
5. Install Recycled Content Carpet with Low VOCs
4 Resource pts
y=yes
Total Points Aval able: 1 1401 1301 57 •
Total Points Project R 1 01 01 0
G:dataiprogs/gmenbuildngguidefineshemodelersigreenpointsfina1212.04pnnetled.ds
J
IM
1
�J
SEQ-
CITY OF CUPERTINO
,REROOF
CITY OF
•CUPERTINO PERMIT APPLICATION
APN # 36 Ta 69 03e?. 0 Date:
Building Address:
!amu
Owner's Name: Phon #:
(6,s-OJ 3�1
GYOAJI�VAJ DSC ovp 94L(\
Contractor: �`0.jKNr-,tj✓,^� �o� n9 Sn c , Phone #: �Vo g - 2X (D –so F
006 Oob b A Aq-,ve sco) -ase CON Q5-! 3J ' Fax #: y0 g
Cupertino Business License #: Contractor License #:
22 X 90/3j
Type of Roof Covering:
Existing: Proposed:
Built-Up Roof A Built-Up roof
❑ Asphalt Shingles ❑ Asphalt Shingles
❑ Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
o Other (Specify) ❑ Other (Specify) o� +
Number of existing coverings & ❑ Provide I.C.B.O. Report # To d
❑ To be Removed p,11 ❑ Provide Mfgr. Installation Specs. c&—
F ,e
Job Description: --eAv, - oFr- e_?c,-A;nc,S mors ons ; nS �� 0. Cba,,( PLS
Q 0%kV- UP Cap S4ce4 'Cool cap Sled 1// 0&4�
Residential 171 Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the there are any restrictions: ❑
application or if applicable, include in plan
set & the sheet index.
Valuation:
/s 7-Z s-62
• I Have Read, Understand and Will Comply with Cupertino's Tear -Off Policy:
SoSE? (77Pc-tn
Signature
CITY OF
CUPEkTINO
CITY OF CUPERTINO
REROOF
FEESCHEDULE
Number of
Squares
Fee ID
Fee Description
Fee
Group
Permit Type
qzo 5625
1 REROOFCOM
Re -roof Commercial
B
1COMMLROOF
1BSEISMICO
Seismic Commercial
B
1REROOFRES
Re -roof Residential
B
1SFDWLROOF
1BSEISMICRE
Seismic Residential
B
IREROOFMRES
Re -roof Multi -Family
B
1MFDWLROOF
1BSEISMICRE
Seismic Residential
B
1BUSLIC
Business License
B
•
Community Development Department
Building Division
City of Cupertino
• 10300 Torre Avenue
Telephone: (408) 777-3228
Fax: (408) 777-3333
Building Department
Subject: Re -roofing policy for the City of Cupertino
1. Prior to permit issuance, you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re -roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re -roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre -inspection and/or tear off approval.
2) In -progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re -inspection fee of $176.18. The re -inspection fee must
be paid before another inspection can be scheduled
IMPORTANT:
1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re -roofing.
Homeowner's Name: J� 11.01 Gn J C! MnU G I P n G ox /13'0/0 AX11 iI)J e
Job Site Address: /0'120 11A,Ih 4�.
Roofing Company Name: J C& L A 1J rA V -o t1
Applicant's Signature: OSP Date:
•
Greg Casteel
Building Official
Revised 11/2/04
0
0
CITY OF
UPEkTINO
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
Fax(408)777-3333
Building Department
JOB ADDRESS:
PERMIT #
/
01 i�r� r
OWNER'S NAME: i
PHONE t,,5-0) 3L1 .-QD
GENERAL CONTRACTOR: r1
FAX #
I am not using any subcontractors: -Ib-s :� cC-"
Signature Date
Please check applicable subcontractors and complete the following information:
-To-se- D --e 1k
Owner/ Contractor Signature
Date
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
ja ✓nn /1
/
Septic Tank
Sheet Metal
Sheet Rock
Tile
-To-se- D --e 1k
Owner/ Contractor Signature
Date